NextMaps›WA Tenements›E 31/1363

E 31/1363

PendingExploration LicenceShire of MenziesYerilla District

E 31/1363 is a pending exploration licence in the Shire of Menzies, Western Australia, applied for by M3 Mining (Edjudina) Pty Ltd (part of M3 Mining Limited). The application was received on 25 May 2023 and is awaiting a decision. The ground is covered by 75 historical WAMEX reports.

Area
297.709ha
Applied
May 2023
3 years ago
WAMEX reports
75
WA median is 53
Report drilling
39
of 75 reports
Free Tenure Pack for E 31/1363
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 31/1363 that covers 75 WAMEX reports · 70 open-file drillholes (1,444 m drilled) · 26 earlier titles on the ground since 1894 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Menzies Explore on the live map

Register summary

Holder
M3 Mining (Edjudina) Pty Ltd
Part of
M3 Mining Limited (ASX:M3M) as at 2024-06-30
Local government
Shire of Menzies
Application received
25 May 2023

The full record on E 31/1363

The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.

Free account
  • Current holders and their shares (no change of holder on record)
  • Expenditure history, conditions and endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • Expenditure compliance, expiry and ownership signals, once the application is granted
  • Dealings, mortgages, caveats and transfer history
See Premium

Exploration history on this ground

75 historical WAMEX exploration reports intersect E 31/1363: 41 report geochemistry or sampling, 61 include a digital data package.
Work on record: Rock chip sampling 25 · Soil sampling 25 · Geophysical interpretation 18 · RC drilling 17 · Rotary drilling 12 · Geological mapping 10.
Rather than open these one by one on the DMPE site, have them read into one cited report on E 31/1363, free for new accounts.
When this ground was worked · 73 of 75 reports dated
11970s
11980s
151990s
172000s
332010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A143825 2024 Nexus Minerals Limited Wallbrook Project 1.7% Wallbrook Project E31/1118 Partial Surrender Report for the period 31 May 2018 to 30 May 2024
A135664 2023 Solstice Minerals Limited Hobbes 2.9% E31/1117 Partial Surrender Report Hobbes for the period ending 26/04/2023.
A123409 2020 Nexus Minerals Limited Wallbrook <1% Annual Report for Wallbrook Project C73/2018 for the period ending 24/02/2020
A124067 2020 Orecorp Holdings Pty Ltd Hobbes 2.9% Annual Report for Licence E31/1117 Hobbes Project for the Period 27 April 2019 to 26 April 2020
A124780 2020 Orecorp Holdings Pty Ltd Yarri <1% Annual Report for Yarri Project E31/1175 for the Period 5 July 2019 to 4 July 2020
70 more reports
A124900 2020 Saracen Gold Mines Pty Limited Yilgangi <1% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2019 to 2 July 2020, E 31/00814,E 31/01058,E 31
A119999 2019 Nexus Minerals Limited Wallbrook <1% Annual Report for Wallbrook Project – Combined Reporting Group C73/2018 For the Period 25 February 2018 to 24
A120281 2019 Orecorp Limited Hobbes 2.9% Hobbes E31/1117 Annual Report for the period 27/04/2018 to 26/04/2019
A121190 2019 Saracen Gold Mines Pty Limited Yilgangi <1% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2018 to 2 July 2019, E31/00814, E31/01058, E31/
A115932 2018 Salazar Gold Pty Ltd Porphyry North <1% Porphyry North Project Combined Annual Technical Report Exploration Licences E31/910, 942, 1001 and E39/1978 N
A116504 2018 Salazar Gold Pty Ltd Porphyry North <1% Porphyry North Exploration Licence E31/1001 Final Surrender Technical Report for the period 14 June 2012 to 21
A117251 2018 Crosspick Resources Pty Ltd Yilgangie 2.9% Annual Mineral Exploration Report E31/1117 Yilgangie Gold Project for the period 27 April 2017 to 26 April 201
A117873 2018 Newmont Exploration Pty Ltd Mulgabbie North 1% Combined Annual Report for C23/2018 (Mulgabbie North Project) for the period 5th July 2017 to 4th July 2018, E
A117824 2018 Saracen Gold Mines Pty Limited Yilgangi <1% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2017 to 2 July 2018, E31/00814, E31/01058, E31/
A114787 2017 Saracen Gold Mines Pty Limited Yilgangi <1% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2016 to 2 July 2017, E31/00721, E31/00814, E31/
A108372 2016 Renaissance Minerals Ltd Yilgangi 1.5% E31/597 Final Report 2015 Report Period: 3rd December 2014 to 1st December 2015
A109981 2016 Saracen Gold Mines Pty Ltd Yilgangi <1% Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2015 to 2 July 2016, E31/00721, E31/00814, E31/
A108024 2016 Salazar Gold Pty Ltd Porphyry North <1% Porphyry North Project Combined Annual Technical Report Exploration Licences E31/910, 942 and 1001 North Coolg
A110577 2016 Salazar Gold Pty Ltd Porphyry North <1% Porphyry North Project Combined Annual Technical Report Exploration Licences E31/910, 942 and 1001 North Coolg
A104864 2015 Renaissance Minerals Ltd Yilgangi 1.5% Yilgangi Project, Annual Report for the period 03/12/2013 to 02/12/2014, E31/597. [C193/2007]
A104672 2015 Salazar Gold Pty Ltd Porphyry North <1% Porphyry North Project (C115/2012) Combined Annual Technical Report Exploration Licences E31/910, 942, 954 and
A105468 2015 Saracen Gold Mines Pty Ltd Yilgangi <1% Yilagangi Project E31/814 Partial Surrender Report for the period 25/11/2008 - 24/11/2014
A107001 2015 Saracen Gold Mines Pty Ltd Yilgangi <1% Yilgangi Project (C162/2008) Annual Report for the Period 3 July 2014 to 2 July 2015, E31/721, E31/814, P31/18
A100680 2014 Renaissance Minerals Ltd Yilgangi 1.5% E31/597 Annual Report 3rd December 2012 to 2nd December 2013
A103501 2014 Saracen Gold Mines Pty Ltd Yilgangi <1% Yilgangi Project C162/2008 Annual Report for the period 3 July 2013 to 2 July 2014, E31/721, E31/814, P31/1815
A100757 2014 Salazar Gold Pty Ltd Porphyry North <1% Porphyry North Project Combined Annual Technical Report Exploration Licences E31/910, 942, 954 and 1001 North
A100045 2013 Saracen Gold Mines Pty Ltd Yilgangi <1% Yilgangi Project Annual Report for the period 3 July 2012 to 2 July 2013, E31/721, E31/814, E31/958, E31/959,
A96183 2013 Saracen Gold Mines Pty Ltd Yilgangi <1% Yilgangi Project, Annual Report for the period 3rd July 2011 to 2nd July 2012, E31/721, 814, 958, 959; P31/181
A97051 2013 Salazar Gold Pty Ltd Porphyry North <1% PORPHYRY NORTH PROJECT COMBINED ANNUAL TECHNICAL REPORT EXPLORATION LICENCES E31/910, 942, 954, 1001, and E39/
A97219 2013 Renaissance Minerals Ltd Yilgangi 1.4% Yilgangi Project, Annual Report for the period 04/12/2011 to 03/12/2012, E31/597& 660; P31/1802-1803 & P31/194
A92715 2012 Newcrest Mining Ltd Yilgangi 1.4% YILGANGI JV Combined Reporting Group C193/2007, E31/597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 An
A89343 2011 Newcrest Mining Ltd Yilgangi 1.4% YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 Annual Re
A90953 2011 Rubicon Resources Ltd Yilgangi <1% Yilgangi Project C162/2008, Combined Annual Report 3rd July 2010 – 2nd July 2011, E31/721,814; P31/1815, 1832,
A91476 2011 Goldphyre Wa Pty Ltd Edjudina <1% Final Surrender Report Edjudina Project Exploration Licence 31/747 for the period: 26/06/08 to 24/06/2011
A92539 2011 Seatommy Pty Ltd Edjudina <1% Edjudina Project, Final Surrender Report for the period 09/11/2009 to 20/10/2011, E31/848.
A85937 2010 Newcrest Operations Ltd Yilgangi JV 1.4% YILGANGI JV Combined Reporting Group C193/2007, E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 AN
A87530 2010 Goldphyre Resources Pty Ltd EDJUDINA <1% ANNUAL REPORT EDJUDINA PROJECT EXPLORATION LICENCE 31/747 For the period: 26/06/09 – 25/06/10
A87857 2010 Rubicon Resources Ltd Yilgangi <1% Yilgangi Project, Combined Annual Report
A88728 2010 Seatommy Pty Ltd Edjudina <1% ANNUAL REPORT EDJUDINA PROJECT EXPLORATION LICENCE 31/848 For the period: 9/11/09 – 8/11/10
A83003 2009 Goldphyre Resources Pty Ltd Edjudina <1% Edjudina Project, Annual Report for the period 26/06/2008 to 25/06/2009, E31/747.
A80606 2009 Jackson Minerals Ltd Yilgangi <1% Yilgangi – E31/642 Surrender Report, 16 November 2007 – 21 November 2008
A84625 2009 Rubicon Resources Ltd Yilgangi <1% Yilgangi Project Combined Annual Report 3rd July 2008 to 2nd July 2009, C162/2009, E31/721,814; P31/1815, 1832
A77037 2008 Newcrest Mining Ltd Yilgangi JV 1.5% Yilgangi JV E31/597 and E31/660 Annual Report to DOIR for the period ending 3 December 2007 Eastern Goldfields
A77726 2008 Jackson Minerals Ltd Yilgangi 2 <1% Yilgangi - C110/2006 Project 2007 Annual Report 1 January 2007 - 31 December 2007
A79894 2008 Jackson Minerals Ltd Yilgangi 2 <1% Yilgangi 2 Project – E31/669 2008 Partial Surrender Report, Report Period: 6 July 2005 – 5 July 2008
A80359 2008 Jackson Minerals Ltd Yilgangi 2 <1% Yilgangi – E31/669 2008 Surrender Report, Period: 6 July 2005 – 21 November 2008
A81065 2008 Newcrest Operations Ltd YILGANGI JV 1.4% YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 FOR THE P
A80236 2008 Jackson Minerals Ltd Yilgangi <1% Yilgangi – E31/642 2008 Annual Report
A74487 2007 Jackson Gold Ltd Yilgangi <1% Yilgangi Project E31/669,P31/1420, 2006 Annual Report, Period 1 January 2006 to 31 December 2006, Combined Rep
A76073 2007 Newcrest Operations Ltd Yilgangi JV 1.5% Yilgangi Joint Venture E31/597 For the period ending 10 September, 2007 Report No. K400/5
A73132 2006 Jackson Gold Ltd Yilgangi <1% E31/669 Yilgangi Project 2005 - 2006 Annual Report, 6 July 2005 to 5 July 2006, (Edjudina).
A74156 2006 Newcrest Operations Ltd Yilgangi JV 1.5% Yilgangi JV E31/597, Annual Report for the Period Ending 3 December 2006, (Newcrest Report No. K400/3, Edjudin
A69836 2005 Newcrest Operations Ltd Yilgangi JV 1.5% Annual report for the period 03/12/03 - 02/12/04 Yilgangi Joint Venture Project, Quondong Prospect, E31/597, E
A71437 2005 Newcrest Operations Ltd Yilgangi JV 1.5% Yilgangi JV E31/597, Annual report for the period ending 3 December 2005, Eastern Goldfields WA, (Report no. K
A68319 2004 Jindalee Resources Ltd Yilgangi 1.5% Annual report for the year period ending 2nd December 2003 Yilgangi Project E31/597
A64651 2002 Gutnick Resources Nl Edjudina 1.3% Exploration Licence: E31/103 'Edjudina' Surrender Report For The Period 7 April 1991 To 15 June 2000.
A58957 1999 Gutnick Resources Nl Edjudina 1% Edjudina Project, , E31/96, E31/103, M31/125, M31/127-132, M31/135 - 136, Annual Report 07/04/1998 - 06/04/199
A55740 1998 Mt Kersey Mining Nl Edjudina 1% Edjudina Project, E31/96, E31/103, M31/125, M31/127 - 132 M31/135 - 136, Annual Report 07/04/1997 - 06/04/199
A56143 1998 Capricorn Resources Aust Nl Quondong 2.9% Quondong Project, Partial Surrender/Surrender Report EL 31/130.
A52042 1997 Goldfields Exploration Pty Ltd Edjudina - Quondong 2.9% Edjudina - Quondong (JV) Project, Annual Report for the period 22/06/1996 to 21/06/1997, E31/130.
A46771 1996 Goldfields Exploration Pty Ltd Heppingstone JV 3.4% Surrender Report Heppingstone JV. E31/83. 12/01/96.
A48005 1996 Mt Kersey Mining Nl Edjudina 1% Edjudina Project, E31/96, E31/103, M31/125, M31/127 - 132, M31/135 - 136, Annual Report 07/04/1995 - 06/04/199
A48676 1996 Goldfields Exploration Pty Ltd Edjudina/ Quondong 2.9% Edjudina/ Quondong (JV) Project, Annual Report for the period 22/06/1995 to 21/06/1996, E31/130.
A47450 1996 Goldfields Exploration Pty Ltd Heppingstone 2.9% Annual Report, Report for the period 23/1/95 to 22/1/96 Heppingstone JV E31/83, M31/14, M31/122, P31/1420 Repo
A43473 1995 Rgc Exploration Pty Ltd Yilgangi 2.9% Annual report Heppingstone project E31/83, P31/1420, M31/14 and M31/122. Report for the period 2 November 1993
A44745 1995 Mt Kersey Mining Nl Edjudina 1% Edjudina Project E31/96, E31/103, M31/125, M31/127 - 132, M37/135 - 136, Annual Report 07/04/1994 - 06/04/1995
A45123 1995 Goldfields Ltd Quondong 2.9% Quondong Project, Annual Report E31/130 for the period 22/06/1994 to 21/06/1995.
A41419 1994 Mt Kersey Mining Nl Edjudina 1.3% Edjudina Project E31/103, Annual Report 07/04/1993 - 06/04/1994
A41592 1993 North Coolgardie Resources Nl Yilgangi Queen and Heppingstone South 3.4% Yilgangi Queen and Heppingstone South Project, Annual Report for the period January 1992 - January 1993, E31/
A39642 1993 Capricorn Resources Aust Nl Porphyry West 2.9% Porphyry West Project, Annual Report for the period 22/06/1992 to 21/06/1993, E31/130.
A35589 1992 Mt Kersey Mining Nl Edjudina 1.3% Edjudina Project E31/103, Annual Report 07/04/1991 - 06/04/1991
A10935 1982 Duval Mining Australia Ltd Q 2.1% 'Q' Project Edjudina W.A final report December 31st 1981
A2524 1971 Le Nickel Aust Exp Pty Ltd Quandong - Four Corners Well 1.8% Quandong - Four Corners Well (JV) Project, Annual Report for the period ending 31/12/1971, MC30/795-816, 818-
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
A51332 1753 Mt Kersey Mining Nl Edjudina 1% Edjudina (JV) Project, E31/96, E31/103, M31/125, M31/127 - 132, M31/135 - 136. Annual Report 07/04/1996 - 06

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 31/1363 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 31/1363? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.