E 38/3082
Register summary
- Holder
- Regis Resources Limited
- Local government
- Shire of Laverton
- Application received
- 18 Aug 2015
- Commenced
- 8 Mar 2016
- Expiry
- 7 Mar 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123482 | 2020 | Duketon Mining Limited; Regis Resources Limited | Bandya Hill, Risden Well | <1% | Partial Surrender Report E38/2717, Bandya Hill, Risden Well, 5 March 2014 to 27 February 2020 |
| A125005 | 2020 | Regis Resources Limited | Duketon Central | <1% | Combined Annual Mineral Exploration Report for the Duketon Central Project C95/2016 for the period ending 30/0 |
| A122543 | 2020 | Regis Resources Limited | Little Well | <1% | Final Surrender Report P38/04216,P38/04226,P38/04227,P38/04228,P38/04229,P38/04230,P38/04231,P38/04232,P38/042 |
| A123195 | 2020 | Duketon Mining Limited; Regis Resources Limited | Duketon East | <1% | Group Annual Report - Duketon East - C188/2007 - 1 January 2019 to 31 Deember 2019 |
| A123846 | 2020 | Regis Resources Limited | Duketon South West | <1% | Combined Annual Mineral Exploration Report for Duketon South West E38/2717 for the period ending 31/3/2020 |
91 more reports
| A122082 | 2019 | Duketon Mining Limited | Duketon South West | <1% | Surrender Report E38/2892 Duketon South West for the period 19 August 2014 to 18 August 2019 |
| A120150 | 2019 | Duketon Mining Limited | Duketon South West | <1% | Group Annual Report - Duketon South West - C14/2017 For the Period 1 April 2018 to 31 March 2019, E38/02717, E |
| A119511 | 2019 | Duketon Mining Limited | Duketon East | <1% | Annual Report Duketon East C188/2007 For the Period 1 January 2018 to 31 December 2018, E38/02231, E38/02666, |
| A121211 | 2019 | Regis Resources Limited | Duketon Central | <1% | Annual Report C95/2016 Duketon Central Project for the period 1 July 2018 to 30 June 2019 |
| A119041 | 2019 | Duketon Mining Limited | Duketon East | <1% | Partial Surrender Report E38/2699 Duketon East for the period 20 December 2012 to 19 December 2018 |
| A116261 | 2018 | Duketon Mining Limited | Duketon East | <1% | Annual Report - Duketon East C188/2007 for the period 01/01/2017 - 31/12/2017, E38/02231, E38/02666, E38/02699 |
| A116825 | 2018 | Duketon Mining Limited | Duketon South West | <1% | Annual Report - C14/2017 Duketon South East For the Period 1 April 2017 to 31 March 2018 |
| A117884 | 2018 | Regis Resources Limited | Duketon Central | <1% | Duketon Central C95/2016 Annual Report for the period 1 July 2017 to 30 June 2018 |
| A112325 | 2017 | Duketon Mining Limited; Regis Resources Limited | Duketon East | <1% | Annual Report C188/2007 Duketon East Project for the period 1 January 2016 to 31 December 2016, E 38/02231, E |
| A112446 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95/2016 Final Surrender Report for the period 01/01/2016 to 08/11/2016 |
| A113936 | 2017 | Duketon Mining Limited | Duketon | <1% | Duketon Project Annual Report C14/2017 for the year ending 31 March 2017, E38/02717, E38/02892, E38/03011, E38 |
| A114932 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95-2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A110027 | 2016 | Duketon Mining Limited | Bandya Hill | <1% | Bandya Hill E38/2892 Annual Report for the period 19/08/2015 to 18/08/2016 |
| A108471 | 2016 | Duketon Mining Limited | Duketon East | <1% | C188/2007 Combined Annual Report Duketon East Project 1 January 2015 to 31 December 2015 |
| A108892 | 2016 | Duketon Mining Limited | Duketon | <1% | Duketon E38/2717 Annual Report For the Period 5 March 2015 to 4 March 2016 |
| A109758 | 2016 | Regis Resources Limited | Duketon Central | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 DUKETON CENTRAL PROJECT C61/2003 |
| A105463 | 2015 | Duketon Mining Ltd | Duketon East | <1% | C188/2007 Combined Annual Report for “Duketon East Project” for the Period 1/1/2014 to 31/12/2014, E38/2231... |
| A105564 | 2015 | Duketon Mining Ltd | Duketon | <1% | Duketon Project E38/2717, Annual Report for the period 04/03/2014 to 03/03/2015 |
| A106601 | 2015 | Regis Resources Limited | Duketon Central | <1% | C61-2003 2015A Duketon Central Project Annual Report for the period 01/07/2014 - 30/06/2015 |
| A106766 | 2015 | Regis Resources Limited | Duketon | 8.3% | E38-2003 Partial Surrender Report for the period 30 June 2009 to 29 June 2015 |
| A107303 | 2015 | Duketon Mining Ltd | Duketon | <1% | E38/2892, Annual Report for the period 19/08/2014 to 18/08/2015 |
| A101511 | 2014 | Duketon Mining Ltd | Duketon East | <1% | C188/2007 2013A Combined Annual Report for “Duketon East Project” for the Period 1/1/2013 to 31/12/2013 Includ |
| A102988 | 2014 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central Project, Annual Report for the period 01/07/2013 to 30/06/2014, E38/378.........E38/2857; M38/ |
| A97223 | 2013 | South Boulder Mines Ltd | Duketon East | <1% | Duketon East Project, Annual Report for the period 01/01/2012 to 31/12/2012, E38/2231, 2397, 2614, 2666, 2699 |
| A98828 | 2013 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38 |
| A94597 | 2012 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2011 to 30 June 2012 Duketon Central Project C61/2003, E38/ |
| A91193 | 2011 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2010 to 30 June 2011, Duketon Central Project (C61/2003) |
| A92270 | 2011 | South Boulder Mines Ltd | Dukewest | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2010 to 30 Sept 2011 |
| A85516 | 2010 | South Boulder Mines Ltd | Duketon West | <1% | Final Surrender Report E38/1564, Formerly part of “Duketon West Project” |
| A88530 | 2010 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2009 to 30 Sept 2010 |
| A87969 | 2010 | Regis Resources Ltd | Duketon | <1% | C61/2003 Duketon Central: Combined Annual Report On Exploration For The Period 1/07/2009 to 30/06/2010 |
| A84137 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2008 TO 30/06/2009 PROJECT C61/2003 DUKETON CENTRAL |
| A76989 | 2008 | South Boulder Mines Ltd | Duketon | <1% | Combined Annual Report C99/2007, E38/1043,....E38/1801, M38/330, P38/3160....P38/3309, Duketon West, for the p |
| A79266 | 2008 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2007 TO 30/06/2008 PROJECT C61/2003 DUKETON |
| A80474 | 2008 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007 Duketon West on :-E 38/1499, E 38/1511, E 38/1537, E 38/1548, E 38/1564, E 38/ |
| A85436 | 2008 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007, Duketon West Project, for the period 1st Oct 2008 to 30th Sept 2009, E38/1499 |
| A75801 | 2007 | Regis Resources Nl | Duketon Central | <1% | Combined Annual Report On Exploration For The Period 1/7/200 5 to 30/6/2006; C61/2003 Duketon Central: E38/378 |
| A73284 | 2006 | Regis Resources Nl | Duketon Central | <1% | Combined Annual Report on exploration for the period 1/07/2005 to 30/06/2006, Project C61/2003 Duketon Central |
| A69760 | 2005 | Newmont Australia Ltd | Duketon | <1% | Combined annual report for the period 01/07/03 - 30/06/04 Duketon Central Project, C61/2003, E38/378, E38/379, |
| A70955 | 2005 | Newmont Duketon Pty Ltd | Duketon | <1% | Combined annual report on exploration for the period 1/07/2004 to 30/06/2005, Project C61/2003, Duketon Centra |
| A68339 | 2004 | Johnsons Well Mining Nl | Erlistoun | 4% | Joint Surrender Report for the period 21 September 1995 to 2 6 November 2002 Erlistoun Project M38/422 and 423 |
| A66600 | 2003 | Newmont Australia Ltd | Duketon Belt/Erlistoun | 1.2% | Combined Annual Report on Exploration for period ended 17/3/2003 Project C16/1996 Erlistoun E38/379, 387, 565, |
| A64531 | 2002 | Newmont Yandal Operations Ltd | Duketon | <1% | Duketon Project, Annual Report for the period 1st January 2001 to 31st December 2001, E38/438, 440, 477, 567, |
| A64877 | 2002 | Newmont Australia Ltd | Duketon Belt/Erlistoun | 1.1% | Combined Annual Report On Exploration For Period Ended 17/3/2002 Project C16/1996 Erlistoun E38/379, 386, 387, |
| A62782 | 2001 | Normandy Yandal Operations Ltd | Duketon | <1% | Annual Report for period ended 31 December 2000, E38/438, 440, 477, 567, 5 85, 630, 654 & P38/2715, 2716, 271 |
| A64529 | 2001 | Normandy Yandal Operations Ltd | Little Well | 3.3% | Surrender Report On Exploration For Period Ended 08/05/2001 E38/654 Little Well Project. |
| A62652 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 1% | Exploration Licences: E38/379, 386-7, 404, 565, 649, 651, 653, 843, 1189-92, 1196 Mining Leases: M38/114, 237, |
| A63672 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration licences: E38/379, 386-387, 404, 565, 649, 651, 653, 789, 843, 1189-1192, 1196. Mining leases: M3 |
| A61966 | 2000 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 1% | C16/1996 - Erlistoun Joint Annual Report for the period 18 March 1999 to 17 March 2000. Gold mining lease: GM |
| A57806 | 1999 | Johnsons Well Mining Nl | Texrise Duketon No 1 | <1% | Texrise Duketon No 1 Project, Partial Surrender Report for the period 2nd December 1994 to 10th September 199 |
| A57805 | 1999 | Johnsons Well Mining Nl | Texrise Duketon No 1 | 3.8% | Texrise Duketon No 1 Project, Partial Surrender Report for the period 2nd December 1994 to 10th Sept 1998, E38 |
| A59200 | 1999 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 1% | Joint Annual Report on the Erlistoun Project, E38/379, 386- 387, 404, 565, 649, 651, 653, 789, M38/114, 237, 2 |
| A55392 | 1998 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 1% | Exploration Licences E38/379 E38/386 to E38/387 E38/565 E38/649 E38/651 E38/653 Mining Leases M38/114 M38/237 |
| A53944 | 1997 | Wiluna Mines Ltd | Duketon Project | <1% | Duketon Project, 1997 Annual Report Exploration Licence: 38/438, 440, 477, 509, 567, 585, 630, 38/654 Prospect |
| A50344 | 1997 | Aurora Gold Ltd | Duketon | <1% | Duketon Project, Partial Surrender Report, Exploration Licences 38/380, 381, 387 for the Period 13 January 19 |
| A50352 | 1997 | Aurora Gold Ltd | Duketon | <1% | Annual Technical Report, Duketon Project , E38/348 E38/380 E38/381 E38/387 E31/404 E38/430; M38/421 M38/422 an |
| A50419 | 1997 | Wiluna Mines Ltd | Duketon | <1% | Duketon Project, Annual Report for the year ending 31/12/1996, E38/438 ,440, E38/477 E38/509 E38/567 E38/585 E |
| A52316 | 1997 | Johnsons Well Mining Nl | Erlistoun | 3.6% | Annual Report for the period 17th October 1995 to 16th October 1996, E38/651, Erlistoun Project. |
| A46725 | 1996 | Johnsons Well Mining Nl | Kulguddi | 2.6% | Exploration E38/649 and E38/653 'Kulguddi Project' Annual report for the period 2 December 1994 to 1 December |
| A47561 | 1996 | Johnsons Well Mining Nl | Duketon Belt 4 | 1.1% | Duketon Belt 4 (JV) Project, Annual Report for the period 10th February 1995 to 9th February 1996, E38/559. 64 |
| A43908 | 1995 | Aurora Gold Ltd | Duketon | <1% | Annual Report, Duketon Project ,E38/348, 380, 381, 387, 404 & 430 for the period 1 January 1994 to 31 December |
| A47215 | 1995 | Aurora Gold Ltd | Duketon | <1% | Annual Technical Report, Duketon Project, E38/348 E38/380 E38/381 E38/387 E38/404 And E38/430; M38/421 M38/42 |
| A40892 | 1994 | Aurora Gold Ltd | Duketon | <1% | Duketon Project, Partial Surrender Report for E38/348 for the period 28th February 1990 to 28th February 1994; |
| A40945 | 1994 | Aurora Gold Ltd | Duketon | <1% | Annual Report for the Period 01/01/93 - 31/12/93 Duketon Project |
| A38734 | 1993 | Ashton Gold Wa Ltd | Duketon | <1% | Annual Report for the period 01/01/92-31/12/92 Duketon Project P38/2101,2234,2286-2287 E38/348,379-381,387,404 |
| A35629 | 1992 | Ashton Gold Wa Ltd | Duketon | <1% | Annual Report for 1 January 1991 to 31 December 1991. Duketon Project E38/348, E38/379, E38/380, E38/381, E38/ |
| A2706 | 1981 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report:Exploration Report , Miscellaneous Maps & Plans, November 19 |
| A5811 | 1974 | Kennecott Exp Aust Pty Ltd | Duketon | <1% | Duketon Claim Block, Annual Report for the year ending 31st December 1973, MC38/1150 ... 38/4677. |
| A5813 | 1974 | Kennecott Exp Aust Pty Ltd | Duketon | <1% | Duketon (JV) Project, Final Surrender Report, July 1974, MC38/1150-1151..............MC38/4673-4677.[ See also |
| A3727 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Erlistoun Project, Non-statutory Report: Summary Report , Erlistoun Examination, 1972, MC37/506-515; MC38/380- |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2470 | 1972 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Final Report, April 1972, TR70/3813, 4490 & 4492H. |
| A2694 | 1972 | Cominco Exploration Pty Ltd | Erlistoun -Baneygo | <1% | Erlistoun - Baneygo Project, Final Surrender Report for the period ending 09/02/1972, TR70/3813H. |
| A9159 | 1972 | Cominco Exploration Pty Ltd | Erlistoun- Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report:Exploration Report for the period 01/01/1971 to 31/12/1971, TR |
| A9156 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo (JV) Project, Non-statutory Report:Progress Report for the period 31st May 1970 to 1st Ja |
| A2707 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Miscellaneous Plans (25) for Baneygo-King of Creation, for |
| A6946 | 1971 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Erlistoun Project, Non-statutory Report: Geophysics Data, to February 1971. |
| A9157 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Annual Report for the period 01/01/1970 to 31/12/1970, TR70/3813; MC38/3917...... |
| A9158 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun-Baneygo (JV) Project, Non-statutory Report, Progress Report for the period 01/01/1971 to 30/06/1971, |
| A1118 | 1969 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/3 |
| A1112 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Report on the Induced Polarization & Resistivity Survey on Th |
| A1113 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps & Magnetic Anomalies, December |
| A1114 | 1968 | Cominco Exploration Pty Ltd | Erlistoun | <1% | Erlistoun Project, Non-statutory Report: A Review of Activities to March 21st 1968, TR70/ 3813, 3899, 4490-449 |
| A1115 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1968, TR70/3 |
| A1116 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Final Reports 1967 & 1968, TR70/3899 & 4349H. |
| A1110 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report Progress Report for the period 01/09/1966 to 31/03/1967, TR70/ |
| A1111 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps, December 1966 to April 1967,TR |
| A1117 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project: |
| A1119 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: |
| A1120 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Annual Report for the period ending 30th June 1970, TR70/3813, 4490 & 4492H |
| A50779 | 1753 | Johnsons Well Mining Nl | Duketon Belt 4 | 1.1% | Exploration Licences E38/559 E38/649 E38/653 and Prospecting Licences P38/2558 to P38/2561 'Duketon Belt 4 Pro |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 18 months · 7 Mar 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 38/3082 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 38/3082? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.