E 27/520
Register summary
- Holder
- Essential Metals Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 28 May 2013
- Commenced
- 21 Jan 2014
- Expiry
- 20 Jan 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148960 | 2025 | Minex (Aust) Pty Ltd | Kurnalpi | <1% | Final Surrender Report for the Kurnalpi Project (C73/2015) for thge period ending 15/4/2025 |
| A139281 | 2024 | Northern Star Resources Ltd | Acra | <1% | Final Surrender Report on E27/569, Acra Project, for the period 6 February 2017 to 31 January 2024. |
| A139298 | 2024 | Northern Star Resources (Carosue Dam) Pty Ltd | Acra | <1% | Final Surrender Report on E28/2586, Acra Project, for the period 11 August 2016 to 31 January 2024.(C74/2004) |
| A138330 | 2024 | Minex (Aust) Pty Ltd | Kurnalpi | <1% | Annual Report for the Kurnalpi Project (C73/2015) for the period ending 31/10/2023. |
| A136641 | 2023 | Essential Metals Limited; Northern Star Resources Ltd | Acra | <1% | Final Surrender Report on E27/491, Acra Project, for the period 15 March 2013 to 18 July 2023 |
117 more reports
| A134554 | 2023 | Northern Star Resources Ltd | Acra | <1% | Partial Surrender Report on E27/569, Acra Project, for the period 6 February 2017 to 5 February 2023 |
| A126680 | 2021 | Northern Star Resources Ltd | Acra | <1% | Acra E28/2483 Partial Surrender Report for the period 23 February 2015 to 22 February 2021 |
| A127753 | 2021 | Carnavale Resources Limited | Grey Dam Project | <1% | Partial Surrender Report for E 28/2506 for the period ending 5 May 2021 |
| A122881 | 2020 | Carnavale Resources Limited | Grey Dam | <1% | Grey Dam C73/2015 Annual Report for the period ending 31st October 2019, E28/02506, E28/02567, E28/02682, E28/ |
| A122547 | 2020 | Northern Star (Kanowna) Pty Limited | Acra | 1.7% | Acra project C74/2014 for the period 9 December 2018 to 8 December 2019 E 27/00278,E 27/00438,E 27/00491,E 27/ |
| A123158 | 2020 | Newmont Exploration Pty Ltd | Kalpini Hill | <1% | Combined Annual Report for C 57/2019 (Kalpini Hill Project) for the period 1st January 2019 to 31st December 2 |
| A122048 | 2019 | Ardea Resources Limited | Kalpini | <1% | Annual for the Kalpini Project C31/2002 for the period 27 September 2019 to 26 September 2019, E28/01224, M27/ |
| A118926 | 2019 | Northern Star (Kanowna) Pty Limited | Acra | 1.7% | Acra Project C74/2004 Annual Report for the period 9 December 2017 to 8 December 2018, E27/00278, E27/00438, E |
| A119575 | 2019 | Newmont Exploration Pty Ltd | Kalpini Hill | <1% | Annual Report for E27/569 Kalpini Hill Project for the period 6th February to 5th February 2019 |
| A115727 | 2018 | Mithril Resources Ltd | Kurnalpi | <1% | Annual Report for Kurnalpi Project C73/2015, E28/02506, P28/01271 for the period 1 November 2016 to 31 October |
| A116417 | 2018 | Newmont Exploration Pty Ltd | Kalpini Hill | <1% | Annual Report for E27/569 (Kalpini Hill) for the period 6th February 2017 to 5th February 2018 |
| A117907 | 2018 | Newmont Exploration Pty Ltd | Kalpini Hill | <1% | Annual Report for E28/2586 (Kalpini Hill Project) for the period 11th August 2017 to 10th August 2018 |
| A118244 | 2018 | Ardea Resources Limited | Kalpini | <1% | Kalpini C31/2002 Annual Report for the period 27 September 2017 to 26 September 2018, E28/01224, M27/00395, M2 |
| A118494 | 2018 | Mithril Resources Ltd | Kurnalpi | <1% | Annual Report for Kurnalpi Project C73/2015 for the period 1 November 2017 to 31 October 2018, E28/02506, P28/ |
| A110744 | 2017 | Mithril Resources Ltd | Kurnalpi | <1% | ANNUAL REPORT For the Period 1 November 2015 to 31 October 2016 Kurnalpi Project |
| A111857 | 2017 | Heron Resources Ltd | Kalpini | <1% | C31/2002 Kalpini Annual Report 2015 - 2016 |
| A111955 | 2017 | Kalnorth Gold Mines Limited | Kalpini | <1% | Annual Report for the period ending 16 December 2016, Kalpini Project C106/2010 for the period 17 December 201 |
| A112095 | 2017 | Pioneer Resources Limited | Acra | 2% | Combined Annual Report for the Acra Project C74/2004 (E27/278, E27/438, E27/491, E27/520, E27/548, E28/1746 & |
| A114896 | 2017 | Newmont Exploration Pty Ltd | Kalpini Hill | <1% | Annual Report for Kalpini Hill Project (E28/2586) for the period 11th August 2016 to 10th August 2017 |
| A115441 | 2017 | Ardea Resources Limited | Kalpini | <1% | Kalpini Project C31/2002 Annual Report For the Period 27 September 2016 to 26 September 2017, E28/01224, M27/0 |
| A115507 | 2017 | Northern Star (Kanowna) Pty Limited | Acra | 1.7% | Acra Project Annual Technical Report, C74/2004 for the period 09/12/2016-08/12/2017, E27/00278, E28/01746, E27 |
| A107801 | 2016 | Mithril Resources Ltd | Kurnalpi | <1% | C73/2015 Kurnalpi Project, E28/2506 and P28/1271, Year 1 Combined Annual Report for the period 1 November 2014 |
| A107827 | 2016 | Heron Resources Ltd | Kalpini | <1% | Combined Annual Report for the period 27 September 2014 to 26 September 2015, Kalpini Nickel Project, C31/2002 |
| A108162 | 2016 | Pioneer Resources Limited | Acra | 2.9% | Combined Annual report for the Acra Project, C74/2004 (E27/278, E27/438, E27/491, E27/520, E28/1746 & P28/1120 |
| A108259 | 2016 | Pioneer Resources Limited | Binti South | 20% | Partial Surrender Report for the Binti South project, E27/520, for the period 21 January 2014 to 20 January 20 |
| A108511 | 2016 | Pioneer Resources Limited | Jubilee South | <1% | Annual Report for the Jubilee South Project E28/2483 for the period 23 February 2015 to 22 February 2016 |
| A108817 | 2016 | Kalnorth Gold Mines Limited | Kalpini | <1% | C106/2010 Kalpini Project Annual Technical Report for the period 17 December 2014 to 16 December 2015, M27/004 |
| A104732 | 2015 | Pioneer Resources Ltd | Acra | 1.8% | Combined Annual Report for the Acra Project C74/2004 (E27/273, E27/278, E27/438, E27/482, E27/491, E27/520, E2 |
| A106460 | 2015 | Kalnorth Gold Mines Limited | Kurnalpi | <1% | ANNUAL REPORT, For the Period 14 April 2014 to 13 April 2015, KURNALPI, Kurnalpi Project [C101/2011] |
| A101345 | 2014 | Pioneer Resources Ltd | Acra | <1% | Acra Project C74/2004 E27/273, E27/278, E28/1746, E28/2109, P28/1120 Combined Annual Report for the period 9 D |
| A101779 | 2014 | Pioneer Resources Ltd | Jubilee | <1% | JUBILEE PROJECT E28/1746 North East Coolgardie Mineral Field Partial Surrender Report for the period 20 Februa |
| A102468 | 2014 | Pioneer Resources Ltd | Kalpini | <1% | Annual report for the Kalpini Project, E27/491, North East Coolgardie Mineral Field, for the period 15 March 2 |
| A102540 | 2014 | Kalnorth Gold Mines Ltd | Kalpini | <1% | Annual report for the period ending 16 December 2013, Kalpini Project, C106/2010, E27/412, E27/411, E27/339, E |
| A103481 | 2014 | Kalnorth Gold Mines Ltd | Kurnalpi | <1% | Combined Annual report for the period ending 13 April 2014, C101/2011, Kurnalpi Project E28/1477...P28/1255 |
| A104147 | 2014 | Heron Resources Ltd | Kalpini | <1% | Kalpini Project, Annual Report for the period 27/09/2014 to 26/09/2014, E28/1224; M27/395; M28/199, 201 & 205. |
| A96975 | 2013 | Pioneer Resources Ltd | Acra | <1% | Combined Annual report for the Acra Project, C74/2004 (E27/273, E27/278, E28/1746, E28/2109 & P28/1120), North |
| A98422 | 2013 | Kalnorth Gold Mines Ltd | Kurnalpi | <1% | Annual report for the period ending 13 April 2013, Kurnalpi Project, C101/2011 for the period 14 April 2012 – |
| A99848 | 2013 | Heron Resources Ltd | Kalpini | <1% | Combined annual report for the period 27 September 2012 to 26 September 2013, Kalpini Nickel Project, C31/2002 |
| A97207 | 2013 | Kalnorth Gold Mines Ltd | Kalpini | <1% | Annual Report for the period 17th December 2011 to 16th December 2012, C106/2010, Kalpini. [E27/411-412, 339 & |
| A92708 | 2012 | Pioneer Resources Ltd | Lady of the Lake | <1% | Annual report for the Lady of the Lake Project, E28/1783, North East Coolgardie Mineral Field, for the period |
| A93062 | 2012 | Carrick Gold Ltd | Kalpini | <1% | Annual report for the period 17 December 2010 to 16 December 2011, Kalpini Project, C106/2010, P27/1739, P27/1 |
| A94230 | 2012 | Carrick Gold Ltd | Kurnalpi | <1% | Annual Report for the period 14 April 2011 to 13 April 2012, Kurnalpi Project, C101/2011 Kurnalpi |
| A95851 | 2012 | Heron Resources Ltd | Kalpini | <1% | Combined annual report for the period 27 September 2011 to 26 September 2012, Kalpini Nickel Project, C31/2002 |
| A88948 | 2011 | Pioneer Resources Ltd | Lady of the Lake | <1% | Annual Technical Report E28/1783 Lady of the Lake Project For the Period 3/12/2009 to 2/12/2010 |
| A89139 | 2011 | Heron Resources Ltd | Kalpini | <1% | Combined annual report for the period 27 September 2009 to 26 September 2010, Kalpini Nickel Project, C31/2002 |
| A89850 | 2011 | Xstrata Nickel Australasia Operations Pty Ltd | Acra Joint Venture | 2.1% | Acra Joint Venture Project, Combined Annual Report for E27/273, E27/278, E28/1223, E28/1746 and P28/1120, Ref: |
| A90166 | 2011 | Carrick Gold Ltd | Kalpini | <1% | Kalpini Project, Annual Report for the period 29th January 2010 to 28th January 2011, E27/412. |
| A92182 | 2011 | Pioneer Resources Ltd | Acra | 7.7% | Surrender report for the Acra Project, E28/1223, North East Coolgardie Mineral Field, for the period 6 Novembe |
| A93259 | 2011 | Xstrata Nickel Australasia Operations Pty Ltd | Acra | 2.1% | Acra (JV) Project, Annual Report for the period 9th December 2010 to 8th December 2011, E27/273, 278; E28/1223 |
| A85437 | 2010 | Pioneer Resources Ltd | Lady of the Lake | <1% | Annual Technical Report E28/1783, Lady of the Lake Project for the period 3/12/2008 to 2/12/2009 |
| A85941 | 2010 | Pioneer Resources Ltd | Acra Joint Venture | 2.1% | ACRA JOINT VENTURE PROJECT C74/2004 (E27/273, E27/278 and E28/1223, E28/1746 and P28/1120) ANNUAL TECHNICAL RE |
| A85942 | 2010 | Pioneer Resources Ltd | Acra Joint Venture | <1% | ACRA JOINT VENTURE PROJECT E27/278 (C74/2004) PARTIAL SURRENDER REPORT For the Period 13th December 2005 to 8t |
| A82047 | 2009 | Pioneer Nickel Ltd | ACRA JOINT VENTURE | <1% | ACRA JOINT VENTURE PROJECT E27/278 (C74/2004) PARTIAL SURRENDER REPORT, For the Period 13th December 2005 to 1 |
| A85025 | 2009 | Heron Resources Ltd | Kalpini | <1% | Kalpini Nickel Project, C31/2002, Combined annual report for the period 27 September 2008 to 26 September 2009 |
| A81641 | 2009 | Pioneer Nickel Ltd | ACRA JOINT VENTURE | 2.1% | ACRA JOINT VENTURE PROJECT C74/2004 (E27/273, E27/278 and E28/1223, E28/1746 and P28/1120) ANNUAL TECHNICAL RE |
| A77402 | 2008 | Jubilee Mines Nl | Acra Joint Venture | 2.1% | Acra Joint Venture Project Technical Report for the work car ried out by Jubilee Mines NL on E28/273, 278 and |
| A80185 | 2008 | Vale Inco Australia Limited Partnership | Kalpini | <1% | KALPINI NICKEL PROJECT, COMBINED ANNUAL REPORT – C31/2002 27 SEPTEMBER 2007 – 26 SEPTEMBER 2008 |
| A74026 | 2007 | Inco Australia Ltd | Kalpini | <1% | Kalpini Nickel Project Combined Annual Report C31/2002, 27 September 2005 to 26 September 2006, (Kurnalpi). |
| A74190 | 2007 | Sir Samuel Mines Nl | Camelia | <1% | Acra Project, Camelia E27/278, Technical Report Between the Period 12 December 2005 to 11 December 2006, (Annu |
| A74549 | 2007 | Jubilee Mines Nl | Acra | 7.6% | Acra Joint Venture Project C74/2004 Technical Report for the work carried out by Jubilee Mines N L on E28/1223 |
| A76729 | 2007 | Inco Australia Ltd | Kalpini | <1% | KALPINI NICKEL PROJECT, C31/2002, COMBINED ANNUAL REPORT 27 SEPTEMBER 2006 - 26 SEPTEMBER 2007 TENEMENTS: E2 |
| A72036 | 2006 | Sir Samuel Mines Nl | Acra JV | 7.6% | Acra Joint Venture Project, Technical Report on E28/1223, P28/972,979,991,1013, Period 9 December 2004 to 8 De |
| A73238 | 2006 | Heron Resources Ltd | Kalpini | <1% | Kalpini Nickel Project M28/127,199,201,205, Combined Annual Report C31/2002, 27 September 2004 to 26 September |
| A70280 | 2005 | Pioneer Nickel Ltd | Acra | 4.8% | Acra Project , Annual Report for the period 9th December 2003 to 8th December 2004, E28/1055, 1058, 1059, 122 |
| A69846 | 2005 | Heron Resources Ltd | Kalpini | <1% | Combined annual report for the period 27/09/03 - 26/09/04 Kalpini Nickel Project, C31/2002, M28/127, M28/199, |
| A68598 | 2004 | Pioneer Nickel Ltd | Acra | 7.7% | Annual Report 6th November 2003 to 5th November 2003 Acra Prospect E28/1223 |
| A65162 | 2002 | Croesus Mining Nl | Queen Lapage | <1% | Queen Lapage Project Final Surrender Report For Tenement E27/196 |
| A66019 | 2002 | Heron Resources Ltd | Kalpini | <1% | Combined Annual Report - C31/2002 27 September 2001 - 26 September 2002 Kalpini Nickel Project Acra North & We |
| A59896 | 2000 | Mining Project Investors Pty Ltd | Pineapple Dam | <1% | Annual Report, E28/568,E28/569,E28/621,M28/80, M28/81,M28/85,P28/823, Pineapple Dam Project , for the year en |
| A57274 | 1999 | Heron Resources Ltd | Pineapple Dam | <1% | Pineapple Dam Project, E28/568 E28/569 E28/621 M28/80 M28/81 M28/85 P28/823 , Annual Report for 01/01/98-31/12 |
| A57507 | 1999 | Fodina Minerals Pty Ltd | Acra | <1% | Acra Project, Partial Surrender Report for the period 14th October 1991 to 6th October 1998, E27/76. |
| A58431 | 1999 | Heron Resources Ltd | Kalpini | 1.8% | Kalpini Project Exploration Licences 27/76,129,170,426 & 459 Prospecting Licences 27/1448 to 1453 North East C |
| A59373 | 1999 | Mining Project Investors Pty Ltd | Pineapple Dam | <1% | Partial Surrender Report E28/568, Pineapple Dam Project, for the period 23rd January 1995 to 14th July 1999. |
| A53841 | 1998 | Fodina Minerals Pty Ltd | Acra | 2.7% | Annual Technical Report E27/76 and E28/426, Acra Project, Western Australia, For the Period 1 January 1997 to |
| A54039 | 1998 | Anvil Mining Nl | Pineapple Dam | <1% | Partial Surrender Report E28/568 Pineapple Dam Project ,Western Australia, for period 23rd January 1995 to 22 |
| A54038 | 1998 | Anvil Mining Nl | Pineapple Dam | <1% | Annual Report , Pineapple Dam Project, for the year ending 31/12/1997, E28/568, 569, 621, M28/80, 81, 85, P28/ |
| A50395 | 1997 | Fodina Minerals Pty Ltd | Acra | 4% | Acra Project, Partial Surrender Report E28/426 . |
| A50756 | 1997 | Wiluna Mines Ltd | Garibaldi | <1% | Garibaldi Project,1996 Annual Report Exploration Licences E70/103 & 104, February 1997. |
| A51633 | 1997 | Resolute Ltd | Cane Grass | <1% | Cane Grass Project, Annual Report Exploration Licence E28/406, for period 7th April 1996 to 6th April 1997. |
| A50943 | 1997 | Mining Project Investors Pty Ltd | Pineapple Dam | <1% | Annual Report , E28/568 E28/569 E28/621 M28/80 M28/81 M28/85 & P28/823, Pineapple Dam Project, for the year e |
| A50946 | 1997 | Mining Project Investors Pty Ltd | Acra | 2.7% | Acra Project, Annual Report E27/76 & E28/426 for the period 14th October 1995 to 31st December 1996. |
| A48112 | 1996 | Cra Exploration Pty Ltd | Canegrass/ Kurnalpi | <1% | Canegrass/ Kurnalpi Project, 1995/1996 Annual Report to 6th April 1996, E28/406. |
| A47398 | 1996 | Anvil Mining Nl | Kurnalpi | <1% | Kurnalpi Project, Annual report for the period 01 January 1995 to 31 December 1995,E28/568 E28/569 E28/621; M2 |
| A47908 | 1996 | Wiluna Mines Ltd | Garibaldi | <1% | Garibaldi Project, Annual Report for the period December 1st 1994 to December 31st, 1995, E27/103 & E27/104. |
| A43993 | 1995 | Cra Exploration Pty Ltd | Kurnalpi | <1% | Annual Report to 19 December 1994 on E28/406, E28/438 & E25/84 Kurnalpi Project, January 1995. |
| A45827 | 1995 | Kkr Resources Nl | Kurnalpi | <1% | Kurnalpi Project, Non-statutory Report :Exploration Report , July 1995, E28/568-569; M28/80-81 & 85; P28/283. |
| A45974 | 1995 | Cra Exploration Pty Ltd | Canegrass | <1% | Canegrass Project, Partial Surrender Report for the period to 06/04/95 [Kurnalpi Project] E28/406. |
| A46296 | 1995 | Fodina Minerals Pty Ltd | Kalpini | <1% | Annual Technical Report for the year ending 13 October 1995 E27/76 - Kalpini Project |
| A46297 | 1995 | Fodina Minerals Pty Ltd | Kalpini | 4% | Kalpini Project, Annual Report Exploration Licence E28/426 (Acra) for the year ending 13th October 1995. |
| A41339 | 1994 | Cra Exploration Pty Ltd | Kurnalpi | <1% | Partial Relinquishment Report to 7 April 1994 on E28/406, Kurnalpi Project, Western Australia. |
| A42047 | 1994 | Artrayu Investments Pty Ltd | Lake Yindarlgooda | <1% | Surrender Report for the period ending 20/06/94, Lake Yindarlgooda Project, E28/463 E28/505 |
| A43261 | 1994 | Capital Energy Nl | Kalpini | 4% | Kalpini Project, Annual Report Exploration Licence E28/426 for the period 14th October 1993 to 13th October 19 |
| A43263 | 1994 | Capital Energy Nl | Kalpini | <1% | Kalpini Project, Partial Surrender Report Exploration Licence E27/76 for the period 14th October 1993 to 13th |
| A43448 | 1994 | Sovereign Resources Aust Nl | Garibaldi | <1% | Garibaldi Project, Annual Report E27/103 & E27/104 for the period to 1st December 1994. |
| A37733 | 1993 | Poseidon Exploration Ltd | Kalpini | <1% | Kalpini (JV) Project, Annual Report for the period 01/07/1991 to 01/10/1992-10/92 ,E27/76 & 80. |
| A39770 | 1993 | Geopeko | Kalpini | 6.6% | Kalpini Project, Final Surrender Report for the peiod ending 31/10/1992, M27/118. |
| A39901 | 1993 | Poseidon Exploration Ltd | Kalpini | <1% | Annual report for the period 10/92-10/93 Kalpini JV Project, E27/76. |
| A40961 | 1993 | Cra Exploration Pty Ltd | Kurnalpi | <1% | Kurnalpi Project, Annual Report for the period ending 19th December 1993, E28/406. |
| A41357 | 1993 | Normandy Poseidon Ltd | Kalpini | 4% | Kalpini Project, Annual report on exploration operations for the year ending 13 December, 1993 Exploration li |
| A39022 | 1992 | Cra Exploration Pty Ltd | Kurnalpi | <1% | Kurnalpi Project, Annual Report for the two year period ending 19th December 1992, E28/406, 438, & E25/84. |
| A34436 | 1991 | Geopeko | Kalpini | <1% | Geopeko Report No:WA91/49S Kalpini Project, WA Progress report 01/01/91 to 08/08/91 City Resources Pty Ltd E2 |
| A33041 | 1991 | Geopeko | Kalpini | <1% | Kalpini Project, Annual Report for the year ending 31/12/1990, Combined Reporting Group 340/1996. |
| A10402 | 1981 | Western Mining Corporation Ltd | Jubilee -Wellington | <1% | Jubilee - Wellington Project, Non-statutory Report:Terminal Report for the period 16th July 1979 to 1st Decemb |
| A7380 | 1977 | International Nickel Aust Ltd | Kalpini Dam | 1.8% | Kalpini Dam Project, Non-statutory Report: Final Report for the year ending 03/06/1977, MC 28/2329-2342. |
| A6545 | 1976 | International Nickel Aust Ltd | Kalpini Dam | 1.8% | Kalpini Dam Project, Annual Report for the year ending 31/12/1975, MC28/2329-2342. |
| A4721 | 1974 | Carpentaria Exp Co Pty Ltd | Jubilee North | 2% | Jubilee North Project, Non-statutory Report: Final Report , February 1974, MC28/2213-2214 & 2228-2233. |
| A4697 | 1974 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Cowarna I. P. Survey : Lines 158N-164N, 156N-192N ( No 3 Sill)., |
| A3543 | 1973 | Jododex Australia Pty Ltd | North Jubilee - Kurnalpi | 1.5% | North Jubilee - Kurnalpi Project, Annual Report for the year ending 31/12/1972, MC28/4-6, 673-674, 674-676 1 |
| A4492 | 1972 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Summary Report, December 1972. |
| A2430 | 1972 | Jododex Australia Pty Ltd | North Jubilee | 2.6% | North Jubilee Project, Non-statutory Report: Exploration Report for the period ending 31/12/1971, MC28/4-6, 12 |
| A3031 | 1972 | Jones Mining Nl | Jubilee North | <1% | Jubilee North Project, Annual Report for the period ending 31/12/1971, MC28/4-6, 175, 672-682, 775-781,791-793 |
| A4696 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: ( No 1 Sill), Percussion Logs & Drill Hole Sections, 1970/1971. |
| A4698 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: I. P. Lines 60N-92N & 128N-174N, to January 1971. |
| A4693 | 1970 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: No 3 Sill, Drill Holes & Logs, November 1970, |
| A4695 | 1970 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Drill Holes & Logs, ( No 2 Sill) for the year ending 31/12/1970. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43262 | 1753 | Capital Energy Nl | Kalpini | <1% | Annual Report , Kalpini Project , Exploration Licence E27/76 14 October 1993 to 13 October 1994 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 17 months · 20 Jan 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 27/520 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 27/520? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.