E 38/2805
Register summary
- Holder
- Regis Resources Limited
- Local government
- Shire of Laverton
- Application received
- 21 Nov 2012
- Commenced
- 23 Dec 2013
- Expiry
- 22 Dec 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123481 | 2020 | Duketon Mining Limited; Regis Resources Limited | Elistoun | <1% | Final Surrender Report E38/2819, Elistoun, 4 March 2014 to 27 February 2020 |
| A124517 | 2020 | Regis Resources Limited | Camel Hump | <1% | Combined Surrender report for the Camel Hump group tenements for the period 3 July 2008 to 16 June 2020. E 38/ |
| A124561 | 2020 | Australian Potash Limited | Laverton Downs | <1% | Annual Technical Report - Laverton Downs Project C59/2016 for the period 1 June 2019 to 31 May 2020. E 38/0272 |
| A124221 | 2020 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report for the period ending 28/02/2020 |
| A124516 | 2020 | Regis Resources Limited | Somerset | 43% | Partial Surrender Report for Somerset - E38/2866 for the period 17 June 2014 to 16 June 2020 |
228 more reports
| A122809 | 2020 | Duketon Mining Limited; Regis Resources Limited | Duketon South | 38% | Group Annual Report Duketon South C129/2016 for the period ending 31/12/2019 |
| A123520 | 2020 | Stone Resources Australia | Brightstar North | <1% | C209/2006 COMBINED ANNUAL EXPLORATION REPORT, BRIGHTSTAR NORTH, 1 JANUARY 2019 TO 31 DECEMBER 2019 |
| A123332 | 2020 | Duketon Mining Limited; Regis Resources Limited | Swincers | 55% | Partial Surrender Report - E38/2805 Swincers for the period ending 19/12/2019 |
| A119355 | 2019 | Duketon Mining Limited | Duketon South | 38% | Annual Report - Duketon South C129/2016 for the period 1 January 2018 to 31 December 2018, E38/02805, E38/029 |
| A119561 | 2019 | Stone Resources Australia Limited | Brightstar North | <1% | C209/2006 Combined Annual Exploration Report for the period 1 January 2018 to 31 December 2018 |
| A120411 | 2019 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report for the period 1 March 2018 to 28 February 2019 |
| A120532 | 2019 | Australian Potash Limited | Laverton Downs | <1% | Annual Technical Report - Laverton Downs Project (C59/2016) for the period 1 June 2018 to 31 May 2019 E 38/027 |
| A121211 | 2019 | Regis Resources Limited | Duketon Central | <1% | Annual Report C95/2016 Duketon Central Project for the period 1 July 2018 to 30 June 2019 |
| A121507 | 2019 | Regis Resources Limited; Duketon Mining Limited | Duketon Central | <1% | Duketon Central - Combined Annual Report - C47/2016 for the period 1 August 2018 to 31 July 2019, E38/02976, E |
| A115819 | 2018 | Duketon Mining Limited | Duketon South | 38% | Duketon South C129/2016 E38/02805, E38/02983, E38/03098, E38/02866 Annual Report for the period 1 January 2017 |
| A116093 | 2018 | Australian Potash Limited | Laverton Downs | <1% | Annual Technical Report, Laverton Downs Project E 38/02724 For the Period 18 January 2017 to 17 January 2018 |
| A116697 | 2018 | Stone Resources Australia Limited | Brightstar North | <1% | Brightstar North C209/2006 Combined Annual Exploration Report for the period 19/05/2017 - 20/05/2018 |
| A116824 | 2018 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report For the Period 1 March 2017 to 28 February 2018 |
| A117523 | 2018 | Australian Potash Limited | Laverton Downs | <1% | Laverton Downs Project Annual Technical Report 2018, C59/2016, 01 June 2017 - 21 May 2018 |
| A117884 | 2018 | Regis Resources Limited | Duketon Central | <1% | Duketon Central C95/2016 Annual Report for the period 1 July 2017 to 30 June 2018 |
| A118049 | 2018 | Duketon Mining Limited | Duketon Central | <1% | Annual Report Duketon Central C47/2016 for the period 01/08/2017 - 31/07/2018 |
| A118081 | 2018 | Stone Resources Australia Limited | E38/3198 | <1% | Annual Report E38/03198 For the Period 11 July 2017 to 10 July 2018 |
| A112118 | 2017 | Duketon Mining Limited | Duketon South | 38% | Annual Report C129/2016 Duketon South Project for the period 1 January 2016 to 31 December 2016, E38/02805, E3 |
| A111883 | 2017 | Stone Resources Australia Limited | Brightstar North | <1% | Final Surrender Report for E38/2506 |
| A112011 | 2017 | Duketon Mining Limited | Duketon | 55% | Duketon Project E38/2805 Annual Report for the period 23/12/2015 to 22/12/2016 |
| A112446 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95/2016 Final Surrender Report for the period 01/01/2016 to 08/11/2016 |
| A112656 | 2017 | Duketon Mining Limited | Duketon | <1% | Duketon Project E38/2819 Annual Report For the Period 4 March 2016 to 3 March 2017 |
| A112788 | 2017 | Stone Resources Australia Limited | Brightstar North | <1% | Brightstar North C209/2006 Combined Annual Exploration Report for the period 01/01/2016 – 31/12/2016 |
| A113931 | 2017 | Focus Minerals (Laverton) Pty Limited | Central Laverton | <1% | Combined Annual Report C119/2014 Central Laverton Project for the period 1 March 2016 to 28 February 2017, E38 |
| A114509 | 2017 | Australian Potash Limited | Laverton Downs | <1% | Laverton Downs Project C59/2016, E38/03014, E38/02724 Annual Report for the period 1 June 2016 to 31 May 2017 |
| A114932 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95-2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A115072 | 2017 | Duketon Mining Limited | Duketon Central | <1% | Annual Report Duketon Central C47/2016 for the period 1 August 2016 to 31 July 2017, E38/02976, E38/03083, E38 |
| A115519 | 2017 | Gsm Mining Company Pty Ltd | Boondocks | <1% | Boondocks Project Annual Technical Report, E38/3132 for the period 02/12/2016-01/12/2017 |
| A108342 | 2016 | Goldphyre Resources Limited | Laverton Downs | <1% | ANNUAL REPORT LAVERTON DOWNS PROJECT EXPLORATION LICENCE 38/2724 For the period: 18/01/15 – 17/01/16 |
| A109301 | 2016 | Gme Resources Ltd | Laverton Downs | <1% | Final Surrender Report Laverton Downs E38/1876 Laverton Downs for the period 21/02/2007 to 20/04/2016 |
| A108163 | 2016 | Duketon Mining Limited | Duketon | 55% | ANNUAL REPORT For the Period 23 December 2014 to 22 December 2015 DUKETON PROJECT E38/2805 |
| A108719 | 2016 | Gme Resources Ltd | Laverton Downs | <1% | C125/2014 Laverton Downs Annual Report for the period 01/02/2015 to 31/01/2016, E38/01876, M38/01266 |
| A108862 | 2016 | Focus Minerals (Laverton) Pty Limited | Central Laverton | <1% | Combined Annual Report C119_2014 Central Laverton Project for the period 1 March 2015 to 28 February 2016 |
| A108839 | 2016 | Stone Resources Australia Ltd | Brightstar North | <1% | C209/2006 Combined Annual Exploration Report for period 01/01/2015 – 31/12/2015 |
| A108880 | 2016 | Duketon Mining Limited | Duketon | <1% | Duketon E38/2819 Annual Report for the period 04/03/2015 to 03/03/2016 |
| A109364 | 2016 | Duketon Mining Limited | Duketon | 43% | Duketon Project E38/2866 Annual Report for the period 17/06/2015 to 16/06/2016 |
| A109755 | 2016 | Goldphyre Resources Limited | Laverton Downs | <1% | COMBINED ANNUAL REPORT LAVERTON DOWNS PROJECT EXPLORATION LICENCES 38/2724 and 38/3014 C59/2016 FOR THE PERIOD |
| A109758 | 2016 | Regis Resources Limited | Duketon Central | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 DUKETON CENTRAL PROJECT C61/2003 |
| A104644 | 2015 | Duketon Mining Ltd | Duketon | 55% | Duketon Project E38/2805, Annual Report for the period 23/12/2013 to 22/12/2014 |
| A105103 | 2015 | Goldphyre Resources Limited | Laverton Downs | <1% | Annual Report Laverton Downs Project E38/2724 For the period: 18/01/14 – 17/01/15 |
| A105227 | 2015 | Stone Resources Australia Ltd | Brightstar North | <1% | Combined Annual Exploration Report for C209/2006 from 01/01/2014 to 31/12/2014, E38/1936.....P38/4115 |
| A105526 | 2015 | Gme Resources Ltd | Laverton Downs | <1% | Laverton Downs (C125/2014) E38/1876 & M38/1266 Annual Report for the period 1st February 2014 to 31st January |
| A105565 | 2015 | Duketon Mining Ltd | Duketon | <1% | Duketon Project E38/2819, Annual Report for the period 04/03/2014 to 03/03/2015 |
| A105606 | 2015 | Focus Minerals (Laverton) Pty Ltd | Mount Weld | <1% | Mt Weld Project - C148/2014, Western Australia, for the period 1 March 2014 to 28 February 2015, E38/1642, E38 |
| A106313 | 2015 | Duketon Mining Ltd | Duketon | 43% | Duketon Project E38/2866, Annual Report for the period 17/06/2014 to 16/16/2015 |
| A106314 | 2015 | Duketon Mining Ltd | Duketon West | 13% | Surrender Report E38/1535 Duketon West Project for the period 10/06/2008 – 09/06/2015 |
| A106601 | 2015 | Regis Resources Limited | Duketon Central | <1% | C61-2003 2015A Duketon Central Project Annual Report for the period 01/07/2014 - 30/06/2015 |
| A106764 | 2015 | Regis Resources Limited | Duketon | <1% | E38-1952 Final Surrender Report for the period 3 July 2008 to 30 March 2015 |
| A101263 | 2014 | Stone Resources Australia | Brightstar North | <1% | Combined Annual Exploration Report for Brightstar North Project C209/2006 from 01/01/2013 to 31/12/2013, E 38/ |
| A101733 | 2014 | Stone Resources Australia | Cork Tree Well | <1% | Cork Tree Well Project, E38/1618 Final Surrender Report for the period 9/11/2006 to 6/3/2014. |
| A102031 | 2014 | Focus Minerals Ltd | East Laverton | <1% | Combined Annual Report on Exploration for the period 01/02/2013 to 31/01/2014, East Laverton Project C317/2011 |
| A101108 | 2014 | Goldphyre Resources Limited | Laverton Downs | <1% | Laverton Downs Project, Annual Report for the period 18/01/2013 to 17/01/2014, E38/2724. |
| A102028 | 2014 | Gme Resources Ltd | Laverton Downs | <1% | Laverton Downs Project E38/1876 (C248/2008) Annual Report for the period 1st March 2013 to 28th February 2014 |
| A102600 | 2014 | Victory Mines Ltd | Laverton Downs | <1% | Annual Mineral Exploration Report Exploration Licence E38/2374 (Laverton Downs Project) For Period 30 June 201 |
| A102988 | 2014 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central Project, Annual Report for the period 01/07/2013 to 30/06/2014, E38/378.........E38/2857; M38/ |
| A104336 | 2014 | Duketon Mining Ltd | Duketon West | 4.1% | Duketon West Project. Annual Report, Combined Reporting No.: C99/2007, for the period 01/10/2013 – 30/09/2014 |
| A97984 | 2013 | Gme Resources Ltd | Laverton Downs | <1% | Laverton Downs Project, C248/2008, Annual Report 2013. Reporting Period: 1st March 2012 to 28th February 2013, |
| A96887 | 2013 | Regis Resources Ltd | Duketon Central | 50% | Surrender Report for the period 16 Feb 2006 to 15 Feb 2013 E38/1566 Duketon Central Group (C61/2003) |
| A97680 | 2013 | Stone Resources Australia | Brightstar North | <1% | CR209-2006 COMBINED ANNUAL EXPLORATION REPORT Reporting Period 1/01/2012 – 31/12/2012 |
| A97923 | 2013 | Focus Minerals (Laverton) Pty Ltd | East Laverton | <1% | East Laverton Project, Annual Report for the period 01/02/2012 to 31/01/2013, E38/1559, 1670, 1860, 1864,1867, |
| A98362 | 2013 | Victory Mines Ltd | Laverton Downs | <1% | Annual Mineral Exploration Report Exploration Licence E38/2374 (Laverton Downs Project) For Period 30 June 201 |
| A98828 | 2013 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38 |
| A99215 | 2013 | Gme Resources Ltd | Laverton Downs | <1% | Laverton Downs Project E38/2394 for the period 3rd August 2010 – 28th June 2013 |
| A100800 | 2013 | Duketon Mining Ltd | Duketon West | 3.6% | Duketon West Project, Annual Report for the period 01/10/2012 to 30/09/2013, E38/1535, 1537, 1800, 2177, 2206, |
| A93506 | 2012 | Gme Resources Ltd | Laverton Downs | <1% | Laverton Downs Project C248/2008 Annual Report for the period 1st March 2011 to 28th February 2012 |
| A93635 | 2012 | Crescent Gold Ltd | East Laverton | <1% | Combined Annual Report on Exploration for the period 01/02/2011 to 31/01/2012; East Laverton Project; C317/201 |
| A94337 | 2012 | Victory Mines Ltd | Laverton Downs | <1% | Annual Mineral Exploration Report Exploration Licence E38/2374 Laverton Downs Project for the period 30 June 2 |
| A94597 | 2012 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2011 to 30 June 2012 Duketon Central Project C61/2003, E38/ |
| A94953 | 2012 | South Boulder Mines Ltd | Duketon West | 13% | Exploration Licence E38/1535 Duketon West Project C99/2007 Partial Surrender Report for the period 10/06/2008 |
| A96070 | 2012 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | 2.7% | Combined Annual Report C99/2007 “Duketon West” E38/1511, 1535, 1537, 1800, 1979, 2177, 2206, 2255, 2661, M38/1 |
| A89791 | 2011 | Crescent Gold Ltd | East Laverton | <1% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; East Laverton Project; C3/2011 |
| A89810 | 2011 | A1 Minerals Ltd | Bright Star North | <1% | Bright Star North Project C209/2006 Combined Annual Report for the period 01/01/2010 to 31/12/2010 |
| A91193 | 2011 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2010 to 30 June 2011, Duketon Central Project (C61/2003) |
| A92270 | 2011 | South Boulder Mines Ltd | Dukewest | 2.1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2010 to 30 Sept 2011 |
| A88989 | 2011 | A1 Minerals Ltd | Cork Tree Well (Delta) | <1% | Partial Surrender Report, E 38/1618 Report Period: 09 November 2009 – 08 November 2010 |
| A90349 | 2011 | Gme Resources Ltd | Laverton Downs | <1% | Laverton Downs Project, Annual Report for the period 1st March 2010 to 28th February 2011, E38/1876, E38/2066 |
| A91145 | 2011 | Northeast Minerals Pty Ltd | Laverton Downs | <1% | Annual Mineral exploration Report Exploration Licence E38/2374 (Laverton Downs Project) For Period 30 June 201 |
| A91382 | 2011 | South Boulder Mines Ltd | Duketon | 13% | Exploration Licence E38/1535, Duketon Project, Partial Surrender Report for the period 10/06/2008 to 9/06/2011 |
| A93427 | 2011 | A1 Minerals Ltd | Bright Star North | <1% | Bright Star North Project Combined Annual report for the period 01/01/2011 to 31/12/2011, C209/2006, E38/1936, |
| A86734 | 2010 | Crescent Gold Ltd | Central Laverton | <1% | Central Laverton Combined AnnualL Report C133/2006, E38/0812, M38/0376, P38/3609, P38/3710, E38/1349, M38/0377 |
| A88530 | 2010 | South Boulder Mines Ltd | Duketon West | 2.1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2009 to 30 Sept 2010 |
| A85614 | 2010 | A1 Minerals Ltd | Cork Tree Well (Delta Project) | <1% | Partial Surrender Report 09 November 2006 - 08 November 2009 |
| A86180 | 2010 | A1 Minerals Ltd | Brightstar North | <1% | Bright Star North Project C209/2006 Annual Combined Report for the period 01/01/2009 to 31/12/2009 |
| A86738 | 2010 | Gme Resources Ltd | Laverton Downs | <1% | Laverton Downs C248/2008, E38/1876 and E38/2066 Annual Report for the period 1st March 2009 to 28th February 2 |
| A87969 | 2010 | Regis Resources Ltd | Duketon | <1% | C61/2003 Duketon Central: Combined Annual Report On Exploration For The Period 1/07/2009 to 30/06/2010 |
| A81351 | 2009 | Heron Resources Ltd | LAVERTON | 19% | Annual report for the period 30 November 2007 to 29 November 2008, Laverton Nickel Project, C180/2006 |
| A85350 | 2009 | Heron Resources Ltd | Laverton | 19% | Annual report for the period 30 November 2008 to 29 November 2009, Laverton Nickel Project, C180/2006, Report |
| A81502 | 2009 | Regis Resources Ltd | Angus / Camel Hump (Duketon Central) | 50% | Partial Surrender Report on Exploration for the period 16/02/2006 to 19/02/2009: Angus/ Camel Hump (Duketon Ce |
| A81504 | 2009 | Regis Resources Ltd | Angus / Camel Hump (Duketon Central) | 50% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 16/02/2008 TO 15/02/2009 Camel Hump/Angus (Duketon Central) E38/15 |
| A81678 | 2009 | A1 Minerals Ltd | Bright Star North | <1% | Bright Star North Project, Annual Report for th eperuiod 01/01/2008 to 31/12/2008, E38/1368. 1375, 1563, 1618, |
| A81707 | 2009 | Crescent Gold Ltd | Central Laverton | <1% | Central Laverton Combined Annual report C133/2006, 1st January 2008 to 31st December 2008 |
| A82295 | 2009 | Gme Resources Ltd | LAVERTON DOWNS | <1% | Laverton Downs Project C248/2008 Annual Report, Period: 21st February 2008 to 28th May 2009, E38/1876 and E38/ |
| A84137 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2008 TO 30/06/2009 PROJECT C61/2003 DUKETON CENTRAL |
| A77144 | 2008 | Heron Resources Ltd | Laverton | 8.1% | Annual report for the period 30 November 2006 to 29 October 2007, Laverton Nickel Project, C125/2006 E38/1724, |
| A77711 | 2008 | A1 Minerals Ltd | Brightstar North | <1% | Brightstar North Project Laverton, WA Combined Annual Report 1st January 2007 to 31 December 2007 Project No: |
| A78828 | 2008 | Crescent Gold Ltd | Laverton (Barnicoat) | <1% | VERIFICATION REPORT LAVERTON Annual Report for E38/1864 Period 29th March 2007 to 28th March 2008 |
| A77598 | 2008 | Niwest Ltd | Laverton Downs | <1% | Laverton Downs Project E38/1876 Annual Progress Report For the period 21st February 2007 to 20th February 2008 |
| A77627 | 2008 | Independence Group Nl | Royal North | 47% | ROYAL NORTH PROJECT ANNUAL TECHNICAL REPORT Reporting Period 9 December 2006 to 8 December 2007 E38/1626 |
| A77696 | 2008 | Regis Resources Ltd | Angus | 50% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 16/02/2007 TO 15/02/2008 ANGUS E38/1566 |
| A78051 | 2008 | Heron Resources Ltd | Mount Varden | 37% | MOUNT VARDEN PROJECT E38/1695 MT MARGARET MINERAL FIELD ANNUAL REPORT 21 January 2007 to 20 January 2008 |
| A85436 | 2008 | South Boulder Mines Ltd | Duketon West | 2.3% | Combined Annual Report C99/2007, Duketon West Project, for the period 1st Oct 2008 to 30th Sept 2009, E38/1499 |
| A74176 | 2007 | A1 Minerals Ltd | Brightstar North | <1% | Combined Annual Technical Report, Brightstar North Project C209/2006, For the period 31 January 2006 to 31 Jan |
| A74471 | 2007 | Heron Resources Ltd | Laverton | 8.1% | Laverton Nickel Project, C180/2006, E38/1724, E38/1742, Annual Report, 30 November 2005 to 29 November 2006, ( |
| A74511 | 2007 | Independence Group Nl | Royal North | 47% | Royal North Project E38/1626, Annual Technical Report Period 9 December 2005 to 8 December 2006, (Laverton). |
| A74816 | 2007 | Regis Resources Nl | Angus | 50% | Annual Report on Exploration for the Period 16/2/2006 to 15/2/2007: Angus E38/1566 Report No.2007/006 |
| A73196 | 2006 | A1 Minerals Ltd | King of Creation | <1% | King of Creation Project M38/160, Annual Technical Report for the Period 27 July 2005 to 26 July 2006, (Lavert |
| A71100 | 2005 | Copperco Ltd | Laverton Downs | <1% | Laverton Downs Project E38/506, Annual report for period ending 25th July 2005 (Report No. 0501). |
| A71350 | 2005 | Bronzewing Gold Nl | King of Creation | <1% | King of Creation Project, Mining Lease 38/160, Annual Technical Report for the period 27 July 2004 to 26 July |
| A69449 | 2004 | Bronzewing Gold Nl | King of Creation | <1% | Annual report for the period 27/07/03 - 26/07/04 King of Creation Project, M38/160 |
| A69615 | 2004 | Regis Resources Nl | Camel Hump | <1% | Joint surrender report for the period 12/05/00 - 14/11/03 Camel Hump Project, C184/1997, E38/1147, E38/1148, E |
| A67365 | 2003 | Vulcan Resources Ltd | Varden | 21% | Varden Project, Annual Report for the period 1 August 2002 to 31 July 2003 for the Tenement, E38/1152. |
| A67366 | 2003 | Vulcan Resources Ltd | Varden | 21% | Varden Project, Partial Surrender Report for the tenement E38/1152 September 2003. |
| A67379 | 2003 | West Australian Metals Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 27th July 2002 to 26th July 2003, M38/160. |
| A67616 | 2003 | Johnsons Well Mining Nl | Camel Hump | 31% | Exploration Licence: E38/495, Prospecting Licences: P38/2718-P37/2722, Camel Hump, C184/1997: Joint Surrender |
| A67672 | 2003 | Niwest Ltd | Laverton Downs | <1% | Annual Technical Report for the period 26/07/2002-25/07/2003 Laverton Downs Project E38/506 |
| A67823 | 2003 | Apollo Gold Mining Ltd | Swincer | 14% | Surrender Report for the period 28/02/2003- 09/09/2003, Swincer Project, E38/521. |
| A65365 | 2002 | West Australian Metals Ltd | King of Creation | <1% | King of Creation Project , Annual Report for the period 27th July, 2001 to 26th July 2002, M38/160. |
| A65434 | 2002 | Sons Of Gwalia Ltd | Swincer | 14% | Swincer Project , Annual Report for the period 20 August 2001 - 19 August 2002, E38/521. |
| A65317 | 2002 | Croesus Mining Nl | Varden | 17% | Annual Report For The Period 1 August 2001 to 31 July 2002 On The Tenements E38/945, E38/1152 & E38/1153 Combi |
| A65459 | 2002 | Auriongold Exploration Pty Ltd | Laverton Downs | <1% | Laverton Downs Project Annual Report Reporting Period 26/07/2001 - 25/07/2002 Tenement E38/506 |
| A63371 | 2001 | Croesus Mining Nl | Varden | 17% | Varden JV Project Annual Report For The Preiod 1 August 2000 to 31 July 2001 On The Tenements E38/945, E38/115 |
| A63442 | 2001 | Bronzewing Gold Nl | King of Creation | <1% | King of Creation Project, Annual Report for the period 27th July, 2000 to 26th July 2001,M38/160. |
| A63547 | 2001 | Johnsons Well Mining Nl | Camel Hump | 17% | Exploration Licences: E38/495, 518, 845, 1147, 1148, Mining Lease: M38/262, Prospecting Licences: P38/2660, 27 |
| A63725 | 2001 | Delta Gold Ltd | Laverton Downs | <1% | Annual Technical Report Laverton Downs from 26/07/2000 to 25/07/2001 DOME reference: M8961. Delta Report Numb |
| A63837 | 2001 | Johnsons Well Mining Nl | Breakaway Bore | 36% | Surrender Report for the period 2 June 1995 to 5 January 2001, Breakaway Bore, E38/764. |
| A64028 | 2001 | Delta Gold Ltd | Freshwater | 14% | Annual Report , Freshwater Project , for the period 20/08/00 - 27/09/01, E38/521. WA 01.046. |
| A61748 | 2001 | Delta Gold Ltd | Freshwater | 14% | Freshwater Project , Annual Report for the period 20/08/1999 to 19/08/2000, E38/521. |
| A61238 | 2000 | Sons Of Gwalia Ltd | Swincer | 12% | Swincer Project, Surrender Report for the Period 20/08/1993 to 23/06/2000, E38/520. |
| A61848 | 2000 | Johnsons Well Mining Nl | Camel Hump | 19% | Exploration Licences E38/495,518,845, Mining Leases M38/262, Prospecting Licences P38/2660,2718-2724,2737,2949 |
| A61116 | 2000 | Sons Of Gwalia Ltd | Swincer | 13% | Swincer Project, Annual Report for the period 01/01/1999 to 31/12/1999, E38/520, E38/521. |
| A61250 | 2000 | Delta Gold Ltd | Laverton Downs | <1% | Annual Technical Report, Laverton Downs, 26/06/1999 to 25/07/2000. DOME Reference M8961.Tenements E38/506 Repo |
| A57292 | 1999 | Johnsons Well Mining Nl | Breakaway Bore | 36% | Partial Surrender Report for the period 2 June 1995 to 29 October 1998 , E38/764, Breakaway Bore Project. |
| A57543 | 1999 | Sons Of Gwalia Ltd | Swincer | 13% | Swincer Project - Partial Surrender Report 20/08/93-09/07/98 E38/520-521 |
| A59471 | 1999 | Delta Gold Ltd | Laverton Downs | <1% | Annual technical report for the Laverton Downs, E38/506, 26/07/1998 to 25/07/1999. |
| A54583 | 1998 | Sons Of Gwalia Ltd | Swincer | 13% | Swincer Project, Annual Report for the period 1 January 1997 - 31 December 1997, E38/520-521, P38/2518-2519. |
| A55510 | 1998 | Johnsons Well Mining Nl | Camel Hump | 19% | C184/1997 - Camel Hump, Joint Annual Report Exploration Licence:E38/495, 518, 845 26/03/97 - 25/03/98 |
| A55879 | 1998 | Bronzewing Gold Nl | King of Creation | <1% | King of Creation Project, Annual Report for the period 27//07/1997 to 26/07/1998, M38/160. |
| A55967 | 1998 | Triton Resources Ltd | Laverton Down | <1% | Laverton Downs Project, E38/506, Annual Report Year Ended: 25/07/98 |
| A56200 | 1998 | Johnsons Well Mining Nl | Angus | 15% | Joint annual report for the period 20 June 1997 to 19 June 1998. C15/1996 - Angus Project, E38/602, E38/764, |
| A52281 | 1997 | Triton Resources Ltd | Laverton Downs | <1% | Laverton Downs Project Annual report for the year ended 25/07/97 (E38/506 , Laverton). |
| A52823 | 1997 | Triton Resources Ltd | Laverton Downs | <1% | Laverton Downs project, partial surrender report E38/506, 26 July 1993 to 13 October 1997 |
| A52934 | 1997 | Johnsons Well Mining Nl | Mount Varden | 12% | Mt Varden Project, Partial Surrender Report for the period 11th June 1993 to 25th June 1997, E38/518. |
| A52935 | 1997 | Johnsons Well Mining Nl | Golden Star | 37% | Golden Star Project, Partial Surrender Report for the period 15th January 1993 to 25th June 1997, E38/495. |
| A50479 | 1997 | Sons Of Gwalia Ltd | Swincer | 13% | Swincer Project , Annual Report for the period 1 January 1996 - 31 December 1996, E38/520-521, P38/2518-2519. |
| A47175 | 1996 | Artane Minerals Nl | Laverton Downs | <1% | 'Laverton Downs' Annual report for E38/506 for the year ended 25 July 1995 |
| A47345 | 1996 | Johnsons Well Mining Nl | Golden Star | 37% | Annual Report for the period 15 January 1995 to 14 January 1996 ,Golden Star Project, E38/495. |
| A47742 | 1996 | Sons Of Gwalia Ltd | Swincer | 13% | Swincer Project ,Annual Report for the period 1 January 1995 - 31 December 1995,E38/520-521, P38/2518-2519. |
| A48548 | 1996 | Johnsons Well Mining Nl | Duketon 2 | 28% | Annual Joint Report for the period 11 June 1995 to 10 June 1996 'Duketon 2 Project' exploration licences E38/4 |
| A48880 | 1996 | Triton Resources Ltd | Laverton Downs | <1% | E38/506 Laverton Downs Project Annual report for the year ended 25 July 1996 |
| A49227 | 1996 | Sons Of Gwalia Ltd | Swincer | 13% | Laverton Region Swincer Project Partial Surrender Report for the Period 20th Augusr 1996-19 August 1996 E38/5 |
| A49562 | 1996 | Roehampton Developments Pty Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 27/07/1995 to 26/07/1996, M38/160. |
| A44727 | 1995 | Johnsons Well Mining Nl | Golden Star | 37% | Annual Report for the period 15 January 1994 to 14 January 1995 'Golden Star' exploration licence E38/495. |
| A45207 | 1995 | Johnsons Well Mining Nl | Mount Varden | 12% | Annual Report for the period 11 June 1994 to 10 June 1995,Mt Varden Project, E38/518. |
| A45391 | 1995 | Roehampton Developments Pty Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 27th July 1994 to 26th July 1995, M38/160. |
| A42226 | 1994 | Mr Legendre Br | Laverton Downs | <1% | Annual report for the period 26/07/93-25/07/94 Laverton Downs Project E38/506 |
| A43881 | 1994 | Sons Of Gwalia Ltd | Breakaway Bore | 42% | Breakaway Bore Project, Partial Surrender Report for the period 27/10/91 - 26/10/94, E38/398. |
| A43882 | 1994 | Sons Of Gwalia Ltd | Swincer | 13% | Swincer Project, Annual Report for the period 1 January 1994 - 31 December 1994,E38/520-521, P38/2518-2519. |
| A39474 | 1993 | Sons Of Gwalia Ltd | Breakaway Bore | 42% | Breakaway Bore Project, Annual Report for the period 27th October 1992 to 26th October 1993, E38/398. |
| A41404 | 1993 | Nevoria Gold Mines Ltd | Doris Creek | 12% | Annual Report 06/93 - 06/94 Doris Creek (E38/518) Geological Report. |
| A38895 | 1993 | Sons Of Gwalia Ltd | Breakaway Bore | 42% | Breakaway Bore Project, Annual Report for the period 27th October 1991 to 26th October 1992, E38/398. |
| A40386 | 1993 | Mr Mcknight Rg | Mount Varden | 28% | Annual Report 01/93 - 01/94 E38/495, Mount Varden Prospect. |
| A33659 | 1991 | Ashton Gold Mines Pty Ltd | Creation East | 100% | Creation East Project, Annual Report for the period 1st January 1990 to 31st December 1990, M38/282 & P38/2081 |
| A33557 | 1991 | Ashton Gold Wa Ltd | Mount Varden | 44% | Mount Varden Project, Annual Report for the period 1st January 1990 to 31st December 1990, M38/112 & M38/308, |
| A33563 | 1991 | Ashton Gold Wa Ltd | Laverton Downs | 4.5% | FINAL TECHNICAL REPORT LAVERTON DOWNS PROJECT LAVERTON DOWNS NORTH & LAVERTON DOWNS SOUTH PROSPECTS Mining Lea |
| A33672 | 1991 | Ashton Gold Mines Pty Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 01/01/1990 to 31/12/1990, L38/160 M38/160. |
| A35682 | 1991 | Ashton Gold Wa Ltd | Varden | 44% | Varden project, Annual Report for the period 1st January 1991 to 31st December 1991, M38/308. |
| A35683 | 1991 | Ashton Gold Wa Ltd | Varden | 44% | Varden Project, Final Surrender Report for the period 28th December 1990 to 16th April 1992, M38/308. |
| A35684 | 1991 | Ashton Gold Wa Ltd | Creation East | 100% | Creation East Project, Final Surrender Report for the period 20th February 1990 to 31st December 1991, M38/282 |
| A35687 | 1991 | Ashton Gold Wa Ltd | KIng of Creation | <1% | KIng of Creation Project, Annual Report for the period 01/01/1991 to 31/12/1991, M38/160. |
| A15923 | 1990 | Ashton Gold Mines Pty Ltd | Laverton Downs | 2.7% | Laverton Downs Project, Annual Report for period 1st January 1989 to 31st December 1989, M38/83, M38/157-158, |
| A15925 | 1990 | Ashton Gold Mines Pty Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 1st January 1989 to 31st December 1989, M38/160; L38/18 |
| A27594 | 1989 | Bp Minerals Aust Pty Ltd | Mount Varden | 41% | Mount Varden, M38/112, Annual Report, for year ending 28th March 1989. |
| A27734 | 1989 | Hillmin Gold Mines Pty Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 1st January 1988 to 31st December 1988, M38/160. |
| A27748 | 1989 | Hillmin Gold Mines Pty Ltd | Laverton Downs | 2.8% | Annual Technical Report, Laverton Downs, Exploration Licence 38/37, Mining Lease 38/83, 38/154-158, Mining Lea |
| A26149 | 1988 | Bp Minerals Aust Pty Ltd | Mighty Atom | 59% | Mighty Atom Project, P38/144,146,696,700, M38/113, Final Report. |
| A24315 | 1988 | Hillmin Gold Mines Pty Ltd | Laverton Downs | <1% | Laverton Downs Project, Annual report for period 1 January 1987 to 31 December 1987, E38/05, E38/08, M38/83, M |
| A20641 | 1987 | Hillmin Gold Mines Pty Ltd | Laverton Downs | 1.6% | Laverton Downs Project, Annual technical report for the period 1/1/86 to 31/12/86, E38/5, 38/37, P38/457, 458, |
| A40647 | 1986 | Hillmin Gold Mines Pty Ltd | Laverton Downs North | 1.6% | Laverton Downs North, Annual Report for the period 01/01/1985 to 31/12/1985, E38/5. |
| A15076 | 1985 | Hillmin Gold Mines Pty Ltd | Laverton Downs North | 1.6% | Laverton Downs North Project, Annual Report for the period 01/01/1984 to 31/12/1984, E38/5. |
| A13629 | 1984 | Teck Explorations Ltd | Laverton Downs | 1.6% | Laverton Downs (JV) Project, Annual Report for the period 18/12/1982 to 17/12/1983, E38/5. |
| A11968 | 1982 | Teck Explorations Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the year ending 31/12/1982 , GML38/2618 & 2825; MC38/7617-7620. |
| A2706 | 1981 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | 1.8% | Erlistoun - Baneygo Project, Non-statutory Report:Exploration Report , Miscellaneous Maps & Plans, November 19 |
| A9619 | 1981 | Whim Creek Consolidated Nl | King of Creation | <1% | King Of Creation Project, Annual Report for the year ending 31/12/ 1980,GML38/2618 & 2825; MC38/7617-7620. |
| A34208 | 1981 | Teck Explorations Ltd | Burtville | <1% | Burtville Prospecting Syndicate JV, Laverton WA Proposed exploration programme and budget Raymond L. Smith Pro |
| A34209 | 1980 | Teck Explorations Ltd | Morrison | <1% | Morrison JV Laverton WA Review of the tenements and their Exploration Potential |
| A7375 | 1978 | Esso Australia Ltd | Laverton Downs | 2.7% | Laverton Downs Project, Annual Report , January 1978, TR70/6389H. |
| A8054 | 1978 | Esso Australia Ltd | Laverton Downs | 2.7% | Laverton Downs Project, Non-statutory Report: Final & Annual Report, October 1978, TR70/6389H. |
| A3727 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | 1.6% | Erlistoun Project, Non-statutory Report: Summary Report , Erlistoun Examination, 1972, MC37/506-515; MC38/380- |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A9160 | 1973 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | 12% | Erlistoun - Baneygo Project, Annual Report for the period 0101/1972 to 15/10/1973, MC38/5299-5301, 5312, 5927- |
| A2470 | 1972 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | 1.8% | Erlistoun - Baneygo Project, Non-statutory Report: Final Report, April 1972, TR70/3813, 4490 & 4492H. |
| A3155 | 1972 | International Nickel Aust Ltd | Laverton Downs | 17% | Laverton Downs Project, Non-statutory Report: Final Report for the period 4th November 1970 to 5th April 1972, |
| A2694 | 1972 | Cominco Exploration Pty Ltd | Erlistoun -Baneygo | 1.8% | Erlistoun - Baneygo Project, Final Surrender Report for the period ending 09/02/1972, TR70/3813H. |
| A3533 | 1972 | Mines Administration Pty Ltd | Breakaway Bore | 46% | Breakaway Bore Project, Final Surrender Report for the year ending 31/12/1972, MC38/1632-1640. |
| A9159 | 1972 | Cominco Exploration Pty Ltd | Erlistoun- Baneygo | 1.8% | Erlistoun-Baneygo Project, Non-statutory Report:Exploration Report for the period 01/01/1971 to 31/12/1971, TR |
| A9156 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | 1.8% | Erlistoun - Baneygo (JV) Project, Non-statutory Report:Progress Report for the period 31st May 1970 to 1st Ja |
| A2707 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | 1.8% | Erlistoun - Baneygo Project, Non-statutory Report: Miscellaneous Plans (25) for Baneygo-King of Creation, for |
| A2954 | 1971 | Carpentaria Exp Co Pty Ltd | Skies Well | 6.7% | Skies Well Project, Non-statutory Report :Final Report, May 1971, MC39/1052-1055, 1243-1244 & 2175. |
| A6946 | 1971 | Kennecott Exp Aust Pty Ltd | Erlistoun | 2.6% | Erlistoun Project, Non-statutory Report: Geophysics Data, to February 1971. |
| A9157 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | 1.8% | Erlistoun - Baneygo Project, Annual Report for the period 01/01/1970 to 31/12/1970, TR70/3813; MC38/3917...... |
| A9158 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | 1.8% | Erlistoun-Baneygo (JV) Project, Non-statutory Report, Progress Report for the period 01/01/1971 to 30/06/1971, |
| A12730 | 1971 | Kia Ora Gold Corp Nl | Erlistoun | 85% | Erlistoun Project, Non-statutory Report: Geological Report No 5, February 1971, MC38/309-314. |
| A12731 | 1971 | Kia Ora Gold Corp Nl | Erlistoun | 88% | Erlistoun Project, Non-statutory Report: Geological Report No 6, February 1971, MC38/327-329, 336-339. |
| A12732 | 1971 | Kia Ora Gold Corp Nl | Erlistoun | 88% | Erlistoun Project, Non-statutory Report: Geological Report No 7, March 1971, MC38/309-314, 327-328, & 335-339. |
| A12734 | 1971 | Kia Ora Gold Corp Nl | Erlistoun | 62% | Erlistoun Project, Non-statutory Report: Percussion Drilling Report, June - July 1971, MC38/309-314, 326-329, |
| A12735 | 1971 | Kia Ora Gold Corp Nl | Erlistoun | 62% | Erlistoun Project, Non-statutory Report: Report on Assay Results, November 1971, MC38/309-314, 326-329, 335-33 |
| A12738 | 1971 | Kia Ora Gold Corp Nl | Laverton Downs | 5% | Laverton Downs Project, Non-statutory Report; Report on Percussion Drilling - Holes PDH 13-22, & Diamond Drill |
| A12729 | 1970 | Kia Ora Gold Corp Nl | Erlistoun | 88% | Erlistoun Project, Non-statutory Report: Geological Report No 3, July 1970, MC38/327-329, 336-339. |
| A12724 | 1970 | Kia Ora Gold Corp Nl | Cork Tree Well | 32% | Cork Tree Well Project, Non-statutory Report: Geological Report, February 1970, MC38/2168-2176. |
| A12737 | 1970 | Magnum Explorations Nl | Laverton Downs | 4.3% | Laverton Downs Project, Non-statutory Report: Report on phase 1 Investigations, August 1970, MC38/369-373, & 7 |
| A1118 | 1969 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1.8% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/3 |
| A12727 | 1969 | Kia Ora Gold Corp Nl | Erlistoun - Swincers Well | 82% | Erlistoun - Swincers Well Project, Non-statutory Report: Reconnaissance Report, June 1969, MC38/309-314, 326-3 |
| A12728 | 1969 | Kia Ora Gold Corp Nl | Erlistoun | 82% | Erlistoun Project, Non-statutory Report: Geological Report, July 1969, MC38/309-314, 326-329, & 335-339. |
| A12736 | 1969 | Kia Ora Gold Corp Nl | Laverton Downs | 5% | Laverton Downs Project, Non-statutory Report: Summary Report, July 1969, MC38/369-373. |
| A1112 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1.7% | Erlistoun-Baneygo Project, Non-statutory Report: Report on the Induced Polarization & Resistivity Survey on Th |
| A1113 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps & Magnetic Anomalies, December |
| A1114 | 1968 | Cominco Exploration Pty Ltd | Erlistoun | 1.7% | Erlistoun Project, Non-statutory Report: A Review of Activities to March 21st 1968, TR70/ 3813, 3899, 4490-449 |
| A1115 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1968, TR70/3 |
| A1110 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1.7% | Erlistoun-Baneygo Project, Non-statutory Report Progress Report for the period 01/09/1966 to 31/03/1967, TR70/ |
| A1111 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1.7% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps, December 1966 to April 1967,TR |
| A82635 | 1753 | Crescent Gold Ltd | Central Laverton | <1% | Partial Surrender Report for Lease E38/1864, Period 29th March 2007 to 26th May 2009 |
| A51882 | 1753 | Johnsons Well Mining Nl | Angus | 15% | Annual Report for the period 20 June 1996 to 19 June 1997, Angus Project, E38/602, E38/764, E38/821, P38/2655 |
| A1117 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project: |
| A1119 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1% | Erlistoun-Baneygo Project, Non-statutory Report: |
| A1120 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | 1.8% | Erlistoun-Baneygo Project, Annual Report for the period ending 30th June 1970, TR70/3813, 4490 & 4492H |
| A12733 | 1753 | Kia Ora Gold Corp Nl | Erlistoun | 62% | Erlistoun Project, Non-statutory Report: Report on Induced Polarisation Survey, January 1971,MC38/309-314,326 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A105989 | Victory Mines Ltd | Laverton Downs | <1% | Surrender Exploration Report Exploration Licence E38/2374 (Laverton Downs Project) For Period 30 June 2010 to |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 16 months · 22 Dec 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 38/2805 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.