E 31/1366
E 31/1366 is a pending exploration licence in the Shire of Menzies, Western Australia, applied for by M3 Mining (Edjudina) Pty Ltd (part of M3 Mining Limited). The application was received on 25 May 2023 and is awaiting a decision. The ground is covered by 76 historical WAMEX reports.
Register summary
- Holder
- M3 Mining (Edjudina) Pty Ltd
- Part of
- M3 Mining Limited (ASX:M3M) as at 2024-06-30
- Local government
- Shire of Menzies
- Application received
- 25 May 2023
The full record on E 31/1366
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Dealings, mortgages, caveats and transfer history
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143825 | 2024 | Nexus Minerals Limited | Wallbrook Project | <1% | Wallbrook Project E31/1118 Partial Surrender Report for the period 31 May 2018 to 30 May 2024 |
| A135664 | 2023 | Solstice Minerals Limited | Hobbes | 2.9% | E31/1117 Partial Surrender Report Hobbes for the period ending 26/04/2023. |
| A123409 | 2020 | Nexus Minerals Limited | Wallbrook | <1% | Annual Report for Wallbrook Project C73/2018 for the period ending 24/02/2020 |
| A124067 | 2020 | Orecorp Holdings Pty Ltd | Hobbes | 2.9% | Annual Report for Licence E31/1117 Hobbes Project for the Period 27 April 2019 to 26 April 2020 |
| A124898 | 2020 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project Exploration Licences 31/1058 & 31/1059 Partial Surrender Report for the Period 19 June 2016 t |
71 more reports
| A124900 | 2020 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2019 to 2 July 2020, E 31/00814,E 31/01058,E 31 |
| A119999 | 2019 | Nexus Minerals Limited | Wallbrook | <1% | Annual Report for Wallbrook Project – Combined Reporting Group C73/2018 For the Period 25 February 2018 to 24 |
| A120281 | 2019 | Orecorp Limited | Hobbes | 2.9% | Hobbes E31/1117 Annual Report for the period 27/04/2018 to 26/04/2019 |
| A121190 | 2019 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2018 to 2 July 2019, E31/00814, E31/01058, E31/ |
| A117251 | 2018 | Crosspick Resources Pty Ltd | Yilgangie | 2.9% | Annual Mineral Exploration Report E31/1117 Yilgangie Gold Project for the period 27 April 2017 to 26 April 201 |
| A117873 | 2018 | Newmont Exploration Pty Ltd | Mulgabbie North | <1% | Combined Annual Report for C23/2018 (Mulgabbie North Project) for the period 5th July 2017 to 4th July 2018, E |
| A117824 | 2018 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2017 to 2 July 2018, E31/00814, E31/01058, E31/ |
| A114787 | 2017 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2016 to 2 July 2017, E31/00721, E31/00814, E31/ |
| A108372 | 2016 | Renaissance Minerals Ltd | Yilgangi | 1.5% | E31/597 Final Report 2015 Report Period: 3rd December 2014 to 1st December 2015 |
| A109981 | 2016 | Saracen Gold Mines Pty Ltd | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2015 to 2 July 2016, E31/00721, E31/00814, E31/ |
| A104864 | 2015 | Renaissance Minerals Ltd | Yilgangi | 1.5% | Yilgangi Project, Annual Report for the period 03/12/2013 to 02/12/2014, E31/597. [C193/2007] |
| A106912 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam (C065/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/586, E31/741, E31/105 |
| A106422 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Exploration Licence 31/586 (Old Plough Dam) Surrender Report for the Period 9 December 2003 to the 31 March 20 |
| A100680 | 2014 | Renaissance Minerals Ltd | Yilgangi | 1.5% | E31/597 Annual Report 3rd December 2012 to 2nd December 2013 |
| A100741 | 2014 | Cazador Resources Pty Ltd | Carosue Dam | <1% | E31/0889 Final Surrender Report for the period ended 17/10/2013 |
| A104219 | 2014 | Ellice T | Edjudina | <1% | Edjudina Project E31/877 Annual Report for the period 19 March 2013 – 18 March 2014 |
| A103510 | 2014 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 1 July 2013 to 30 June 2014, C65/2001, E31/586, E31/741, M31/156, M31/2 |
| A98365 | 2013 | Ellice T | Edjudina | <1% | Edjudina Project E31/877 Annual Report for the period 19 March 2012 to 19 march 2013 |
| A97219 | 2013 | Renaissance Minerals Ltd | Yilgangi | 1.4% | Yilgangi Project, Annual Report for the period 04/12/2011 to 03/12/2012, E31/597& 660; P31/1802-1803 & P31/194 |
| A99470 | 2013 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2012 to 30 June 2013, C65/2001, E31/586, E31/741, M |
| A92715 | 2012 | Newcrest Mining Ltd | Yilgangi | 1.4% | YILGANGI JV Combined Reporting Group C193/2007, E31/597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 An |
| A93996 | 2012 | Ellice T | Edjudina | <1% | Edjudina, Annual Report 2012 for, E31/877, for the period 19 March 2011 – 19 March 2012 |
| A95050 | 2012 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/ |
| A95128 | 2012 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2011 to 30 June 2012, C65/2001, E31/586, 741, M31/1 |
| A89343 | 2011 | Newcrest Mining Ltd | Yilgangi | 1.4% | YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 Annual Re |
| A90060 | 2011 | Ellice T | Edjudina | <1% | Edjudina Project, Annual Report for the period 19th March 2010 to 19th March 2011, E31/877. |
| A91960 | 2011 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31 |
| A91511 | 2011 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project C065/2001 Annual Report 01 July 2010 to 30 June 2011, E31/586, 741, M31/156, 208, 209, |
| A85937 | 2010 | Newcrest Operations Ltd | Yilgangi JV | 1.4% | YILGANGI JV Combined Reporting Group C193/2007, E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 AN |
| A81448 | 2009 | Saracen Gold Mines Pty Ltd | Edjudina | <1% | EXPLORATION LICENCE E31/585 FINAL REPORT – 19 OCTOBER 2004 TO 05 DECEMBER 2008 |
| A77037 | 2008 | Newcrest Mining Ltd | Yilgangi JV | 1.5% | Yilgangi JV E31/597 and E31/660 Annual Report to DOIR for the period ending 3 December 2007 Eastern Goldfields |
| A79782 | 2008 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3 |
| A81065 | 2008 | Newcrest Operations Ltd | YILGANGI JV | 1.4% | YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 FOR THE P |
| A77736 | 2008 | Saracen Gold Mines Pty Ltd | Edjudina | <1% | E31/585 Annual Report 19 October 2006 to 18 October 2007 |
| A75140 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | E31/586, Old Plough Dam Project, Partial Surrender Report 9 December 2003 to 8 December 2006. (C65/2001) |
| A75142 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Partial Surrender Report, 16 December 2003 to 15 December 2006.(C65/2001) |
| A76073 | 2007 | Newcrest Operations Ltd | Yilgangi JV | 1.5% | Yilgangi Joint Venture E31/597 For the period ending 10 September, 2007 Report No. K400/5 |
| A76674 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1 |
| A74156 | 2006 | Newcrest Operations Ltd | Yilgangi JV | 1.5% | Yilgangi JV E31/597, Annual Report for the Period Ending 3 December 2006, (Newcrest Report No. K400/3, Edjudin |
| A73244 | 2006 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21 |
| A69836 | 2005 | Newcrest Operations Ltd | Yilgangi JV | 1.5% | Annual report for the period 03/12/03 - 02/12/04 Yilgangi Joint Venture Project, Quondong Prospect, E31/597, E |
| A70985 | 2005 | St Barbara Mines Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10 |
| A71437 | 2005 | Newcrest Operations Ltd | Yilgangi JV | 1.5% | Yilgangi JV E31/597, Annual report for the period ending 3 December 2005, Eastern Goldfields WA, (Report no. K |
| A68319 | 2004 | Jindalee Resources Ltd | Yilgangi | 1.5% | Annual report for the year period ending 2nd December 2003 Yilgangi Project E31/597 |
| A68975 | 2004 | Sons Of Gwalia Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E |
| A64651 | 2002 | Gutnick Resources Nl | Edjudina | 1.4% | Exploration Licence: E31/103 'Edjudina' Surrender Report For The Period 7 April 1991 To 15 June 2000. |
| A59713 | 2000 | Gutnick Resources Nl | Edjudina | 3% | Mining Licences, M31/125, 127-131, Edjudina, Surrender Report for the period 26 July 1994 to 29 October 1999 |
| A58406 | 1999 | Cove Mining Nl | Lake Rebecca (East) | 5.9% | Lake Rebecca (East) Project, Partial Surrender Report E31/133 for the period 09/08/1992 to 28/01/1999, E31/133 |
| A58957 | 1999 | Gutnick Resources Nl | Edjudina | 1.1% | Edjudina Project, , E31/96, E31/103, M31/125, M31/127-132, M31/135 - 136, Annual Report 07/04/1998 - 06/04/199 |
| A53937 | 1998 | Cove Mining Nl | Lake Rebecca | 2.9% | Lake Rebecca Project E31/133 and E31/134 Edjudina 1:250,000 SH51-6 Western Australia Relinquishment Report for |
| A55740 | 1998 | Mt Kersey Mining Nl | Edjudina | 1.1% | Edjudina Project, E31/96, E31/103, M31/125, M31/127 - 132 M31/135 - 136, Annual Report 07/04/1997 - 06/04/199 |
| A56575 | 1998 | Cove Mining Nl | Lake Rebecca | 5.9% | E31/133 Lake Rebecca Project Edjudina 1:250,000 SH51-6 Western Australia Annual Report for the period 1 Septem |
| A52733 | 1997 | Cove Mining Nl | Lake Rebecca | 2.9% | Lake Rebecca project, Annual Report for the period ending 31st August 1997, E31/133 & 134. |
| A48005 | 1996 | Mt Kersey Mining Nl | Edjudina | 1.1% | Edjudina Project, E31/96, E31/103, M31/125, M31/127 - 132, M31/135 - 136, Annual Report 07/04/1995 - 06/04/199 |
| A48754 | 1996 | Cove Mining Nl | Lake Rebecca | 5.9% | Lake Rebecca Project E31/133 Edjudina 1:250,000 SH51-6 Western Australia Annual Report for period ending 9 Au |
| A44745 | 1995 | Mt Kersey Mining Nl | Edjudina | 1.1% | Edjudina Project E31/96, E31/103, M31/125, M31/127 - 132, M37/135 - 136, Annual Report 07/04/1994 - 06/04/1995 |
| A41419 | 1994 | Mt Kersey Mining Nl | Edjudina | 1.4% | Edjudina Project E31/103, Annual Report 07/04/1993 - 06/04/1994 |
| A40061 | 1993 | Mavia Pty Ltd | Lake Rebecca | 2.9% | Lake Rebecca Project, Annual Report for the period 1st August 1992 to 1st August 1993, E31/133 & 134. |
| A35589 | 1992 | Mt Kersey Mining Nl | Edjudina | 1.4% | Edjudina Project E31/103, Annual Report 07/04/1991 - 06/04/1991 |
| A1993 | 1970 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca [JV] Project, Final Surrender Report for the period ending 01/11/1970,TR70/3811; MC28/1448-1452 & |
| A1143 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st March 1968, TR70/3811H |
| A1144 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Annual Report for the period 18th July 1967 to 30th June 1968, TR70/3811H. |
| A1141 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st October 1967, TR70/381 |
| A1142 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Report on Investigations for the period 18th July 1967 to 31st Dec |
| A43358 | 1753 | Mavia Pty Ltd | Lake Rebecca | 5.9% | Annual Report on EL31/133 Lake Rebecca Edjudina District Western Australia |
| A47973 | 1753 | Mr Molloy Lj | Lake Rebecca | 5.9% | Lake Rebecca Project, Annual Report EL31/133 August 94 to August 95 |
| A81545 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | E31/552 OLD PLOUGH DAM PROJECT FINAL REPORT, 16 DECEMBER 2003 TO 05 DECEMBER 2008 |
| A84243 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT, ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C065/2001, E31/152, E31/388, E31/390, E31/ |
| A87936 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT (C065/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E31/586, E31/620, E31/741, E3 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A51332 | 1753 | Mt Kersey Mining Nl | Edjudina | 1.1% | Edjudina (JV) Project, E31/96, E31/103, M31/125, M31/127 - 132, M31/135 - 136. Annual Report 07/04/1996 - 06 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 31/1366 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 31/1366? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.