E 31/1390
Register summary
- Holder
- Solstice Minerals Limited
- Local government
- Shire of Menzies
- Application received
- 2 Apr 2024
- Commenced
- 11 May 2026
- Expiry
- 10 May 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A154672 | 2026 | Solstice Minerals Limited | Horse Rock Bore | <1% | Annual Report for Combined Reporting Group C173/2021 Horse Rock Bore for the period ending 31/03/2026 |
| A149037 | 2025 | Solstice Minerals Limited | Horse Rock Bore | <1% | Annual Report for Horse Rock Bore C173/2021 for the period ending 31/3/2025 |
| A148905 | 2025 | Solstice Minerals Limited | Horse Rock Bore (E31/1121) | <1% | Partial Surrender Report for E31/1121 Horse Rock Bore for the period ending 14/04/2025. |
| A139461 | 2024 | Nexus Minerals Limited | Wallbrook | 13% | Wallbrook Project E31/1160 Partial Surrender Report for the period ending 22/02/2024 |
| A143429 | 2024 | Solstice Minerals Limited | Horse Rock Bore | <1% | Annual Report for Horse Rock Bore C173/2021 for the period ending 31/03/2024 |
103 more reports
| A143825 | 2024 | Nexus Minerals Limited | Wallbrook Project | <1% | Wallbrook Project E31/1118 Partial Surrender Report for the period 31 May 2018 to 30 May 2024 |
| A135759 | 2023 | Solstice Minerals Limited | Horse Rock Bore | <1% | Annual Technical Report for Horse Rock Bore C173/2021 for the period ending 31/03/2023 |
| A135664 | 2023 | Solstice Minerals Limited | Hobbes | <1% | E31/1117 Partial Surrender Report Hobbes for the period ending 26/04/2023. |
| A131235 | 2022 | Solstice Minerals Ltd | Horse Rock Bore | <1% | Annual Technical Report for the Horse Rock Bore C173/2021 for the period ending 31/03/2022 |
| A131803 | 2022 | Nexus Minerals Limited | Wallbrook | <1% | Tenement E31/1107 Partial Surrender Report Wallbrook Project for the period ending 23/06/2022. |
| A123409 | 2020 | Nexus Minerals Limited | Wallbrook | 2.1% | Annual Report for Wallbrook Project C73/2018 for the period ending 24/02/2020 |
| A123855 | 2020 | Global Fortune Holdings Investments Pty Ltd | Horse Rock Bore | <1% | Annual Exploration Report E 31/1121 Horse Rock Bore Project for the period ending 14/4/2020 |
| A124067 | 2020 | Orecorp Holdings Pty Ltd | Hobbes | <1% | Annual Report for Licence E31/1117 Hobbes Project for the Period 27 April 2019 to 26 April 2020 |
| A120281 | 2019 | Orecorp Limited | Hobbes | <1% | Hobbes E31/1117 Annual Report for the period 27/04/2018 to 26/04/2019 |
| A119015 | 2019 | Saracen Gold Mines Pty Limited | Edjudina | <1% | Edjudina Project (C6/2016) Annual Report for the Period 1 January to 31 December 2018 |
| A119999 | 2019 | Nexus Minerals Limited | Wallbrook | 2.1% | Annual Report for Wallbrook Project – Combined Reporting Group C73/2018 For the Period 25 February 2018 to 24 |
| A115980 | 2018 | Saracen Gold Mines Pty Limited | Edjudina | 6.9% | Edjudina Project (C6/2016) Annual Report for the Period 1 January to 31 December 2017, M31/00003, M31/00004, M |
| A117251 | 2018 | Crosspick Resources Pty Ltd | Yilgangie | <1% | Annual Mineral Exploration Report E31/1117 Yilgangie Gold Project for the period 27 April 2017 to 26 April 201 |
| A117873 | 2018 | Newmont Exploration Pty Ltd | Mulgabbie North | <1% | Combined Annual Report for C23/2018 (Mulgabbie North Project) for the period 5th July 2017 to 4th July 2018, E |
| A112109 | 2017 | Saracen Gold Mines Pty Ltd | Edjudina | 6.7% | Annual Report For the Period 1 January to 31 December 2016, Edjudina Project (C6/2016), E31/00793, M31/00003, |
| A114606 | 2017 | Newmont Exploration Pty Ltd | Mulgabbie North | <1% | Mulgabbie North Project E31/01107 for the period 5th July 2016 to 4th July 2017 |
| A114686 | 2017 | Saracen Gold Mines Pty Limited | Edjudina | 16% | Exploration Licence 31/793 Edjudina Final Surrender Report for the Period 11 September 2008 to the 5 July 2017 |
| A108031 | 2016 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 13% | Wallbrook Hill Project Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/793, M31/172, |
| A108372 | 2016 | Renaissance Minerals Ltd | Yilgangi | <1% | E31/597 Final Report 2015 Report Period: 3rd December 2014 to 1st December 2015 |
| A104527 | 2015 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 16% | Wallbrook Hill Project Partial Surrender Report E31/793 for the period 11/09/2008 to 10/09/2014 |
| A104864 | 2015 | Renaissance Minerals Ltd | Yilgangi | <1% | Yilgangi Project, Annual Report for the period 03/12/2013 to 02/12/2014, E31/597. [C193/2007] |
| A106912 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam (C065/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/586, E31/741, E31/105 |
| A105465 | 2015 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 10% | Wallbrook Hill C57/2008 Annual Report for the period 01/01/2014 - 31/12/2014, E31/793, E31/946, M31/172, M31/ |
| A106422 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Exploration Licence 31/586 (Old Plough Dam) Surrender Report for the Period 9 December 2003 to the 31 March 20 |
| A103510 | 2014 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 1 July 2013 to 30 June 2014, C65/2001, E31/586, E31/741, M31/156, M31/2 |
| A100680 | 2014 | Renaissance Minerals Ltd | Yilgangi | <1% | E31/597 Annual Report 3rd December 2012 to 2nd December 2013 |
| A101802 | 2014 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 10% | Wallbrook Hill Project, Annual Report for the period 01/01/2013 to 31st December 2013, E31/793, 946; M31/172, |
| A97182 | 2013 | Legacy Iron Ore Ltd | Kingsley | 3.8% | Final Surrender Report, Kingsley Project (Deenya Hill) E31/717, For the Period 7th February 2008 to 6th Februa |
| A97219 | 2013 | Renaissance Minerals Ltd | Yilgangi | <1% | Yilgangi Project, Annual Report for the period 04/12/2011 to 03/12/2012, E31/597& 660; P31/1802-1803 & P31/194 |
| A97489 | 2013 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 10% | Wallbrook Hill Project Annual Report 1 January 2012 to 31 December 2012, CR Group: C57/2008, Tenements: E31/7 |
| A97749 | 2013 | Legacy Iron Ore Ltd | Wallbrook Swamp | <1% | Annual Mineral Exploration Report South Laverton Area Wallbrook Swamp Project E31/862 For the Period 16th Marc |
| A99470 | 2013 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2012 to 30 June 2013, C65/2001, E31/586, E31/741, M |
| A92715 | 2012 | Newcrest Mining Ltd | Yilgangi | <1% | YILGANGI JV Combined Reporting Group C193/2007, E31/597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 An |
| A93615 | 2012 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 10% | Wallbrook Hill Project C57/2008 annual report for the period 1 January 2011 to 31 December 2011, E31/793, 946, |
| A93738 | 2012 | Legacy Iron Ore Ltd | Kingsley | 3.8% | Annual Mineral Exploration Report – Kingsley Project E31/717, Report Period: 7th February 2011 – 6th February |
| A93994 | 2012 | Legacy Iron Ore Ltd | Wallbrook Swamp | <1% | Annual Mineral Exploration Report – Wallbrook Swamp Project E31/862, 16th March 2011 – 15th March 2012 |
| A95128 | 2012 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2011 to 30 June 2012, C65/2001, E31/586, 741, M31/1 |
| A89343 | 2011 | Newcrest Mining Ltd | Yilgangi | <1% | YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 Annual Re |
| A89963 | 2011 | Legacy Iron Ore Ltd | Wallbrook | 3.8% | Annual Mineral Exploration Report, Wallbrook Project, E 31/717, For the Period 7th February 2010 to 6th Februa |
| A89980 | 2011 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 13% | WALLBROOK HILL PROJECT, ANNUAL REPORT, 01 JANUARY 2010 TO 31 DECEMBER 2010, C057/2008, TENEMENTS: E31/793, M31 |
| A90151 | 2011 | Legacy Iron Ore Ltd | Wallbrook Swamp | <1% | Wallbrook Swamp Project, Annual Report for the period 16th March 2010 to 15th March 2011, E31/862. |
| A91511 | 2011 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project C065/2001 Annual Report 01 July 2010 to 30 June 2011, E31/586, 741, M31/156, 208, 209, |
| A86310 | 2010 | Legacy Iron Ore Ltd | Wallbrook | 3.8% | Annual Mineral Exploration Report Wallbrook Project E 31/717 For the Period 7th February 2009 to 6th February |
| A85937 | 2010 | Newcrest Operations Ltd | Yilgangi JV | <1% | YILGANGI JV Combined Reporting Group C193/2007, E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 AN |
| A86546 | 2010 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 12% | Wallbrook Hill Project Annual Report 1 January 2009 to 31 December 2009, C57/2008, E31/757, E31/793, M31/172, |
| A80799 | 2009 | Jackson Minerals Ltd | Wallbrook | 3.8% | E31/717 Partial Surrender Report, 7 February 2008 – 21 November 2008 |
| A81798 | 2009 | Legacy Iron Ore Ltd | Wallbrook | 3.8% | Wallbrook Project E31/717 Annual Report, 7 February 2008 – 6 February 2009 |
| A77698 | 2008 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 10% | Wallbrook Hill Project Annual Report 01 January 2007 to 31 Decemer 2007, C305/1992, E31/89, E31/117, E31/477, |
| A77037 | 2008 | Newcrest Mining Ltd | Yilgangi JV | <1% | Yilgangi JV E31/597 and E31/660 Annual Report to DOIR for the period ending 3 December 2007 Eastern Goldfields |
| A79782 | 2008 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3 |
| A81065 | 2008 | Newcrest Operations Ltd | YILGANGI JV | <1% | YILGANGI JV Combined Reporting Group C193 E31597, E31/660, P31/1802, P31/1803, P31/1949 and P31/1950 FOR THE P |
| A76073 | 2007 | Newcrest Operations Ltd | Yilgangi JV | <1% | Yilgangi Joint Venture E31/597 For the period ending 10 September, 2007 Report No. K400/5 |
| A76674 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1 |
| A75140 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | E31/586, Old Plough Dam Project, Partial Surrender Report 9 December 2003 to 8 December 2006. (C65/2001) |
| A77370 | 2007 | Saracen Gold Mines Pty Ltd | Wallbrook | 4.4% | WALLBROOK PROJECT, ANNUAL REPORT 30 SEPTEMBER 2006 TO 29 SEPTEMBER 2007,C031/2005 |
| A72119 | 2006 | Jackson Gold Ltd | Wallbrook Hill | 2.8% | E31/89,117,174,477,P31/1406,1407, Wallbrook Project 2005 Annual Report, Period 1 January 2005 to 31 December 2 |
| A73244 | 2006 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21 |
| A73922 | 2006 | Jackson Gold Ltd | Wallbrook | 2.5% | Wallbrook Project 2006 Annual Report, Reporting Period: 1st January 2006 to 31st December 2006, Tenements: E3 |
| A73732 | 2006 | Jackson Gold Ltd | Wallbrook | 4.4% | Wallbrook Project, Annual Report, 1st October 2005 to 30th September 2006, (P31/1632-1641,1670-1673, Combined |
| A74156 | 2006 | Newcrest Operations Ltd | Yilgangi JV | <1% | Yilgangi JV E31/597, Annual Report for the Period Ending 3 December 2006, (Newcrest Report No. K400/3, Edjudin |
| A69836 | 2005 | Newcrest Operations Ltd | Yilgangi JV | <1% | Annual report for the period 03/12/03 - 02/12/04 Yilgangi Joint Venture Project, Quondong Prospect, E31/597, E |
| A70136 | 2005 | Jackson Gold Ltd | Wallbrook Hill | 2.8% | Annual report for the period 01/01/04 - 31/12/04 Wallbrook Project, C305/1992, E31/89, E31/117, E31/174, E31/4 |
| A71437 | 2005 | Newcrest Operations Ltd | Yilgangi JV | <1% | Yilgangi JV E31/597, Annual report for the period ending 3 December 2005, Eastern Goldfields WA, (Report no. K |
| A70513 | 2005 | Jackson Gold Ltd | Wallbrook | 26% | Annual report for the period 06/01/04 - 05/01/05 Wallbrook Project, C31/2005, P31/1670-1673, Edjudina |
| A70985 | 2005 | St Barbara Mines Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10 |
| A71528 | 2005 | Jackson Gold Ltd | Wallbrook | 4.4% | Wallbrook Project 2005 Annual report. 1st December 2004 to 30th September 2005 (C31/2005, Edjudina). |
| A68499 | 2004 | Jackson Gold Ltd | Wallbrook | 2.8% | Annual report for the period 01/01/2003-31/12/2003 Wallbrook Project (C305/1992), E31/117, E31/174, E31/89, P3 |
| A68319 | 2004 | Jindalee Resources Ltd | Yilgangi | <1% | Annual report for the year period ending 2nd December 2003 Yilgangi Project E31/597 |
| A68975 | 2004 | Sons Of Gwalia Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E |
| A66214 | 2003 | Jackson Gold Ltd | Wallbrook Hill | 2.8% | Wallbrook Project, 2002 Annual Report, Reporting period 1st January 2002 to 31st December 2002 C305/1992, E31/ |
| A64173 | 2002 | Croesus Mining Nl | Wallbrook | 2.9% | Annual Report 1st January 2001 to 31st December 2001 Wallbrook Joint Venture Project E31/117, C305/1992. |
| A62061 | 2001 | Croesus Mining Nl | Edjudina | <1% | Annual Report Edjudina Joint Venture for the period 1 January 2000 to 31 December 2000 digital format combined |
| A60156 | 2000 | Croesus Mining Nl | Edjudina | <1% | Annual Report, Edjudina Joint Venture, For the Period 1 January 1999 TO 31 December 1999, Combined reporting N |
| A60050 | 2000 | Croesus Mining Nl | Wallbrook Hill | 2.9% | Annual Report, Wallbrook Joint Venture Project, 01/01/1999 to 31/12/1999, Combined Reporting No. C305/1992, Te |
| A57097 | 1999 | Talon Resources Nl | Wallbrook Hill | 14% | Wallbrook Hill Project - Annual Report Year End:31/01/99 E31/89, 117, 1406, 1407 |
| A55163 | 1998 | Heron Resources Ltd | Edjudina | 2.4% | Edjudina Project Exploration Licences 31/237 North Coolgardie Mineral Field Annual report 26/02/97-25/02/98 |
| A53675 | 1998 | Goldfields Exploration Pty Ltd | Edjudina | <1% | 1997 Surrender Report for the period 31/05/93 to 13/11/97 Edjudina Project E31/149 Wallbrook Swamp. |
| A54111 | 1998 | Talon Resources Nl | Wallbrook Hill | 14% | Wallbrook Hill Project, Annual Report for the year ending 31/01/1998, E31/89 & 117; P31/1406 & 1407. |
| A51076 | 1997 | Talon Resources Nl | Wallbrook Hill | 14% | Wallbrook Hill Project Annual report for the year ending 31 January 1997 E31/89 E31/117 P31/1406 and P31/1407. |
| A51561 | 1997 | Heron Resources Ltd | Wallbrook Hill | 2.4% | Wallbrook Hill Project, Exploration Licence E31/237 North Coolgardie Mineral Field Annual report 26 February 1 |
| A51753 | 1997 | Goldfields Exploration Pty Ltd | Edjudina | <1% | Edjudina Project, Annual Report for the period 31/05/1996 to 30/05/1997, E31/147,148, 149 & 225. |
| A48618 | 1996 | Goldfields Exploration Pty Ltd | Edjudina | <1% | Edjudina Project, Annual Report for period 31/05/1995 to 30/05/1996, E31/147-149, E31/225. |
| A48703 | 1996 | Talon Resources Nl | Wallbrook Hill | 14% | Annual report on the Wallbrook Hill Project for the period 01/02/95 to 31/01/96 Tenements E31/89 E31/117 P31/1 |
| A45122 | 1995 | Goldfields Ltd | Edjudina/ Wallbrook Swamp | <1% | Edjudina/ Wallbrook Swamp Project, Annual Report E31/149 for the period 31/05/1994 ro 30/05/1995 |
| A43668 | 1995 | Talon Resources Nl | Wallbrook Hill | 14% | Annual report on the Wallbrook Hill project for the year ending 31/1/1995 |
| A40241 | 1994 | Talon Gold Nl | Wallbrook Hill | 14% | Annual report for the period 01/02/93-31/01/94 Wallbrook Hill Project E31/89 E31/117 P31/1406-1407 |
| A41790 | 1994 | Rgc Exploration Pty Ltd | Edjudina - Wallbrook Swamp | <1% | Edjudina - Wallbrook Swamp Project, Annual Report for the period 31/05/1993 to 30/05/1994, E31/149. |
| A40503 | 1993 | Poseidon Gold Ltd | Wallbrook Hill | 6.4% | Partial Surrender Report, Wallbrook Hill (JV) Project, E31/89, for the period to 7 November, 1993. |
| A37515 | 1992 | Poseidon Gold Ltd | Wallbrook Hill | 14% | Annual Report 1991/92 Wallbrook Hill JV E31/89, E31/117, P31/1406, and P31/1407 . |
| A34858 | 1991 | Ivernia West Plc | Wallbrook Hill | 14% | Non-statutory Report : Wallbrook Hill Project Exploration Summary. E31/89,117 P31/1406-1407, 08/91. |
| A31296 | 1989 | Southern Ventures Nl | Edjudina | 4.4% | Edjudina (JV) Project, Final Surrender Report, September1989,E31/30,34;P31/473-478,480,495-515,516-518,544-550 |
| A14597 | 1984 | Paget Gold Mining Co Nl | Edjudina | <1% | Edjudina Project, Non-statutory Report: Chairman's Address to the Shareholders, 23/10/1984. |
| A1993 | 1970 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca [JV] Project, Final Surrender Report for the period ending 01/11/1970,TR70/3811; MC28/1448-1452 & |
| A1144 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Annual Report for the period 18th July 1967 to 30th June 1968, TR70/3811H. |
| A1143 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st March 1968, TR70/3811H |
| A1141 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st October 1967, TR70/381 |
| A1142 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Report on Investigations for the period 18th July 1967 to 31st Dec |
| A61689 | 1753 | Croesus Mining Nl | Wallbrook JV | 2.9% | Annual Report 1st January 2000 to 31st December 2000 Wallbrook Joint Venture Project tenements E31/117, E31/17 |
| A82001 | 1753 | Saracen Gold Mines Pty Ltd | WALLBROOK HILL | 9.6% | WALLBROOK HILL PROJECT ANNUAL REPORT 01 JANUARY 2008 TO 31 DECEMBER 2008, CR GROUP: C57/2008, E31/89, E31/117, |
| A84243 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT, ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C065/2001, E31/152, E31/388, E31/390, E31/ |
| A87936 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT (C065/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E31/586, E31/620, E31/741, E3 |
| A40550 | 1753 | Talon Gold Nl | Wallbrook | 14% | Annual report for the period 01/02/93-31/01/94 Wallbrook Project E31/89 E31/117 P31/1406 P31/1407 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 10 May 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 31/1390 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 31/1390? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.