E 39/2581
E 39/2581 is a pending exploration licence in the Shire of Menzies, Western Australia, applied for by Oranium Exploration Pty Ltd (part of Orange Minerals NL). The application was received on 15 Dec 2025 and is awaiting a decision. The ground is covered by 99 historical WAMEX reports.
Register summary
- Holder
- Oranium Exploration Pty Ltd
- Part of
- Orange Minerals NL (ASX:OMX) as at 2025-06-30
- Local government
- Shire of Menzies
- Application received
- 15 Dec 2025
The full record on E 39/2581
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (3 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A144838 | 2024 | Narnoo Mining Pty Ltd | Mulga Rock | <1% | Partial Surrender Report for E39/2207 Mulga Rock Project for the period ending 30/06/2024. |
| A137664 | 2023 | Velo Resources Pty Ltd | Great Victoria Desert | 8.4% | Final Report for E39/2115 Great Victoria Desert for the period ending 29/09/2023 |
| A134226 | 2023 | Velo Resources Pty Ltd | GVD | 8.4% | Annual Report for E39/2115 GVD Project for the period ending 17/11/2022. |
| A136086 | 2023 | Velo Resources Pty Ltd | Kingston | 15% | Partial Surrender Report for E39/2149 GVD Project for the period ending 01/06/2023. |
| A130305 | 2022 | Velo Resources Pty Ltd | Kingston | 8.4% | Annual Report for E39/2115 Kingston Project for the period ending 17/11/2021. |
94 more reports
| A132039 | 2022 | Fortescue Metals Group Ltd | E39/2104 | <1% | E39/2104 Final Surrender Report for the period ending 22/07/2022. |
| A126385 | 2021 | Velo Resources Pty Ltd | GVD | 8.4% | Annual Report for E39/2115 GVD Project for the period 11 October 2019 to 10 October 2020 |
| A128024 | 2021 | Fortescue Metals Group Ltd | Nippon | <1% | C102/2019 Nippon Project Annual Report for the period ending 30/06/2021 |
| A118652 | 2019 | Narnoo Mining Pty Ltd | Narnoo | <1% | Final Surrender Report for E39/1551 Narnoo Project for the period 4 October 2010 to 3 October 2018 |
| A120969 | 2019 | Narnoo Mining Pty Ltd | Mulga Rock | 36% | 2019 Mulga Rock Project Annual Report for the period 10 May 2018 to 9 May 2019 |
| A118965 | 2019 | Narnoo Mining Pty Ltd | Mulga Rock | 53% | Final Surrender Report for E39/1150 Mulga Rock For the Period 9 April 2007 to 1 November 2018 |
| A117544 | 2018 | Vimy Resources Limited | Mulga Rock | 21% | Annual Report on C215/2007 (Mulga Rock Project) 09 May 2017 - 08 May 2018 |
| A118012 | 2018 | Velo Resources Pty Ltd | Narnoo North | 17% | Final Surrender Report for E 39/1683 for the period 15 September 2012 to 4 September 2018 |
| A111930 | 2017 | Vimy Resources Limited | Mulga Rock | <1% | E39/1551 - Compulsory Partial Surrender Report for the period 4 October 2010 to 3 October 2016 |
| A114624 | 2017 | Vimy Resources Limited | Mulga Rock | 22% | Mulga Rock Project C215/2007 Annual Report for the period 10 May 2016 to 9 May 2017, E39/00876, E39/00877, E39 |
| A114849 | 2017 | St George Mining Limited | East Laverton | <1% | Combined Annual Technical Report - C171/2012 East Laverton Project for the period 02/08/2016 - 01/08/2017 |
| A114935 | 2017 | Manhattan Corporation Limited | Manhattan | 2.1% | Final Surrender Report E39/1782 for the period ending 22/06/2017 |
| A115526 | 2017 | Velo Resources Pty Ltd | Scorpion | 17% | Annual Report for E39/1683, Scorpion for the period 05/09/2016-04/09/2017 |
| A114928 | 2017 | St George Mining Limited | East Laverton | <1% | Final Surrender Report E39/1064 East Laverton Project for the period 02/08/2004 - 01/08/2017 |
| A109672 | 2016 | Narnoo Mining Pty Ltd | Mulga Rock | 25% | 2016 Mulga Rock Project C215/2007 Annual Report for the period 10 May 2015 to 9 May 2016, E39/00876, E39/00877 |
| A110117 | 2016 | Manhattan Corporation Limited | Ponton | 2.1% | Partial Surrender Report of E39/1782 (Ponton) For the Period 10 July 2015 to 8 July 2016 |
| A110249 | 2016 | Zeus Resources Ltd | Narnoo North | 17% | Annual Report On Exploration For E39/1683; Great Victoria Desert, Mount Margaret, Western Australia, For the P |
| A110181 | 2016 | St George Mining Ltd | East Laverton | <1% | Annual Technical Report C171/2012 East Laverton Project for the period 2 August 2015 to 1 August 2016 |
| A110180 | 2016 | Manhattan Corporation Limited | Ponton | 1.2% | Ponton Uranium Project C124/2007 Combined Annual Report for the period 24 August 2015 to 23 August 2016, E28/0 |
| A106473 | 2015 | Zeus Resources Ltd | Great Victoria Desert - Narnoo North | 7.1% | Final Report On Exploration: E39/1689; Great Victoria Desert, Mount Margaret, Western Australia [for the perio |
| A107117 | 2015 | St George Mining Ltd | East Laverton | <1% | East Laverton C171/2012 Annual Report for the period 02/08/2014 to 01/08/2015, E39/981, E39/982, E39/985, E39/ |
| A107504 | 2015 | Manhattan Corporation Ltd | Ponton | 1.2% | Ponton Project C124/2007 Annual Exploration Report for the period 24 August 2014 to 23 August 2015, E28/1523, |
| A106498 | 2015 | Vimy Resources Limited | Mulga Rock | 20% | Mulga Rock Project C215/2007 Annual Report for the period 10/05/2014 to 09/05/2015 |
| A106558 | 2015 | Zeus Resources Ltd | Great Victoria Desert | 17% | Partial Relinquishment Report: E39/1683; Great Victoria Desert, Mount Margaret, Western Australia, for the per |
| A107337 | 2015 | Zeus Resources Ltd | Narnoo North | 17% | Annual Report On Exploration For E39/1683; Great Victoria Desert, Mount Margaret, Western Australia |
| A100506 | 2014 | Manhattan Corporation Ltd | Ponton | 64% | Final Surrender report Exploration Licence E39/1544, Ponton Project for the period ended 27 November 2013 |
| A103779 | 2014 | St George Mining Ltd | East Laverton | <1% | EAST LAVERTON PROJECT ANNUAL TECHNICAL REPORT 2 August 2013 to 1 August 2014 Combined Reporting No: C171/2012 |
| A100510 | 2014 | Manhattan Corporation Ltd | Ponton | 10% | Final Surrender report Exploration Licence E39/1140, Ponton Project for the period ended 27 November 2013 |
| A103495 | 2014 | Energy & Minerals Australia Ltd | Mulga Rock | 21% | Mulga Rock Project, Annual Report for the period 10/05/2013 to 09/05/2014, E39/876-877, 1148-1150 1358 & 1551; |
| A104387 | 2014 | Zeus Resources Ltd | Great Victoria Desert | 9% | Combined Annual Report C114/2013 On Exploration For: E39/1401, E39/1683, E39/1687 & E39/1689; Great Victoria D |
| A99785 | 2013 | Energy And Minerals Australia Pty Ltd | Mulga Rock | 61% | Mulga Rock Project 2013 Partial Surrender E39/876 for the period 28th February 2003 – 11 September 2013 |
| A99786 | 2013 | Energy And Minerals Australia Pty Ltd | Narnoo | 53% | Narnoo Project 2011, Partial Surrender for the period 9 May 2007 – 11 September 2013 |
| A99050 | 2013 | Energy And Minerals Australia Pty Ltd | Mulga Rock | 21% | Mulga Rock Project Annual Report for 2013 for the period 10th May 2012 – 9th May 2013, E39/876....L39/219 |
| A99676 | 2013 | St George Mining Ltd | East Laverton | <1% | East Laverton Project C171/2012 Annual Report for the period 2 August 2012 to 1 August 2013, E39/981.....E39/1 |
| A99787 | 2013 | Energy And Minerals Australia Pty Ltd | Mulga Rock | 31% | Mulga Rock Project E39/1358 2013, Outright Surrender for the period 20 September 2007 – 13 September 2013 |
| A99679 | 2013 | Manhattan Corporation Ltd | Ponton | 1% | Combined Annual Report C124/2007 Ponton Project for period 24 August 2012 to 23 August 2013 Exploration Licenc |
| A100113 | 2013 | Zeus Resources Ltd | Narnoo (North) | 9% | Combined Annual Report CA114 On Exploration For: E39/1401, E39/1683, E39/1687 & E39/1689; Great Victoria Deser |
| A93015 | 2012 | Zeus Uranium Ltd | Great Victoria Desert | 7.1% | Report on Exploration for Period 17 November 2006 to 16 November 2011, E39/1173, Great Victoria Desert, Mt Mar |
| A95142 | 2012 | Energy And Minerals Australia Pty Ltd | Narnoo | 26% | Narnoo Project Annual Report for 2012 for the period 9th May 2011 – 10th May 2012 |
| A95366 | 2012 | St George Mining Ltd | East Laverton | <1% | East Laverton Project, ANNUAL REPORT, Combined Reporting No: C171/2012, 2nd August 2011 –1st August 2012 |
| A95437 | 2012 | Manhattan Corporation Ltd | Ponton | 1.2% | COMBINED ANNUAL REPORT EXPLORATION LICENCES E39/1140, 39/1141, 39/1142, 39/1143, 39/1144, 39/1542, 39/1543, 39 |
| A91112 | 2011 | Energy And Minerals Australia Pty Ltd | Narnoo | 26% | Narnoo Project C215/2007 Annual Report for 2011, 9th May 2010 – 10th May 2011, E’s: 39/876, 877, 1148, 1149, 1 |
| A88976 | 2011 | Energy And Minerals Australia Pty Ltd | Narnoo | 31% | Narnoo Project 2010 Partial Surrender EL 39/1358, 20 September 2007 – 10 November 2010 |
| A89866 | 2011 | Zeus Uranium Ltd | Narnoo | 7.1% | Narnoo Project, Annual Report for the period 17/11/2009 to 16/11/2010, E39/1173. |
| A90466 | 2011 | Energy And Minerals Australia Pty Ltd | Narnoo | 34% | Narnoo Project 2011, Partial Surrender, Narnoo Mining Pty Ltd. Report Period: 9 May 2007 – 21 April 2011, EL 3 |
| A91717 | 2011 | Manhattan Corporation Ltd | Ponton | 1.2% | COMBINED ANNUAL REPORT EXPLORATION LICENCES E 39/1140, 39/1141, 39/1142, 39/1143, 39/1144, 39/1542, 39/1543, 3 |
| A90468 | 2011 | Energy And Minerals Australia Pty Ltd | Narnoo | 53% | Narnoo Project 2011, Partial Surrender, Narnoo Mining Pty Ltd. Report Period: 9 May 2007 – 21 April 2011, EL 3 |
| A91530 | 2011 | St George Mining Ltd | East Laverton | <1% | East Laverton Project C103/2004 Annual Report for the period 2 August 2010 to 1 August 2011 |
| A85545 | 2010 | A1 Minerals Ltd | Narnoo | 7.1% | Partial Surrender Report for E39/1173 Narnoo Project (C103/2004), 17th November 2006 –16th November 2009 |
| A87304 | 2010 | Energy And Minerals Australia Pty Ltd | Narnoo | 27% | Narnoo Project C215/2007 Annual Report for 2010, 9th May 2009 – 10th May 2010 |
| A88154 | 2010 | Manhattan Corporation Ltd | Ponton | 5% | Partial Surrender Report E39/1140, 39/1141, Ponton Project, Combined Reporting Number C124/2007, 24 August 200 |
| A88155 | 2010 | St George Mining Ltd | East Laverton | <1% | East Laverton Project C103/2004 Annual Report 2nd August 2009 – 1st August 2010 |
| A88199 | 2010 | Manhattan Corporation Ltd | Ponton | 1.7% | Combined Annual Report, Exploration Licences E 39/1140, 39/1141, 39/1142, 39/1143, 39/1144, 28/1523, Ponton No |
| A82943 | 2009 | Energy & Minerals Australia Ltd | Narnoo | 27% | Narnoo Project C215/2007 Annual Report for 2009, Period: 9th May 2008 – 10th May 2009. Tenement Numbers: E’s: |
| A81288 | 2009 | Epsilon Energy Ltd | BALLADONIA (KAKAROOK) | 11% | ANNUAL MINERAL EXPLORATION REPORT 23 NOVEMBER 2007 TO 22 NOVEMBER 2008, BALLADONIA URANIUM PROJECT REPORT, KAK |
| A84954 | 2009 | Manhattan Corporation Ltd | Ponton North | 2% | Partial Surrender Report, Exploration Licences E 39/1140, 39/1141, 39/1142, 39/1143, 39/1144, Ponton North Pro |
| A83087 | 2009 | Epsilon Energy Ltd | Kararook Project | 11% | Final Surrender Exploration Report For the Period: 23 November 2008 to 7 April 2009 Balladonia Uranium Final S |
| A84204 | 2009 | Manhattan Corporation Ltd | Ponton North | 2% | Combined Annual Report, Exploration Licences E 39/1140, 39/1141, 39/1142, 39/1143, 39/1144, Ponton North Proje |
| A84793 | 2009 | A1 Minerals Ltd | Narnoo | <1% | Narnoo Project, Annual Report 2 August 2008 to 1 August 2009, Combined Reporting No: C103/2004, Tenements Incl |
| A77961 | 2008 | Energy & Minerals Australia Ltd | Narnoo uranium exploration | 35% | Fifth Annual Report for the period 28 February 2007 to 27 February 2008, Narnoo Project, E39/876, E39/877. |
| A79156 | 2008 | Energy And Minerals Australia Pty Ltd | Narnoo | 27% | Narnoo Project Annual Report for 2008, 10 May 2007 - 9 May 2008 Es39/876, 39/877, 39/1148, 39/1149, 39/1150 C2 |
| A79448 | 2008 | Oklo Uranium Ltd | Narnoo Uranium Joint Venture (Narnoo) | 1.1% | Mineral Exploration Activities Report For the Period 01/08/2007 to 31/07/2008 Combined Licence Report For E39/ |
| A79853 | 2008 | Uranio Ltd | Ponton North | 2% | Combined Annual Report, Exploration Licences E 39/1140, 39/1141, 39/1142, 39/1143, 39/1144, Ponton North Proje |
| A76152 | 2007 | Oklo Uranium Ltd | Narnoo Uranium JV (Narnoo) | <1% | Mineral Exploration Activities Report For the Period 01/08/2006 to 31/07/2007 Combined Licence Report For E39/ |
| A76266 | 2007 | Deep Yellow Ltd | Ponton North | 2% | Combined Annual Report Exploratrion Licences E39/1140,E39/11 41,39/1142, 39/1143, 39/1144 Ponton North Project |
| A76626 | 2007 | A1 Minerals Ltd | Narnoo | 3.6% | Mineral Exploration Activities Report For the Period 16/11/2006 to 15/11/2007 Combined Licence Report For E39/ |
| A76690 | 2007 | A1 Minerals Ltd | Narnoo | <1% | Partial Surrender Report for the period 02/08/2004 to 01/08/2007 E39/981, E39/982, E39/985, E39/1063 & E39/10 |
| A76847 | 2007 | Epsilon Energy Ltd | Kakarook | 11% | KARAKOOK PROJECT E39/1178 MOUNT MARGARET MINERAL FIELD ANNUAL REPORT 23 November 2006 to 22 November 2007 |
| A74665 | 2007 | Eaglefield Holdings Pty Ltd | Narnoo | 35% | Fourth Annual Report for the Period 28 February 2006 - 27 February 2007 Narnoo Project, E39/876,E39/877, Combi |
| A76718 | 2007 | Oklo Uranium Ltd | Narnoo | 3.6% | Mineral Exploration Activities Report For the Period 16/11/2006 to 15/11/2007 Combined Licence Report For E39/ |
| A72950 | 2006 | A1 Minerals Ltd | Narnoo | <1% | Annual Report, Narnoo Project E39/981-982,985,1063-1064, Exploration for the Period 2 August 2005 to 1 August |
| A72285 | 2006 | Eaglefield Holdings Pty Ltd | Narnoo gold exploration | 35% | Third Annual Report, The Narnoo Project, Combined Reporting No. C67/2003, E39/876,877, For the Period 28 Febru |
| A70700 | 2005 | Eaglefield Holdings Pty Ltd | Narnoo | 35% | Narnoo Project, Annual Report for the period 28th February 2004 to 27th February 2005 , E39/876 & 877.(C67/200 |
| A70825 | 2005 | A1 Minerals Ltd | Narnoo gold exploration | <1% | First Annual Report, Narnoo Project Leases, E39/981, E39/982, E39/985, E39/1063, E39/1064, Exploration for the |
| A68612 | 2004 | Eaglefield Holdings Pty Ltd | Narnoo | 35% | First annual report, the Narnoo project, Combined reporting number C67/2003, all tenements being exploration l |
| A59847 | 2000 | Eaglefield Holdings Pty Ltd | Narnoo | 16% | Combined Annual Report for the Narnoo Project E39/360,361, 472,510,511 for the period 23/02/1999 to 22/02/2000 |
| A58264 | 1999 | Eaglefield Holdings Pty Ltd | Narnoo | 16% | Combined Annual Report E39/360,361, 472,510,511 for the period 23/02/1998 to 22/02/1999 (Narnoo Project). |
| A53658 | 1998 | Great Southern Mines Nl | Narnoo | 16% | Combined Annual Report for the Narnoo Project E39/360, 361, 472, 510 and 511 For the Period 23rd February 199 |
| A55531 | 1998 | Great Southern Mines Nl | Narnoo | 20% | Partial Surrender Report for E39/360 (Narnoo) for the period 24/02/1993 - 16/05/1998.C163/1996 |
| A55734 | 1998 | Great Southern Mines Nl | Narnoo | 62% | Partial Surrender Report for E39/361 (Narnoo) for the period 24th February 1993 to 19th February 1998. |
| A50823 | 1997 | Great Southern Mines Nl | Narnoo | 16% | Narnoo Project, 1996 Annual Report E39/360,361,472, 510, & 511 for the period 24/02/1996 to 23/02/1997. |
| A47724 | 1996 | Great Southern Mines Nl | Narnoo | 40% | Narnoo Project, 1995 Annual Report for the period 24th February 1995 to 23rd February 1996, E39/360 & E39/361. |
| A44903 | 1995 | Sons Of Gwalia Ltd | Narnoo | 40% | Narnoo Project, Progress Report Exploration Licence E39/360-361 for the period ending 24th February 1995. |
| A40906 | 1994 | Eaglefield Holdings Pty Ltd | Narnoo | 40% | Narnoo Project, (1st) Annual Report for the period 24th February 1993 to 23rd February 1994, E39/360 & 361. |
| A37028 | 1992 | Mining Corp Exploration Nl | Plumridge | <1% | Plumridge Project, Non-statutory Report : Airborne Magnetometer Surveys, 1971. |
| A11724 | 1982 | Pnc Exp Aust Pty Ltd | Yilgarn- Officer Basin | 9.1% | Annual Report [Field Season] for the period 1982 Yilgarn(Officer Basin) Project TR70/6870-6874 TR70/7123-7126, |
| A9522 | 1981 | Pnc Exp Aust Pty Ltd | Yilgarn - Officer Basin | 15% | 1980 Annual Report on Temporary Reserves 6870H to 6875H Yilgarn- Officer Basin Project TR70/6870-6875 |
| A10301 | 1981 | Pnc Exp Aust Pty Ltd | Yilgarn - Officer Basin | 8.7% | Non-statutory Report: R Report for the period 1981 Yilgarn (Officer Basin) Project TR70/6870-6875 TR70/7123-71 |
| A13177 | 1981 | Pnc Exp Aust Pty Ltd | Yilgarn- Officer Basin | 17% | Non-statutory Report; R Report , August 1981 ,Yilgarn- Officer Basin Project TR70/6870,7809 Drill Logs |
| A10456 | 1981 | Pnc Exp Aust Pty Ltd | Yilgarn - Officer Basin | 7.5% | Perth Office 1981 Field Season Report on the Yilgarn(Officer Basin) Project TR70/6870-6875,7123-7126,7809-7810 |
| A13178 | 1981 | Pnc Exp Aust Pty Ltd | Yilgarn - Officer Basin | 45% | Non-statutory Report : R Report , June 1981, Yilgarn- Officer Basin Project TR70/6870 Drill Logs. |
| A13179 | 1981 | Pnc Exp Aust Pty Ltd | Yilgarn- Officer Basin | 23% | Non-statutory Report: R Report ,June 1981,Yilgarn- Officer Basin Project TR70/6871-6872,7123 Drill Logs. |
| A8619 | 1979 | Pnc Exp Aust Pty Ltd | Officer Basin | 15% | Annual Report for the period ending 31/12/1979, TR70/6870 TR70/6871 TR70/6872 TR70/6873 TR70/6874 TR70/6875. |
| A79923 | 1753 | Oklo Uranium Ltd | NARNOO | <1% | Logistics Report for a DETAILED AIRBORNE MAGNETIC, RADIOMETRIC AND DIGITAL TERRAIN SURVEY for the NARNOO PROJE |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 39/2581 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 39/2581? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.