NextMapsWA TenementsE 36/1142

E 36/1142

PendingExploration LicenceShire of LeonoraLawlers District
Area
1,860ha
Applied
June 2026
3 months ago
WAMEX reports
81
WA median is 53
Report drilling
58
of 81 reports
Leonora Explore on the live map

Register summary

Holder
Northern Goldfields Resources Pty Ltd
Local government
Shire of Leonora
Application received
2 June 2026

Exploration history on this ground

81 historical WAMEX exploration reports intersect E 36/1142: 43 report geochemistry or sampling, 68 include a digital data package.
When this ground was worked · 78 of 81 reports dated
31970s
21980s
51990s
212000s
402010s
72020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A144750 2024 Darlot Mining Company Pty Ltd Yandal South <1% Final Surrender Report Yandal South C5/2017 for the period ending 31/07/2024
A134215 2023 Auroch Minerals Ltd Valdez 100% Final Surrender Report - Valdez Project E36/936 for the period ending 29/10/2022.
A137394 2023 Future Battery Minerals Limited Valdez <1% Final Surrender Report for P36/1911, Valdez Project, Eastern Goldfields, Western Australia
A128242 2021 Corona Mining Pty Ltd Otto Bore <1% Annual Report E36/995 Otto Bore Project for the period ending 21/07/2021
A122957 2020 Saracen Metals Pty Limited Warrida Well <1% Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2019 to 9 January 2020
76 more reports
A122819 2020 Saracen Metals Pty Limited Wildara 6% Wildara Project (C16/2003) Annual Report for the Period 1 January to 31 December 2019
A122284 2020 Auroch Minerals Ltd Valdez 100% E36/936 Annual Technical Report, Valdez Project, 1 October 2018 to 1 October 2019
A119202 2019 Saracen Metals Pty Limited; Black Mountain Gold Limited Wildara 6% Wildara Project (C16/2003) Annual Report for the Period 1 January to 31 December 2018
A118874 2019 Saracen Metals Pty Limited Warrida Well <1% Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2018 to 9 January 2019, E36/00624, E3
A116019 2018 Saracen Metals Pty Limited Wildara 8.5% Wildara Project (C16/2003) – Volume I Annual Report for the Period 1 January to 31 December 2017, M36/00473, M
A116070 2018 Saracen Metals Pty Limited Warrida Well <1% Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2017 to 9 January 2018, E36/00624, E3
A116110 2018 Altia Resources Pty Ltd Wildara 97% Final Surrender Report, Wildara Project M36/00475 (C37/2007) For the Period 22 December 2000 to 21 December 20
A118162 2018 Iron Wheal Pty Ltd Otto Bore <1% Annual Report for E36/0077 0tto Bore Project For the Period 12 August 2017 to 11 August 2018
A118278 2018 Saracen Metals Pty Limited; Agnew Gold Mining Company Pty Li Warrida Well <1% Exploration Licence 36/628 Warrida Well Partial Surrender Report for the Period 30 January 2009 to 1 November
A111933 2017 Altia Resources Pty Ltd Wildara 8.4% Wildara Project C37/2007 Final Surrender Report E 36/00235, M 36/00548, M 37/00877 for the period 26 July 1993
A112556 2017 Saracen Metals Pty Limited Wildara 8.6% Wildara Project (C16/2003) – Volume I Annual Report for the Period 1 January to 31 December 2016, M 36/00473,
A115122 2017 Iron Wheal Pty Ltd Otto Bore <1% Annual Report for E 36/00770 (C249/2011) Otto Bore Project for the period 12 August 2016 to 11 August 2017
A112180 2017 Altia Resources Pty Ltd Wildara 97% Annual Technical Report, Combined Reporting Group C37/2007, Wildara Project M36/475 for the period 01/01/2016
A112523 2017 Agnew Gold Mining Company Pty Ltd Warrida Well <1% Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2016 to 9 January 2017, E36/00624, E3
A107769 2016 Saracen Metals Pty Limited Wildara 6.4% Wildara Project (C16/2003) Annual Report for the Period 1 January 2015 to 31 December 2015, vol 1- M36/473, M3
A108348 2016 Saracen Metals Pty Limited Warrida Well <1% Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2015 to 9 January 2016
A108331 2016 Minotaur Exploration Ltd Deep South, Valdez, Centura 7.7% Combined Annual Report, C37/2007 Report Period: 1st January 2015 to 31st December 2015
A108788 2016 Altia Resources Pty Ltd Valdez 97% Final Drilling Report, Co-funded Drilling, Application No DAG2015/00595900 (round 11)
A110236 2016 Iron Wheal Pty Ltd Otto Bore <1% Annual Report E36/770 (C249/2011) "Otto Bore" for the period 12 August 2015 to 11 August 2016
A104874 2015 Minotaur Exploration Ltd Wildara - Yillaree 7.7% Wildara - Yillaree, ANNUAL TECHNICAL REPORT COMBINED REPORTING GROUP C37_2007 FOR THE PERIOD 1ST JANUARY 2014
A105598 2015 Saracen Metals Pty Limited Warrida Well <1% Warrida Well Regional Project Annual Report 10/01/2014 to 09/01/2015. [C204/1998 E36/435.....P36/1653]
A106174 2015 Saracen Metals Pty Limited Wildara 6.4% Wildara Project C16/2003 Annual Report for the period 01/01/2014 to 31/12/2015, M36/35......P36/1651
A106421 2015 Saracen Gold Mines Pty Ltd Warrida Well <1% Warrida Well Exploration Licences 36/0624 and 36/0628 Partial Surrender Report for the Period 30 January 2009
A107225 2015 Iron Wheal Pty Ltd Otto Bore <1% Otto Bore Project, Combined Annual Technical Report C249/2011, E36/770, For the period 12th August 2014 to 11t
A100562 2014 Norilsk Nickel Wildara Pty Ltd Wildara - Lehmann’s Well - Spider Well 6.4% Annual Report To the Department of Mines and Petroleum For the period 1 January 2013 to 31 December 2013 Wilda
A101231 2014 Minotaur Exploration Ltd Wildara - Yillaree - Pond Well - Aztec - 7.7% C37_2007 Wildara-Yillaree, Combined Annual Technical Report, year ending 31st December 2013, Wildara Explorati
A100674 2014 Norilsk Nickel Wildara Pty Ltd Warrida Well <1% Annual Report To the Department of Mines and Petroleum For the period 10th January 2013 to 9th January 2014 Wa
A103840 2014 Iron Wheal Pty Ltd Otto Bore <1% Otto Bore Project,Combined Annual Technical Report C249/2011,P36/1758, P36/1759, E36/770, For the period 12th
A96549 2013 Norilsk Nickel Australia Pty Ltd Wildara 6.4% Combined Mineral Exploration Report for the Wildara Project volumes 1,2 & 3 for the period 01/01/2012 to 31/12
A96858 2013 Norilsk Nickel Wildara Pty Ltd Warrida Well <1% Warrida Well Project, Annual Report for the period 10th January 2012 to 9th January 2013, M36/177; E36/434-435
A99844 2013 Iron Wheal Pty Ltd Otto Bore <1% Otto Bore Project,Combined Annual Technical Report C249/2011,P36/1758, P36/1759, E36/770, For the period 12th
A92889 2012 Norilsk Nickel Wildara Pty Ltd Wildara 8.5% Wildara Project, Annual Report for the period 1st January 2011 to 31st December 2011, M36/473-474, 476, 503-50
A96441 2012 Norilsk Nickel Wildara Pty Ltd Warrida Well <1% Final Report on Warrida Well E36/477 for the period 12 May 2006 to 12 December 2012
A97795 2012 Breakaway Resources Ltd Wildara - Yillaree 4.1% Wildara Combined C37/2007 Annual Report C37/2007 for the period 1 Jan 2012 - 31 Dec 2012, E36/235...... P36/16
A92967 2012 Norilsk Nickel Wildara Pty Ltd Warrida Well <1% Annual Report To the Department of Mines and Petroleum For the period 10th January 2011 to 9th January 2012 W
A93272 2012 Altia Resources Pty Ltd Wildara - Yillaree 4.1% Wildara - Yillaree Project, Annual Report for the period 1st January 2011 to 31st December 2011, E36/235, 245,
A95718 2012 Iron Wheal Pty Ltd Otto Bore <1% Otto Bore Project Combined Annual Technical Report C249/2011 P36/1758, P36/1759, E36/770 For the period 12th A
A89558 2011 Breakaway Resources Ltd Wildara 4.1% ANNUAL REPORT COMBINED REPORTING GROUP C37/2007 FOR THE PERIOD 1 JANUARY 2010 TO 31 DECEMBER 2010 WILDARA an
A89619 2011 Norilsk Nickel Wildara Nl Warrida Well Joint Venture <1% ANNUAL REPORT ON THE WARRIDA WELL JOINT VENTURE, FOR THE PERIOD 10 JANUARY 2010 TO 9 JANUARY 2011, Combined Re
A86380 2010 Breakaway Resources Ltd Wildara / Yillaree 4.1% ANNUAL REPORT COMBINED REPORTING GROUP C37/2007 FOR THE PERIOD 1 JANUARY 2009 TO 31 DECEMBER 2009 VOLUME 1: WI
A86443 2010 Norilsk Nickel Australia Ltd Warrida Well Joint Venture <1% ANNUAL REPORT ON THE WARRIDA WELL JOINT VENTURE FOR THE PERIOD 10 JANUARY 2009 TO 9 JANUARY 2010 EAST MURCHISO
A86000 2010 Norilsk Nickel Wildara - Lehmans Well - Spider Well - W 6.8% ANNUAL REPORT ON THE WILDARA PROJECT FOR THE PERIOD 1 JANUARY 2009 TO 31 DECEMBER 2009, EAST MURCHISON MINERAL
A81677 2009 Norilsk Nickel Australia Ltd WILDARA 5.9% ANNUAL REPORT ON THE WILDARA PROJECT FOR THE PERIOD 1 JANUARY 2008 TO 31 DECEMBER 2008, EAST MURCHISON MINERAL
A81723 2009 Breakaway Resources Ltd WILDARA 4% ANNUAL REPORT COMBINED REPORTING GROUP C37/2007 FOR THE PERIOD 1 JANUARY 2008 TO 31 DECEMBER 2008 VOLUME 1: WI
A84114 2009 Norilsk Nickel Warrida Well <1% PARTIAL SURRENDER REPORT ON THE E36/477 TENEMENT FOR THE PERIOD TO 15 MAY 2009, EAST MURCHISON MINERAL FIELD,
A81674 2009 Norilsk Nickel Australia Ltd WARRIDA WELL <1% ANNUAL REPORT ON THE WARRIDA WELL JOINT VENTURE FOR THE PERIOD 10 JANUARY 2008 TO 9 JANUARY 2009, EAST MURCHIS
A77862 2008 Norilsk Nickel Australia Ltd Wildara/ LEHMANS WELL/ SPIDER WELL/ WILS 5.9% ANNUAL REPORT ON THE WILDARA PROJECT FOR THE PERIOD 1 JANUARY 2007 TO 31 DECEMBER 2007 EAST MURCHISON MINERAL
A79205 2008 Norilsk Nickel Australia Ltd Warrida Well <1% ANNUAL REPORT ON THE E36/477 TENEMENt FOR THE PERIOD 12 MAY 2007 TO 11 MAY 2008 EAST MURCHISON MINERAL FIELD,
A80059 2008 Brilliant Gold Pty Ltd Weebo <1% 2008 Annual Mineral Exploration Report for the Period 8th October 2007 22nd October 2008
A77568 2008 Breakaway Resources Ltd Wildara 4% ANNUAL REPORT COMBINED REPORTING GROUP C37/2007 FOR THE PERIOD 1 JANUARY 2007 TO 31 DECEMBER 2007 VOLUME 1: WI
A74345 2007 Forrestania Gold Nl Wildara 3.2% Annual Report on the Wildara Project for the period 1 January 2006 to 31 December 2006 Combined Reporting Numb
A74384 2007 Breakaway Resources Ltd Wildara 7.3% Annual Report Combined Reporting Group C16/2003 for the peri od 1 January 2006 to 31 December 2006 Volume 1: W
A76382 2007 Brilliant Gold Pty Ltd Weebo <1% WEEBO PROJECT E36/559 Leinster-Weebo Area, W.A. 2007 Annual Mineral Exploration Report for the Period 8th Octo
A75658 2007 Lionore Australia Ltd Warrida Well <1% Warrida Well Project, Annual Report for the period 12th May 2006 to 11th May 2007, E36/477.
A71758 2006 Forrestania Gold Nl Wildara 3% Annual Report Combined Reporting Group C16/2003 for the peri od 1 January 2005 to 31 December 2005 Volume 1: W
A69714 2005 Lionore Australia (Wildara) Nl Christmas Bore 100% Annual report on the Christmas Bore Tenement, for the period 29 August 2003 to 28 August 2004, Wildara Project
A69919 2005 Forrestania Gold Nl Wildara 3.7% Annual Report Combined Reporting Group C16/2003 Volume 1: Wi ldara and Yillaree Joint Ventures 1 January 2004
A70548 2005 Lionore Australia (Wildara) Nl Wildara <1% Annual report on the Wildara tenement for the period 3 May 2004 to 2 May 2005 Wildara Project, E36/478, East M
A68164 2004 Forrestania Gold Nl Wildara/Yillaree 3.1% Wildara/Yillaree(JV) Project, Annual Report E36/235, 298, 358; M36/ 473-476, 502-504, 512, 516, 524, 526, 541-
A66001 2003 Forrestania Gold Nl Wildara 3.1% Annual Report on Exploration Activites undertaken during the period 1 January 2002 to 31 December 2002 on the
A64422 2002 Forrestania Gold Nl Wildara 3% 1 January 2001 to 31 December 2001 by Forrestania Gold NL on the Wildara Joint Venture Combined Reporting Grou
A61885 2001 Forrestania Gold Nl Wildara Joint Venture 3% Annual Report on Exploration Activities undertaken during the period 01/01/2000 to 31/12/2000 by Forrestania G
A60308 2000 Forrestania Gold Nl Wildara 3% Annual Report for the period 01/01/1999 to 31/12/1999, Wildara(JV) Project, E36/235,245,256,257,273,298,358,2
A57755 1999 Forrestania Gold Nl Wildara 3.1% Annual Report, Wildara (JV) Project, E36/235, 245, 257, 273, 298, 358, ; e37/237; P36/1338-1342 , 1351, 1357
A53952 1998 Forrestania Gold Nl Wildara 3% Annual report for the period 01/01/97-31/12/97. Wildara (JV) Project, e36/235, 245, 256, 257, 273, 298 & 358;
A48772 1996 Dalrymple Resources Nl Wildara 8.7% Annual report for tenement E36/235, Wildara Project, July 1995 to July 1996.
A45613 1995 Dalrymple Resources Nl Goanna <1% Annual Report for the period 01/07/1994 to 01/07/1995, Goanna Project, E36/256.
A43564 1995 Dominion Mining Ltd Dalrymple 8.7% Annual Report Dalrymple(JV) Project, E36/235 from 26 July 1993 to 31 December 1994
A9572 1980 Seltrust Mining Corp Pty Ltd Marsh Ni/Mount Clifford 11% Final Report on Marsh Ni Prospect.
A9574 1980 Seltrust Mining Corp Pty Ltd Marsh Ni/Mount Clifford 11% Final Report on Marsh Ni Option.
A7588 1978 Esso Exploration Aust Inc Otto Well 8.9% Otto Well Project, Annual Report for the period 31/12/1977, MC36/3889, 3892-3893, 3895, 3899-3905, 3911-3985,
A5717 1975 Occidental Minerals Corp Weebo Bore <1% Final [surrender] report, Weebo Bore, 1975, MC36/2659 ... 36/3805
A3590 1972 Carpentaria Exp Co Pty Ltd Boundary Well 40% Boundary Well Project, Non-statutory Report: Final Report, October 1972, MC36/3191, 4111-4122.
A89404 1753 Norilsk Nickel Australia Ltd WILDARA - LEHMANS WELL - SPIDER WELL 6.4% Annual Report: Combined Reporting Group C16/2003: Volume 1: Wildara Project; VOLUME 2: LEHMANS WELL JOINT VENT
A12472 1753 Seltrust Mining Corp Pty Ltd Marsh 11% Marsh Joint Venture Claim Block Annual Report for 1982.
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 36/1142 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 36/1142 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 36/1142? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.