NextMaps›WA Tenements›E 45/6474

E 45/6474

LiveExploration LicenceShire of East PilbaraMarble Bar District

E 45/6474 is a live exploration licence in the Shire of East Pilbara, Western Australia, held by Keras (Pilbara) Gold Pty Ltd. Granted on 31 Jan 2024 for 5 years, it expires on 30 Jan 2029. The ground is covered by 103 historical WAMEX reports.

Area
639.013ha
Expires
Jan 2029
in 2 years
WAMEX reports
103
WA median is 53
Report drilling
38
of 103 reports
Free Tenure Pack for E 45/6474
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 45/6474 that covers 103 WAMEX reports · 1 open-file drillhole (60 m drilled) · 78 earlier titles on the ground since 1899 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
East Pilbara Explore on the live map

Register summary

Holder
Keras (Pilbara) Gold Pty Ltd
Local government
Shire of East Pilbara
Application received
3 Jan 2023
Commenced
31 Jan 2024
Expiry
30 Jan 2029
Term
5 Years

The full record on E 45/6474

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares, and the one change of holder on record
  • The full record: 3 years of expenditure, 8 conditions and 16 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (1 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

103 historical WAMEX exploration reports intersect E 45/6474: 80 report geochemistry or sampling, 56 include a digital data package.
Work on record: Rock chip sampling 52 · Soil sampling 35 · Geological mapping 32 · Stream sediment sampling 21 · RC drilling 17 · Geological reconnaissance 14. Resource declared in A119726 (2019), A116463 (2018), A54110 (1998).
Rather than open these one by one on the DMPE site, have them read into one cited report on E 45/6474, free for new accounts.
When this ground was worked · 100 of 103 reports dated
51970s
141980s
161990s
282000s
332010s
42020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A133559 2023 Calidus Resources Limited Warrawoona 17% Partial Surrender Report for E45/4666 Warrawoona for the period ending 23/12/2022
A135310 2023 Keras (Pilbara) Gold Pty Ltd Warrawoona <1% Partial Surrender Report for E45/4622 Warrawoona for the period ending 04/05/2023.
A122837 2020 Calidus Resources Limited Warrawoona 3.1% Annual Report C30/2007 Warrawoona Project for the period ending 31/12/2019
A122844 2020 Calidus Resources Limited Warrawoona <1% Annual Report C52/2019 Warrawoona Project for the period ending 31/12/2019
A119726 2019 Calidus Resources Limited Warrawoona 1.8% Annual Report C30/2007 Warrawoona Project For the Period 1 January 2018 to 31 December 2018
98 more reports
A116463 2018 Calidus Resources Limited Warrawoona 2.4% Annual Report C30/2007 Warrawoona Project for the period 1 January 2017 to 31 December 2017, M45/00552, M45/00
A112607 2017 Beatons Creek Gold Pty Ltd Warrawoona <1% Partial Surrender Report For Exploration Licence E45/3381 Warrawoona Project Report Period 17/03/2011 – 16/03/
A113998 2017 Beatons Creek Gold Pty Ltd Warrawoona 2.9% Combined Annual Mineral Exploration Report: Warrawoona Project C237/2011 for the period 17 March 2016 to 16 Ma
A108029 2016 Haoma Mining Nl Warrawoona 4.3% E45/1249 Final Surrender Report
A109035 2016 Beatons Creek Gold Pty Ltd Warrawoona <1% Combined Annual Mineral Exploration Report Warrawoona Project For Combined Reporting Group C237/2011 Report Pe
A107866 2016 Fortescue Metals Group Ltd Corunna <1% C119/2011 Corunna Tin Final Surrender Report for the period 17 July 2013 to 13 July 2015, E 45/03767, E 45/041
A108308 2016 Haoma Mining Nl Marble Bar Group 2 1.5% Marble Bar Project Annual Report C281/1997 for the period 1 December 2014 to 30 November 2015
A104755 2015 Haoma Mining Nl Marble Bar 1.5% C281/1997 Marble Bar Project, Group 2, Annual Report for the Period 1 December 2013 – 30 November 2014, E45/12
A105146 2015 Fortescue Metals Group Ltd Corunna Tin <1% Combined Annual Mineral Exploration Report for the Period 01 January 2014 to 31 December 2014, C119/2011, Coru
A105484 2015 Talga Resources Ltd Warrawoona <1% Warrawoona Project 2015 Annual Report for the period 17th March 2014 to 16th March 2015 Combined Reporting Gro
A101205 2014 Haoma Mining Nl Marble Bar 2% Marble Bar Project C281/1997 Group 2 Annual Report for the period 1 December 2012 to 30 November 2013, E45/124
A101753 2014 Talga Resources Ltd Warrawoona <1% Warrawoona Project E45/3381 2014 Partial Surrender for the period 17th March 2011 to 11th March 2014
A102152 2014 Interquip Pty Ltd Sandy Well <1% Final Surrender Report, Sandy Well Project, E45/2755,for the period 30 March 2007 to 29 March 2014.
A96834 2013 Mithril Resources Ltd Cutting Creek 1 - Cutting Creek 2 <1% E45/3470 and E45/3471 Cutting Creek 1 and 2, Combined Annual Report, year ending 30 November 2012
A98184 2013 Talga Resources Ltd Warrawoona <1% Warrawoona Project, Annual Report for the period 17/03/2012 to 16/03/2013, E45/3381; P45/2661-2662, 2736 & 278
A96316 2013 Haoma Mining Nl Marble Bar 1.3% Marble Bar Project, Annual Report for the period 01/12/2011 to 30/11/2012, E45/1249, 1273 & 1869; M45/14......
A98024 2013 Interquip Pty Ltd Sandy Well <1% Annual Report Sandy Well E45/2755 East Pilbara Shire Western Australia For the period 30 March 2012 to 29 Marc
A93903 2012 Haoma Mining Nl Marble Bar 1.3% C281/1997 Marble Bar Project (Group 2) Annual Report for the Period 1December 2010 – 30 November 2011, Marble
A94558 2012 Interquip Pty Ltd Sandy Well <1% Annual Report Sandy Well E45/2755 For the period 30th March 2011 to 29th March 2012
A92772 2012 Mithril Resources Ltd Cutting Creek 1 - Cutting Creek 2 <1% E45/3470 and E45/3471 Cutting Creek 1 and Cutting Creek 2 Year 1 Combined Annual Report for the period 27 Octo
A93698 2012 Talga Gold Ltd Warrawoona <1% Warrawoona Project 2012 Annual Report for the period 17th March 2011 to 16th March 2012 Combined Reporting Gro
A89884 2011 Talga Gold Ltd Warrawoona 13% Warrawoona Project: Annual Report Report Period: 23/11/2009 to 22/11/2010, C95/2010, P45/2661, P45/2662, P45/2
A91094 2011 Arc Pty Ltd Corunna Downs <1% Final Surrender Report for the period 1 May 2006 to 30 April 2011 Corunna Downs Project E45/2560
A89862 2011 Haoma Mining Nl Marble Bar 1.3% Marble Bar (Group 2), Annual Report for the Period 1 December 2009 – 30 November 2010, C281/1997
A90448 2011 Interquip Pty Ltd Sandy Well <1% Sandy Well Project, Partial Surrender Report for the period 30th March 2007 to 26th March 2011, E45/2755.
A90446 2011 Interquip Pty Ltd Sandy Well <1% Sandy Well Project, Annual Report for the period ending 29th March 2011, E45/2755.
A91096 2011 Arc Pty Ltd Corunna Downs <1% Annual Report for the period 1 May 2010 to 30 April 2011, Corunna Downs Project E45/2560
A87398 2010 Arc Pty Ltd Corunna Downs <1% ANNUAL REPORT For the Period 1 May 2009 to 30 April 2010 CORUNNA DOWNS PROJECT EXPLORATION LICENCE 45/2560 PIL
A87843 2010 Arc Pty Ltd Corunna Downs <1% Partial Surrender Report For the Period 1 May 2006 to 13 May 2010 Corunna Downs Project Exploration Licence 45
A86464 2010 Haoma Mining Nl Marble Bar (Group 2) 1.3% Marble Bar (Group 2) Annual Report for the Period 1 December 2007 – 30 November 2008
A87105 2010 Interquip Pty Ltd Sandy Well <1% Annual Report, Sandy Well, E45/2755, East Pilbara Shire, Western Australia, Reporting Period ending 29/03/2010
A87106 2010 Interquip Pty Ltd Sandy Well <1% Partial Surrender Report,Sandy Well E45/2755, East Pilbara Shire, Western Australia, Reporting Period ending 2
A83099 2009 Interquip Pty Ltd Sandy Well <1% Annual Report E45/2755 For Period Ending 16 June 2009
A84008 2009 Arc Pty Ltd CORUNNA DOWNS <1% Annual Report For the Period 1 May 2008 to 30 April 2009, Corunna Downs Project Exploration Licence 45/2560 Pi
A84085 2009 Arc Pty Ltd CORUNNA DOWNS <1% PARTIAL SURRENDER REPORT FOR THE PERIOD TO 30TH APR 2009, CORUNNA DOWNS PROJECT, EXPLORATION LICENCE 45/2560,
A81714 2009 Image Resources Nl Warrawoona <1% Surrender Report Warrawoona Project E45/2447, East Pilbara Shire Western Australia, Reporting period 24 May 20
A78048 2008 Haoma Mining Nl Marble Bar 1.1% MARBLE BAR (Group 2) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2006 - 30 NOVEMBER 2007, GROUP: CMER281/1997 TENE
A78713 2008 Image Resources Nl Warrawoona <1% Warrawoona E45/2447 East Pilbara Shire Western Australia Annual Report for the period 24 May 2007 to 23 May 20
A78750 2008 Image Resources Nl Warrawoona <1% WARRAWOONA E45/2447 East Pilbara Shire WA First Partial Surrender Report 24 May 2008
A79088 2008 Arc Pty Ltd Corunna <1% ANNUAL REPORT For the Period 1 May 2007 to 30 April 2008 CORUNNA DOWNS PROJECT Exploration Licence 45/2560 Pil
A75833 2007 Image Resources Nl Warrawoona <1% Annual Report Warrawoona E45/2447 Reporting Period 24 May 2006 to 23 May 2007.
A75925 2007 Vgs Pty Ltd Corunna Downs <1% Annual Report for the period 1 May 2006 to 30 April 2007 Corunna Downs Project Exploration Licence 45/2560
A74735 2007 Haoma Mining Nl Marble Bar (Group 2) 2% Marble Bar (Group 2) Project C281/1997 Annual Report for the Period 1 Dec 2006 - 30 Nov 2006 Report No.03-02-2
A73268 2006 Image Resources Nl Warrawoona gold exploration <1% Annual Report, Warrawoona E45/2447, Period 24 May 2005 to 23 May 2006, (Marble Bar).
A72844 2006 Haoma Mining Nl Marble Bar (Group 2) 2.8% Marble Bar(Group 2), Annual Report for the Period 1 December 2004 to 30 November 2005, Combined Reporting No.
A69739 2005 Haoma Mining Nl Fortuna- Salgash 4.3% E45/1249, Fortuna- Salgash Project, Partial Surrender Report for the period 15/09/1992 to 10/08/2004.
A70559 2005 Haoma Mining Nl Marble Bar (Group 2) 2% Annual report for the period 01/12/03 - 30/11/04 Marble Bar (Group 2) Project, C281/1997, E45/1249, 1273, E45/
A68392 2004 Haoma Mining Nl Marble Bar 1% Annual Report for the period 01/12/2002-30/11/2003 Marble Bar Project M45/235, M45/296, M45/655, M45/76, M45/
A66284 2003 Haoma Mining Nl Marble Bar 1% Annual Report for the period ending November 30th 2002 Marble Bar - Group 2 C281/1997: E45/1249, 1273, 1615, 2
A66385 2003 Haoma Mining Nl Marble Bar 2% TENEMENT E45/2045- PILBARA REGION SURRENDER REPORT - APRIL2003 [Warrawoona Prospect]
A67372 2003 Image Resources Nl Cutty Sark 30% Annual Report for the period 28/7/2002 to 27/7/2003 Cutty Sark Project P45/2446
A67736 2003 Image Resources Nl Corunna Downs <1% Annual Report for the period 18/10/2002- 17/10/2003 Corunna Downs Project E45/2108
A64034 2002 Image Resources Nl Corunna Downs <1% Annual Report for period 18 October 2000 to 18 October 2001 Corunna Downs Project E45/2108.
A64172 2002 Haoma Mining Nl Marble Bar <1% Annual Report for period ending November 30, 2001 Group 2 tenements - Marble Bar M45/235; M45/296; M45/655; M4
A64221 2002 Image Resources Nl Cutty Sark 30% Cutty Sark Project, Annual Report for the period 26.07.2000 to 27.07.2001, P45/2446.
A65369 2002 Image Resources Nl Warrawoona 30% Cutty Sark P45/2446 28 July 2001 - 27 July 2002 Annual Report.
A65792 2002 Image Resources Nl Corunna Downs <1% E45/2108 'Corunna Downs'. Annual Exploration Report For The Period 18 October 2001 To 17 October 2002.
A61637 2001 Magnetic Resources Nl Corunna Downs <1% Annual Report for period 18.10.99 to 18.10.00 Corunna Downs Project E45/2108.
A62138 2001 Haoma Mining Nl Marble Bar <1% Annual Report For The Period Ending November 2000. Marble Bar SF50-08. Tenements: 45/1249, E45/1273, E45/1606,
A60049 2000 Haoma Mining Nl Marble Bar <1% Annual Report For The Period Ending November 1999. Marble Bar SF50-08. Tenements: E45/1249, E45/1273, E451607,
A57524 1999 Haoma Mining Nl Marble Bar (Group 2) <1% Marble Bar Group 2 Annual report for the period ending 11/98 Marble Bar SF50-08
A58651 1999 Stockdale Prospecting Ltd Marble Bar <1% Elazac Haoma Mining JV Project E45/1249, 1607-1608, 1615 10/1998
A54110 1998 Haoma Mining Nl Marble Bar (Group 2) <1% Group 2 Marble Bar Annual Report for the Period Ending November 1997 Marble Bar SF50-8.
A56370 1998 Great Southern Mines Nl Coongan <1% Surrender Report for Exploration Licences 45/1238,1239 & 1282 Coongan Gold Basemetal Project Corunna Downs Eas
A50117 1997 Cra Exploration Pty Ltd Coongan <1% Coongan Project, Annual Report for the period ending 31/12/1996, E45/1152-1153, 1238-39 & 1282
A52156 1997 Haoma Mining Nl Marble Bar (Group 2) <1% Annual report for period ending 30/11/96 Group 2:Marble Bar
A49257 1996 Cra Exploration Pty Ltd Coongan <1% Partial Surrender Report for E45/123 (Coongan 3), Marble Bar SG50-80 Western Australia
A52158 1995 Wmc Resources Ltd Marble Bar <1% Technical Report 14/05/95-21/09/95 Marble Bar Project Report No:3 Mickey's Find/Normay E45/1556 E45/1903 M45/6
A52159 1995 Wmc Resources Ltd Marble Bar <1% Technical Report 14/05/95-21/09/95 Marble Bar Project Mickey's Find/Normay E45/1556 E45/1903 M45/665 M45/650 E
A46937 1995 Great Southern Mines Nl Coongan <1% 1995 Annual Report Coongan Gold and Basemetal Project Corunna Downs East Pilbara M7851
A42266 1994 Fortuna Nl Wymans Well 4.3% Annual Report for the period 15/09/93-14/09/94 Wymans Well Project E45/1249
A40455 1994 Fortuna Nl Fieldings Gully 21% Annual report for the period 02/93-02/94 Fielding's Gully Projedt E45/954 M45/521
A43819 1994 Great Southern Mines Nl Coongan <1% Coongan Project , Annual Report for the period 01/01/1993 to 31/12/1993, e45/1152-1153, 1238-1239, 1282, 1524;
A37772 1993 Bacome Pty Ltd Coongan <1% Coongan Basemetal Gold Project Corunna Downs East Pilbara 1992 Annual Report
A39412 1993 Fortuna Nl Wymans Well 4.3% Annual Report for the period 09/92-09/93 Wymans Well Project E45/1249
A38016 1993 Fortuna Nl Fieldings Gully 21% Annual report for the period 02/92-02/93 Fielding's Gully Gold Project E45/954 E45/521
A26466 1989 Aztec Exploration Ltd Warrawoona 3.6% Warrawoona, Relinquishment Report, P45/946-948, P45/951-956, P45/959, E45/350, E45/351.
A29424 1989 Aztec Exploration Ltd Warrawoona 4.6% Warrawoona (JV) Project, Annual Report for the period 1st January 1989 to 31st December 1989, E45/350 & 351;
A25544 1988 Aztec Mining Co Ltd Warrawoona 4.5% Warrawoona Joint Venture, Annual report for period 1 January to 31 December 1988, E45/350-351, P45/945-959
A23636 1988 Aztec Exploration Ltd Warrawoona 4.5% Warrawoona Joint Venture, Annual report 1 January - 31 December 1987, E45/350-351, P45/945-959
A24742 1988 Randolph Holdings Pty Ltd Fielding's Ridge 5.4% Fielding's Ridge, Report on sampling, October 1987, P45/1174-1179
A19724 1987 Aztec Exploration Ltd Warrawoona 14% Warrawoona Project, Drilling report [non-statutory], P45/945-959, January 1987
A20906 1987 Kennecott Exp Aust Pty Ltd Fieldings Ridge 5.4% Annual report, Fieldings Ridge Prospect, P45/1174 to 45/1179, July 1987
A17267 1986 Aztec Exploration Ltd Warrawoona 4.4% Progress Report Warrawoona Project Marble Bar Area, Western Australia 1986 (E45/350, E45/351, M45/4, P45/79, P
A14895 1985 Great Victoria Gold Ltd The Trump 23% The Trump Project, Annual Report for the period ending 31/12/1984, P45/78.
A17233 1985 Alcoa Of Australia Ltd Fielding's Ridge 5.2% Fielding's Ridge Project, Non-statutory Report: Final Explorarion Report for period ending 31/12/1985, P45/44
A14465 1984 Endeavour Resources Ltd Warrawoona 5.2% Warrawoona Project, Annual Report for the period ending 02/11/1984, P45/26-27, 54-56.
A14134 1984 Bp Minerals Aust Pty Ltd Coronation Ridge 3.8% Coronation Ridge Project, Annual Report for the period ending 31st March 1984, GML45/1717-1724; MC45/9809-9809
A13438 1983 Alcoa Of Australia Ltd Fieldings Gully 5.4% Fieldings Gully Project, Non-statutory Report: Exploration of Mineral Claims,July 1983, MC45/8773-8777;PA45/31
A11222 1982 Greenex Ltd Pilbara <1% Pilbara Project, Non-statutory Report: Progress Report, February 1982, ( Tenement Schedule , see page 61).
A7676 1978 Dampier Mining Co Ltd Copper Hills- Kelly Copper 11% Copper Hills - Kellys Copper Project, Non-statutory Report: Exploration Report, January 1978, MC45/8427-8439
A2471 1972 Hawkstone Minerals Ltd Warrawoona - Salgash 1% Warrawoona - Salgash Project, Final Surrender Report , April 1972, MC45/995-1002,1062-1063,1045-1051, 1071-107
A3486 1971 Hawkstone Minerals Ltd Fieldings Gully 46% Fieldings Gully Project, Non-statutory Report: Terminal Report, December 1971, MC45/1024-1029
A2099 1970 Hawkstone Minerals Ltd Fieldings Gully 46% Fieldings Gully Project, Non-statutory Report: Progress Report for the period ending 31/12/1970, MC45/1024-102
A2610 1970 Hawkstone Minerals Ltd Warrawoona <1% Warrawoona (JV) Project, Non-statutory Report: Exploration Report for the period ending 31/12/1969, MC45/995-1
A81837 1753 Haoma Mining Nl MARBLE BAR (Group 2) 1.3% MARBLE BAR (Group 2) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2007 – 30 NOVEMBER 2008
A40358 1753 Bacome Pty Ltd Coongan <1% Coongan Project Corunna Downs East Pilbara . 1993 Annual Report.
A105966 Archean Biosphere Drilling Project 2.8% Archean Biosphere Drilling Project 2003 and 2004. Drillhole locations and Drill Logs ABDP1-ABDP6 inclusive. AB

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 45/6474 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 45/6474? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.