E 29/934
Register summary
- Holder
- Kalgoorlie Nickel Pty Ltd
- Local government
- Shire of Menzies, City of Kalgoorlie-Boulder
- Application received
- 28 July 2014
- Commenced
- 16 Feb 2018
- Expiry
- 15 Feb 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A138869 | 2024 | Ardea Resources Limited | Goongarrie | 27% | Partial Surrender Report Goongarrie Project E29/934 for the period ending 15/02/2024. |
| A133075 | 2022 | Kingwest Resources Limited | Goongarrie | <1% | Partial Surrender Report for Goongarrie E29/0966 for the period ending 05/09/2022 |
| A124985 | 2020 | Kingwest Resources Limited | Goongarrie | <1% | Annual Report for the Goongarrie Project C43/2011 for the period ending 30/06/2020 |
| A123243 | 2020 | Ardea Resources Limited | Goongarrie | 15% | Annual Report For the Goongarrie Project C170/2007, 1 Janaury 2019 to 31 December 2019 |
| A121354 | 2019 | Black Mountain Gold Limited | Goongarrie | <1% | C43/2011 Goongarrie Annual Report for the period 29 September 2018 to 28 September 2019, E29/00966, M29/00420 |
81 more reports
| A119299 | 2019 | Ardea Resources Limited | Goongarrie | 22% | Annual Report For the Goongarrie Project C170/2007 for the period 1 January 2018 to 31 December 2018 |
| A115880 | 2018 | Ardea Resources Limited | Goongarrie | 8.2% | Goongarrie C170/2007 Annual Report for the period 1 January 2017 to 31 December 2017, M24/00541, M24/00731, M2 |
| A117845 | 2018 | Eastern Goldfields Limited | Goongarrie | <1% | C43/2011 - Goongarrie Project Annual Report for the period 1 July 2017 to 30 June 2018, P29/02153, E29/00966, |
| A112744 | 2017 | Heron Resources Ltd | Goongarrie | 8.2% | C170/2007 Goongarrie Annual Report For the Period 1 January 2016 to 31 December 2016, M24/00541, M24/00731, M2 |
| A115123 | 2017 | Eastern Goldfields Limited | Goongarrie | <1% | Goongarrie E29/966 Annual Report For the Period 6 September 2016 to 5 September 2017 |
| A107909 | 2016 | Heron Resources Ltd | Goongarrie | 5% | Combined Annual Report for the period 1 January 2015 to 31 December 2015, Goongarrie Project, C170/2007, E29/8 |
| A110140 | 2016 | Siburan Resources Ltd | Canegrass | 11% | Canegrass Project E24/177 Final Surrender Report for the period 3 July 2015 to 2 July 2016 (C23/C2013) |
| A106520 | 2015 | Siburan Resources Ltd | Canegrass | 4.9% | Annual Technical Report Canegrass Project C23/2013, E29/789, E24/177 for the period 3 July 2014 – 2 July 2015 |
| A103448 | 2014 | Siburan Resources Limited | Canegrass | 11% | Partial Surrender Report for the period 3 July 2012 to 4 July 2014 – C23/2013 – Canegrass Project E24/177 |
| A103189 | 2014 | Siburan Resources Limited | Canegrass | 4.9% | Annual Report for the period 3 July 2013 to 2 July 2014 –C23/2013 – Canegrass Project E29/789, E24/177 |
| A104606 | 2014 | Heron Resources Ltd | Goongarrie | 5% | Combined Annual Report for the period 1 January 2014 to 31 December 2014, Goongarrie Project, C170/2007, E29/8 |
| A101156 | 2014 | Heron Resources Ltd | Goongarrie | 5.3% | Combined annual report for the period 1 January 2013 to 31 December 2013, Goongarrie Project, C170/2007, E29/8 |
| A97165 | 2013 | Heron Resources Ltd | Goongarrie | 4.8% | Combined Annual Report for the period 1 January 2012 to 31 December 2012, Goongarrie Project, C170/2007, M24/5 |
| A99026 | 2013 | Siburan Resources Limited | Canegrass | 4.9% | Annual Report for the period 3 July 2012 to 2 July 2013 – C23/2013 – Canegrass Project E29/789, E24/177 |
| A100445 | 2013 | Shenton Resources Limited | Goongarrie | <1% | Annual Report E29/746 Goongarrie Project For the Period 13/07/2012 to 12/07/2013 |
| A92749 | 2012 | Heron Resources Ltd | Goongarrie | 10% | Combined annual report for the period 1 January 2011 to 31 December 2011, Goongarrie Project, C170/2007 |
| A94534 | 2012 | Heron Resources Ltd | Goongarrie | 12% | Final surrender report for the period 16 January 2006 to 15 July 2012, Goongarrie Project, E29/536 |
| A94683 | 2012 | Shenton Resources Limited | Goongarrie | <1% | Annual Report E29/746 Goongarrie Project For the Period 13/07/2011 to 12/07/2012 |
| A95821 | 2012 | Heron Resources Ltd | Goongarrie | 2.1% | Final surrender report for the period 24 January 2008 to 13 September 2012, Goongarrie Project, P29/1951-3 |
| A89341 | 2011 | Heron Resources Ltd | Goongarrie | 10% | Combined annual report for the period 1 January 2010 to 31 December 2010, Goongarrie Project, C170/2007 |
| A91307 | 2011 | Atlantic Bridge Pty Ltd | Goongarrie | <1% | Annual Technical Report E29/746 Goongarrie Project for the period 13/07/2010 to 12/07/2011 |
| A86284 | 2010 | Heron Resources Ltd | Goongarrie West | 5.7% | Partial surrender report for the period 18 January 2006 to 17 January 2010, Goongarrie West Project, E24/124 |
| A86282 | 2010 | Heron Resources Ltd | Goongarrie | 5% | Annual report for the period 1 January 2009 to 31 December 2009, Goongarrie Project, C170/2007 |
| A86718 | 2010 | Heron Resources Ltd | Goongarrie | 12% | Partial surrender report for the period 16 January 2006 to 15 January 2010, Goongarrie Project, E29/536 |
| A87869 | 2010 | Heron Resources Ltd | Goongarrie | 3% | Surrender report for the period 1 May 2006 to 12 July 2010, Goongarrie Project (C170/2007) tenements E24/124, |
| A82259 | 2009 | Vale Inco Australia Limited Partnership | GOONGARRIE | 5.7% | GOONGARRIE PROJECT TENEMENT E24/124 PARTIAL SURRENDER REPORT, FOR THE PERIOD 18 JANUARY 2006 - 17 JANUARY 2009 |
| A82261 | 2009 | Vale Inco Australia Limited Partnership | GOONGARRIE | 12% | GOONGARRIE PROJECT TENEMENT E29/536 PARTIAL SURRENDER REPORT, FOR THE PERIOD 16 JANUARY 2006 - 15 JANUARY 200 |
| A85073 | 2009 | Thrimby Pty Ltd | Canegrass | <1% | Surrender report, Canegrass Project |
| A77359 | 2008 | Inco Resources (Australia) Pty Ltd | Goongarrie | 5.2% | Goongarrie Project,C170/2007, E24/124, E29/139......P29/1853 North Coolgardie (Menzies) Mineral Field, Combine |
| A80862 | 2008 | Vale Inco Australia Limited Partnership | GOONGARRIE | 5.5% | COMBINED ANNUAL REPORT C170/2007, FOR THE PERIOD 1 JANUARY 2008 - 31 DECEMBER 2008, GOONGARRIE PROJECT, C170/2 |
| A74355 | 2007 | Barrick (Kanowna) Ltd | Scotia | 2.6% | BTZ Scotia Project Annual Report , 01/01/2006 - 31/12/2006 C68/1996, E24/74, E29/131, P24/31130, P24/3193 and |
| A74635 | 2007 | Inco Australia Ltd | Goongarrie | 98% | Googarrie Project, Annual Report for the period 11th February 2004 to 10th February 2007, P24/3810. |
| A74380 | 2007 | Inco Australia Ltd | Goongarrie | 8% | Goongarrie Nickel Project (C185/2001),M24/541, M24/744, ........P24/3804, North Coolgardie Mineral Field, Annu |
| A77029 | 2007 | Thrimby Pty Ltd | Canegrass | <1% | Annual report for the period 30 August 2006 - 29 August 2007 Canegrass project E29/514 |
| A71933 | 2006 | Placer Dome Asia Pacific Ltd | Scotia | 2.6% | BTZ (Bardoc Tectonic Zone) Scotia Project, Annual Report, 01/01/2005 - 31/12/2005, Combined Reporting No. C68 |
| A72624 | 2006 | Heron Resources Ltd | Goongarrie | 5% | Goongarrie Nickel Project, (C185/2001),M24/541, M24/744..... ...P24/3804, North Coolgardie Mineral Field, Annu |
| A71759 | 2006 | Thrimby Pty Ltd | Canegrass | <1% | Annual Report, Canegrass Project, Exploration Licence 29/514 Western Australia, Period 30 August 2004 to 29 Au |
| A73952 | 2006 | Thrimby Pty Ltd | Canegrass | <1% | Annual Report CANEGRASS Project E L 29/514 Western Australia Period 30 August 2005 To 29 August 2006 |
| A70648 | 2005 | Heron Resources Ltd | Goongarrie | 9.8% | Goongarrie Project,Annual Report for the period 1st January 2004 to 31st December 2004, M24/541, 744, 798; M |
| A70051 | 2005 | Placer Dome Asia Pacific Ltd | Scotia Dam | 2.6% | Annual report for the period 01/01/04 - 31/12/04 BTZ Scotia Project 8510, C68/1996, E24/74, E29/131, P24/3130 |
| A68678 | 2004 | Heron Resources Ltd | Goongarrie | 9.8% | Goongarie Nickel Project, M29/272, M29/278, M24/744,M24/798, M29/167, M29/202, M29/283, M24/541, Combined Annu |
| A69568 | 2004 | Thrimby Pty Ltd | Canegrass | <1% | Annual Report, Canegrass Project, Exploration Licence E29/514, for period 30 August 2003 to 29 August 2004. |
| A66134 | 2003 | Placer Dome Asia Pacific Ltd | Scotia | 2.1% | Annual Report 01/01/2002 - 31/12/2002 BTZ Scotia Project C68/1996: E24/74, E29/131, P24/3109-13, P24/3114-17, |
| A64367 | 2002 | Heron Resources Ltd | Goongarrie | 35% | Goongarroe Nickel Project, Combined Annual Report - C185/2001 1 January 2001- 31 December 2001. Exploration Li |
| A66018 | 2002 | Heron Resources Ltd | Goongarrie | 8.9% | Goongarrie Nickel Project, Mining Leases M29/272, 278, 167, 202, 283, M24/541, 744, 798, Prospecting Licences |
| A61978 | 2001 | Kundana Gold Pty Ltd | Scotia | 12% | Combined Annual Report for Scotia Project 01/01/2000 to 31/12/2000 E24/74, E24/102, E29/131, E29/395, P24/3109 |
| A62425 | 2001 | Third Rail Ltd | Canegrass | <1% | Canegrass project, E29/325, 302, 327, 328 Annual Report for the Period 1.4.2000 to 31.3.2001 Combined Reporti |
| A62951 | 2001 | Heron Resources Ltd | Goongarrie | 32% | Goongarrie Nickel Project E29/148, P24/2749, P24/2750 P24/2751, P24/2752, P24/2753, P24/2754, P24/2755, P24/27 |
| A62426 | 2001 | Third Rail Ltd | Canegrass | 1.8% | Canegrass Project, E24/93, 94 & 95 Final Surrender Report for the period 05/06/1996 to 23/03/2001. [C160/199 |
| A59762 | 2000 | Heron Resources Ltd | Goongarrie | 43% | Goongarrie South Exploration Licence 29/148 North Coolgardie Mineral Field Annual Report 09/08/1998 to 08/08/1 |
| A60481 | 2000 | Anglogold Australasia Ltd | Canegrass JV | <1% | Canegrass JV, E29/302,325,328, E24/93,94, Annual Report for the Period 1/4/1999 to 31/3/2000. |
| A59882 | 2000 | Goldfields Exploration Pty Ltd | Scotia | 1.8% | Combined Annual Report for the Scotia Project, 01/01/1999 to 31/12/1999, E24/74, E29/131, P24/3109-3117, 3121 |
| A61375 | 2000 | Centaur Mining & Exploration Ltd | Scotia Dam | 13% | Prospecting licences P24/3124-3130, C290/1997, Scotia Dam Project, Joint Annual Report for the Period 04/06/19 |
| A58378 | 1999 | Amx Resources Nl | Canegrass | <1% | Annual Report, Canegrass Project, E29/325, 327, 328, 302, for the period 15/12/97 - 31/03/99. |
| A57387 | 1999 | Goldfields Exploration Pty Ltd | Scotia | 1.9% | Scotia Project, Annual Report 01/01/98 - 31/12/98 E29/131, E24/74, P24/3109-3117, 3121, 3123, 3137-3138, P24/ |
| A54003 | 1998 | Goldfields Exploration Pty Ltd | Scotia Dam | 1.9% | Scotia Project. Annual report for period 01/01/97-31/12/97. |
| A56012 | 1998 | Centaur Mining & Exploration Ltd | Scotia Dam | 13% | C290/1997 - Scotia Dam, Prospecting Licence: P24/3124-3130 Joint Annual report, 04/06/97 - 03/06/98 |
| A53727 | 1998 | Amx Resources Nl | Canegrass | <1% | Canegrass Project, E29/302 ,Annual Report for the period 15/12/1996 - 14/12/1997. |
| A53030 | 1997 | Mt Edon Gold Mines Aust Ltd | Goongarrie | 43% | Annual report on the Exploration of the Goongarrie Prospect E29/148 Broad Arrow Mineral Field Western Australi |
| A46971 | 1996 | Kilkenny Gold Nl | Goongarrie - Vettersberg | <1% | Goongarrie - Vettersburg Project P29/1418 P29/1419 P29/1420 and P29/1421 Report on Exploration during the per |
| A48911 | 1996 | Mt Edon Gold Mines Aust Ltd | Goongarrie | 43% | Annual report on the exploration of the Goongarrie prospect E29/148 Broad Arrow Mineral Field Western Australi |
| A45413 | 1995 | Mt Kersey Mining Nl | Siberia | <1% | Exploration licences E24/60 & 72 Prospecting licences P24/3124 - 3130 Mining licence M24/406 'Siberia Project' |
| A45426 | 1995 | Centaur Mining & Exploration Ltd | Scotia Dam | 13% | Prospecting licences P24/3124-30 'Scotia Dam' Annual report for the period 4th June 1994 to 3rd June 1995 |
| A45785 | 1995 | Pancontinental Gold Operations Pty Ltd | Scotia Dam | 2.3% | Annual Report Scotia Project K95/012R E29/131,E24/74, P23/3114-3117,3123,3137-38,P24/3217-3226.2 November 1995 |
| A43639 | 1995 | Kilkenny Gold Nl | Goongarrie -Vettersberg | <1% | Goongarrie-Vettersburg Project , P29/1418, 1419, 1420 & 1421Annual Report for the period 7th January 1994 to |
| A46253 | 1995 | Mt Edon Gold Mines Aust Ltd | Goongarrie | 43% | Annual report on the exploration of the Goongarrie prospect E29/148 Broad Arrow Mineral Field Western Australi |
| A40179 | 1994 | Mt Edon Gold Mines Nl | Goongarrie | 43% | Annual report for the period 09/92-08/93 Goongarrie/Broad Arrow Project E29/148 |
| A41955 | 1994 | Pancontinental Mining Ltd | Scotia Dam | 2.3% | Scotia Annual Report (M7584) Period ending 30 June 1994 (Report K94/016R for the period 01/07/93-30/06/94) (E2 |
| A35640 | 1992 | Ashton Gold Wa Ltd | Scotia North | 9.4% | Scotia North Project, Annual Report for the period 30/04/1991 to 31/12/1991, E24/66 & 129. |
| A112 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report:Annual Report, Folder 11, Sample Data Sheets for Kunanal |
| A108 | 1970 | Western Mining Corporation Ltd | Ora Banda/Kunanalling | <1% | Annual Tenements and Temporary Reserve Report Data File, Ora Banda - Kunanalling Area. |
| A109 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report,Folder 8,In |
| A110 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenement & Temporary Reserve Report, Folder 9, Vac |
| A111 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenements & Temporary Reserve Report Folder 10,Sam |
| A107 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report ,Data File |
| A106 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Kalgoorlie Regional & Geological Plans (8), circa July |
| A105 | 1970 | Western Mining Corporation Ltd | Ora Banda- Kunanalling | <1% | Ora Banda- Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Reports Data File, |
| A51932 | 1753 | Centaur Mining & Exploration Ltd | Siberia | 2.1% | Exploration Licence E24/71 Mining Licence M24/406 and Prospecting Licences P24/3124 to P24/3130 'Siberia Joint |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A49674 | 1753 | Centaur Mining & Exploration Ltd | Siberia | 2.1% | Exploration Licence E24/71 Prospecting Licences P24/3124 to P24/3130 Mining Lease M24/406 'Siberia' Joint Repo |
| A50332 | 1753 | Goldfields Exploration Pty Ltd | Scotia | 1.9% | Annual report Project Scotia Period covered 01/07/1995 to 31/12/1996 Tenements E29/131 E24/74 P274/3109 to P24 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 18 months · 15 Feb 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 29/934 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 29/934? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.