E 31/1361
E 31/1361 is a pending exploration licence in the Shire of Menzies, Western Australia, applied for by Nexus Wallbrook Pty Ltd (part of Nexus Minerals Limited). The application was received on 18 May 2023 and is awaiting a decision. The ground is covered by 115 historical WAMEX reports.
Register summary
- Holder
- Nexus Wallbrook Pty Ltd
- Part of
- Nexus Minerals Limited (ASX:NXM) as at 2025-06-30
- Local government
- Shire of Menzies
- Application received
- 18 May 2023
The full record on E 31/1361
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (1 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A139461 | 2024 | Nexus Minerals Limited | Wallbrook | <1% | Wallbrook Project E31/1160 Partial Surrender Report for the period ending 22/02/2024 |
| A143825 | 2024 | Nexus Minerals Limited | Wallbrook Project | 5% | Wallbrook Project E31/1118 Partial Surrender Report for the period 31 May 2018 to 30 May 2024 |
| A135664 | 2023 | Solstice Minerals Limited | Hobbes | 8.8% | E31/1117 Partial Surrender Report Hobbes for the period ending 26/04/2023. |
| A131803 | 2022 | Nexus Minerals Limited | Wallbrook | <1% | Tenement E31/1107 Partial Surrender Report Wallbrook Project for the period ending 23/06/2022. |
| A123409 | 2020 | Nexus Minerals Limited | Wallbrook | 2.4% | Annual Report for Wallbrook Project C73/2018 for the period ending 24/02/2020 |
110 more reports
| A124067 | 2020 | Orecorp Holdings Pty Ltd | Hobbes | 8.8% | Annual Report for Licence E31/1117 Hobbes Project for the Period 27 April 2019 to 26 April 2020 |
| A124898 | 2020 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project Exploration Licences 31/1058 & 31/1059 Partial Surrender Report for the Period 19 June 2016 t |
| A124900 | 2020 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2019 to 2 July 2020, E 31/00814,E 31/01058,E 31 |
| A119999 | 2019 | Nexus Minerals Limited | Wallbrook | 2.4% | Annual Report for Wallbrook Project – Combined Reporting Group C73/2018 For the Period 25 February 2018 to 24 |
| A120281 | 2019 | Orecorp Limited | Hobbes | 8.8% | Hobbes E31/1117 Annual Report for the period 27/04/2018 to 26/04/2019 |
| A121190 | 2019 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2018 to 2 July 2019, E31/00814, E31/01058, E31/ |
| A117251 | 2018 | Crosspick Resources Pty Ltd | Yilgangie | 8.8% | Annual Mineral Exploration Report E31/1117 Yilgangie Gold Project for the period 27 April 2017 to 26 April 201 |
| A117873 | 2018 | Newmont Exploration Pty Ltd | Mulgabbie North | 2.9% | Combined Annual Report for C23/2018 (Mulgabbie North Project) for the period 5th July 2017 to 4th July 2018, E |
| A117824 | 2018 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2017 to 2 July 2018, E31/00814, E31/01058, E31/ |
| A114606 | 2017 | Newmont Exploration Pty Ltd | Mulgabbie North | <1% | Mulgabbie North Project E31/01107 for the period 5th July 2016 to 4th July 2017 |
| A114614 | 2017 | Newmont Exploration Pty Ltd | Mulgabbie North | <1% | Annual Report for Mulgabbie North Project (E 31/1108) for the period 5th July 2016 to 4th July 2017 |
| A114686 | 2017 | Saracen Gold Mines Pty Limited | Edjudina | <1% | Exploration Licence 31/793 Edjudina Final Surrender Report for the Period 11 September 2008 to the 5 July 2017 |
| A114787 | 2017 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2016 to 2 July 2017, E31/00721, E31/00814, E31/ |
| A108031 | 2016 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | Wallbrook Hill Project Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/793, M31/172, |
| A108372 | 2016 | Renaissance Minerals Ltd | Yilgangi | 4.4% | E31/597 Final Report 2015 Report Period: 3rd December 2014 to 1st December 2015 |
| A109981 | 2016 | Saracen Gold Mines Pty Ltd | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2015 to 2 July 2016, E31/00721, E31/00814, E31/ |
| A104527 | 2015 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | Wallbrook Hill Project Partial Surrender Report E31/793 for the period 11/09/2008 to 10/09/2014 |
| A104864 | 2015 | Renaissance Minerals Ltd | Yilgangi | 4.4% | Yilgangi Project, Annual Report for the period 03/12/2013 to 02/12/2014, E31/597. [C193/2007] |
| A105465 | 2015 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | Wallbrook Hill C57/2008 Annual Report for the period 01/01/2014 - 31/12/2014, E31/793, E31/946, M31/172, M31/ |
| A106912 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam (C065/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/586, E31/741, E31/105 |
| A106422 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Exploration Licence 31/586 (Old Plough Dam) Surrender Report for the Period 9 December 2003 to the 31 March 20 |
| A100680 | 2014 | Renaissance Minerals Ltd | Yilgangi | 4.4% | E31/597 Annual Report 3rd December 2012 to 2nd December 2013 |
| A100741 | 2014 | Cazador Resources Pty Ltd | Carosue Dam | <1% | E31/0889 Final Surrender Report for the period ended 17/10/2013 |
| A101802 | 2014 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | Wallbrook Hill Project, Annual Report for the period 01/01/2013 to 31st December 2013, E31/793, 946; M31/172, |
| A103510 | 2014 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 1 July 2013 to 30 June 2014, C65/2001, E31/586, E31/741, M31/156, M31/2 |
| A97182 | 2013 | Legacy Iron Ore Ltd | Kingsley | <1% | Final Surrender Report, Kingsley Project (Deenya Hill) E31/717, For the Period 7th February 2008 to 6th Februa |
| A97219 | 2013 | Renaissance Minerals Ltd | Yilgangi | 4.3% | Yilgangi Project, Annual Report for the period 04/12/2011 to 03/12/2012, E31/597& 660; P31/1802-1803 & P31/194 |
| A97489 | 2013 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | Wallbrook Hill Project Annual Report 1 January 2012 to 31 December 2012, CR Group: C57/2008, Tenements: E31/7 |
| A97749 | 2013 | Legacy Iron Ore Ltd | Wallbrook Swamp | <1% | Annual Mineral Exploration Report South Laverton Area Wallbrook Swamp Project E31/862 For the Period 16th Marc |
| A99470 | 2013 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2012 to 30 June 2013, C65/2001, E31/586, E31/741, M |
| A93615 | 2012 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | Wallbrook Hill Project C57/2008 annual report for the period 1 January 2011 to 31 December 2011, E31/793, 946, |
| A93738 | 2012 | Legacy Iron Ore Ltd | Kingsley | <1% | Annual Mineral Exploration Report – Kingsley Project E31/717, Report Period: 7th February 2011 – 6th February |
| A92715 | 2012 | Newcrest Mining Ltd | Yilgangi | 4.3% | YILGANGI JV Combined Reporting Group C193/2007, E31/597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 An |
| A93994 | 2012 | Legacy Iron Ore Ltd | Wallbrook Swamp | <1% | Annual Mineral Exploration Report – Wallbrook Swamp Project E31/862, 16th March 2011 – 15th March 2012 |
| A95050 | 2012 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/ |
| A95128 | 2012 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2011 to 30 June 2012, C65/2001, E31/586, 741, M31/1 |
| A89343 | 2011 | Newcrest Mining Ltd | Yilgangi | 4.3% | YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 Annual Re |
| A89980 | 2011 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | WALLBROOK HILL PROJECT, ANNUAL REPORT, 01 JANUARY 2010 TO 31 DECEMBER 2010, C057/2008, TENEMENTS: E31/793, M31 |
| A90151 | 2011 | Legacy Iron Ore Ltd | Wallbrook Swamp | <1% | Wallbrook Swamp Project, Annual Report for the period 16th March 2010 to 15th March 2011, E31/862. |
| A91960 | 2011 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31 |
| A89963 | 2011 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report, Wallbrook Project, E 31/717, For the Period 7th February 2010 to 6th Februa |
| A91511 | 2011 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project C065/2001 Annual Report 01 July 2010 to 30 June 2011, E31/586, 741, M31/156, 208, 209, |
| A85937 | 2010 | Newcrest Operations Ltd | Yilgangi JV | 4.3% | YILGANGI JV Combined Reporting Group C193/2007, E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 AN |
| A86546 | 2010 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | Wallbrook Hill Project Annual Report 1 January 2009 to 31 December 2009, C57/2008, E31/757, E31/793, M31/172, |
| A86310 | 2010 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report Wallbrook Project E 31/717 For the Period 7th February 2009 to 6th February |
| A88316 | 2010 | Quantum Resources Ltd | Wallbrook | <1% | Final Surrender Report, Wallbrook Project E31/757, period ending 12/07/2010 |
| A80799 | 2009 | Jackson Minerals Ltd | Wallbrook | <1% | E31/717 Partial Surrender Report, 7 February 2008 – 21 November 2008 |
| A81798 | 2009 | Legacy Iron Ore Ltd | Wallbrook | <1% | Wallbrook Project E31/717 Annual Report, 7 February 2008 – 6 February 2009 |
| A77037 | 2008 | Newcrest Mining Ltd | Yilgangi JV | 4.4% | Yilgangi JV E31/597 and E31/660 Annual Report to DOIR for the period ending 3 December 2007 Eastern Goldfields |
| A78161 | 2008 | Saracen Gold Mines Pty Ltd | Wesbrook gold exploration | <1% | E31/571 PARTIAL SURRENDER REPORT 08 JANUARY 2004 TO 07 JANUARY 2008 |
| A79782 | 2008 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3 |
| A81065 | 2008 | Newcrest Operations Ltd | YILGANGI JV | 4.3% | YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 FOR THE P |
| A77698 | 2008 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 11% | Wallbrook Hill Project Annual Report 01 January 2007 to 31 Decemer 2007, C305/1992, E31/89, E31/117, E31/477, |
| A75140 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | E31/586, Old Plough Dam Project, Partial Surrender Report 9 December 2003 to 8 December 2006. (C65/2001) |
| A76073 | 2007 | Newcrest Operations Ltd | Yilgangi JV | 4.4% | Yilgangi Joint Venture E31/597 For the period ending 10 September, 2007 Report No. K400/5 |
| A77370 | 2007 | Saracen Gold Mines Pty Ltd | Wallbrook | <1% | WALLBROOK PROJECT, ANNUAL REPORT 30 SEPTEMBER 2006 TO 29 SEPTEMBER 2007,C031/2005 |
| A74488 | 2007 | Jackson Gold Ltd | Westbrook | <1% | Westbrook Project E31/571, 2006 Annual Report, Period 8 January 2006 to 7 January 2007, (Edjudina). |
| A76674 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1 |
| A73732 | 2006 | Jackson Gold Ltd | Wallbrook | <1% | Wallbrook Project, Annual Report, 1st October 2005 to 30th September 2006, (P31/1632-1641,1670-1673, Combined |
| A73922 | 2006 | Jackson Gold Ltd | Wallbrook | 2.7% | Wallbrook Project 2006 Annual Report, Reporting Period: 1st January 2006 to 31st December 2006, Tenements: E3 |
| A74156 | 2006 | Newcrest Operations Ltd | Yilgangi JV | 4.4% | Yilgangi JV E31/597, Annual Report for the Period Ending 3 December 2006, (Newcrest Report No. K400/3, Edjudin |
| A72121 | 2006 | Jackson Gold Ltd | Westbrook | <1% | E31/571 - Westbrook Project 2005 Annual Report, Period 8 January 2005 to 7 January 2006, (Edjudina). |
| A72119 | 2006 | Jackson Gold Ltd | Wallbrook Hill | 2.9% | E31/89,117,174,477,P31/1406,1407, Wallbrook Project 2005 Annual Report, Period 1 January 2005 to 31 December 2 |
| A73244 | 2006 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21 |
| A69836 | 2005 | Newcrest Operations Ltd | Yilgangi JV | 4.4% | Annual report for the period 03/12/03 - 02/12/04 Yilgangi Joint Venture Project, Quondong Prospect, E31/597, E |
| A70136 | 2005 | Jackson Gold Ltd | Wallbrook Hill | 2.9% | Annual report for the period 01/01/04 - 31/12/04 Wallbrook Project, C305/1992, E31/89, E31/117, E31/174, E31/4 |
| A70513 | 2005 | Jackson Gold Ltd | Wallbrook | <1% | Annual report for the period 06/01/04 - 05/01/05 Wallbrook Project, C31/2005, P31/1670-1673, Edjudina |
| A70516 | 2005 | Jackson Gold Ltd | Westbrook | <1% | Annual report for the period 08/01/04 - 07/01/05 Westbrook Project, E31/571, Edjudina |
| A70985 | 2005 | St Barbara Mines Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10 |
| A71437 | 2005 | Newcrest Operations Ltd | Yilgangi JV | 4.4% | Yilgangi JV E31/597, Annual report for the period ending 3 December 2005, Eastern Goldfields WA, (Report no. K |
| A71528 | 2005 | Jackson Gold Ltd | Wallbrook | <1% | Wallbrook Project 2005 Annual report. 1st December 2004 to 30th September 2005 (C31/2005, Edjudina). |
| A68319 | 2004 | Jindalee Resources Ltd | Yilgangi | 4.4% | Annual report for the year period ending 2nd December 2003 Yilgangi Project E31/597 |
| A68499 | 2004 | Jackson Gold Ltd | Wallbrook | 2.9% | Annual report for the period 01/01/2003-31/12/2003 Wallbrook Project (C305/1992), E31/117, E31/174, E31/89, P3 |
| A68975 | 2004 | Sons Of Gwalia Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E |
| A66214 | 2003 | Jackson Gold Ltd | Wallbrook Hill | 2.9% | Wallbrook Project, 2002 Annual Report, Reporting period 1st January 2002 to 31st December 2002 C305/1992, E31/ |
| A64173 | 2002 | Croesus Mining Nl | Wallbrook | 3% | Annual Report 1st January 2001 to 31st December 2001 Wallbrook Joint Venture Project E31/117, C305/1992. |
| A62061 | 2001 | Croesus Mining Nl | Edjudina | 2.6% | Annual Report Edjudina Joint Venture for the period 1 January 2000 to 31 December 2000 digital format combined |
| A60050 | 2000 | Croesus Mining Nl | Wallbrook Hill | 3% | Annual Report, Wallbrook Joint Venture Project, 01/01/1999 to 31/12/1999, Combined Reporting No. C305/1992, Te |
| A60156 | 2000 | Croesus Mining Nl | Edjudina | 4.8% | Annual Report, Edjudina Joint Venture, For the Period 1 January 1999 TO 31 December 1999, Combined reporting N |
| A57097 | 1999 | Talon Resources Nl | Wallbrook Hill | 14% | Wallbrook Hill Project - Annual Report Year End:31/01/99 E31/89, 117, 1406, 1407 |
| A53675 | 1998 | Goldfields Exploration Pty Ltd | Edjudina | 1.1% | 1997 Surrender Report for the period 31/05/93 to 13/11/97 Edjudina Project E31/149 Wallbrook Swamp. |
| A54111 | 1998 | Talon Resources Nl | Wallbrook Hill | 14% | Wallbrook Hill Project, Annual Report for the year ending 31/01/1998, E31/89 & 117; P31/1406 & 1407. |
| A55163 | 1998 | Heron Resources Ltd | Edjudina | 38% | Edjudina Project Exploration Licences 31/237 North Coolgardie Mineral Field Annual report 26/02/97-25/02/98 |
| A51076 | 1997 | Talon Resources Nl | Wallbrook Hill | 14% | Wallbrook Hill Project Annual report for the year ending 31 January 1997 E31/89 E31/117 P31/1406 and P31/1407. |
| A51561 | 1997 | Heron Resources Ltd | Wallbrook Hill | 38% | Wallbrook Hill Project, Exploration Licence E31/237 North Coolgardie Mineral Field Annual report 26 February 1 |
| A51753 | 1997 | Goldfields Exploration Pty Ltd | Edjudina | <1% | Edjudina Project, Annual Report for the period 31/05/1996 to 30/05/1997, E31/147,148, 149 & 225. |
| A48618 | 1996 | Goldfields Exploration Pty Ltd | Edjudina | <1% | Edjudina Project, Annual Report for period 31/05/1995 to 30/05/1996, E31/147-149, E31/225. |
| A48703 | 1996 | Talon Resources Nl | Wallbrook Hill | 14% | Annual report on the Wallbrook Hill Project for the period 01/02/95 to 31/01/96 Tenements E31/89 E31/117 P31/1 |
| A45122 | 1995 | Goldfields Ltd | Edjudina/ Wallbrook Swamp | 1.1% | Edjudina/ Wallbrook Swamp Project, Annual Report E31/149 for the period 31/05/1994 ro 30/05/1995 |
| A43668 | 1995 | Talon Resources Nl | Wallbrook Hill | 14% | Annual report on the Wallbrook Hill project for the year ending 31/1/1995 |
| A41790 | 1994 | Rgc Exploration Pty Ltd | Edjudina - Wallbrook Swamp | 1.1% | Edjudina - Wallbrook Swamp Project, Annual Report for the period 31/05/1993 to 30/05/1994, E31/149. |
| A40241 | 1994 | Talon Gold Nl | Wallbrook Hill | 14% | Annual report for the period 01/02/93-31/01/94 Wallbrook Hill Project E31/89 E31/117 P31/1406-1407 |
| A37515 | 1992 | Poseidon Gold Ltd | Wallbrook Hill | 14% | Annual Report 1991/92 Wallbrook Hill JV E31/89, E31/117, P31/1406, and P31/1407 . |
| A34858 | 1991 | Ivernia West Plc | Wallbrook Hill | 14% | Non-statutory Report : Wallbrook Hill Project Exploration Summary. E31/89,117 P31/1406-1407, 08/91. |
| A31296 | 1989 | Southern Ventures Nl | Edjudina | 21% | Edjudina (JV) Project, Final Surrender Report, September1989,E31/30,34;P31/473-478,480,495-515,516-518,544-550 |
| A14597 | 1984 | Paget Gold Mining Co Nl | Edjudina | <1% | Edjudina Project, Non-statutory Report: Chairman's Address to the Shareholders, 23/10/1984. |
| A2522 | 1971 | Le Nickel Aust Exp Pty Ltd | Four Corners Well | 1.7% | Four Corners Well Project, Annual Report for the period ending 31/12/1971, MC31/864-887. |
| A1993 | 1970 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca [JV] Project, Final Surrender Report for the period ending 01/11/1970,TR70/3811; MC28/1448-1452 & |
| A1143 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st March 1968, TR70/3811H |
| A1144 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Annual Report for the period 18th July 1967 to 30th June 1968, TR70/3811H. |
| A1141 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st October 1967, TR70/381 |
| A1142 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Report on Investigations for the period 18th July 1967 to 31st Dec |
| A3499 | 1753 | Falconbridge Aust Pty Ltd | Lake Rebecca | 3.2% | Lake Rebecca Project, Annual Report for the year ending 31/12/1972, MC31/722-725 & 1549-1554. |
| A82001 | 1753 | Saracen Gold Mines Pty Ltd | WALLBROOK HILL | 9.5% | WALLBROOK HILL PROJECT ANNUAL REPORT 01 JANUARY 2008 TO 31 DECEMBER 2008, CR GROUP: C57/2008, E31/89, E31/117, |
| A84243 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT, ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C065/2001, E31/152, E31/388, E31/390, E31/ |
| A87936 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT (C065/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E31/586, E31/620, E31/741, E3 |
| A40550 | 1753 | Talon Gold Nl | Wallbrook | 14% | Annual report for the period 01/02/93-31/01/94 Wallbrook Project E31/89 E31/117 P31/1406 P31/1407 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A61689 | 1753 | Croesus Mining Nl | Wallbrook JV | 3% | Annual Report 1st January 2000 to 31st December 2000 Wallbrook Joint Venture Project tenements E31/117, E31/17 |
| A81859 | 1753 | Saracen Gold Mines Pty Ltd | EDJUDINA | <1% | EDJUDINA PROJECT ANNUAL REPORT 23 DECEMBER 2007 TO 22 DECEMBER 2008 CR GROUP: C206/1995 TENEMENTS: E31/113, E3 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 31/1361 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 31/1361? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.