NextMaps›WA Tenements›E 31/1344

E 31/1344

LiveExploration LicenceShire of MenziesYerilla District

E 31/1344 is a live exploration licence in the Shire of Menzies, Western Australia, held by M3 Mining (Edjudina) Pty Ltd (part of M3 Mining Limited). Granted on 22 Sept 2023 for 5 years, it expires on 21 Sept 2028. The ground is covered by 94 historical WAMEX reports.

Area
1,191.431ha
Expires
Sept 2028
in 23 months
WAMEX reports
94
WA median is 53
Report drilling
56
of 94 reports
Free Tenure Pack for E 31/1344
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 31/1344 that covers 94 WAMEX reports · 365 open-file drillholes (2,392 m drilled) · 42 earlier titles on the ground since 1969 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Menzies Explore on the live map

Register summary

Holder
M3 Mining (Edjudina) Pty Ltd
Part of
M3 Mining Limited (ASX:M3M) as at 2024-06-30
Local government
Shire of Menzies
Application received
16 Sept 2022
Commenced
22 Sept 2023
Expiry
21 Sept 2028
Term
5 Years

The full record on E 31/1344

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares (no change of holder on record)
  • The full record: 4 years of expenditure, 10 conditions and 12 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Dealings, mortgages, caveats and transfer history
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

94 historical WAMEX exploration reports intersect E 31/1344: 34 report geochemistry or sampling, 68 include a digital data package.
Work on record: RC drilling 29 · Rock chip sampling 18 · Soil sampling 16 · Diamond drilling 14 · Aircore drilling 13 · Rotary drilling 13. Resource declared in A79782 (2008), A76674 (2007), A73748 (2006), A73244 (2006) and 2 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on E 31/1344, free for new accounts.
When this ground was worked · 90 of 94 reports dated
21970s
1980s
211990s
232000s
342010s
102020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A149465 2025 Northern Star Resources Ltd Carosue Dam 33% Final Surrender Report on E31/1093-I, Carosue Dam Project, for the Period 29 May 2015 to 28 May 2025
A129275 2022 Sumitomo Metal Mining Oceania Pty Ltd Mount Boyce <1% Mt Boyce Project (C22/2016) Annual Report for the Period November 17 2020 to November 16 2021
A129223 2022 Sumitomo Metal Mining Oceania Pty Ltd Mount Boyce <1% E31/1104 Final Surrender Report for the period ending 16 November 2021
A126104 2021 Sumitomo Metal Mining Oceania Pty Ltd Mount Boyce <1% Mt Boyce Project (C22/2016) Annual Report for the period ending 16/11/2020
A127627 2021 Northern Star Resources (Carosue Dam) Pty Ltd Yilgangi 33% Partial Surrender Report on E31/1093-I, Yilgangi Project, for the period 29 May 2015 to 28 May 2021
89 more reports
A122541 2020 Sumitomo Metal Mining Oceania Pty Ltd Mount Boyce <1% Mt Boyce Project (C22/2016) Annual Report for the Period November 17 2018 to November 16 2019, E31/01103,E31/0
A124900 2020 Saracen Gold Mines Pty Limited Yilgangi 3.1% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2019 to 2 July 2020, E 31/00814,E 31/01058,E 31
A123438 2020 Strada D'Oro Pty Ltd Edjudina <1% Final Surrender Report for E31/1135 - Jump Start: Edjudina Project for the period 24 February 2017 to 20 Febru
A125194 2020 Ardea Resources Limited Jump Up Dam <1% Jump Up Dam Project C168/2005 Annual Report for the period ending 31/08/2020
A125431 2020 Strada D'Oro Pty Ltd Edjudina <1% Edjudina Project C131/2017 Annual Report for the period ending 30/07/2020, E31/1135, E31/1140, E31/1141, E31/1
A119030 2019 Sumitomo Metal Mining Oceania Pty Ltd Mount Boyce <1% Mt Boyce Project (C22/2016) Annual Report for the Period November 17 2017 to November 16 2018. E31/01103, E31/
A121426 2019 Strada D'Oro Pty Ltd Edjudina <1% Combined Annual Report for the period 01/07/2018 to 30/06/2019 on E31/1135, E31/1140, E31/1141, E31/1168 & P31
A121949 2019 Ardea Resources Limited Jump Up Dam <1% Annual Report For the Jump Up Dam Project C168/2005 For the Period 1 September 2018 to 31 August 2019, M 31/00
A121190 2019 Saracen Gold Mines Pty Limited Yilgangi 3.1% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2018 to 2 July 2019, E31/00814, E31/01058, E31/
A118093 2018 Ardea Resources Limited Jump Up Dam <1% Jump Up Dam C168/2005 Annual Report for the Period 01/09/2017 to 31/08/2018, M31/00475, M31/00477, M31/00479
A117824 2018 Saracen Gold Mines Pty Limited Yilgangi 3.1% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2017 to 2 July 2018, E31/00814, E31/01058, E31/
A118157 2018 Strada D'Oro Pty Ltd Edjudina <1% COMBINED ANNUAL REPORT FOR THE PERIOD 01 JULY 2017 to 30 JUNE 2018 ON E31/1135, E31/1140, and E31/1141 C131/20
A114787 2017 Saracen Gold Mines Pty Limited Yilgangi 3% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2016 to 2 July 2017, E31/00721, E31/00814, E31/
A115035 2017 Ardea Resources Limited Jump Up Dam <1% C168/2005 Jump Up Dam Annual Report For the Period 31 August 2016 to 30 August 2017, M31/00475, M31/00477, M31
A115439 2017 Sumitomo Metal Mining Oceania Pty Ltd Mount Boyce <1% Mt Boyce Project (C22/2016) Annual Report for the Period November 17 2016 to November 16 2017, E31/01103, E31/
A110683 2017 Sumitomo Metal Mining Oceania Pty Ltd Mount Boyce <1% Mt Boyce Project (C22/2016) Annual Report for the Period November 17 2015 to November 16 2016
A108372 2016 Renaissance Minerals Ltd Yilgangi 5.9% E31/597 Final Report 2015 Report Period: 3rd December 2014 to 1st December 2015
A109981 2016 Saracen Gold Mines Pty Ltd Yilgangi 3% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2015 to 2 July 2016, E31/00721, E31/00814, E31/
A110415 2016 Heron Resources Limited Jump Up Dam <1% C168/2005 Jump Up Dam Annual Report For the Period 31 August 2015 to 30 August 2016, M31/00475, M31/00477, M31
A104864 2015 Renaissance Minerals Ltd Yilgangi 5.9% Yilgangi Project, Annual Report for the period 03/12/2013 to 02/12/2014, E31/597. [C193/2007]
A105468 2015 Saracen Gold Mines Pty Ltd Yilgangi 14% Yilagangi Project E31/814 Partial Surrender Report for the period 25/11/2008 - 24/11/2014
A107001 2015 Saracen Gold Mines Pty Ltd Yilgangi 13% Yilgangi Project (C162/2008) Annual Report for the Period 3 July 2014 to 2 July 2015, E31/721, E31/814, P31/18
A100680 2014 Renaissance Minerals Ltd Yilgangi 5.9% E31/597 Annual Report 3rd December 2012 to 2nd December 2013
A103430 2014 Heron Resources Ltd Jump-up Dam <1% Combined annual report for the period 31 August 2013 to 30 August 2014, Jump-up Dam Project C168/2005, C168/20
A103501 2014 Saracen Gold Mines Pty Ltd Yilgangi 13% Yilgangi Project C162/2008 Annual Report for the period 3 July 2013 to 2 July 2014, E31/721, E31/814, P31/1815
A100045 2013 Saracen Gold Mines Pty Ltd Yilgangi 6.2% Yilgangi Project Annual Report for the period 3 July 2012 to 2 July 2013, E31/721, E31/814, E31/958, E31/959,
A96183 2013 Saracen Gold Mines Pty Ltd Yilgangi 6.2% Yilgangi Project, Annual Report for the period 3rd July 2011 to 2nd July 2012, E31/721, 814, 958, 959; P31/181
A97219 2013 Renaissance Minerals Ltd Yilgangi 5.8% Yilgangi Project, Annual Report for the period 04/12/2011 to 03/12/2012, E31/597& 660; P31/1802-1803 & P31/194
A92715 2012 Newcrest Mining Ltd Yilgangi 5.8% YILGANGI JV Combined Reporting Group C193/2007, E31/597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 An
A94843 2012 Heron Resources Ltd Jump-up Dam <1% Partial surrender report for the period 13 July 2007 to 11 June 2012, Jump-up Dam Project C168/2005.
A95622 2012 Heron Resources Ltd Jump-up Dam <1% Combined annual report for the period 31 August 2011 to 30 August 2012, Jump-up Dam Project, C168/2005, M31/47
A89180 2011 Heron Resources Ltd Yerilla South <1% Surrender report for the period 3 November 2006 to 12 November 2010, Yerilla South Project, E31/713
A89343 2011 Newcrest Mining Ltd Yilgangi 5.8% YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 Annual Re
A90953 2011 Rubicon Resources Ltd Yilgangi 13% Yilgangi Project C162/2008, Combined Annual Report 3rd July 2010 – 2nd July 2011, E31/721,814; P31/1815, 1832,
A89589 2011 Heron Resources Ltd Mount Boyce <1% Surrender report for the period 26 November 2003 to 12 November 2010, Mount Boyce Project, E31/524
A85766 2010 Heron Resources Ltd Yerilla South <1% Partial surrender report for the period 3 November 2006 to 2 November 2009, Yerilla South Project, E31/713
A85937 2010 Newcrest Operations Ltd Yilgangi JV 5.8% YILGANGI JV Combined Reporting Group C193/2007, E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 AN
A87857 2010 Rubicon Resources Ltd Yilgangi 13% Yilgangi Project, Combined Annual Report
A88227 2010 Heron Resources Ltd Jump-up Dam <1% Combined annual report for the period 31 August 2009 to 30 August 2010, Jump-up Dam Project, C168/2005
A85026 2009 Heron Resources Ltd Jump up Dam <1% Annual Report for the period 31 August 2008 to 30 August 2009, Jump-up Dam Project, C168/2005
A84625 2009 Rubicon Resources Ltd Yilgangi 13% Yilgangi Project Combined Annual Report 3rd July 2008 to 2nd July 2009, C162/2009, E31/721,814; P31/1815, 1832
A77037 2008 Newcrest Mining Ltd Yilgangi JV 5.8% Yilgangi JV E31/597 and E31/660 Annual Report to DOIR for the period ending 3 December 2007 Eastern Goldfields
A79782 2008 Saracen Gold Mines Pty Ltd OLD PLOUGH DAM <1% OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3
A80265 2008 Heron Resources Ltd JUMP UP DAM <1% JUMP-UP DAM PROJECT C168/2005 E31/524, E31/ 670, E31/713, E31/738, E31/739, M31/475, M31/477, M31/479 NORTH CO
A81065 2008 Newcrest Operations Ltd YILGANGI JV 5.8% YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 FOR THE P
A75142 2007 Saracen Gold Mines Pty Ltd Old Plough Dam <1% Old Plough Dam Project, Partial Surrender Report, 16 December 2003 to 15 December 2006.(C65/2001)
A76073 2007 Newcrest Operations Ltd Yilgangi JV 5.9% Yilgangi Joint Venture E31/597 For the period ending 10 September, 2007 Report No. K400/5
A76226 2007 Heron Resources Ltd Jump Up Dam <1% Jump Up Dam Project C168/2005 E31/524, E31/670, E31/713 AND E31/664 Annual Report 1st September 2006 to 31st A
A76674 2007 Saracen Gold Mines Pty Ltd Old Plough Dam <1% Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1
A74156 2006 Newcrest Operations Ltd Yilgangi JV 5.9% Yilgangi JV E31/597, Annual Report for the Period Ending 3 December 2006, (Newcrest Report No. K400/3, Edjudin
A71661 2006 Vulcan Resources Ltd Yerilla <1% Yerilla Project, Tenement E31/524, Annual report, 26 November 2004 - 25 November 2005, (Edjudina).
A73244 2006 Saracen Gold Mines Pty Ltd Old Plough Dam <1% Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21
A73748 2006 Heron Resources Ltd Jump Up Dam <1% Jump Up Dam Project E31/664,670,P31/1669,1697,1698, Combined Annual Report, 01 September 2005 to 31 October 20
A69758 2005 Sons Of Gwalia Ltd Yerilla JV <1% Yerilla JV Project, Annual Report For the Period 26 November 2003 - 25 November 2004, E31/524,(Edjudina)
A69836 2005 Newcrest Operations Ltd Yilgangi JV 5.9% Annual report for the period 03/12/03 - 02/12/04 Yilgangi Joint Venture Project, Quondong Prospect, E31/597, E
A69939 2005 Jindalee Resources Ltd Lake Rebecca <1% Annual report for the period 19/11/03 - 18/11/04 Lake Rebecca Project, E31/551, Edjudina, North Coolgardie min
A70985 2005 St Barbara Mines Ltd Old Plough Dam <1% Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10
A71437 2005 Newcrest Operations Ltd Yilgangi JV 5.9% Yilgangi JV E31/597, Annual report for the period ending 3 December 2005, Eastern Goldfields WA, (Report no. K
A68319 2004 Jindalee Resources Ltd Yilgangi 5.9% Annual report for the year period ending 2nd December 2003 Yilgangi Project E31/597
A68975 2004 Sons Of Gwalia Ltd Old Plough Dam <1% Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E
A60970 2000 Paddington Gold Pty Ltd Keith Kilkenny - Old Plough Dam <1% Annual Report, Keith Kilkenny (JV)- Old Plough Dam Project, E31/107,152,150,101,153,184 for the Period 1st Jul
A60971 2000 Goldfields Exploration Pty Ltd Keith Kilkenny- Old Plough Dam <1% Final Report, Keith Kilkenny (JV)- Old Plough Dam Project, E31/184 [Barba Hills].
A58255 1999 Goldfields Exploration Pty Ltd Keith Kilkenny- Old Plough Dam <1% Partial Surrender Report ,Keith Kilkenny (JV)- Old Plough Dam Project , E31/184[Barba Hills] for the period
A58869 1999 Goldfields Exploration Pty Ltd Keith Kilkenny <1% Annual report, Keith Kilkenny Joint Venture Old Plough Dam, Tenements E31/101,E31/107,E31/150,E31/152,E31/153,
A55388 1998 Goldfields Exploration Pty Ltd Keith Kilkenny <1% Keith Kilkenny(JV) Project, Annual Report for the period 01/07/1997 to 30/06/1998, E28/444; E31/101, 107, 150,
A56143 1998 Capricorn Resources Aust Nl Quondong 10% Quondong Project, Partial Surrender/Surrender Report EL 31/130.
A56598 1998 Dragon Mining Nl Jump Up Dam 2.1% Surrender Report Jump Up Dam Project E31/322, from the 27th August 1997 to 26 August 1998
A50633 1997 Goldfields Exploration Pty Ltd Keith Kilkenny/ Jump up Dam 3.9% Keith Kilkenny/Jump up Dam (JV) Project, Surrender Report P31/1471 for period 21st March 1994 to 17th March 19
A50634 1997 Goldfields Exploration Pty Ltd Keith Kilkenny/Jump up Dam 11% Keith Kilkenny/Jump up Dam Project, Surrender Report P31/1472 for period 21st March 1994 to 17th March 1997.
A51944 1997 Goldfields Exploration Pty Ltd Keith Kilkenny- Old Plough Dam <1% Keith Kilkenny (JV)- Plough Dam Project,Annual Report for the period 1 July 1996 to 30 June 1994, E28/444, E
A52042 1997 Goldfields Exploration Pty Ltd Edjudina - Quondong 10% Edjudina - Quondong (JV) Project, Annual Report for the period 22/06/1996 to 21/06/1997, E31/130.
A52113 1997 Goldfields Exploration Pty Ltd Old Plough Dam <1% Old Plough Dam Project, Partial Surrender Report, July 1997, E31/184 ( Barba Hills).
A52211 1997 Crest Resources Australia Nl Jump Up Dam 2.1% Jump Up Dam Project, Annual Report for the period 09/08/1996 to 08/08/1997, E31/127.
A48676 1996 Goldfields Exploration Pty Ltd Edjudina/ Quondong 10% Edjudina/ Quondong (JV) Project, Annual Report for the period 22/06/1995 to 21/06/1996, E31/130.
A50067 1996 Crest Resources Australia Nl Jump Up Dam 2.1% Jump up Dam Project Eastern Goldfields of Western Australia E31/127 Partial Relinquishment Report
A48713 1996 Goldfields Exploration Pty Ltd Keith Kilkenny JV <1% Annual Report Keith Kilkenny Joint Venture Old Plough Dam E28/444, E28/101, E28/107, E28/150, E28/152, E28/153
A49575 1996 Crest Resources Australia Nl Jump Up Dam 2.1% Jump up Dam Project Easter Goldfields of Western Australia E21/127 Annual Exploraion Progress Report for the P
A45752 1995 Goldfields Exploration Pty Ltd Old Plough Dam <1% Annual Report Old Plough Dam Project E31/101,E31/107,E28/444 ,E31/150,E31/152,E31/153,P31/1471-72,E31/184
A45123 1995 Goldfields Ltd Quondong 10% Quondong Project, Annual Report E31/130 for the period 22/06/1994 to 21/06/1995.
A45814 1995 Zapopan Nl Jump Up Dam 2.1% Jump Up Dam Project, Annual Report Exploration Licence E30/127 for period ending 8th August 1995.
A42452 1994 Zapopan Nl Jump Up Dam 2.1% Jump Up Dam Project, Annual Report for the period ending 8th August 1994, E31/127.
A39513 1993 Capella Holdings Pty Ltd Jump Up Dam 2.1% Jump Up Dam Project, Annual Report for the year ending 08/08/1993, E31/127.
A39642 1993 Capricorn Resources Aust Nl Porphyry West 10% Porphyry West Project, Annual Report for the period 22/06/1992 to 21/06/1993, E31/130.
A2524 1971 Le Nickel Aust Exp Pty Ltd Quandong - Four Corners Well 3.8% Quandong - Four Corners Well (JV) Project, Annual Report for the period ending 31/12/1971, MC30/795-816, 818-
A1361 1970 Australian Selection Pty Ltd Yerilla <1% Yerilla Project, Annual Report for the period ending 31/12/1970, TR70/3750 & 4533H; MC31/116-270, 272-322, 385
A99725 1899 Heron Resources Ltd Jump-up Dam <1% Combined annual report for the period 31 August 2012 to 30 August 2013, Jump-up Dam Project, C168/2005, M31/47
A81545 1753 Saracen Gold Mines Pty Ltd OLD PLOUGH DAM <1% E31/552 OLD PLOUGH DAM PROJECT FINAL REPORT, 16 DECEMBER 2003 TO 05 DECEMBER 2008
A84243 1753 Saracen Gold Mines Pty Ltd OLD PLOUGH DAM <1% OLD PLOUGH DAM PROJECT, ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C065/2001, E31/152, E31/388, E31/390, E31/
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 31/1344 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 31/1344? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.