E 45/4703
E 45/4703 is a live exploration licence in the Town of Port Hedland, Western Australia, held by Elevra Lithium Limited and Altura Minerals Pty Ltd (part of Morella Corporation Limited). Granted on 30 Oct 2017 for 5 years (extended), it expires on 29 Oct 2027. The ground is covered by 45 historical WAMEX reports.
Register summary
- Holders
- Elevra Lithium Limited, Altura Minerals Pty Ltd
- Part of
- Morella Corporation Limited (ASX:1MC) as at 2025-06-30
- Local government
- Town of Port Hedland, Shire of East Pilbara
- Application received
- 15 Feb 2016
- Commenced
- 30 Oct 2017
- Expiry
- 29 Oct 2027
- Term
- 5 Years (Extended)
The full record on E 45/4703
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 2 changes of holder
- The full record: 9 years of expenditure, 9 conditions and 15 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (7 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148812 | 2025 | Sayona Mining Limited | Tabba Tabba Lithium Project | <1% | Round 29 CoFunded Drilling, Tabba Tabba Lithium Project E45/2364, Pilbara Region Western Australia |
| A137880 | 2023 | Morella Corporation Limited; Sayona Mining Limited | Tabba Tabba East | 59% | Tabba Tabba East Partial Surrender Report E45/04703 for the period ending 29/10/2023 |
| A122346 | 2020 | Sayona Mining Limited | Tabba Tabba East | 59% | Tabba Tabba East Lithium Project, E45/4703 Annual Technical Report for the period 30 October 2018 to 29 Octobe |
| A123208 | 2020 | De Grey Mining Ltd | Turner River | <1% | C17/2013 Annual Report Turner River Base Metal Project period ending 31 December 2019 |
| A119073 | 2019 | Sayona Mining Limited | Tabba Tabba South East Lithium Project | 59% | Tabba Tabba South East Annual Technical Report E45/04703 for the period 30 October 2017 to 29 October 2018 |
40 more reports
| A119545 | 2019 | De Grey Mining Ltd | Turner River | <1% | Turner River Base Metals Project C17/2013 Annual Report for the period ending 31 December 2018 |
| A116172 | 2018 | De Grey Mining Ltd | Turner River | <1% | Annual Report for the period 1 January 2017 to 31 December 2017 Turner River Base Metals Project C17/2013, E45 |
| A118141 | 2018 | Strike Australian Operations Pty Ltd | Tabba Tabba | <1% | E45/4800 Annual Technical Report |
| A118152 | 2018 | De Grey Mining Ltd | Turner River | <1% | Final Report for EIS Co-funded drilling at King Col Lithium Prospect (R#15) |
| A112647 | 2017 | De Grey Mining Ltd | Turner River | <1% | Turner River Project C17/2013 Annual Report for the period 1 January 2016 to 31 December 2016, E45/02364, E45/ |
| A105142 | 2015 | Fortescue Metals Group Ltd | Kangan | 3.4% | Annual Technical Report for the Period 01 January 2014 to 31 December 2014, C123/2011 Kangan Project E45/3191, |
| A105076 | 2015 | De Grey Mining Ltd | Turner River | <1% | Turner River Project Annual Exploration Report (C17/2013) E45/2364 & E45/2533 for the period 01/01/2014 - 31/1 |
| A105315 | 2015 | Fmg Pilbara Pty Ltd | Glacier Valley | 14% | Final Surrender Mineral Exploration Report: E45/2852 Turner River 4 Project for the period 13 February 2012 to |
| A106515 | 2015 | Fortescue Metals Group Ltd | Kangan | 4.2% | C123/2011 Kangan Final Surrender Report for the period 30/06/2010 - 18/05/2015, E47/02157, E45/04135, E45/0376 |
| A101391 | 2014 | Fortescue Metals Group Ltd | Kangan | 1.3% | Kangan Project Annual Report for the Period 01 January 2013 to 31 December 2013, C123/2011, E45/3270, E45/3191 |
| A101516 | 2014 | Polymetals (Turner River) Pty Ltd | Turner River | <1% | Reporting Group C17/2013, Combined Annual Report for E45/2364, E45/2533 Turner River Project year ending Decem |
| A101524 | 2014 | Fortescue Metals Group Ltd | Glacier Valley | 2% | Combined Report for the Period 1st December 2012 to 30th November 2013, C120/2008 Glacier Valley |
| A97245 | 2013 | Polymetals Mining Ltd | Turner River | <1% | TURNER RIVER PROJECT Annual Exploration Report for the tenement group C17/2013 including (E45/2364, E45/2533) |
| A96750 | 2013 | Fortescue Metals Group Ltd | Glacier Valley | 2.3% | Glacier Valley Combined Report (Iron Bridge Project) C120/2008 Annual Report for the period 1st December 2011 |
| A93612 | 2012 | Atlas Iron Ltd | Mount Dove | <1% | Mount Dove Project E45/2364, E45/2533, E45/2995 P45/2655 & E47/891annual report To The Department Of Mines and |
| A93732 | 2012 | Lansdowne Resources Pty Ltd | Turner River | <1% | Annual Exploration Report Turner River Project E45/2364 for the period 22nd March 2011 to 21st March 2012 |
| A93731 | 2012 | Lansdowne Resources Pty Ltd | Turner River | <1% | Annual exploration report Turner River Project E45/2533 for the period 22nd March 2011 to 21st March 2012 |
| A89208 | 2011 | Cazaly Resources Ltd | Wallareenya | 14% | Annual and Final Surrender Report - Wallareenya - E45/3346, For the Period 29 October 2009 to 28 October 2010 |
| A90150 | 2011 | Atlas Iron Ltd | Turner River - Mount Dove | <1% | Turner River - Mount Dove Project, Annual Report for the period ending 21st March 2011, E45/ 2364, 2533, 2995; |
| A90231 | 2011 | De Grey Mining Ltd | Turner River | <1% | Annual Report, Turner River Project, E45/2611, 2465, 2533, 2364, 2995; E47/891; P47/2655, DMPR REF: C220/1997 |
| A86149 | 2010 | De Grey Mining Ltd | Turner River | <1% | Partial Surrender Report - Turner River Project E45/2364, for the period 28th February 2006 to 15th February 2 |
| A86895 | 2010 | De Grey Mining Ltd | Turner River | <1% | Annual Exploration Report Turner River Project E47/891, E45/2533, E45/2465, E45/2364, E45/2611, E45/2995, P45/ |
| A82266 | 2009 | De Grey Mining Ltd | TURNER RIVER | <1% | ANNUAL EXPLORATION REPORT TURNER RIVER PROJECT E47/891, E45/1353, E45/1641, E45/2212, E45/2213, E45/2354, E45/ |
| A84242 | 2009 | De Grey Mining Ltd | Turner River | <1% | PARTIAL SURRENDER REPORT E45/2533, SURRENDERED 12TH JUNE 2009 |
| A81763 | 2009 | De Grey Mining Ltd | TURNER RIVER | <1% | PARTIAL SURRENDER REPORT TURNER RIVER PROJECT E45/2364, FOR THE PERIOD 28th February 2006 to 27th February 200 |
| A78428 | 2008 | De Grey Mining Ltd | Indee | <1% | Annual Exploration Report, Turner River Project, E45/1353-.E45/2611, E47/891-E47/1132, P45/2554, -.P45/1167, |
| A75206 | 2007 | De Grey Mining Ltd | Indee | <1% | Annual Exploration Report, Turner River Project, E47/891, E45/1353, 1641, 2212, 2213, 2354, 2403, E47/1132, E4 |
| A72708 | 2006 | De Grey Mining Ltd | Indee | <1% | Annual Exploration Report, Turner River Project C220/1997, For the Period 22 March 2005 to 21 March 2006, (Roe |
| A61851 | 2001 | De Beers Australia Exploration Ltd | Pilton | 17% | Final Report for Exploration lIcence 45/1981 February 2001 |
| A58756 | 1999 | Stockdale Prospecting Ltd | Exposed Pilbara | 1.8% | Annual Report Exploration Licence E45/1678 Exposed Pilbara Project July 1999 |
| A59509 | 1999 | Stockdale Prospecting Ltd | Exposed Pilbara | 1.8% | Exploration Licence E45/1678, Final Report, Exposed Pilbara Project, October 1999. |
| A56106 | 1998 | Stockdale Prospecting Ltd | Exposed Pilbara | 1.8% | Annual Report on E45/1678 (Exposed Pilbara) |
| A51565 | 1997 | Lynas Gold Nl | Tabba Tabba | 1.8% | Tabba Tabba Project, Annual Report E45/1678 for the period 17th May 1996 to 16th May 1997. |
| A21308 | 1987 | Goldrim Mining Aust Ltd | Wodgina, Tabba Tabba | 6.6% | Final Report PL45/83 to PL45/90 Tabba Tabba Western Australia June 1987 |
| A11045 | 1982 | Csr Ltd | Tabba Tabba | 14% | Tabba Tabba Project, Non-statutory Report: Relilnquishment Report for the year ending 12th February 1982, TR70 |
| A1440 | 1961 | Consolidated Gold Fields Aust Ltd | Port Hedland | <1% | Port Hedland Project, Non-statutory Report: Report for the year ending 31st December 1961, TR70/2059, 2061-207 |
| A121485 | Strike Operations Pty Ltd | Tabba Tabba | <1% | E45/4800 Tabba Tabba Annual Report For The Period Ended 10th August 2019 | |
| A122929 | Strike Operations Pty Ltd | Tabba Tabba | <1% | E45/4800 ‘Tabba Tabba’, Final Report for the period ending 30/01/2020 | |
| A139411 | Sqm Australia Pty Ltd | King Col | <1% | Core Library Sampling of EIS Drillholes KDD001 and KDD002 (P1848) | |
| A149380 | Terra Petrophysics Pty Ltd | <1% | Core Library Sampling Of Drillholes C3DD024, PLSEIS001 And KDD002 For Petrophysics |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 45/4703 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 45/4703? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.