E 28/2913
Register summary
- Holder
- Ac Minerals Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 27 Mar 2019
- Commenced
- 23 Oct 2019
- Expiry
- 22 Oct 2029
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146405 | 2025 | Ramelius Resources Ltd | Rebecca | <1% | Partial Surrender Report for E28/2733 — Rebecca Project for the period ending 12 December 2024 |
| A152885 | 2025 | Ramelius Resources Limited | Rebecca | 44% | Partial Surrender Report for E28/2913 — Rebecca Project for the period ending 3/10/2025. |
| A143203 | 2024 | Kula Gold Limited | Lake Rebecca | <1% | Final Surrender of E28/2942 (from C151/2021) of the Lake Rebecca Project |
| A137876 | 2023 | E79 Gold Mines Limited | Lake Yindana | <1% | Partial Surrender Report for E28/2659 Lake Yindana for the period ending 3/7/2023 |
| A131524 | 2022 | Kula Gold Limited | Lake Rebecca | <1% | Partial Surrender Report of E28/2942 (of C15/12021), Lake Rebecca Project for the period ending 21/06/2022. |
84 more reports
| A127153 | 2021 | Kula Gold Ltd | Lake Rebecca Gold | <1% | Lake Rebecca Gold Project Annual Report E28/2942 for the period ending 21 April 2020 to 20 April 2021 |
| A122252 | 2020 | Ac Minerals Pty Ltd | Rebecca | 4.9% | Group Annual Technical Report for the Rebecca Project, C302/2011, 1 October 2018 to 30 September 2019 |
| A125661 | 2020 | Ac Minerals Pty Ltd | Rebecca | 15% | Rebecca Project C302/2011 Group Annual Technical Report for the period 1 October 2019 to 30 September 2020 |
| A118826 | 2019 | Ac Minerals Pty Ltd | Rebecca | 7.7% | Combined Annual Technical Report - Rebecca Project C302/2011 for the period 1 October 2017 to 30 September 201 |
| A122197 | 2019 | Stakewell Pty Ltd | Lake Yindana | <1% | Lake Yindana Annual Report, E28/2659, 3 July 2018 to 4 July 2019 |
| A115831 | 2018 | Ac Minerals Pty Ltd | Rebecca | 7.7% | Combined Annual Technical Report C302/2011 Rebecca Project For the Period 1 October 2016 to 30 September 2017, |
| A117640 | 2018 | Stakewell Pty Ltd | Lake Yindana | <1% | Lake Yindana Annual Report, E28/2659, 04 July 2017 - 03 July 2018 |
| A110810 | 2017 | Ac Minerals Pty Ltd | Rebecca | 14% | Combined Annual Technical Report C302/2011 Rebecca Project 1 October 2015 to 30 September 2016 |
| A114500 | 2017 | Ac Minerals Pty Ltd | Rebecca | 50% | Final Surrender Report E28/2243 Rebecca Project for the period 11 March 2013 to 3 May 2017 |
| A107804 | 2016 | Ac Minerals Pty Ltd | Rebecca | 3.4% | Combined Annual Technical Report C302/2011 Rebecca Project E28/1610, E28/2146, E28/2233, E28/2243, E28/2275, E |
| A109203 | 2016 | Ac Minerals Pty Ltd | Rebecca | <1% | Final Surrender Report E28/2233 & E28/2306 Rebecca Project C302/2011 for the period 30/05/2013 - 07/06/2016 |
| A100978 | 2014 | Ac Minerals Pty Ltd | Rebecca | 20% | Rebecca Project, Annual Report for the period 01/10/2012 to 30/09/2013, E28/1610 & 2146. |
| A103683 | 2014 | Independence Group Nl | Rebecca | 3.4% | Combined Annual Report Rebecca JV Project C302/2011, E28/2233, 2275, 2306, 2146, 1610, 2243 for the period 1st |
| A96679 | 2013 | Ac Minerals Pty Ltd | Rebecca | 11% | Combined Annual Technical Report Rebecca Project E28/1610 & E28/2146 C302/2012, Period 1st October 2011 – 30th |
| A96875 | 2013 | Renaissance Minerals Ltd | Pinjin | 12% | Pinjin Project, Final Surrender Report for the period 13th December 2007 to 12th December 2012, E28/1562. [C14 |
| A97554 | 2013 | Magma Metals Ltd | Roe | <1% | Partial Surrender Report E28/1659 for the period 21 March 2007 to 20 March 2013 |
| A97555 | 2013 | Magma Metals Ltd | Roe | <1% | Roe Project, Annual Report for the period 1st January 2012 to 31st December 2012, E28/1416 & 1659. [C408/1996 |
| A92642 | 2012 | Magma Metals Ltd | Roe | <1% | Roe Project, Annual Report for the period 1st January 2011 to 31st December 2011, E28/1659 & 1416. (C408/1996) |
| A93735 | 2012 | Renaissance Minerals Ltd | Pinjin | <1% | C146/2005 - Combined Annual Report on Exploration for the Period 1st January 2011 to 31st December 2011, E28/1 |
| A92611 | 2012 | Ac Minerals Pty Ltd | Rebecca | 14% | Combined Annual Technical Report Rebecca Project E28/1610 & P28/1197 CR302/2011 Period 1st October 2010 – 30th |
| A88152 | 2011 | Magma Metals Ltd | Roe | <1% | Annual Report for the period 1st January 2010 to 31st December 2010, Roe Project E28/1659, E28/1416 |
| A89989 | 2011 | Renaissance Minerals Ltd | Pinjin | 1.4% | Pinjin Project, Annual Report for the period 1st January 2010 to 31st December 2010, P28/1055, 1057-1061, 1073 |
| A89561 | 2011 | Renaissance Minerals Ltd | Crab Hill | 12% | E28/1562 “Crab Hill” Partial Surrender Report March 2010. Report Period: 13 December 2007 to 09 December 2010 |
| A85573 | 2010 | Magma Metals Ltd | Roe | <1% | Roe Project Annual Report for period 1st January 2009 - 31st December2009, Group Reporting No C408/1996 E28/16 |
| A86130 | 2010 | Newmont Asia Pacific | Pinjin | 1.5% | Combined Annual Report On Exploration For The Period 1st January 2009 to 31st January 2009 for E28/1143, 1506, |
| A89036 | 2010 | Ac Minerals Pty Ltd | Rebecca | 14% | Annual Technical Report Rebecca Project, E28/1610,for the period 25 October 2009 to 26 September 2010. |
| A81567 | 2009 | Newmont Asia Pacific | Pinjin | 1% | COMBINED ANNUAL REPORT ON EXPLORATION for the period 01/01/2008 to 31/12/2008, Project C146/2005 Pinjin, WESTE |
| A81359 | 2009 | Drake Resources Ltd | LAKE REBECCA | 14% | LAKE REBECCA PROJECT E28 / 1610 ANNUAL REPORT 04/10/2007 to 03/10/2008 |
| A86252 | 2009 | Ac Minerals Pty Ltd | Rebecca | 14% | Annual Technical Report, Rebecca Project, E28/1610, Period 25th October 2008 - 26th September 2009. |
| A77220 | 2008 | Magma Metals Ltd | Roe | <1% | Annual report for the period 1st January 2007 to 31st Decemb December 2007,Roe Project, E28/803, E28/1153, E28 |
| A80784 | 2008 | Magma Metals Ltd | ROE | <1% | ROE PROJECT, ANNUAL REPORT For Period 1st January 2008 – 31st December 2008, Group Reporting No C 408/1996 E28 |
| A76825 | 2007 | Drake Resources Ltd | Lake Rebecca | 14% | LAKE REBECCA PROJECT E28/1610 Annual Report, Period: 04/10/2005 to 03/10/2006. |
| A70622 | 2005 | Newcrest Mining Ltd | Roe | <1% | Annual Report Roe Project for the Period 1/1/2004 to 31/12/2004 Group Reporting No.: C408/1996 Report No: K420 |
| A68651 | 2004 | Metex Resources Ltd | Roe | <1% | 2003 Annual Report for Period 01/01/2003 to 31/12/2003 Roe Project (C408/1996), E28/620, E28/672, E28/720, E28 |
| A69562 | 2004 | Metex Resources Ltd | Roe | 16% | Final surrender report for the period 15/10/98 - 04/11/04 Roe Project, E28/804, North East Coolgardie mineral |
| A66142 | 2003 | Placer Dome Asia Pacific Ltd | Roe Metex | <1% | Annual Report 01/01/2002 - 31/12/2002 Roe Metex JV Project C408/1996: E28/620, 672, 720, 803-04, 810, 833, 836 |
| A66624 | 2003 | Placer Dome Asia Pacific Ltd | Roe | 2.5% | Roe (JV) Project, Partial Surrender Report for the period 15/12/1998 to 14/12/2002 E28/803 & 804, E28/810. [C |
| A64192 | 2002 | Delta Gold Ltd | Roe Joint Venture | <1% | Roe Joint Venture Project C408/1996 Annual Report 01/01/2001 to 31/12/2001 tenements E28/620, 672, 720, 803, 8 |
| A65129 | 2002 | Newcrest Operations Ltd | Lake Rebecca - Pinjin | 14% | Annual Report for the period 05/05/2001 - 04/05/2002, Pinjin - Lake Rebecca Project, E28/466. |
| A64526 | 2002 | Newcrest Operations Ltd | Pinjin/Lake Rebecca | 5.1% | Interim Report To November 15, 2001. Pinjin/Lake Rebecca Option E28/635, E28/636 & E28/617 |
| A62882 | 2001 | Metex Resources Ltd | Roe | <1% | Combined Biannual Technical Report W503 Roe Project E28/620, E28/672, E28/720, E28/803-804, E28/810, E28/833, |
| A61896 | 2001 | Central Kalgoorlie Gold Mines Nl | Round Hill | 11% | Round Hill (North and South) E28/635 & 636 Annual Report for the period 30 November 1999 to 29 November 2000. |
| A62721 | 2001 | Central Kalgoorlie Gold Mines Nl | Lake Rebecca | 14% | 2000/2001 Annual Report Lake Rebecca E28/466 For Period 05/05/200 To 04/05/2001. |
| A60451 | 2000 | Central Kalgoorlie Gold Mines Nl | Pinjin | 6.3% | Pinjin E28/592,635 & 636 Annual Report for the period 30/11/1998 to 29/11/1999 |
| A60452 | 2000 | Central Kalgoorlie Gold Mines Nl | Lake Rebecca | 14% | 1999 to 2000 Annual Report Lake Rebecca E28/466 For period 05/05/1999 to 04/05/2000. |
| A60849 | 2000 | Pacmin Mining Corporation Ltd | Kurnalpi East | 10% | 2000 Final Report, E28/453, Report for Period 11/06/1992 to 02/02/2000. |
| A59345 | 1999 | Pacmin Mining Corporation Ltd | Lake Rebecca | 14% | 1998 to 1999 Annual Report. Lake Rebecca Project, E28/466, Report for Period 05/05/1998 to 04/05/1999 |
| A53375 | 1998 | Aberfoyle Resources Ltd | Pinjin | <1% | Annual Report for the period 30 November 1996 to 29 November 1997 Pinjin E28/592, 596, 597, 635, 636, P28/908. |
| A53769 | 1998 | Aberfoyle Resources Ltd | Lake Rebecca | 14% | Lake Rebecca Project, E28/466 , Partial Surrender Report to 23 February 1998 |
| A54417 | 1998 | Aberfoyle Resources Ltd | Pinjin | <1% | Pinjin, E28/569,597, & P28/908 Final Report to 25th February 1998. |
| A55172 | 1998 | Aberfoyle Resources Ltd | Lake Rebecca | 14% | Lake Rebecca Project, E28/466 , Annual Report for the Period 5th May 1997 to 4th May 1998. |
| A56805 | 1998 | Aberfoyle Resources Ltd | Pinjin | 6.3% | Annual Report for the period 30 November 1997 to 29 November 1998 Pinjin E28/592, 635 & 636. ARL Report No: W |
| A53474 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | <1% | E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report |
| A56807 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 1.1% | E28/372 Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam Annual Report 07/12/97 - 06/12/98 |
| A49938 | 1997 | Aberfoyle Resources Ltd | Pinjin | 1% | Annual Report for the period ending 29 November 1996 Pinjin E28/592, 596, 597, 635, P28/908. GSWA reference C |
| A50042 | 1997 | Aberfoyle Resources Ltd | Kurnalpi | <1% | Kurnalpi (JV) Project, E28/372 E28/374 E28/453 E31/93 E31/94 Annual report for the period 7th December 1995 t |
| A51139 | 1997 | Aberfoyle Resources Ltd | Round Hill | 10% | Round Hill Project,(Kurnalpi JV), Partial Surrender Report E28/453 to 5th February 1997. |
| A49333 | 1996 | Aberfoyle Resources Ltd | Lake Rebecca | 14% | Lake Rebecca E28/466 Partial Surrender Report to 4 May 1996 |
| A46680 | 1996 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual Report to 7 December 1995 on E31/93 E31/94 E28/372 E28/372 E28/374 E28/433 E28/453 E28/572 Kurnalpi Eas |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A41417 | 1994 | Central Kalgoorlie Gold Mines Nl | Lake Rebecca | 14% | Annual report for the period 05/05/93-04/05/94, Lake Rebecca Project, E28/466 |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A26795 | 1989 | Bhp Minerals Pty Ltd | Pinjin | 7.4% | CR 6391 PINJIN PROJECT E31/38 RUTTER$ DAM E28/158 KIRGELLA E28/87 MAGPIES FIND FINAL REPORT TO 31st JANUARY. 1 |
| A22865 | 1988 | Bhp Minerals Pty Ltd | Magpies Find | 7.4% | Partial relinquishment to 24/1/88 for E28/87, Magpie's Find, WA |
| A22463 | 1987 | Bhp Minerals Pty Ltd | Magpie's Find | 7.4% | Magpie's Find Project, Annual Report for the period ending 25/01/1987, E28/87. |
| A19316 | 1986 | Bhp Minerals Pty Ltd | Magpies Find | 7.4% | Magpies Find Project, Annual Report for the period ending 25th January 1986, E28/87. |
| A15685 | 1985 | Uranerz Australia Pty Ltd | Lake Rebecca | 7.4% | Lake Rebecca Project, Annual Report for the period 25/01/1984 to 24/01/1985, E28/87. |
| A17458 | 1985 | Bhp Minerals Ltd | Magpies Find | 7.4% | Magpies Find Project, Non-statutory Report: Proposed Field Test Work - Yilgarn Block Tertiary Channels - Plac |
| A22866 | 1985 | Bhp Minerals Pty Ltd | Magpies Find | 7.4% | Magpies Find Project, Annual Report for the period ending 25/01/1988, E28/87 |
| A14180 | 1984 | Csr Ltd | Round Hill | 6.7% | Round Hill Project, (2nd) Annual & Final Surrender Report for the period ending 23/07/1984, E28/8. |
| A12393 | 1983 | Csr Ltd | Round Hill | 6.7% | Round Hill Project, Annual Report for the period ending 17th November 1982, E28/8. |
| A51529 | 1979 | Aberfoyle Resources Ltd | Lake Rebecca | 14% | Lake Rebecca Project, E28/466 Annual Report for the period 5 May 1996 to May 1997. |
| A7472 | 1978 | Aquitaine Aust Minerals Pty Ltd | Binti- South Crab | 11% | Binti- South Crab Project, Non-statutory Report: Geophysical Investigations at South Crab Claims (Binti), W.A, |
| A7471 | 1977 | Aquitaine Aust Minerals Pty Ltd | Binti - South Crab | 11% | Binti - South Crab Project, Non-statutory Report: Progress Report, September 1977, MC28/480-488, 517, 1182, 1 |
| A5269 | 1974 | Aquitaine Aust Minerals Pty Ltd | Lake & Yindi Crab | 10% | Interim and final reports [non-statutory], Crab and Lake claims, MC28/483, 28/487 |
| A4372 | 1973 | Noranda Australia Ltd | Pinjin - Kirgella Rocks | 3.7% | Pinjin and Kirgella Rocks (JV) Project, Final Surrender Report, May 1973, MC28/495-500, 544-547, 593,595-603, |
| A4339 | 1972 | Endeavour Oil Co Nl | Pinjin | 4.2% | Pinjin Project, Non-statutory Report: Exploration Report, February 1972, MC28/495-500, 544-547, 593-599, 601, |
| A82465 | 1753 | Runnell Holdings Pty Ltd | Cundeelee | 1.4% | SURRENDER REPORT E28/1702 Cundeelee Project For the period 24/09/07 to 23/09/08 |
| A48218 | 1753 | Aberfoyle Resources Ltd | Lake Rebecca | 14% | Lake Rebecca Project, E28/466, Annual Report for the period 5th May 1995 to 4th May 1966. |
| A83025 | 1753 | Runnell Holdings Pty Ltd | Yindi | 5.2% | SURRENDER REPORT E28/1788 Yindi Project, For the period 23/04/08 to 15/05/09 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A44862 | 1753 | Aberfoyle Resources Ltd | Lake Rebecca | 14% | E28/466 Lake Rebecca Project Annual Report to 5 May 1995. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 22 Oct 2029
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 28/2913 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 28/2913? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.