NextMaps›WA Tenements›E 45/6487

E 45/6487

PendingExploration LicenceShire of East PilbaraMarble Bar District

E 45/6487 is a pending exploration licence in the Shire of East Pilbara, Western Australia, applied for by Strindberg, Maxwell. The application was received on 30 Jan 2023 and is awaiting a decision. The ground is covered by 30 historical WAMEX reports.

Area
956.05ha
Applied
Jan 2023
4 years ago
WAMEX reports
30
WA median is 53
Report drilling
4
of 30 reports
Free Tenure Pack for E 45/6487
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 45/6487 that covers 30 WAMEX reports · 36 earlier titles on the ground since 1927 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
East Pilbara Explore on the live map

Register summary

Holder
Strindberg, Maxwell
Local government
Shire of East Pilbara
Application received
30 Jan 2023

The full record on E 45/6487

The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.

Free account
  • Current holders and their shares (no change of holder on record)
  • Expenditure history, conditions and endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • Expenditure compliance, expiry and ownership signals, once the application is granted
  • Every register dealing (2 on record), with mortgages, caveats and transfers flagged
See Premium

Exploration history on this ground

30 historical WAMEX exploration reports intersect E 45/6487: 17 report geochemistry or sampling, 12 include a digital data package.
Work on record: Stream sediment sampling 8 · Rock chip sampling 7 · Geological reconnaissance 6 · Ore reserve estimate 5 · Surface geochemistry 5 · Cassiterite 4. Resource declared in A19220 (1987), A16921 (1985), A15909 (1985), A8135 (1977).
Rather than open these one by one on the DMPE site, have them read into one cited report on E 45/6487, free for new accounts.
When this ground was worked
31970s
111980s
21990s
12000s
92010s
42020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A153601 2026 Tambourah Metals Ltd Shaw River 11% Partial Surrender Report Shaw River Project E45/04601 for the period ending 23/12/2025
A133365 2022 Minrex Resources Limited SHAW RIVER 11% Partial Surrender Report on the Shaw River Project, E45/4601 for the period 30 December 2016 to 9 December 202
A128040 2021 Atlas Iron Pty Ltd Western Shaw <1% Final Surrender Report for Western Shaw E45/4658 for the period of 15 July 2016 to 30 June 2021
A123132 2020 Atlas Iron Limited Western Shaw <1% Combined Annual Report for the C232/2011 Western Shaw Project for the period ending 05 January 2020
A116297 2018 Atlas Iron Limited Western Shaw <1% Annual Report for Western Shaw Project (C232/2011) for the period 06 January 2017 to 05 January 2018, E45/0434
25 more reports
A108282 2016 Fortescue Metals Group Ltd Hillside <1% C129/2011 Hillside Final Surrender Report for the period 14/02/2012 to 07/12/2015 (E45/2862 and E45/2867)
A107708 2016 Fortescue Metals Group Ltd Hillside <1% C129/2011 Hillside Project Annual Report for the period 1 November 2014 to 31 October 2015, E45/02862, E45/028
A106216 2015 Atlas Iron Ltd Mount Webber 11% Webber Project E45/2244 Final Surrender Report to the Department of Mines and Petroleum for the Period 23 Apri
A102479 2014 Bourke B G Hillside 11% Exploration Licence 45/2244 Hillside Project Annual Report for period 23rd April 2013 to 22nd April 2014
A104367 2014 Fortescue Metals Group Ltd Hillside <1% Hillside Project, Annual Report for the period 01/11/2013 to 31/10/2014, E45/2860-2862, 2867, 2946, 3328, 3412
A98221 2013 Altura Exploration Pty Ltd Hillside 11% Hillside Project, Annual Report for the period 23rd April 2012 to 22nd April 2013, E45/2244.
A100572 2013 Fortescue Metals Group Ltd Hillside <1% Annual Report for the Period 1 November 2012 to 31 October 2013, C129/2011 Hillside Project E45/2861, E45/2862
A96143 2012 Fortescue Metals Group Ltd Hillside <1% Hillside Project, Annual Report for the period 01/11/2011 to 31/10/2012, E45/2860-2862, 2867, 2946, 3328, 3412
A66632 2003 Geotech International Pty Ltd Hillside <1% E45/2255, Hillside, Annual Report to 3 January 2003 and Final and urrender Report to 7 April 2003.
A40371 1994 Mt Edon Gold Mines Nl Shaw River 1.9% Shaw River Project, Annual Report for the period 01/09/1993 to 01/09/1994, E45/1219 -1221.
A43234 1994 Mt Edon Gold Mines Nl Shaw River 1.9% Annual report for the period 09/93-09/94 Shaw River Project E45/1219 E45/1220 E45/1221
A28378 1989 Greenex Ltd Shaw River 2.1% Shaw River Project, Non-statutory Report: Exploration Report , February 1989, M45/20, 44, 46, 81, 260-261, 287
A28379 1989 Greenex Ltd Shaw River 2.1% Shaw River Project, Non-statutory Report: Thin Sections & Sample Data, July 1987, M45/20, 44, 46, 81, 260-261,
A28385 1989 Greenex Ltd Pilbara 1.7% Pilbara, 1989, Feasibility Study, E45/327.
A24569 1988 Greenbushes Ltd Shaw River - Pilbara 1.8% Pilbara Tin Tantalum Rare Earth Project, Pre feasibility study, April 1988, E45/327; P45/864-865, 1041-1042, 1
A25218 1988 Greenbushes Ltd Hartigans, Spear Hill 2.1% [ Shaw River tin-tantalum - rare earth exploration, Hartigans and Spear Hill, Non-statutory report, E45/327 ]
A28387 1988 Greenex Ltd Pilbara 2.1% Pilbara, Mining Feasibility Study and Cost Analysis, December 1988.
A19220 1987 Greenex Ltd Shaw River - Pilbara 1.9% Pilbara Tin, Tantalum, Rare Earth Project, Progress [annual] report, December 1986, E45/327, M45/20...45/81, P
A15909 1985 Kincora Pty Ltd Shaw River 9.1% Shaw River Project, Non-statutory Report: Geologist's Report for the period 20/05/1984 to 08/11/1984, M45/44.
A16921 1985 Greenex Ltd Pilbara 3.7% Pilbara Project, Annual Report for the period ending 31/12/1985, M45/81;P45/500-510, 513-519, P45/615-618,621-
A11222 1982 Greenex Ltd Pilbara <1% Pilbara Project, Non-statutory Report: Progress Report, February 1982, ( Tenement Schedule , see page 61).
A11346 1982 Delhi Petroleum Pty Ltd Hillside 6.1% Hillside Project, Annual Report for the period 19th February 1981 to 5th March 1981, TR70/8415H.
A8135 1977 Straits Trading Co Ltd Spear Hill <1% Spear Hill Project, Non-statutory Report: Exploration Report , September to November 1977, DC45/202...........
A4779 1974 British Metals Corporation Eleys Creek 4.8% Eleys Creek Project, Non-statutory Report: Plan Nos BMC10-17,September 1965, DC45/259, 286, 295-296, 299, 301-
A2975 1970 Placer Prospecting ( Australia) Pty Ltd Hillside 7.3% Hillside Project, Non-statutory Report: Report of Investigation , February 1970, DC45/295-296, 298-299, 300, 3

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 45/6487 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 45/6487? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.