E 39/2592
Register summary
- Holder
- Lord Byron Mining Pty Ltd
- Local government
- Shire of Menzies, Shire of Laverton
- Application received
- 17 Feb 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148083 | 2025 | Baracus Pty Ltd | Cables | 58% | Final Surrender Report for Cables Project (E39/2069) for the period ending 14/01/2025. |
| A142819 | 2024 | Baracus Pty Ltd | Cables | 58% | Annual Report Cables Project E39/02069 for the period ending 14/01/2024 |
| A134307 | 2023 | Baracus Pty Ltd | Cables | 58% | Cables project E39/2069 for the period ending 14/01/2023. |
| A136952 | 2023 | Mtm Critical Metals Limited | Shay Cart Range | <1% | Voluntary Partial Surrender of E38/3302 Shay Cart Range Project for the period ending 1/8/2023 |
| A130514 | 2022 | Baracus Pty Ltd | Cables | 58% | Cables Project E39/2069 Annual Report for the period ending 14/01/2022 |
96 more reports
| A126396 | 2021 | Baracus Pty Ltd | Cables | 58% | Cables Project E39/02069 Annual Report for the period ending 14/01/2021 |
| A125361 | 2020 | Trigg Mining Ltd | East Laverton | <1% | Annual Report for the Period ended 31st July 2020, E38/3302 - East Laverton |
| A122266 | 2020 | Trigg Mining Ltd | East Laverton | <1% | Annual report for the period ended 21st August 2019, East Laverton Project, C128/2018 |
| A123652 | 2020 | Trigg Mining Ltd | East Laverton | <1% | Partial Surrender Report for period ended 19 March 2020, E38/3302, East Laverton, Combined Reporting Group (C1 |
| A123757 | 2020 | Baracus Pty Ltd | Cables | 58% | Cables Project E39/2069 Annual Report for the period ended 14/01/2020 |
| A122201 | 2019 | Lorikeet Resources (Wcm) Pty Ltd | Ironstone Gold JV | <1% | Ironstone Gold JV part of the Coglia Cobalt-Nickel Project, Annual Report E38/2693, 24 September 2018 to 23 Se |
| A120711 | 2019 | Charge Cobalt Pty Ltd; White Cliff Minerals Limited | Coglia | <1% | Surrender report Coglia Cobalt-Nickel Project E39/1833 for the period 7 April 2017 to 30 April 2019 |
| A120864 | 2019 | Northern Drilling Pty Ltd; White Cliff Minerals Limited | Coglia | <1% | Coglia Cobalt-Nickel Project E38/02693 Exploration within surrendered blocks for the period 24/09/2013 to 30/0 |
| A115770 | 2018 | Matsa Resources Limited | Mount Weld | 22% | E38/2823 Mt Weld Final Surrender Report for the period 17/01/2017 - 12/12/2017 |
| A117211 | 2018 | Strategic Resource Management Pty Ltd | Jasper Hills | <1% | Final Surrender Report Jasper Hills Project E39/01772 for the period 10 August 2015 to 20 March 2018 |
| A117350 | 2018 | White Cliff Minerals Limited | Coglia | <1% | Coglia Cobalt-Nickel Project E39/01833 Exploration during the first year of grant 7 April 2017 to 6 April 2018 |
| A117990 | 2018 | Northern Drilling Pty Ltd; White Cliff Minerals Limited | Coglia | <1% | Coglia Cobalt/Nickel Project E38/02693 Partial Surrender Report for the period 24 September 2013 to 23 Septemb |
| A118571 | 2018 | White Cliff Minerals Limited; Northern Drilling Pty Ltd | Coglia | <1% | Coglia Cobalt-Nickel Project E38/02693 Annual Report for the period 24 September 2017 to 23 September 2018 |
| A115502 | 2017 | Northern Drilling Pty Ltd | Coglia | <1% | Work done in the fourth year of grant, E38/2693 Coglia Cobalt-Nickel Project for the period 24-09/2016 - 23/09 |
| A110714 | 2017 | White Cliff Minerals Limited | Coglia | <1% | WHITE CLIFF MINERALS LIMITED ANNUAL REPORT For the Period 24 September 2015 to 23 September 2016 |
| A112048 | 2017 | Strategic Resource Management Pty Ltd | Jasper Hills | <1% | Annual Report Jasper Hills E39/1772 for the period 10 August 2015 to 9 August 2016 |
| A112792 | 2017 | Matsa Resources Limited | Mount Weld | 22% | Mount Weld E38/2823 Annual Mineral Exploration Report for the period 16/01/2016 - 15/01/2017 |
| A115207 | 2017 | Strategic Resource Management Pty Ltd | Jasper Hills | <1% | Annual Technical Report - E39/1772 Jasper Hills For the Period 10 August 2016 to 9 August 2017 |
| A107810 | 2016 | Northern Drilling Pty Ltd | Coglia | <1% | Annual Report E38/2693 Coglia Project for the period 24/09/2014 to 23/09/2015 |
| A108702 | 2016 | Matsa Resources Limited | Mount Weld | 22% | Mount Weld E38/2823 Annual Mineral Exploration Report for the period 16/01/2015 to 15/01/2016 |
| A104722 | 2015 | Yilgarn Mining (Wa) Pty Ltd; Murrin Murrin Operations Pty Lt | Irwin Hills | 14% | Surrender Report for P39/4594, P39/4595 and P39/4682 (C112/1997 Irwin Hills) for the period 17 October 2008 to |
| A105249 | 2015 | Minara Resources Ltd | Irwin Hills | 14% | Surrender Report – P39/4594, P39/4595 and P39/4682 Irwin Hills Project – C112/1997 for the period 17 October 2 |
| A101913 | 2014 | Murrin Murrin Operations Pty Ltd; Yilgarn Mining (Wa) Pty Lt | Irwin Hills | <1% | Combined Annual Report, Irwin Hills Project, C112/1997, E39/1284, E39/1307, E39/1471, P39/4594, P39/4595, P39/ |
| A103872 | 2014 | White Cliff Minerals Limited | Coglia | <1% | Annual Report E38/2693 Coglia Project For the period 24th September 2013 to 23rd September 2014 |
| A98827 | 2013 | Focus Minerals (Laverton) Pty Ltd | Jasper Hills | 1.4% | Jasper Hills Project, C318/2011, Combined Annual Report, 01/05/2012 to 30/04/2013, Licences: M39/0138 M39/0139 |
| A100227 | 2013 | Murrin Murrin Operations Pty Ltd; Yilgarn Mining (Wa) Pty Lt | Irwin Hills - Rocky Well | <1% | Partial Surrender Report – E39/1284 – Rocky Well 13 October 2008 to 12 October 2013 (Irwin Hills Project – C11 |
| A93566 | 2012 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | <1% | IRWIN HILLS PROJECT (E39/1284, E39/1307, E39/1471, P39/4594–4595 and P39/4682) Annual Technical Report For the |
| A94619 | 2012 | Crescent Gold Ltd | Jasper Hills | 1.4% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 01/05/2011 TO 30/04/2012 JASPER HILLS PROJECT C318/2011 T |
| A95468 | 2012 | Tropicana Gold Ltd | Irwin Hills | <1% | Irwin Hills Project, Annual Report for the period 30/06/2011 to 29/06/2012, E39/1359. |
| A93014 | 2012 | White Cliff Nickel Ltd | White Cliff | 2.2% | Combined Annual Report White Cliff Nickel Project C22/2008 For the Period 1st January 2011 to 31st December 20 |
| A90003 | 2011 | Crescent Gold Ltd | Jasper Hills | 1.4% | Jasper Hills Project, Annual Report for the period 01/0102010 to 31/12/2010, E39/970; M39/138-139, 185 & 262. |
| A90048 | 2011 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | <1% | Irwin Hills Project, Annual Report for the period ending 17th January 2011, E39/1284, 1307, 1471; P39/4594-459 |
| A91152 | 2011 | Sulphide Resources Pty Ltd | Irwin Hills | <1% | Annual report for the period 30 June 2010 to 29 June 2011, E39/1066 |
| A89356 | 2011 | White Cliff Nickel Ltd | White Cliff | 2.2% | Combined Annual Report For the Period 1st January 2010 to 31st December 2010 White Cliff Project, E38/1841, E3 |
| A90758 | 2011 | Sulphide Resources Pty Ltd | Irwin Hills | <1% | Partial surrender report for the period 30 June 2009 to 28 June 2011, E39/1066 |
| A86467 | 2010 | Crescent Gold Ltd | Jasper Hills | 1.4% | Partial Surrender Report - Jasper Hills for Lease E39/970, Period 29th November 2008 to 28th November 2009 |
| A86516 | 2010 | Crescent Gold Ltd | Jasper Hills | 1.4% | Jasper Hills Combined Annual Report C242/1995 for Leases E39/0970, M39/0138, M39/0139, M39/0185 and M39/0262, |
| A86866 | 2010 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | <1% | IRWIN HILLS PROJECT (E39/1284, E39/1307, E39/1471, P39/4594–4595 and P39/4682) Annual Technical Report, For th |
| A87339 | 2010 | Sulphide Resources Pty Ltd | Irwin Hills | <1% | Annual Report for the period 30 June 2009 to 29 June 2010, E39/1359, Irwin Hills |
| A87550 | 2010 | White Cliff Nickel Ltd | White Cliff | 2.2% | C22/2008 Combined Partial Surrender Report for the period 19TH June 2009 to 18th June 2010, White Cliff Projec |
| A81092 | 2009 | White Cliff Nickel Ltd | WHITE CLIFF | <1% | COMBINED REPORTING EXPLORATION LICENCES E38/1841, E38/1897, E38/1909, E38/2091, E38/2092 WHITE CLIFF PROJECT A |
| A81879 | 2009 | Yilgarn Mining (Wa) Pty Ltd | IRWIN HILLS | 7.9% | IRWIN HILLS PROJECT E 38/1714, E38/1718, E38/1719, E39/1105 and E39/1313, Surrender Report For the period ende |
| A81512 | 2009 | Crescent Gold Ltd | JASPER HILLS | 1.4% | Partial Surrender Report for Lease E39/0970, Period 29th November 2005 to 28th November 2008. |
| A81649 | 2009 | Crescent Gold Ltd | JASPER HILLS | 1.4% | JASPER HILLS Combined Annual Report C242/1995 For Leases E39/0970, M39/0138, M39/0139, M39/0185 & M39/0262, Pe |
| A81877 | 2009 | Yilgarn Mining (Wa) Pty Ltd | IRWIN HILLS | <1% | IRWIN HILLS PROJECT E 38/1714, Partial Surrender Report, For the period ended 18th July 2008 |
| A81934 | 2009 | Yilgarn Mining (Wa) Pty Ltd | IRWIN HILLS | 3.8% | IRWIN HILLS PROJECT (E 39/352, 407, 1074, 1105; P 39/2588; E 38/1714, 1718, & 1719), Annual Technical Report, |
| A85918 | 2009 | White Cliff Nickel Ltd | White Cliff | 2.2% | White Cliff Nickel Project, Combined Annual Report for Exploration Licenses 38/1841, E38/1897, E38/1909, E38/2 |
| A78087 | 2008 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | 3.8% | IRWIN HILLS PROJECT (E 39/352, 407, 1074, 1105; P 39/2588; E 38/1714, 1718, & 1719) Annual Technical Report fo |
| A78190 | 2008 | Crescent Gold Ltd | Jasper Hills | 1.4% | VERIFICATION REPORT JASPER HILLS Combined Annual Report C242/1995 For leases E39/970, M39/138, M39/139, M39/18 |
| A75099 | 2007 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills(Bungani) | 3.8% | Irwin Hills Project, (E39/352, 407, 1074, 1105; P39/2588; E38/1714, 1718, & 1719), Annual Technical Report for |
| A74542 | 2007 | Crescent Gold Ltd | Jasper Hills | 1.4% | Jasper Hills Project E39/970 Annual Report for the Period 29th Nov 2005 to 28th Nov 2006 (Minigwal) |
| A73742 | 2006 | Dynasty Metals Australia Ltd | Coglia Well | 5.3% | Coglia Well E39/929, Annual Technical Report Period Ending 30 August 2006, (Minigwal). |
| A72387 | 2006 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills (Bungani) | <1% | Irwin Hills Project E39/352,407,1074,P39/2588, Annual Technical Report for the Period Ended 17 January 2006, C |
| A74625 | 2006 | Heron Resources Ltd | Laverton | 13% | Mineral Patch Project E38/931, Annual Report, 5 May 2005 to 4 May 2006, (Laverton). |
| A71612 | 2005 | Yilgarn Mining (Wa) Pty Ltd | Coglia Well (Bungani) | 2% | Coglia Well Project E39/407, Annual Technical Report for the period ended 25 October 2005, (Minigwal). |
| A70382 | 2005 | Yilgarn Mining Pty Ltd | Irwin Hills | <1% | Annual technical report for the period 16/01/04 - 17/01/05 Irwin Hills Project, C112/1997, E39/352, P39/2588, |
| A71199 | 2005 | Target Mineral Exploration Pty Ltd | Stella Range | 5.3% | Stella Range, Exploration Licence E39/929, 20/08/2004 to 19/08/2005, (Miningwal). |
| A71313 | 2005 | Heron Resources Ltd | Mineral Patch | 13% | Mineral Patch Project Exploration Licence 38/931, Mt Margaret Mineral Field, Annual Report, 5 May 2004 to 4 Ma |
| A69481 | 2004 | Sons Of Gwalia Ltd | Coglia Well | 2% | Annual report for the period 26/10/03 - 25/10/04 Coglia Well Project, E39/407 |
| A68279 | 2004 | Red Back Mining Nl | Irwin Hills | <1% | Annual Report for the period 18/01/2003-17/01/2004 Irwin Hills Project (C112/1997), E39/352, P39/2588 |
| A65817 | 2003 | Sons Of Gwalia Ltd | Coglia Well | 2% | Coglia Well. Annual Report For The Period 26 October 2001 - 25 October 2002. Tenement: E39/407. Report No. 029 |
| A66627 | 2003 | Red Back Mining Nl | Irwin Hills | <1% | Annual Report for the period 18 January 2002 to 17 January 2003 Irwin Hills Project E39/352, P39/2588 Group C1 |
| A67830 | 2003 | Heron Resources Ltd | Laverton | 13% | Annual Report for the period 05/05/2002- 04/05/2003 Mineral Patch Hill Project E38/931 |
| A67590 | 2003 | Sons Of Gwalia Ltd | Coglia Well | 2% | Annual Report for the period 26 October-25 October 2003 Coglia Well Project E39/407 |
| A64471 | 2002 | Sons Of Gwalia Ltd | Coglia Well | 2% | Coglia Well Project, Partial Surrender Report for the period 26th October 1993 to 6th November 2001, E39/407. |
| A64655 | 2002 | Red Back Mining Nl | Irwin Hills | <1% | Irwin Hills Project Exploration Licence: 39/352 Prosecting Licence: 39/2588 Mining Lease Applications: M39/462 |
| A64027 | 2001 | Sons Of Gwalia Ltd | Coglia Well | 2% | Annual Report for the period 26 October 2000 - 25 October 2001 Coglia Well tenement E39/407. Report no: 0299- |
| A63823 | 2001 | Heron Resources Ltd | Laverton | 13% | Annual Report 5 May 2000 to 4 May 2001 Mineral Patch Hill exploration licence 38/931, Mt Margaret Mineral Fiel |
| A62171 | 2001 | Red Back Mining Nl | Irwin Hills | <1% | Irwin Hills Project , E 39/352, P 39/2588, M39/462, 641, 643 & 644 [Applications],Annual Report for 18 Januar |
| A60097 | 2000 | Wmc Resources Ltd | Irwin Hills | <1% | Annual Report for the Irwin Hills JV for the Period 18/01/1999 to the 17/01/2000 Exploration Licences E39/352 |
| A58161 | 1999 | Sons Of Gwalia Ltd | Coglia Well | 2% | Coglia Well Project 26/10/97 - 25/10/98 E39/407 |
| A57369 | 1999 | Wmc Resources Ltd | Irwin Hills | <1% | Annual Report For The Irwin Hills JV 18/01/98 - 17/01/99 Exploration Licence:E39/352, Prospecting Licence:P39/ |
| A53907 | 1998 | Wmc Resources Ltd | Irwin Hills | <1% | Annual report for the Irwin Hills JV for the period 18/01/97-17/01/98 Exploration Licences E53/352 Prospecting |
| A53705 | 1998 | Sons Of Gwalia Ltd | Coglia Well | 2% | Coglia Well Project - Annual Report 26/10/1996 - 25/10/1997 E39/407 |
| A56748 | 1998 | Sons Of Gwalia Ltd | Coglia Well | 2% | Coglia Well Project - Partial Surrender Report 26/10/93 - 02/04/98 E39/407 |
| A50473 | 1997 | Wmc Resources Ltd | Irwin Hills | <1% | Annual report for the period 18 January 1996 to 17 January 1997 Irwin Hills (JV) Project, E39/352 & P39/2588 |
| A46723 | 1996 | Sons Of Gwalia Ltd | Coglia Well | 2% | North Eastern Goldfields Coglia Well Project Annual report for the period 26 October 1994 - 25 October 1995 (T |
| A46806 | 1996 | Mining Project Investors Pty Ltd | Mineral Patch Hill | 13% | Mineral Patch Hill Project, Annual Technical Report For the Period 02/08/1994 to 01/08/1995, Exploration Licen |
| A49836 | 1996 | Sons Of Gwalia Ltd | Coglia Well | 2% | Laverton Region Coglia Well Project Annual report for the period 26 October 1995 - 25 October 1996 (Tenement E |
| A48985 | 1996 | Fodina Minerals Pty Ltd | Mineral Patch Hill | 13% | Mineral Patch Hill Project, Surrender Report,September 1996, E38/641. |
| A47760 | 1995 | Laverton Gold Nl | Rocky Well | <1% | Annual Report on Reverse Circulation (Air Core) Drilling at the Rocky Well NI - PT Prospect Irwin Hills (E39/3 |
| A43153 | 1994 | Laverton Gold Nl | Rocky Well | <1% | Annual Report on Reverse Circulation Drilling at Rocky Well Project, (E39/352) WA September 1994. |
| A43154 | 1994 | Laverton Gold Nl | Irwin Hills | <1% | Non-statutory Report : Geochemical sampling and mapping program Irwin Hills project. February 1994 (E39/352 |
| A43155 | 1994 | Laverton Gold Nl | Rocky Well | <1% | Non-statutory Report : Rock-chip Sampling- February 1994 , Rocky Well Project, Irwin Hills Project (E39/352 |
| A43299 | 1994 | Sons Of Gwalia Ltd | Coglia Well | 2% | North Eastern goldfields Coglia well project Annual report for the period 26th October 1993 - 25th October 199 |
| A40336 | 1993 | Laverton Gold Nl | Irwin Hills | <1% | Annual Report for the period 10/92-10/93, Irwin Hills Project, E39/352 P39/2588 |
| A37028 | 1992 | Mining Corp Exploration Nl | Plumridge | <1% | Plumridge Project, Non-statutory Report : Airborne Magnetometer Surveys, 1971. |
| A32148 | 1990 | Western Mining Corporation Ltd | Jasper Hill | <1% | Terminal report on Jasper Hill, M39/191-196, for the period 9 March 1989 to 2 August 1990 |
| A30384 | 1990 | Western Mining Corporation Ltd | Jasper Hills | <1% | Annual report for the period 07/12/88-06/12/89 Jasper Hill Project E38/212 E39/144-145 E39/157 E39/159 E39/161 |
| A2580 | 1972 | International Nickel Aust Ltd | Colga Well | 5% | Colga Well Project, Annual (& Final) Report for the period 1st January 1971 to 30th March 1972, TR70/3671H. |
| A1880 | 1971 | International Nickel Aust Ltd | Colga Well | 5% | Colga Well Project, Annual Report for the period ending 31st December 1970, TR70/3617H. |
| A312 | 1970 | International Nickel Southern Exp Ltd | Colga Well | 5% | Colga Well Project, Annual Report for the period ending 31st December 1969, TR70/3671H. |
| A311 | 1969 | International Nickel Aust Ltd | Cogla Well | 5% | Cogla Well Project, Annual Report for the period ending 31st January 1968, TR70/3671H. |
| A310 | 1968 | International Nickel Southern Exp Ltd | Cogla Well | 5% | Cogla Well Project, Annual Report for the year ending 31st December 1967, TR70/3671H. |
| A308 | 1966 | International Nickel Southern Exp Ltd | Cogla Well | 5% | Cogla Well Project, Annual Report: Geological Report, December 30th 1966, TR70/3671H. |
| A97720 | 1753 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | <1% | Irwin Hills Project (E39/1284, E39/1307, E39/1471, P39/4594–4595 and P39/4682) Annual Technical Report For the |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 39/2592 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 39/2592 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 39/2592? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.