E 31/1362 is a pending exploration licence in the Shire of Menzies, Western Australia, applied for by Nexus Wallbrook Pty Ltd (part of Nexus Minerals Limited). The application was received on 18 May 2023 and is awaiting a decision. The ground is covered by 150 historical WAMEX reports.
Register summary
- Holder
- Nexus Wallbrook Pty Ltd
- Part of
- Nexus Minerals Limited (ASX:NXM) as at 2025-06-30
- Local government
- Shire of Menzies
- Application received
- 18 May 2023
The full record on E 31/1362
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (1 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A139461 | 2024 | Nexus Minerals Limited | Wallbrook | <1% | Wallbrook Project E31/1160 Partial Surrender Report for the period ending 22/02/2024 |
| A143825 | 2024 | Nexus Minerals Limited | Wallbrook Project | 5% | Wallbrook Project E31/1118 Partial Surrender Report for the period 31 May 2018 to 30 May 2024 |
| A135664 | 2023 | Solstice Minerals Limited | Hobbes | 8.8% | E31/1117 Partial Surrender Report Hobbes for the period ending 26/04/2023. |
| A123409 | 2020 | Nexus Minerals Limited | Wallbrook | 2.4% | Annual Report for Wallbrook Project C73/2018 for the period ending 24/02/2020 |
| A124067 | 2020 | Orecorp Holdings Pty Ltd | Hobbes | 8.8% | Annual Report for Licence E31/1117 Hobbes Project for the Period 27 April 2019 to 26 April 2020 |
145 more reports
| A124898 | 2020 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project Exploration Licences 31/1058 & 31/1059 Partial Surrender Report for the Period 19 June 2016 t |
| A124900 | 2020 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2019 to 2 July 2020, E 31/00814,E 31/01058,E 31 |
| A122457 | 2020 | Saracen Gold Mines Pty Limited | Edjudina | 2.3% | Edjudina Project (C6/2016) Annual Report for the Period 1 January to 31 December 2019, M31/00003, M31/00004, M |
| A119015 | 2019 | Saracen Gold Mines Pty Limited | Edjudina | 1.4% | Edjudina Project (C6/2016) Annual Report for the Period 1 January to 31 December 2018 |
| A119999 | 2019 | Nexus Minerals Limited | Wallbrook | 2.4% | Annual Report for Wallbrook Project – Combined Reporting Group C73/2018 For the Period 25 February 2018 to 24 |
| A120281 | 2019 | Orecorp Limited | Hobbes | 8.8% | Hobbes E31/1117 Annual Report for the period 27/04/2018 to 26/04/2019 |
| A121190 | 2019 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2018 to 2 July 2019, E31/00814, E31/01058, E31/ |
| A115980 | 2018 | Saracen Gold Mines Pty Limited | Edjudina | <1% | Edjudina Project (C6/2016) Annual Report for the Period 1 January to 31 December 2017, M31/00003, M31/00004, M |
| A117251 | 2018 | Crosspick Resources Pty Ltd | Yilgangie | 8.8% | Annual Mineral Exploration Report E31/1117 Yilgangie Gold Project for the period 27 April 2017 to 26 April 201 |
| A117873 | 2018 | Newmont Exploration Pty Ltd | Mulgabbie North | 2.9% | Combined Annual Report for C23/2018 (Mulgabbie North Project) for the period 5th July 2017 to 4th July 2018, E |
| A117824 | 2018 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2017 to 2 July 2018, E31/00814, E31/01058, E31/ |
| A112109 | 2017 | Saracen Gold Mines Pty Ltd | Edjudina | <1% | Annual Report For the Period 1 January to 31 December 2016, Edjudina Project (C6/2016), E31/00793, M31/00003, |
| A114614 | 2017 | Newmont Exploration Pty Ltd | Mulgabbie North | <1% | Annual Report for Mulgabbie North Project (E 31/1108) for the period 5th July 2016 to 4th July 2017 |
| A114787 | 2017 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2016 to 2 July 2017, E31/00721, E31/00814, E31/ |
| A108007 | 2016 | Saracen Gold Mines Pty Ltd | Edjudina | 2.4% | Edjudina Project (C206/1995) Annual Report for the Period 23 December 2014 to 22 December 2015, E31/895, E31/9 |
| A108372 | 2016 | Renaissance Minerals Ltd | Yilgangi | 4.4% | E31/597 Final Report 2015 Report Period: 3rd December 2014 to 1st December 2015 |
| A109981 | 2016 | Saracen Gold Mines Pty Ltd | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2015 to 2 July 2016, E31/00721, E31/00814, E31/ |
| A108267 | 2016 | Saracen Gold Mines Pty Ltd | Edjudina | <1% | Exploration Licence 31/930 Partial Surrender Report for the Period 19 January 2011 to 5 January 2016 |
| A104864 | 2015 | Renaissance Minerals Ltd | Yilgangi | 4.4% | Yilgangi Project, Annual Report for the period 03/12/2013 to 02/12/2014, E31/597. [C193/2007] |
| A106912 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam (C065/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/586, E31/741, E31/105 |
| A105464 | 2015 | Saracen Gold Mines Pty Ltd | Edjudina | 1.8% | Edjudina Project C206/1995 Annual Report for the period 23/12/2013 to 22/12/2014, E31/621.....M31/381 |
| A106422 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Exploration Licence 31/586 (Old Plough Dam) Surrender Report for the Period 9 December 2003 to the 31 March 20 |
| A100680 | 2014 | Renaissance Minerals Ltd | Yilgangi | 4.4% | E31/597 Annual Report 3rd December 2012 to 2nd December 2013 |
| A100741 | 2014 | Cazador Resources Pty Ltd | Carosue Dam | <1% | E31/0889 Final Surrender Report for the period ended 17/10/2013 |
| A104219 | 2014 | Ellice T | Edjudina | <1% | Edjudina Project E31/877 Annual Report for the period 19 March 2013 – 18 March 2014 |
| A101746 | 2014 | Saracen Gold Mines Pty Ltd | Edjudina | 1% | Edjudina Project (C206/1995) Annual Report for the period 23 Dec 2012 to 22 Dec 2013, E31/621.......P31/1751 |
| A103510 | 2014 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 1 July 2013 to 30 June 2014, C65/2001, E31/586, E31/741, M31/156, M31/2 |
| A98365 | 2013 | Ellice T | Edjudina | <1% | Edjudina Project E31/877 Annual Report for the period 19 March 2012 to 19 march 2013 |
| A97219 | 2013 | Renaissance Minerals Ltd | Yilgangi | 4.3% | Yilgangi Project, Annual Report for the period 04/12/2011 to 03/12/2012, E31/597& 660; P31/1802-1803 & P31/194 |
| A97522 | 2013 | Saracen Gold Mines Pty Ltd | Edjudina | <1% | Edjudina Project, Annual Report for the period 23rd December 2011 to 22nd December 2012, E31/573.....E31/944; |
| A99470 | 2013 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2012 to 30 June 2013, C65/2001, E31/586, E31/741, M |
| A93389 | 2012 | Saracen Gold Mines Pty Ltd | Edjudina | <1% | Edjudina Project, Annual Report for the period 23rd December 2010 to 22nd December 2011, E31/573............E3 |
| A92715 | 2012 | Newcrest Mining Ltd | Yilgangi | 4.3% | YILGANGI JV Combined Reporting Group C193/2007, E31/597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 An |
| A93996 | 2012 | Ellice T | Edjudina | <1% | Edjudina, Annual Report 2012 for, E31/877, for the period 19 March 2011 – 19 March 2012 |
| A95050 | 2012 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/ |
| A95128 | 2012 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2011 to 30 June 2012, C65/2001, E31/586, 741, M31/1 |
| A89343 | 2011 | Newcrest Mining Ltd | Yilgangi | 4.3% | YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 Annual Re |
| A90060 | 2011 | Ellice T | Edjudina | <1% | Edjudina Project, Annual Report for the period 19th March 2010 to 19th March 2011, E31/877. |
| A91960 | 2011 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31 |
| A91511 | 2011 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project C065/2001 Annual Report 01 July 2010 to 30 June 2011, E31/586, 741, M31/156, 208, 209, |
| A85937 | 2010 | Newcrest Operations Ltd | Yilgangi JV | 4.3% | YILGANGI JV Combined Reporting Group C193/2007, E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 AN |
| A86546 | 2010 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | <1% | Wallbrook Hill Project Annual Report 1 January 2009 to 31 December 2009, C57/2008, E31/757, E31/793, M31/172, |
| A88316 | 2010 | Quantum Resources Ltd | Wallbrook | <1% | Final Surrender Report, Wallbrook Project E31/757, period ending 12/07/2010 |
| A77037 | 2008 | Newcrest Mining Ltd | Yilgangi JV | 4.4% | Yilgangi JV E31/597 and E31/660 Annual Report to DOIR for the period ending 3 December 2007 Eastern Goldfields |
| A78013 | 2008 | Saracen Gold Mines Pty Ltd | Edjudina | 1% | EDJUDINA PROJECT ANNUAL REPORT 23 DECEMBER 2006 TO 22 DECEMBER 2007 CR GROUP: C206/1995 E31/113, E31/568, E31/ |
| A78161 | 2008 | Saracen Gold Mines Pty Ltd | Wesbrook gold exploration | <1% | E31/571 PARTIAL SURRENDER REPORT 08 JANUARY 2004 TO 07 JANUARY 2008 |
| A79782 | 2008 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3 |
| A81065 | 2008 | Newcrest Operations Ltd | YILGANGI JV | 4.3% | YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 FOR THE P |
| A77698 | 2008 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 7.5% | Wallbrook Hill Project Annual Report 01 January 2007 to 31 Decemer 2007, C305/1992, E31/89, E31/117, E31/477, |
| A74159 | 2007 | Inco Australia Ltd | Yilgamgie South | 1.2% | Yilgamgie South Project P31/1710-1713, Combined Annual Report C68/2006, 01 November 2005 to 31 October 2006, ( |
| A74939 | 2007 | Saracen Gold Mines Pty Ltd | Edjudina | 1% | Edjudina Project, Annual Report, 23 December 2005 TO 22 December 2006, (C206/1995) |
| A75140 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | E31/586, Old Plough Dam Project, Partial Surrender Report 9 December 2003 to 8 December 2006. (C65/2001) |
| A76073 | 2007 | Newcrest Operations Ltd | Yilgangi JV | 4.4% | Yilgangi Joint Venture E31/597 For the period ending 10 September, 2007 Report No. K400/5 |
| A77370 | 2007 | Saracen Gold Mines Pty Ltd | Wallbrook | <1% | WALLBROOK PROJECT, ANNUAL REPORT 30 SEPTEMBER 2006 TO 29 SEPTEMBER 2007,C031/2005 |
| A74488 | 2007 | Jackson Gold Ltd | Westbrook | <1% | Westbrook Project E31/571, 2006 Annual Report, Period 8 January 2006 to 7 January 2007, (Edjudina). |
| A76674 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1 |
| A73732 | 2006 | Jackson Gold Ltd | Wallbrook | <1% | Wallbrook Project, Annual Report, 1st October 2005 to 30th September 2006, (P31/1632-1641,1670-1673, Combined |
| A73922 | 2006 | Jackson Gold Ltd | Wallbrook | 1.8% | Wallbrook Project 2006 Annual Report, Reporting Period: 1st January 2006 to 31st December 2006, Tenements: E3 |
| A74156 | 2006 | Newcrest Operations Ltd | Yilgangi JV | 4.4% | Yilgangi JV E31/597, Annual Report for the Period Ending 3 December 2006, (Newcrest Report No. K400/3, Edjudin |
| A72121 | 2006 | Jackson Gold Ltd | Westbrook | <1% | E31/571 - Westbrook Project 2005 Annual Report, Period 8 January 2005 to 7 January 2006, (Edjudina). |
| A72119 | 2006 | Jackson Gold Ltd | Wallbrook Hill | 2% | E31/89,117,174,477,P31/1406,1407, Wallbrook Project 2005 Annual Report, Period 1 January 2005 to 31 December 2 |
| A73244 | 2006 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21 |
| A69836 | 2005 | Newcrest Operations Ltd | Yilgangi JV | 4.4% | Annual report for the period 03/12/03 - 02/12/04 Yilgangi Joint Venture Project, Quondong Prospect, E31/597, E |
| A70005 | 2005 | Sons Of Gwalia Ltd | Edjudina | <1% | Annual report for the period 23/12/03 - 22/12/04 Edjudina Project, C206/1995, M31/03, M31/04, M31/05, M31/06, |
| A70136 | 2005 | Jackson Gold Ltd | Wallbrook Hill | 2% | Annual report for the period 01/01/04 - 31/12/04 Wallbrook Project, C305/1992, E31/89, E31/117, E31/174, E31/4 |
| A70513 | 2005 | Jackson Gold Ltd | Wallbrook | <1% | Annual report for the period 06/01/04 - 05/01/05 Wallbrook Project, C31/2005, P31/1670-1673, Edjudina |
| A70516 | 2005 | Jackson Gold Ltd | Westbrook | <1% | Annual report for the period 08/01/04 - 07/01/05 Westbrook Project, E31/571, Edjudina |
| A70985 | 2005 | St Barbara Mines Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10 |
| A71437 | 2005 | Newcrest Operations Ltd | Yilgangi JV | 4.4% | Yilgangi JV E31/597, Annual report for the period ending 3 December 2005, Eastern Goldfields WA, (Report no. K |
| A71528 | 2005 | Jackson Gold Ltd | Wallbrook | <1% | Wallbrook Project 2005 Annual report. 1st December 2004 to 30th September 2005 (C31/2005, Edjudina). |
| A68256 | 2004 | Sons Of Gwalia Ltd | Edjudina | <1% | Edjudina Project, Annual Report for the period 23/12/2002-22/12/2003 : M31/3-6, M31/30, M31/76, M31/119-121, E |
| A68319 | 2004 | Jindalee Resources Ltd | Yilgangi | 4.4% | Annual report for the year period ending 2nd December 2003 Yilgangi Project E31/597 |
| A68326 | 2004 | Sons Of Gwalia Ltd | Edjudina | 13% | Edjudina Project Report on tenements surrendered between 2 O ctober 1992 and 6 February 2004 C206/1995 P31/143 |
| A68499 | 2004 | Jackson Gold Ltd | Wallbrook | 2% | Annual report for the period 01/01/2003-31/12/2003 Wallbrook Project (C305/1992), E31/117, E31/174, E31/89, P3 |
| A68975 | 2004 | Sons Of Gwalia Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E |
| A66214 | 2003 | Jackson Gold Ltd | Wallbrook Hill | 2% | Wallbrook Project, 2002 Annual Report, Reporting period 1st January 2002 to 31st December 2002 C305/1992, E31/ |
| A66630 | 2003 | Sons Of Gwalia Ltd | Porphyry Margaret Yarri | 1.3% | Porphyry, Margaret and Yarri Projects (Edjudina Combined Reporting Group)Annual Report for the period 23 Decem |
| A64173 | 2002 | Croesus Mining Nl | Wallbrook | 2.1% | Annual Report 1st January 2001 to 31st December 2001 Wallbrook Joint Venture Project E31/117, C305/1992. |
| A64358 | 2002 | Sons Of Gwalia Ltd | Porphyry | 1.9% | 2000/01 Annual Report Porphyry Project Area E31/91, M31/3-6 M31/76, M31/120, M31/121, P31/1437, P31/1438, P31/ |
| A64651 | 2002 | Gutnick Resources Nl | Edjudina | 3.5% | Exploration Licence: E31/103 'Edjudina' Surrender Report For The Period 7 April 1991 To 15 June 2000. |
| A62061 | 2001 | Croesus Mining Nl | Edjudina | 1.8% | Annual Report Edjudina Joint Venture for the period 1 January 2000 to 31 December 2000 digital format combined |
| A62080 | 2001 | Pacmin Mining Corporation Ltd | Porphyry | 1.9% | 1999/2000 Annual Report Porphyry Project Area Combined Report for period 23/12/99 to 22/12/00 E31/91, M31/3-6, |
| A59713 | 2000 | Gutnick Resources Nl | Edjudina | 4% | Mining Licences, M31/125, 127-131, Edjudina, Surrender Report for the period 26 July 1994 to 29 October 1999 |
| A59872 | 2000 | Pacmin Mining Corporation Ltd | Porphyry | 1.9% | 1998/1999 Annual Report, Porphry project Area, E31/91, M31/3-6,76,120,121, P31/1437,1438,1441,1476, Combined R |
| A60050 | 2000 | Croesus Mining Nl | Wallbrook Hill | 2.1% | Annual Report, Wallbrook Joint Venture Project, 01/01/1999 to 31/12/1999, Combined Reporting No. C305/1992, Te |
| A60156 | 2000 | Croesus Mining Nl | Edjudina | 3.3% | Annual Report, Edjudina Joint Venture, For the Period 1 January 1999 TO 31 December 1999, Combined reporting N |
| A60935 | 2000 | Gutnick Resources Nl | Edjudina | 20% | Edjudina Project, , M31/132, Surrender Report for 07/04/1991 to 04/02/2000 |
| A57097 | 1999 | Talon Resources Nl | Wallbrook Hill | 9.9% | Wallbrook Hill Project - Annual Report Year End:31/01/99 E31/89, 117, 1406, 1407 |
| A58150 | 1999 | Pacmin Mining Corporation Ltd | Porphyry | 1.9% | Annual Report Porphyry combined reporting area. E31/91. M31/3-6,76,120,121. P31/1437,1438,1476. |
| A58957 | 1999 | Gutnick Resources Nl | Edjudina | 2.6% | Edjudina Project, , E31/96, E31/103, M31/125, M31/127-132, M31/135 - 136, Annual Report 07/04/1998 - 06/04/199 |
| A53675 | 1998 | Goldfields Exploration Pty Ltd | Edjudina | <1% | 1997 Surrender Report for the period 31/05/93 to 13/11/97 Edjudina Project E31/149 Wallbrook Swamp. |
| A54111 | 1998 | Talon Resources Nl | Wallbrook Hill | 9.9% | Wallbrook Hill Project, Annual Report for the year ending 31/01/1998, E31/89 & 117; P31/1406 & 1407. |
| A55163 | 1998 | Heron Resources Ltd | Edjudina | 26% | Edjudina Project Exploration Licences 31/237 North Coolgardie Mineral Field Annual report 26/02/97-25/02/98 |
| A55180 | 1998 | Pacific Mining Corporation Ltd | Porphyry | 2.1% | Annual report Porphyry Combined Reporting Area E31/91 M31/3-6 M31/120-121 P31/1437-1438 P31/1441 P31/1476 Yeri |
| A55740 | 1998 | Mt Kersey Mining Nl | Edjudina | 2.6% | Edjudina Project, E31/96, E31/103, M31/125, M31/127 - 132 M31/135 - 136, Annual Report 07/04/1997 - 06/04/199 |
| A51076 | 1997 | Talon Resources Nl | Wallbrook Hill | 9.9% | Wallbrook Hill Project Annual report for the year ending 31 January 1997 E31/89 E31/117 P31/1406 and P31/1407. |
| A50987 | 1997 | Mt Edon Gold Mines Aust Ltd | Porphyry | 1.9% | Annual report Porphyry combined Reporting Area E31/91 M31/3 to M31/6 M31/76 M31/120 M31/121 P31/1437 P31/1438 |
| A51561 | 1997 | Heron Resources Ltd | Wallbrook Hill | 26% | Wallbrook Hill Project, Exploration Licence E31/237 North Coolgardie Mineral Field Annual report 26 February 1 |
| A51753 | 1997 | Goldfields Exploration Pty Ltd | Edjudina | <1% | Edjudina Project, Annual Report for the period 31/05/1996 to 30/05/1997, E31/147,148, 149 & 225. |
| A48005 | 1996 | Mt Kersey Mining Nl | Edjudina | 2.6% | Edjudina Project, E31/96, E31/103, M31/125, M31/127 - 132, M31/135 - 136, Annual Report 07/04/1995 - 06/04/199 |
| A48618 | 1996 | Goldfields Exploration Pty Ltd | Edjudina | <1% | Edjudina Project, Annual Report for period 31/05/1995 to 30/05/1996, E31/147-149, E31/225. |
| A48703 | 1996 | Talon Resources Nl | Wallbrook Hill | 9.9% | Annual report on the Wallbrook Hill Project for the period 01/02/95 to 31/01/96 Tenements E31/89 E31/117 P31/1 |
| A46999 | 1996 | Mt Edon Gold Mines Aust Ltd | Edjudina | 1.9% | Annual Report Porphyry Combined Reporting Area E31/91, M31/3 to M31/6, M31/76, M31/120, M31/121, P31/1437, P31 |
| A45122 | 1995 | Goldfields Ltd | Edjudina/ Wallbrook Swamp | <1% | Edjudina/ Wallbrook Swamp Project, Annual Report E31/149 for the period 31/05/1994 ro 30/05/1995 |
| A43668 | 1995 | Talon Resources Nl | Wallbrook Hill | 9.9% | Annual report on the Wallbrook Hill project for the year ending 31/1/1995 |
| A44745 | 1995 | Mt Kersey Mining Nl | Edjudina | 2.6% | Edjudina Project E31/96, E31/103, M31/125, M31/127 - 132, M37/135 - 136, Annual Report 07/04/1994 - 06/04/1995 |
| A47584 | 1995 | Mt Edon Gold Mines Nl | Edjudina | <1% | Edjudina Gold Project Report on Interpretation of Airborne Magnetometer Survey Edjudina, Western Australia Jun |
| A41419 | 1994 | Mt Kersey Mining Nl | Edjudina | 3.5% | Edjudina Project E31/103, Annual Report 07/04/1993 - 06/04/1994 |
| A41790 | 1994 | Rgc Exploration Pty Ltd | Edjudina - Wallbrook Swamp | <1% | Edjudina - Wallbrook Swamp Project, Annual Report for the period 31/05/1993 to 30/05/1994, E31/149. |
| A40241 | 1994 | Talon Gold Nl | Wallbrook Hill | 9.9% | Annual report for the period 01/02/93-31/01/94 Wallbrook Hill Project E31/89 E31/117 P31/1406-1407 |
| A35589 | 1992 | Mt Kersey Mining Nl | Edjudina | 3.5% | Edjudina Project E31/103, Annual Report 07/04/1991 - 06/04/1991 |
| A36567 | 1992 | Yarri Mining Pty Ltd | Porphyry | <1% | Predevelopment drill programme and revised resource estimate for the North Extension and Pioneer Paddock depos |
| A37396 | 1992 | Enterprise Gold Mines Nl | Edjudina | 1.7% | Completion Report on a Reverse Circulation Drilling Program Edjudina Gold Project |
| A37397 | 1992 | Enterprise Gold Mines Nl | Edjudina | 5.5% | Progress Report Edjudina Gold Project November 1992 Edjudina/Yarri Project |
| A37515 | 1992 | Poseidon Gold Ltd | Wallbrook Hill | 9.9% | Annual Report 1991/92 Wallbrook Hill JV E31/89, E31/117, P31/1406, and P31/1407 . |
| A34858 | 1991 | Ivernia West Plc | Wallbrook Hill | 9.9% | Non-statutory Report : Wallbrook Hill Project Exploration Summary. E31/89,117 P31/1406-1407, 08/91. |
| A35619 | 1991 | Westralian Resource Projects Ltd | Porphyry | <1% | R Report for the period 04/91 to 05/91 : Reverse circulation drill program Pioneer Paddock & Main Waste Dump M |
| A35620 | 1991 | Westralian Resource Projects Ltd | Porphyry | <1% | R Report for the period 07/91. Porphyry Project Bedrock gold Geochemical program July 1991 M31/3 to M31/6 West |
| A35621 | 1991 | Westralian Resource Projects Ltd | Porphyry | <1% | Porphyry Project Bedrock gold geochemical program October 1991 M31/3 to M31/6. December 1991. Westralian Resou |
| A28892 | 1989 | Audax Resources Nl | Porphyry | 9.5% | Porphyry Gold Project, Progress report on exploration and assessment of gold mineralisation (non-statutory rep |
| A27517 | 1988 | Goldfields Resource Dev Pty Ltd | Porphyry | <1% | Soil Geochemical Survey - Edjudina W.A. 08/1988 M31/3-6 |
| A27518 | 1988 | Proram International Pty Ltd | Porphyry | <1% | Review of Exploration and Development Potential of the Porphyry Gold Mine Leases, Edjudina WA (M31/3-6 for per |
| A15432 | 1985 | Picon Explorations Pty Ltd | Porphyry | <1% | Porphyry Project, Annual Report :Lease Ownership and Management Details during year ended 30th March 1985, M3 |
| A15267 | 1985 | Picon Explorations Pty Ltd | Porphyry | <1% | Porphyry Project, Annual Report :Lease Ownership and Management Details during year ended 30th March 1985, M31 |
| A14597 | 1984 | Paget Gold Mining Co Nl | Edjudina | <1% | Edjudina Project, Non-statutory Report: Chairman's Address to the Shareholders, 23/10/1984. |
| A8892 | 1980 | Seltrust Mining Corp Pty Ltd | Welsh Find | 19% | Welsh Find Project, Non-statutory Report: Final Report, March 1980, MC31/1873 -1882, 2135-2140,2201-2203. |
| A2522 | 1971 | Le Nickel Aust Exp Pty Ltd | Four Corners Well | 5.7% | Four Corners Well Project, Annual Report for the period ending 31/12/1971, MC31/864-887. |
| A1993 | 1970 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca [JV] Project, Final Surrender Report for the period ending 01/11/1970,TR70/3811; MC28/1448-1452 & |
| A1143 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st March 1968, TR70/3811H |
| A1144 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Annual Report for the period 18th July 1967 to 30th June 1968, TR70/3811H. |
| A1141 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st October 1967, TR70/381 |
| A1142 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Report on Investigations for the period 18th July 1967 to 31st Dec |
| A44415 | 1753 | Consolidated Resources Nl | Edjudina | <1% | Edjudina Project Annual report Porphyry Leases M31/3 M31/4 M31/5 M31/6 for the period 30 March 1994 to 29 Marc |
| A82001 | 1753 | Saracen Gold Mines Pty Ltd | WALLBROOK HILL | 6.5% | WALLBROOK HILL PROJECT ANNUAL REPORT 01 JANUARY 2008 TO 31 DECEMBER 2008, CR GROUP: C57/2008, E31/89, E31/117, |
| A84243 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT, ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C065/2001, E31/152, E31/388, E31/390, E31/ |
| A87936 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT (C065/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E31/586, E31/620, E31/741, E3 |
| A40259 | 1753 | Consolidated Resources Nl | Edjudina | <1% | Annual Report Edjudina Project E31/91, E31/98, E31/113, E31/125, E31/142, M31/30, M31/76, M31/106, P31/1417, P |
| A40550 | 1753 | Talon Gold Nl | Wallbrook | 9.9% | Annual report for the period 01/02/93-31/01/94 Wallbrook Project E31/89 E31/117 P31/1406 P31/1407 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43715 | 1753 | Consolidated Resources Nl | Edjudina | <1% | Annual Report Edjudina Project E31/91,E31/98,E31/113,E31/125 ,E31/142,M31/30,M31/76,M31/117,M31/119,M31/120,M3 |
| A51332 | 1753 | Mt Kersey Mining Nl | Edjudina | 2.6% | Edjudina (JV) Project, E31/96, E31/103, M31/125, M31/127 - 132, M31/135 - 136. Annual Report 07/04/1996 - 06 |
| A61689 | 1753 | Croesus Mining Nl | Wallbrook JV | 2.1% | Annual Report 1st January 2000 to 31st December 2000 Wallbrook Joint Venture Project tenements E31/117, E31/17 |
| A81859 | 1753 | Saracen Gold Mines Pty Ltd | EDJUDINA | <1% | EDJUDINA PROJECT ANNUAL REPORT 23 DECEMBER 2007 TO 22 DECEMBER 2008 CR GROUP: C206/1995 TENEMENTS: E31/113, E3 |
| A86419 | 1753 | Saracen Gold Mines Pty Ltd | Edjudina | <1% | Edjudina Project Annual Report, 23rd December 2008 to 22 December 2009, C206/1995, E31/573, E31/621, E31/645, |
| A89964 | 1753 | Saracen Gold Mines Pty Ltd | EDJUDINA | <1% | EDJUDINA PROJECT, ANNUAL REPORT, 23 DECEMBER 2009 TO 22 DECEMBER 2010, CR GROUP: C206/1995 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 31/1362 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 31/1362? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.