E 38/3767
Register summary
- Holder
- Regis Resources Limited
- Local government
- Shire of Laverton
- Application received
- 25 Aug 2022
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149600 | 2025 | Regis Resources Limited | Duketon Central East | <1% | Partial Surrender Report - E38/3355 Duketon Central East for the period ending 04/06/2025 |
| A136083 | 2023 | Rarex Ltd | Weld North | <1% | C73/2022 Weld North Annual Report for the period ending 23/05/2023 |
| A131671 | 2022 | Rarex Limited | Weld North | <1% | First Year combined Report for Weld North C73/2022 for the period ending 28/03/2022. |
| A130449 | 2022 | Regis Resources Limited | Tooheys Well | 6.5% | Garden Well – Tooheys Well Trend DAG2020/00163333 EIS Final Report, R22 |
| A129071 | 2021 | Rarex Limited | Weld North | <1% | First Year Annual Report for Weld North E38/3455 for the period 15 July 2020 to 14 July 2021 |
245 more reports with detail
| A123198 | 2020 | Regis Resources Limited | Moolart Well | <1% | Combined Annual Mineral Exploration Report for the Moolart Well Project, C82/2011, 1 January 2019 to 31 Decemb |
| A123428 | 2020 | Regis Resources Limited | Mckenzies Well - Camel Hump | 3.3% | Final Surrender Report for McKenzies Well to Camel Hump for the period 25 July 2013 to 20 February 2020 |
| A123481 | 2020 | Duketon Mining Limited; Regis Resources Limited | Elistoun | 100% | Final Surrender Report E38/2819, Elistoun, 4 March 2014 to 27 February 2020 |
| A124433 | 2020 | Regis Resources Limited | Reichelts | <1% | Annual Report for E38/3355 - Reichelts for the period ending 06/06/2020 |
| A124516 | 2020 | Regis Resources Limited | Somerset | <1% | Partial Surrender Report for Somerset - E38/2866 for the period 17 June 2014 to 16 June 2020 |
| A124932 | 2020 | Stone Resources Australia Limited | E38/1936 | <1% | E38/1936 Final Surrender Report for the period ending 31 October 2019 |
| A124986 | 2020 | Stone Resources Australia Limited | E38/1937 | <1% | E38/1937 Final Surrender Report for the period ending 08/07/2020 |
| A125005 | 2020 | Regis Resources Limited | Duketon Central | 2% | Combined Annual Mineral Exploration Report for the Duketon Central Project C95/2016 for the period ending 30/0 |
| A125250 | 2020 | Regis Resources Limited | Duketon Central | <1% | Combined Annual Mineral Exploration Report for the Duketon Central Project C47/2016 for the period ending 31/0 |
| A125258 | 2020 | Stone Resources Australia Limited | Brightstar North | <1% | E38/2332 Final Surrender Report for the period ending 27/07/2020 |
| A125259 | 2020 | Stone Resources Australia Limited | E38/2361 | <1% | E38/2361 Final Surrender Report For the Period 8 June 2010 to 7 June 2020 |
| A125260 | 2020 | Stone Resources Australia Limited | Brightstar | <1% | E38/3233 Final Surrender Report for the period ending 27/07/2020 |
| A122809 | 2020 | Duketon Mining Limited; Regis Resources Limited | Duketon South | <1% | Group Annual Report Duketon South C129/2016 for the period ending 31/12/2019 |
| A123520 | 2020 | Stone Resources Australia | Brightstar North | <1% | C209/2006 COMBINED ANNUAL EXPLORATION REPORT, BRIGHTSTAR NORTH, 1 JANUARY 2019 TO 31 DECEMBER 2019 |
| A123528 | 2020 | Stone Resources Australia Limited | Brightstar North | <1% | E38/2234 Final surrender report, Brightstar North, 15 February 2015 to 14 February 2020 |
| A123332 | 2020 | Duketon Mining Limited; Regis Resources Limited | Swincers | <1% | Partial Surrender Report - E38/2805 Swincers for the period ending 19/12/2019 |
| A119548 | 2019 | Regis Resources Limited | Moolart Well | <1% | Moolart Well C82/2011 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A118665 | 2019 | Duketon Mining Limited | Duekton East | <1% | Final Surrender Report E38/3026 Duekton East Project for the period 6 July 2015 to 30 October 2018 |
| A119355 | 2019 | Duketon Mining Limited | Duketon South | <1% | Annual Report - Duketon South C129/2016 for the period 1 January 2018 to 31 December 2018, E38/02805, E38/029 |
| A119429 | 2019 | Stone Resources Australia Limited | Brightstar | <1% | Annual Mineral Exploration Report Brightstar P38/04417 for the period 23 January 2018 to 22 January 2019 |
| A119561 | 2019 | Stone Resources Australia Limited | Brightstar North | <1% | C209/2006 Combined Annual Exploration Report for the period 1 January 2018 to 31 December 2018 |
| A121211 | 2019 | Regis Resources Limited | Duketon Central | 1.2% | Annual Report C95/2016 Duketon Central Project for the period 1 July 2018 to 30 June 2019 |
| A121507 | 2019 | Regis Resources Limited; Duketon Mining Limited | Duketon Central | 61% | Duketon Central - Combined Annual Report - C47/2016 for the period 1 August 2018 to 31 July 2019, E38/02976, E |
| A115819 | 2018 | Duketon Mining Limited | Duketon South | <1% | Duketon South C129/2016 E38/02805, E38/02983, E38/03098, E38/02866 Annual Report for the period 1 January 2017 |
| A116261 | 2018 | Duketon Mining Limited | Duketon East | <1% | Annual Report - Duketon East C188/2007 for the period 01/01/2017 - 31/12/2017, E38/02231, E38/02666, E38/02699 |
| A116442 | 2018 | Regis Resources Limited | Moolart Well | <1% | C82-2011 Moolart Well Project Annual Report for the period 1 January 2017 to 31 December 2017 |
| A116697 | 2018 | Stone Resources Australia Limited | Brightstar North | <1% | Brightstar North C209/2006 Combined Annual Exploration Report for the period 19/05/2017 - 20/05/2018 |
| A117884 | 2018 | Regis Resources Limited | Duketon Central | 1.2% | Duketon Central C95/2016 Annual Report for the period 1 July 2017 to 30 June 2018 |
| A118049 | 2018 | Duketon Mining Limited | Duketon Central | 61% | Annual Report Duketon Central C47/2016 for the period 01/08/2017 - 31/07/2018 |
| A112118 | 2017 | Duketon Mining Limited | Duketon South | <1% | Annual Report C129/2016 Duketon South Project for the period 1 January 2016 to 31 December 2016, E38/02805, E3 |
| A112549 | 2017 | Regis Resources Limited | Moolart Well - Garden Well | <1% | Moolart Well & Garden Well Project C82-2011 Annual Report for the period 1 January 2016 to 31 December 2016 |
| A115186 | 2017 | Guj A L | Falconbridge | 4.3% | Falconbridge Ni, Co and Au Project Information Memorandum |
| A112011 | 2017 | Duketon Mining Limited | Duketon | <1% | Duketon Project E38/2805 Annual Report for the period 23/12/2015 to 22/12/2016 |
| A112325 | 2017 | Duketon Mining Limited; Regis Resources Limited | Duketon East | <1% | Annual Report C188/2007 Duketon East Project for the period 1 January 2016 to 31 December 2016, E 38/02231, E |
| A112446 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95/2016 Final Surrender Report for the period 01/01/2016 to 08/11/2016 |
| A112656 | 2017 | Duketon Mining Limited | Duketon | 100% | Duketon Project E38/2819 Annual Report For the Period 4 March 2016 to 3 March 2017 |
| A112788 | 2017 | Stone Resources Australia Limited | Brightstar North | <1% | Brightstar North C209/2006 Combined Annual Exploration Report for the period 01/01/2016 – 31/12/2016 |
| A114311 | 2017 | Stone Resources Australia Ltd | Laverton | <1% | Final Surrender Report for E38/2596 for the period 18/08/2011 - 04/05/2017 |
| A114312 | 2017 | Stone Resources Australia Ltd | Laverton | <1% | E38/2597 Final Surrender Report for the period 18/08/2011 - 04/05/2017 |
| A114932 | 2017 | Regis Resources Limited | Duketon Central | 1.3% | Duketon Central Project C95-2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A115072 | 2017 | Duketon Mining Limited | Duketon Central | 49% | Annual Report Duketon Central C47/2016 for the period 1 August 2016 to 31 July 2017, E38/02976, E38/03083, E38 |
| A108163 | 2016 | Duketon Mining Limited | Duketon | <1% | ANNUAL REPORT For the Period 23 December 2014 to 22 December 2015 DUKETON PROJECT E38/2805 |
| A108426 | 2016 | Regis Resources Limited | Moolart Well | <1% | Annual Report Title: C82-2011 2015A Report Period: 1 January 2015 to 31 December 2015 |
| A108471 | 2016 | Duketon Mining Limited | Duketon East | <1% | C188/2007 Combined Annual Report Duketon East Project 1 January 2015 to 31 December 2015 |
| A108839 | 2016 | Stone Resources Australia Ltd | Brightstar North | <1% | C209/2006 Combined Annual Exploration Report for period 01/01/2015 – 31/12/2015 |
| A108880 | 2016 | Duketon Mining Limited | Duketon | 100% | Duketon E38/2819 Annual Report for the period 04/03/2015 to 03/03/2016 |
| A109364 | 2016 | Duketon Mining Limited | Duketon | <1% | Duketon Project E38/2866 Annual Report for the period 17/06/2015 to 16/06/2016 |
| A109758 | 2016 | Regis Resources Limited | Duketon Central | 1.3% | Annual Report For the Period 1 July 2015 to 30 June 2016 DUKETON CENTRAL PROJECT C61/2003 |
| A110014 | 2016 | Strategic Energy Resources Limited | Falconbridge | 4.3% | Falconbridge E38/1970 Annual Mineral Exploration Report For the Period 22 September 2015 to 21 September 2016 |
| A104644 | 2015 | Duketon Mining Ltd | Duketon | <1% | Duketon Project E38/2805, Annual Report for the period 23/12/2013 to 22/12/2014 |
| A104982 | 2015 | Strategic Energy Resources Limited | Falcon Bridge | 4.3% | Falconbridge E38/1970 Annual Mineral Exploration Report For the Period 2 September 2013 to 1 September 2014 |
| A105214 | 2015 | Regis Resources Limited | Moolart Well | <1% | Moolart Well Project C82/2011 Annual Combined Report for the period 1 January 2014 to 31 December 2014, E38/01 |
| A105227 | 2015 | Stone Resources Australia Ltd | Brightstar North | <1% | Combined Annual Exploration Report for C209/2006 from 01/01/2014 to 31/12/2014, E38/1936.....P38/4115 |
| A105565 | 2015 | Duketon Mining Ltd | Duketon | 100% | Duketon Project E38/2819, Annual Report for the period 04/03/2014 to 03/03/2015 |
| A106313 | 2015 | Duketon Mining Ltd | Duketon | <1% | Duketon Project E38/2866, Annual Report for the period 17/06/2014 to 16/16/2015 |
| A106314 | 2015 | Duketon Mining Ltd | Duketon West | 33% | Surrender Report E38/1535 Duketon West Project for the period 10/06/2008 – 09/06/2015 |
| A106601 | 2015 | Regis Resources Limited | Duketon Central | 1.3% | C61-2003 2015A Duketon Central Project Annual Report for the period 01/07/2014 - 30/06/2015 |
| A101263 | 2014 | Stone Resources Australia | Brightstar North | <1% | Combined Annual Exploration Report for Brightstar North Project C209/2006 from 01/01/2013 to 31/12/2013, E 38/ |
| A101465 | 2014 | Regis Resources Ltd | Moolart Well | <1% | Annual Report C82-2011 Moolart Well Project for the period 1 January 2013 to 31 December 2013, E38/1096......P |
| A102553 | 2014 | Duketon Mining Ltd | Duketon West | <1% | Duketon West Project, Surrender Report E38/2255 for the period 06/01/2010 – 17/03/2014. |
| A102988 | 2014 | Regis Resources Ltd | Duketon Central | 1.3% | Duketon Central Project, Annual Report for the period 01/07/2013 to 30/06/2014, E38/378.........E38/2857; M38/ |
| A103266 | 2014 | Stone Resources Australia | E38/1937 | <1% | E38/1937 Partial Surrender Report for the period 08/08/2008 to 07/08/2014 |
| A104336 | 2014 | Duketon Mining Ltd | Duketon West | 11% | Duketon West Project. Annual Report, Combined Reporting No.: C99/2007, for the period 01/10/2013 – 30/09/2014 |
| A104407 | 2014 | Regis Resources Ltd | Moolart Well | 3.9% | SURRENDER REPORT FOR THE PERIOD 4 DECEMBER 2007 TO 3 DECEMBER 2014 TENEMENT NO: E38/1096 PROJECT: MOOLART WELL |
| A97945 | 2013 | Stone Resources Australia | King of Creation West | <1% | King of Creation West Project, Annual Report for the period 05/08/2010 to 04/08/2011, P38/3783. |
| A97947 | 2013 | Stone Resources Australia | Epsilon | 55% | Epsilon Project, Annual Report for the period 05/08/2011 to 04/08/2012, P38/3781. |
| A98255 | 2013 | Regis Resources Ltd | Moolart Well | 100% | Moolart Well Project, Final Surrender Report for the period 5th November 2008 to 4th November 2012, P38/3433. |
| A98256 | 2013 | Regis Resources Ltd | Moolart Well | 85% | Moolart Well Project, Final Surrender Report for the period 5th November 2008 to 4th November 2012, P38/3436. |
| A96631 | 2013 | South Boulder Mines Ltd | Duketon East | 20% | Final Surrender Report on E38/1522 for the Period 16/9/2008 to 17/10/2012 |
| A97680 | 2013 | Stone Resources Australia | Brightstar North | <1% | CR209-2006 COMBINED ANNUAL EXPLORATION REPORT Reporting Period 1/01/2012 – 31/12/2012 |
| A97942 | 2013 | Stone Resources Australia | Brightstar North | 55% | Brightstar North Project, Annual Report for the period 05/08/2010 to 04/08/2011, P38/3781. [C209/2006] |
| A98734 | 2013 | Stone Resources Australia | E38/2361 | <1% | Annual Exploration Report E38/2361 for the period 07/06/2012 – 06/06/2013 |
| A98753 | 2013 | Regis Resources Ltd | Duketon Central | 100% | Surrender Report for the period 5 November 2008 to 4 November 2012 tenement no. P38/3431 Duketon Central Proje |
| A98828 | 2013 | Regis Resources Ltd | Duketon Central | 1.4% | Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38 |
| A99054 | 2013 | Stone Resources Australia | King Of Creation West | <1% | King Of Creation West P38/3873 Annual Exploration Report for the period 5/08/2012 – 4/08/2013 |
| A99056 | 2013 | Stone Resources Australia | P38/3871 | 55% | P38/3871 Annual Exploration Report 5/08/2012 – 4/08/2013 |
| A99094 | 2013 | Regis Resources Ltd | Duketon Central | 4.2% | Surrender Report E38/1133 for the period 20 June 2006 to 18 July 2013 |
| A100273 | 2013 | Strategic Energy Resources | Falcon Bridge | 4.3% | EL 38/1970 Falcon Bridge Exploration Lease Annual Report for the Period. 22/9/2012 to 21/9/2013 |
| A100800 | 2013 | Duketon Mining Ltd | Duketon West | 9.3% | Duketon West Project, Annual Report for the period 01/10/2012 to 30/09/2013, E38/1535, 1537, 1800, 2177, 2206, |
| A92415 | 2012 | South Boulder Mines Ltd | Duketon East | 20% | Partial Surrender Report on E38/1522 for the period 16/9/2008 to 15/9/2011. |
| A95410 | 2012 | Stone Resources Australia | Epsilon | <1% | Epsilon E38/2597 Annual Exploration Report for the period 18/08/2011 – 17/08/2012 |
| A97302 | 2012 | Regis Resources Ltd | Moolart Well | <1% | Moolart Well Project, Annual Report for the peiod 1st January 2012 to 31st December 2012, E38/1096.......E38/2 |
| A93027 | 2012 | Regis Resources Ltd | Moolart Well | <1% | Annual Combined Group Report for Moolart Well (C82/2011) for the period 1/1/2011 to 31/12/2011 |
| A93224 | 2012 | South Boulder Mines Ltd | Duketon East | 2.8% | Combined Annual Report C188/2007 “Duketon East” E38/1522, E38/2397, E38/2231, E38/2614, P38/3893, P38/3897. fo |
| A94597 | 2012 | Regis Resources Ltd | Duketon Central | 1.3% | Annual Combined Group Report for the period 1 July 2011 to 30 June 2012 Duketon Central Project C61/2003, E38/ |
| A94867 | 2012 | Stone Resources Australia | Eta | <1% | Annual Exploration Report reporting period 08/06/2011 – 07/06/2012, E38/2361, Eta |
| A94953 | 2012 | South Boulder Mines Ltd | Duketon West | 33% | Exploration Licence E38/1535 Duketon West Project C99/2007 Partial Surrender Report for the period 10/06/2008 |
| A95127 | 2012 | Redfeather Exploration Pty Ltd | Derby Well | <1% | Derby Well Project Exploration Licence: E38/2621, Final Surrender Report for the period: 14 December 2011 to 1 |
| A95374 | 2012 | Regis Resources Ltd | Duketon Central | 100% | Duketon Central Project Surrender Report P38/2800 for the period 18 April 2008 to 17 April 2012 |
| A95409 | 2012 | Stone Resources Australia | Epsilon | <1% | Epsilon E38/2596 Annual Exploration Report for the period 18/08/2011 – 17/08/2012 |
| A95707 | 2012 | Regis Resources Ltd | Duketon Central | 11% | Duketon Central (C61/2003) E38/1282 Surrender Report for the period 26 July 2005 to 20 June 2012 |
| A96070 | 2012 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | 7.1% | Combined Annual Report C99/2007 “Duketon West” E38/1511, 1535, 1537, 1800, 1979, 2177, 2206, 2255, 2661, M38/1 |
| A89673 | 2011 | Regis Resources Ltd | Moolart Well | <1% | Annual Combined Group Report for Moolart Well (C182/1997) for the period 13/12/2009 to 12/12/2010 |
| A89810 | 2011 | A1 Minerals Ltd | Bright Star North | 7.4% | Bright Star North Project C209/2006 Combined Annual Report for the period 01/01/2010 to 31/12/2010 |
| A91193 | 2011 | Regis Resources Ltd | Duketon Central | 1.4% | Annual Combined Group Report for the period 1 July 2010 to 30 June 2011, Duketon Central Project (C61/2003) |
| A91351 | 2011 | A1 Minerals Ltd | Eta | <1% | Eta Project E38/2361, Annual Exploration Report for the period 08/06/2010 – 07/06/2011 |
| A91943 | 2011 | Ishine International Resources Ltd | Falcon Bridge | 4.9% | FALCON BRIDGE PROJECT ANNUAL TECHNICAL REPORT Licenses E38/1970 P38/3382 P38/3383 P38/3384 Combined Report for |
| A92270 | 2011 | South Boulder Mines Ltd | Dukewest | 5.5% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2010 to 30 Sept 2011 |
| A89303 | 2011 | A1 Minerals Ltd | King of Creation | 67% | Final Surrender Report E38/1368 (King of Creation Area) Period covered 18/01/2006 -17/01/2011 |
| A89432 | 2011 | South Boulder Mines Ltd | Duketon East | 3.6% | Combined Annual Report C188/2007 “Duketon East”: E38/1825, E38/1836 and E38/1522 for the period January 1, 2 |
| A91382 | 2011 | South Boulder Mines Ltd | Duketon | 33% | Exploration Licence E38/1535, Duketon Project, Partial Surrender Report for the period 10/06/2008 to 9/06/2011 |
| A93427 | 2011 | A1 Minerals Ltd | Bright Star North | <1% | Bright Star North Project Combined Annual report for the period 01/01/2011 to 31/12/2011, C209/2006, E38/1936, |
| A85517 | 2010 | South Boulder Mines Ltd | Duketon West | 100% | Final Surrender Report E38/1602, Formerly part of “Duketon West Project” |
| A86217 | 2010 | Regis Resources Ltd | Moolart Well | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 13/12/2008 TO 12/12/2009 PROJECT C182/1997 MOOLART W |
| A88530 | 2010 | South Boulder Mines Ltd | Duketon West | 5.5% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2009 to 30 Sept 2010 |
| A88750 | 2010 | Ishine International Resources Ltd | Falcon Bridge | 4.9% | Falcon Bridge Nickel Project C1/2010 Combined Annual Report for the Period 2/9/2009 to 1/9/2010, E38/1970, P38 |
| A86180 | 2010 | A1 Minerals Ltd | Brightstar North | 7.6% | Bright Star North Project C209/2006 Annual Combined Report for the period 01/01/2009 to 31/12/2009 |
| A86523 | 2010 | A1 Minerals Ltd | King of Creation | 67% | Partial Surrender Report E38/1368 (King of Creation Area), Period covered 18/01/2006 -17/01/2010 |
| A86544 | 2010 | South Boulder Mines Ltd | Duketon East | 3.6% | COMBINED ANNUAL REPORT C188/2007 on E38/1825, 1836 & 1522 Duketon East for the Period January 1, 2009 to Decem |
| A86948 | 2010 | South Boulder Mines Ltd | Duketon West | 100% | Final Surrender Report E38/1548 Formerly part of “Duketon West Project” |
| A87969 | 2010 | Regis Resources Ltd | Duketon | 1.2% | C61/2003 Duketon Central: Combined Annual Report On Exploration For The Period 1/07/2009 to 30/06/2010 |
| A80831 | 2009 | Regis Resources Ltd | MOOLART WELL/ Duketon Central | 2.4% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 13/12/2007 TO 12/12/2008, PROJECT C182/1997 MOOLART WELL, |
| A81351 | 2009 | Heron Resources Ltd | LAVERTON | 32% | Annual report for the period 30 November 2007 to 29 November 2008, Laverton Nickel Project, C180/2006 |
| A81985 | 2009 | A1 Minerals Ltd | King of Creation Area | 67% | PARTIAL SURRENDER REPORT E38/1368 (King of Creation Area), Period covered 18/01/2006 -17/01/2009 |
| A80699 | 2009 | Regis Resources Ltd | MOOLART WELL | 3.9% | Annual Report on Exploration for the period 4/12/2007 to 3/12/2008: Moolart Well E38/1096 |
| A85238 | 2009 | Strategic Energy Resources | Duketon | 4.9% | Annual Report Exploration Licences EL 38-1970, P38/3382-4, A Combined Report for the Period 29/9/2008 to 28/9/ |
| A85348 | 2009 | Heron Resources Ltd | Erlistoun – Kurrajong Well | 55% | Surrender report for the period 27 October 2005 to 24 October 2009, Erlistoun – Kurrajong Well Project, E38/17 |
| A85350 | 2009 | Heron Resources Ltd | Laverton | 32% | Annual report for the period 30 November 2008 to 29 November 2009, Laverton Nickel Project, C180/2006, Report |
| A81286 | 2009 | Regis Resources Ltd | Duketon Central | 11% | PARTIAL SURRENDER REPORT ON EXPLORATION FOR THE PERIOD 26/07/2005 TO 1/12/2008 Duketon Central PROJECT E38/128 |
| A81678 | 2009 | A1 Minerals Ltd | Bright Star North | 7.5% | Bright Star North Project, Annual Report for th eperuiod 01/01/2008 to 31/12/2008, E38/1368. 1375, 1563, 1618, |
| A82290 | 2009 | South Boulder Mines Ltd | Duketon East | 2.5% | COMBINED ANNUAL REPORT C188/2007 on E38/1762, 1825, 1836 & 1522 Duketon East for the Period January 1, 2008 to |
| A84064 | 2009 | Regis Resources Ltd | Duketon Central | 4.2% | PARTIAL SURRENDER REPORT ON EXPLORATION, FOR THE PERIOD 20/06/2006 TO 19/06/2009, Duketon Central, E38/1133, R |
| A84137 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | 1.2% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2008 TO 30/06/2009 PROJECT C61/2003 DUKETON CENTRAL |
| A84357 | 2009 | Regis Resources Ltd | Duketon Central | 11% | Partial Surrender Report on Exploration for the period 26/07/2005 to 27/07/2009, E38/1282 (Kalgoorlie 29s), Du |
| A76989 | 2008 | South Boulder Mines Ltd | Duketon | 1% | Combined Annual Report C99/2007, E38/1043,....E38/1801, M38/330, P38/3160....P38/3309, Duketon West, for the p |
| A77144 | 2008 | Heron Resources Ltd | Laverton | 68% | Annual report for the period 30 November 2006 to 29 October 2007, Laverton Nickel Project, C125/2006 E38/1724, |
| A77711 | 2008 | A1 Minerals Ltd | Brightstar North | 15% | Brightstar North Project Laverton, WA Combined Annual Report 1st January 2007 to 31 December 2007 Project No: |
| A77242 | 2008 | Regis Resources Ltd | Moolart Well | 2.6% | Combined Annual Report on explorationfor the period 13/12/2006 TO 12/12/2007, C182/1997, Moolart Well E38/380, |
| A79043 | 2008 | Regis Resources Ltd | CAMEL HUMP | 4.2% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 20/06/2007 TO 19/06/2008 CAMEL HUMP E38/1133 |
| A79266 | 2008 | Regis Resources Ltd | DUKETON CENTRAL | 1.3% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2007 TO 30/06/2008 PROJECT C61/2003 DUKETON |
| A80474 | 2008 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | 1.9% | Combined Annual Report C99/2007 Duketon West on :-E 38/1499, E 38/1511, E 38/1537, E 38/1548, E 38/1564, E 38/ |
| A85436 | 2008 | South Boulder Mines Ltd | Duketon West | 6.7% | Combined Annual Report C99/2007, Duketon West Project, for the period 1st Oct 2008 to 30th Sept 2009, E38/1499 |
| A74176 | 2007 | A1 Minerals Ltd | Brightstar North | 15% | Combined Annual Technical Report, Brightstar North Project C209/2006, For the period 31 January 2006 to 31 Jan |
| A74195 | 2007 | Regis Resources Nl | Duketon | 2.6% | Combined Annual Report on Exploration for the Period 13/12/2005 to 12/12/2006, Moolart Well Project C182/1997, |
| A74471 | 2007 | Heron Resources Ltd | Laverton | 68% | Laverton Nickel Project, C180/2006, E38/1724, E38/1742, Annual Report, 30 November 2005 to 29 November 2006, ( |
| A75801 | 2007 | Regis Resources Nl | Duketon Central | 1.3% | Combined Annual Report On Exploration For The Period 1/7/200 5 to 30/6/2006; C61/2003 Duketon Central: E38/378 |
| A75748 | 2007 | Regis Resources Nl | Camel Hump | 4.2% | Annual Report on Exploration for the Period 20/06/2006 to 19/6/2007 Camel Hump E38/1133 Volume 1 of 1 Report N |
| A73194 | 2006 | Regis Resources Nl | Duketon Central | 11% | Annual Report on Exploration for the Period 26/07/2005 to 25/07/2006, Duketon Central E38/1282, (Regis Report |
| A73196 | 2006 | A1 Minerals Ltd | King of Creation | <1% | King of Creation Project M38/160, Annual Technical Report for the Period 27 July 2005 to 26 July 2006, (Lavert |
| A72734 | 2006 | Regis Resources Nl | Moolart Well | 2.6% | Combined Annual Report on Exploration for the Period 01/01/2005 to 31/12/2005, Project C182/1997 Moolart Well, |
| A73284 | 2006 | Regis Resources Nl | Duketon Central | 1.4% | Combined Annual Report on exploration for the period 1/07/2005 to 30/06/2006, Project C61/2003 Duketon Central |
| A73380 | 2006 | Mr Guj Al | Duketon | 71% | Annual Mineral Exploration Report, P38/3022, Period 25/11/2003 to 24/11/2004, (Duketon). |
| A69819 | 2005 | Newmont Australia Ltd | Moolart Well | 2.6% | Combined annual report for the period 13/12/03 - 12/12/04 Moolart Well Project, C182/1997, E38/348, E38/380, E |
| A69760 | 2005 | Newmont Australia Ltd | Duketon | 1% | Combined annual report for the period 01/07/03 - 30/06/04 Duketon Central Project, C61/2003, E38/378, E38/379, |
| A69761 | 2005 | Newmont Australia Ltd | Moolart Well | 2.6% | Combined annual report for the period 13/12/02 - 12/12/03 Moolart Well Project, C182/1997, E38/348, E38/380, E |
| A70955 | 2005 | Newmont Duketon Pty Ltd | Duketon | 1.5% | Combined annual report on exploration for the period 1/07/2004 to 30/06/2005, Project C61/2003, Duketon Centra |
| A71350 | 2005 | Bronzewing Gold Nl | King of Creation | <1% | King of Creation Project, Mining Lease 38/160, Annual Technical Report for the period 27 July 2004 to 26 July |
| A69449 | 2004 | Bronzewing Gold Nl | King of Creation | <1% | Annual report for the period 27/07/03 - 26/07/04 King of Creation Project, M38/160 |
| A65969 | 2003 | Newmont Australia Ltd | Moolart Well | 2.6% | Combined Annual Report on Exploration for period ended 12/12/2002 Moolart Well Project, E38/348, E38/380, E3 |
| A66264 | 2003 | Mr Guj Al | NORTH KUNDANA | 11% | ANNUAL EXPLORATION REPORT E24/85 “NORTH KUNDANA PROJECT” BROAD ARROW AND COOLGARDIE MINERAL FIELDS WESTERN AUS |
| A66509 | 2003 | Newmont Australia Ltd | Erlistoun | 13% | Final Surrender Report for period ended 2002 Project C16/1996 Erlistoun E38/386, 404, 1189-90, 1196, P38/2306 |
| A66600 | 2003 | Newmont Australia Ltd | Duketon Belt/Erlistoun | 2.7% | Combined Annual Report on Exploration for period ended 17/3/2003 Project C16/1996 Erlistoun E38/379, 387, 565, |
| A67365 | 2003 | Vulcan Resources Ltd | Varden | 48% | Varden Project, Annual Report for the period 1 August 2002 to 31 July 2003 for the Tenement, E38/1152. |
| A67366 | 2003 | Vulcan Resources Ltd | Varden | 48% | Varden Project, Partial Surrender Report for the tenement E38/1152 September 2003. |
| A67379 | 2003 | West Australian Metals Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 27th July 2002 to 26th July 2003, M38/160. |
| A67616 | 2003 | Johnsons Well Mining Nl | Camel Hump | <1% | Exploration Licence: E38/495, Prospecting Licences: P38/2718-P37/2722, Camel Hump, C184/1997: Joint Surrender |
| A64523 | 2002 | Acm Mines Pty Ltd | Moolart Well | 2.6% | Annual Report for the period ending 12/12/2001,E38/348, E38/380 E38/381, E38/419, E38/648, E38/1160-64, E38/11 |
| A64629 | 2002 | Mr Guj Al | Duketon | 11% | Combined Annual Mineral Exploration Report E38/714, P38/2902 2903, 2904, 2905, 2946, 2947, 2948 'Duketon Proje |
| A64877 | 2002 | Newmont Australia Ltd | Duketon Belt/Erlistoun | 4.3% | Combined Annual Report On Exploration For Period Ended 17/3/2002 Project C16/1996 Erlistoun E38/379, 386, 387, |
| A65365 | 2002 | West Australian Metals Ltd | King of Creation | <1% | King of Creation Project , Annual Report for the period 27th July, 2001 to 26th July 2002, M38/160. |
| A65317 | 2002 | Croesus Mining Nl | Varden | 39% | Annual Report For The Period 1 August 2001 to 31 July 2002 On The Tenements E38/945, E38/1152 & E38/1153 Combi |
| A63371 | 2001 | Croesus Mining Nl | Varden | 39% | Varden JV Project Annual Report For The Preiod 1 August 2000 to 31 July 2001 On The Tenements E38/945, E38/115 |
| A63442 | 2001 | Bronzewing Gold Nl | King of Creation | <1% | King of Creation Project, Annual Report for the period 27th July, 2000 to 26th July 2001,M38/160. |
| A63547 | 2001 | Johnsons Well Mining Nl | Camel Hump | 19% | Exploration Licences: E38/495, 518, 845, 1147, 1148, Mining Lease: M38/262, Prospecting Licences: P38/2660, 27 |
| A61653 | 2001 | Smd Investments Pty Ltd | Duketon gold-base metals exploration | 11% | Combined Annual Mineral Exploration Report E38/714, P38/2902 , 2903, 2904, 2905, 2946, 2947, 2948 'Duketon Pro |
| A62652 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 6.4% | Exploration Licences: E38/379, 386-7, 404, 565, 649, 651, 653, 843, 1189-92, 1196 Mining Leases: M38/114, 237, |
| A63104 | 2001 | Magnetic Resources Nl | Adam Range | 4.8% | Combined Annual Report June, 2000 To May, 2001 E38/1130, Adam Range, E38/1203, Darby Well. |
| A63672 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 6.5% | Exploration licences: E38/379, 386-387, 404, 565, 649, 651, 653, 789, 843, 1189-1192, 1196. Mining leases: M3 |
| A61238 | 2000 | Sons Of Gwalia Ltd | Swincer | 60% | Swincer Project, Surrender Report for the Period 20/08/1993 to 23/06/2000, E38/520. |
| A61848 | 2000 | Johnsons Well Mining Nl | Camel Hump | 21% | Exploration Licences E38/495,518,845, Mining Leases M38/262, Prospecting Licences P38/2660,2718-2724,2737,2949 |
| A63219 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | 1% | Amy Clarke Project, Surrender Report for the period 5 January 1993 to 28 September 2000, E38/496, 566, 598; P |
| A59621 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | 1.4% | Amy Clarke (JV Project, Partial Surrender Report for the period 16/11/1993 to 02/08/1999, E38/566 |
| A59845 | 2000 | Smd Investments Pty Ltd | Duketon | 11% | Annual Exploration Report E38/714 Duketon Project Mount Margaret Mineral Field Western Australia Period 31/10/ |
| A60613 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke JV, Annual Report for the Period 1/12/1998 to 30/11/1999, E38/496, E38/566, E38/598, P38/2486-9, P3 |
| A60777 | 2000 | Sons Of Gwalia Ltd | Banyego | 1.6% | Baneygo Project, Surrender Report for the Period 1/02/1995 to 23/06/2000. |
| A61116 | 2000 | Sons Of Gwalia Ltd | Swincer | 27% | Swincer Project, Annual Report for the period 01/01/1999 to 31/12/1999, E38/520, E38/521. |
| A61966 | 2000 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 4.8% | C16/1996 - Erlistoun Joint Annual Report for the period 18 March 1999 to 17 March 2000. Gold mining lease: GM |
| A57857 | 1999 | Johnsons Well Mining Nl | Moolart Well | 3% | Moolart Well Project, Annual Report 13/12/97 - 12/12/98, E338/348, 380-381, 648, 774, 790; M38/354; P38/2768 |
| A57535 | 1999 | Smd Investments Pty Ltd | Duketon | 11% | Duketon Project E38/714 05/03/1999 |
| A57543 | 1999 | Sons Of Gwalia Ltd | Swincer | 27% | Swincer Project - Partial Surrender Report 20/08/93-09/07/98 E38/520-521 |
| A59200 | 1999 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 2.9% | Joint Annual Report on the Erlistoun Project, E38/379, 386- 387, 404, 565, 649, 651, 653, 789, M38/114, 237, 2 |
| A59840 | 1999 | Johnsons Well Mining Nl | Deleta | 67% | Deleta Project, Partial Surrender Report for the period 22/04/1996 to 29/10/1999 ,E38/843. |
| A53688 | 1998 | Smd Investments Pty Ltd | Duketon | 11% | Annual Exploration Report E38/714 Duketon Project Mount Margaret Mineral Field WA for period 31/10/96-30/10/97 |
| A54261 | 1998 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke JV Project Annual report for the period 01/12/96-30/11/97 Tenements E38/496,566,598 P38/2486-2489,2 |
| A54583 | 1998 | Sons Of Gwalia Ltd | Swincer | 27% | Swincer Project, Annual Report for the period 1 January 1997 - 31 December 1997, E38/520-521, P38/2518-2519. |
| A54591 | 1998 | Mim Exploration Pty Ltd | McLaren | 21% | Annual Report for the Period Ending 21st April 1998 , McLaren Project, E38/842 and E38/843. |
| A55359 | 1998 | Sons Of Gwalia Ltd | Baneygo | 3.1% | Baneygo Project Annual report for the period 01/01/97- 31/12/97 Tenements EL38/545 EL38/547 EL38/665 EL38/667 |
| A55392 | 1998 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3% | Exploration Licences E38/379 E38/386 to E38/387 E38/565 E38/649 E38/651 E38/653 Mining Leases M38/114 M38/237 |
| A55457 | 1998 | Sons Of Gwalia Ltd | Baneygo | 1.6% | Baneygo Project, EL38/665, Partial Surrender Report, 01/02/95 - 31/01/98 |
| A55510 | 1998 | Johnsons Well Mining Nl | Camel Hump | 22% | C184/1997 - Camel Hump, Joint Annual Report Exploration Licence:E38/495, 518, 845 26/03/97 - 25/03/98 |
| A55547 | 1998 | Sons Of Gwalia Ltd | Baneygo | 94% | Baneygo Project, PL 38/2520, 2521, 2525 Final Surrender Report, 23/03/94 - 18/04/98 |
| A55879 | 1998 | Bronzewing Gold Nl | King of Creation | <1% | King of Creation Project, Annual Report for the period 27//07/1997 to 26/07/1998, M38/160. |
| A56181 | 1998 | Sons Of Gwalia Ltd | Baneygo | <1% | Baneygo Project, Partial Surrender Report E38/547 24/09/93 - 09/07/98 |
| A56945 | 1998 | Smd Investments Pty Ltd | Duketon | 11% | Duketon Project E38/714 Mount Margaret Mineral Field W.A. 31/10/97 - 30/10/98 |
| A53560 | 1998 | Johnsons Well Mining Nl | Moolart Well | 2.9% | Moolart Well Project , E38/348, E38/380, E38/381, E38/648 E38/751, E38/774, E38/790, M38/354, P38/2614, P38/26 |
| A56182 | 1998 | Sons Of Gwalia Ltd | Amy Clarke | 1.4% | Amy Clarke J.V. Project, Partial Surrender Report 16/11/93 - 02/04/98 E38/566. |
| A52367 | 1997 | Mim Exploration Pty Ltd | McLaren | 21% | Annual Report for the Period Ending June 21 1997, E38/842 & 843,McLaren Project. |
| A52934 | 1997 | Johnsons Well Mining Nl | Mount Varden | 87% | Mt Varden Project, Partial Surrender Report for the period 11th June 1993 to 25th June 1997, E38/518. |
| A52935 | 1997 | Johnsons Well Mining Nl | Golden Star | <1% | Golden Star Project, Partial Surrender Report for the period 15th January 1993 to 25th June 1997, E38/495. |
| A53635 | 1997 | Sons Of Gwalia Ltd | Doris Creek | 1.3% | Laverton Region, Doris Creek, Annual Report E38/542 For the Period 23/08/96 - 24/0897. |
| A50167 | 1997 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Laverton Region Amy Clarke Joint Venture Project Annual report for the period 1 December 1995 to 30 November 1 |
| A50344 | 1997 | Aurora Gold Ltd | Duketon | 3.3% | Duketon Project, Partial Surrender Report, Exploration Licences 38/380, 381, 387 for the Period 13 January 19 |
| A50352 | 1997 | Aurora Gold Ltd | Duketon | 2.4% | Annual Technical Report, Duketon Project , E38/348 E38/380 E38/381 E38/387 E31/404 E38/430; M38/421 M38/422 an |
| A50479 | 1997 | Sons Of Gwalia Ltd | Swincer | 27% | Swincer Project , Annual Report for the period 1 January 1996 - 31 December 1996, E38/520-521, P38/2518-2519. |
| A50637 | 1997 | Sons Of Gwalia Ltd | Baneygo | <1% | Partial Surrender Report for the period 24 November 1993 - 23 November 1996 |
| A50928 | 1997 | Sons Of Gwalia Ltd | Laverton | 3.1% | Laverton Region Baneygo Project Annual report for the period 1 January 1996 to 31 December 1996 Tenements E38/ |
| A48746 | 1996 | Central Kalgoorlie Gold Mines Nl | Doris Creek | 1.3% | Doris Creek Project, Annual Report for period ending 30th June 1996, E38/542. |
| A49701 | 1996 | Smd Investments Pty Ltd | Duketon | 11% | Annual Exploration Report E38/714 'Duketon Project' Mount Margaret Mineral Field Western Australia period 31 O |
| A47345 | 1996 | Johnsons Well Mining Nl | Golden Star | <1% | Annual Report for the period 15 January 1995 to 14 January 1996 ,Golden Star Project, E38/495. |
| A47739 | 1996 | Sons Of Gwalia Ltd | Laverton | 3.2% | Laverton Region North Eastern Goldfields Baneygo Project Annual report for the period 1 January 1995 to 31 Dec |
| A47742 | 1996 | Sons Of Gwalia Ltd | Swincer | 27% | Swincer Project ,Annual Report for the period 1 January 1995 - 31 December 1995,E38/520-521, P38/2518-2519. |
| A47872 | 1996 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 7.4% | Gold Mining Lease G38/2882,Exploration Licences E38/379,565, Mining Leases M38/114,262,283,292,303,316-317,341 |
| A48543 | 1996 | Westex Resources Pty Ltd | Duketon | 21% | Non-statutory Report :DuketonProject, Interim Report, January 1996. |
| A48548 | 1996 | Johnsons Well Mining Nl | Duketon 2 | 29% | Annual Joint Report for the period 11 June 1995 to 10 June 1996 'Duketon 2 Project' exploration licences E38/4 |
| A49227 | 1996 | Sons Of Gwalia Ltd | Swincer | 27% | Laverton Region Swincer Project Partial Surrender Report for the Period 20th Augusr 1996-19 August 1996 E38/5 |
| A49562 | 1996 | Roehampton Developments Pty Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 27/07/1995 to 26/07/1996, M38/160. |
| A43908 | 1995 | Aurora Gold Ltd | Duketon | 2.4% | Annual Report, Duketon Project ,E38/348, 380, 381, 387, 404 & 430 for the period 1 January 1994 to 31 December |
| A44727 | 1995 | Johnsons Well Mining Nl | Golden Star | <1% | Annual Report for the period 15 January 1994 to 14 January 1995 'Golden Star' exploration licence E38/495. |
| A45207 | 1995 | Johnsons Well Mining Nl | Mount Varden | 87% | Annual Report for the period 11 June 1994 to 10 June 1995,Mt Varden Project, E38/518. |
| A45391 | 1995 | Roehampton Developments Pty Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 27th July 1994 to 26th July 1995, M38/160. |
| A45519 | 1995 | Sons Of Gwalia Ltd | Laverton | 3.1% | Laverton Region Northeastern Goldfields Baneygo project Annual report for the period 01 January 1994 to 31 Dec |
| A45722 | 1995 | Aurora Gold Ltd | Duketon | 3.9% | Partial Surrender Report for the period 13/01/91-06/09/95 ,Duketon Project, E38/380 E38/381 |
| A46412 | 1995 | Johnsons Well Mining Nl | Duketon | 10% | Exploration Licence E38/379 Mining Licences M38/292 M38/303 M38/114 M38/352 M38/262 M38/316 M38/317 M38/341 M3 |
| A45428 | 1995 | Central Kalgoorlie Gold Mines Nl | Doris Creek | 1.3% | Doris Creek Project, Second Annual Report E38/542, August 1995 |
| A47215 | 1995 | Aurora Gold Ltd | Duketon | 2.4% | Annual Technical Report, Duketon Project, E38/348 E38/380 E38/381 E38/387 E38/404 And E38/430; M38/421 M38/42 |
| A47328 | 1995 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke (JV) Project, Annual report for the period 1 December 1994 to 30 November 1995 E38/496 E38/566 E38 |
| A40892 | 1994 | Aurora Gold Ltd | Duketon | 3.2% | Duketon Project, Partial Surrender Report for E38/348 for the period 28th February 1990 to 28th February 1994; |
| A43247 | 1994 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region North Eastern Goldfields Baneygo Project Interim Report to 23 September 1994 Tenements:E38/545 |
| A40945 | 1994 | Aurora Gold Ltd | Duketon | 2.4% | Annual Report for the Period 01/01/93 - 31/12/93 Duketon Project |
| A42598 | 1994 | Central Kalgoorlie Gold Mines Nl | Doris Creek | 1.3% | Doris Creek Project, (1st) Annual Report for the period 25th August 1993 to 24th August 1994, E38/542. |
| A43882 | 1994 | Sons Of Gwalia Ltd | Swincer | 27% | Swincer Project, Annual Report for the period 1 January 1994 - 31 December 1994,E38/520-521, P38/2518-2519. |
| A38734 | 1993 | Ashton Gold Wa Ltd | Duketon | 2.4% | Annual Report for the period 01/01/92-31/12/92 Duketon Project P38/2101,2234,2286-2287 E38/348,379-381,387,404 |
| A41404 | 1993 | Nevoria Gold Mines Ltd | Doris Creek | 87% | Annual Report 06/93 - 06/94 Doris Creek (E38/518) Geological Report. |
| A38735 | 1993 | Ashton Gold Wa Ltd | Hack Well | 6.2% | Annual Technical Report H475 Hack Well Project E38/85, M38/114, M38/283, M38/292, M38/303, M38/316, M38/317, M |
| A40386 | 1993 | Mr Mcknight Rg | Mount Varden | 29% | Annual Report 01/93 - 01/94 E38/495, Mount Varden Prospect. |
| A40943 | 1993 | Aurora Gold Ltd | Hack Well | 6.2% | H475 Hack Well Project Western Australia Annual Technical` Report for the period 01 January 1993 to 31st Decem |
| A35628 | 1992 | Ashton Gold Wa Ltd | Hack Well | 6.5% | Annual Technical Report Hack Well Project E38/25, M38/114, M38/283, M38/291 to M38/293, M38/302 to M38/307, M3 |
| A35642 | 1992 | Ashton Gold Wa Ltd | Reichelts Find | 79% | Annual Technical Report The Reichelts Find Project Mining Leases M38/196 & M38/206 Period 01/01/91 to 31/12/91 |
| A35704 | 1992 | Ashton Gold Wa Ltd | Russell East | 100% | Annual report for the period 01/01/91-31/12/91 Russell East Project GML38/2882 P38/1881 P38/1882 |
| A35629 | 1992 | Ashton Gold Wa Ltd | Duketon | 3% | Annual Report for 1 January 1991 to 31 December 1991. Duketon Project E38/348, E38/379, E38/380, E38/381, E38/ |
| A33632 | 1991 | Ashton Gold Wa Ltd | Reichelts Find | 79% | Annual technical report Reichelts Find Project M38/196 M38/206 period 01/01/90-31/12/90 |
| A33661 | 1991 | Ashton Gold Wa Ltd | Russell East | 100% | Annual report for the period 01/01/90-31/12/90 Russell East Project GML38/2882 P38/1881 P38/1882 |
| A33665 | 1991 | Ashton Gold Wa Ltd | Hack Well | 9.2% | Annual Technical Report H475 Hack Well Project. Prospecting Licences P38/835 to P38/837, P38/842, P38/843, P3 |
| A33666 | 1991 | Ashton Gold Wa Ltd | Paillard Find | 12% | Annual Technical Report H548 Paillard Find Project. M38/77-78,120,262 for the period 01/01/90-31/12/90. |
| A33672 | 1991 | Ashton Gold Mines Pty Ltd | King of Creation | <1% | King of Creation Project, Annual Report for the period 01/01/1990 to 31/12/1990, L38/160 M38/160. |
All 304 report numbers over this ground
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 38/3767 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 38/3767 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 38/3767? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.