E 45/7013
E 45/7013 is a pending exploration licence in the Shire of East Pilbara, Western Australia, applied for by Fmg Pilbara Pty Ltd (part of Fortescue Ltd). The application was received on 28 Oct 2024 and is awaiting a decision. The ground is covered by 99 historical WAMEX reports.
Register summary
- Holder
- Fmg Pilbara Pty Ltd
- Part of
- Fortescue Ltd (ASX:FMG) as at 2026-06-30
- Local government
- Shire of East Pilbara
- Application received
- 28 Oct 2024
The full record on E 45/7013
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (3 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A154269 | 2026 | State Resources Pty Ltd | Bernts East | <1% | Partial Surrender Report for Bernts East E45/4611 for the period ending 04/02/2026. |
| A155079 | 2026 | Atlas Iron Pty Ltd | Abydos | <1% | Final Surrender Report for Abydos E45/5113 for the period 13/08/2018 to 4/05/2026 |
| A146373 | 2025 | Dalrymple Mining & Construction Pty Ltd | Panorama | 96% | Panorama Project - P45/3163 Annual Report for the period ending 15/08/2024 |
| A146374 | 2025 | Dalrymple Mining & Construction Pty Ltd | Panorama | 49% | Panorama Project - P45/3164 Annual Report for the period ending 15/12/2024 |
| A146375 | 2025 | Dalrymple Mining & Construction Pty Ltd | Panorama | 27% | Panorama Project P45/3165 Annual Report for the period ending 15/08/2024 |
94 more reports
| A146376 | 2025 | Dalrymple Mining & Construction Pty Ltd | Panorama | <1% | Panorama Project P45/3166 Annual Report for the period ending 15/08/2024 |
| A145932 | 2024 | Atlas Iron Pty Ltd | Abydos | 100% | Final Surrender Report for Abydos E45/3619 for the period 26/10/2010 to 25/10/2024 |
| A144250 | 2024 | Australian Critical Minerals Limited | Shaw | <1% | Partial Relinquishment Report E45/5006 Shaw Project for the period ending 3/7/2024 |
| A137058 | 2023 | State Resources Pty Ltd | Bernts East | <1% | Bernts East Partial Surrender for E45/4611 for the period ending 30/06/2023 |
| A132781 | 2022 | Atlas Iron Pty Ltd | Abydos | <1% | Final Surrender Report for Abydos E45/3298 for the Period 20/08/2009 to 14/10/2022 |
| A125747 | 2021 | Baracus Pty Ltd | Bernts | 38% | Annual Combined Reporting for Bernts Project C176/2017 for the period ending 4/11/2020 |
| A122397 | 2020 | State Resources Pty Ltd | Bernts East | <1% | Annual Technical Report for Bernts East Project E45/04611 for the period 3 July 2018 to 19 November 2019 |
| A123029 | 2020 | Baracus Pty Ltd | Honeyeater Creek | <1% | Annual Technical Report for Honeyeater Creek Project E45/04778 for the period 17 January 2019 to 16 January 20 |
| A124012 | 2020 | Atlas Iron Pty Ltd | Abydos | 3.4% | Abydos Project Annual Report C40/2007 for the period ending 30 April 2020 |
| A125161 | 2020 | Baracus Pty Ltd | Bernts East | <1% | Bernts East E45/4611 Annual Report for the period ending 17/7/2020 |
| A122294 | 2020 | Baracus Pty Ltd | Bernts | 38% | Annual Combined Reporting for Bernts Project C176/2017 for the period 5 November 2018 to 4 November 2019 |
| A123057 | 2020 | Venturex Resources Limited | Sulphur Springs | <1% | Annual Technical Report: Sulphur Springs C139/2005 for the period 1 January 2019 to 31 December 2019 |
| A124762 | 2020 | Proterozoic Gold Pty Ltd | Shaw | <1% | Annual Exploration Report E45/5006 Shaw Project for the period ending 03/07/2020 |
| A118671 | 2019 | Baracus Pty Ltd | Bernts | 38% | Annual Technical Report for Bernts East Project C176/2017 For the Period 5 November 2017 to 4 November 2018, P |
| A119399 | 2019 | Baracus Pty Ltd | Honeyeater Creek | <1% | Annual Technical Report for Honeyeater Creek Project E45/04778 for the period 17 January 2018 to 16 January 20 |
| A120926 | 2019 | Proterozoic Gold Pty Ltd | Shaw | <1% | Annual Exploration Report E45/5006 Shaw Project for the period 4 July 2018 to 3 July 2019 |
| A119478 | 2019 | Venturex Resources Limited | Sulphur Springs | <1% | Annual Technical Report Sulphur Springs C139/2005 for the period 1 January 2018 to 31 December 2018 |
| A120372 | 2019 | Atlas Iron Pty Ltd | Abydos | 3.4% | Abydos Project Annual report C40/2007 for the period ending 30 April 2019, E45/03298, E45/03619, M45/01179, M4 |
| A117589 | 2018 | State Resources Pty Ltd | Bernts East | <1% | Annual Technical Report for Bernts East Project, E45/4611, 03 July 2017 - 02 July 2018 |
| A116250 | 2018 | Venturex Resources Limited | Sulphur Springs | 1% | Annual Technical Report Sulphur Springs C139/2005 for the period 1 January 2017 to 31 December 2017, M45/0049 |
| A117215 | 2018 | Atlas Iron Limited | Abydos | 3.5% | Abydos Project Annual Report C40/2007 for the period ending 30 April 2018, E45/02728, E45/03298, E45/03619, E4 |
| A114462 | 2017 | Atlas Iron Limited | Abydos | 2.6% | ABYDOS PROJECT C40/2007 Annual Technical Report to the DMP for the Period Ending 30 April 2017, E45/02308, E45 |
| A110790 | 2017 | Venturex Resources Ltd | Sulphur Springs | 1.1% | Venturex Resources Ltd ANNUAL REPORT For the Period 1 January 2016 to 31 December 2016 Sulphur Springs C139/20 |
| A112824 | 2017 | State Resources Pty Ltd | Strelley | <1% | Combined Annual Technical Report - Strelley Report C51/2013 for the period 07/03/2016 to 06/03/2017, E45/03828 |
| A115500 | 2017 | Baracus Pty Ltd | Bernts | 38% | C176/2017 Annual Technical Combined Report for the Bernts Project 05/11/2016 - 04/11/2017, P 45/02883, P 45/02 |
| A107862 | 2016 | Fortescue Metals Group Ltd | Glacier Extended | <1% | C5/2012 Glacier Extended Final Surrender Report for the period 17 March 2011 to 17 March 2015 |
| A108699 | 2016 | State Resources Pty Ltd | Strelley | <1% | Combined Annual Technical Report Strelley Project C51/2013 For the Period 7 March 2015 to 6 March 2016, E45/03 |
| A109653 | 2016 | Atlas Iron Limited | Abydos | 1.7% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A110479 | 2016 | Baracus Pty Ltd | Bernts | 97% | Annual Technical Report for Bernts Project P45/02883 for the period 05/11/2015 to 04/11/2016 |
| A108062 | 2016 | Venturex Resources Limited | Sulphur Springs | 1.1% | SULPHUR SPRINGS PROJECT ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015, M 45/00494, M 45/0058 |
| A108461 | 2016 | Venturex Sulphur Springs Pty Ltd | Sulphur Springs | <1% | Final Surrender Report E45/4447 for the period 17 March 2015 to 16 March 2016 |
| A110480 | 2016 | Baracus Pty Ltd | Bernts | 66% | Annual Technical Report for Bernts Project P45/02884 for the period 05/11/2015 to 04/11/2016 |
| A110482 | 2016 | Baracus Pty Ltd | Bernts | <1% | Annual Technical Report for Bernts Project P45/02886 for the period 5 November 2015 to 4 November 2016 |
| A110483 | 2016 | Baracus Pty Ltd | Bernts | 26% | Annual Technical Report for Bernts Project P45/02885 for the period 05/11/2015 to 04/11/2016 |
| A105205 | 2015 | Baracus Pty Ltd | Bernts Project | 26% | Bernts Project - Annual Technical Report for Prospecting Licence 45/2885 |
| A105204 | 2015 | Baracus Pty Ltd | Bernts Project | 66% | Bernts Project - Annual Technical Report for Prospecting Licence 45/2884 |
| A105595 | 2015 | State Resources Pty Ltd | Strelley Project | <1% | Combined Annual Technical Report - Strelley Project |
| A107562 | 2015 | Baracus Pty Ltd | Bernts | 97% | Bernts Project P45/02883 Annual Technical Report for the period 5 November 2014 to 4 November 2015 |
| A107563 | 2015 | Baracus Pty Ltd | Bernts Project | 66% | Bernts Project P45/02884 Annual Technical Report for the period 5 November 2014 to 4 November 2015 |
| A104488 | 2015 | Venturex Sulphur Springs Pty Ltd | Sulphur Springs | 1.1% | Sulphur Springs Project C139/2005 Annual Report for the period 1 Jan 2014 to 31 Dec 2014, M45/494, M45/653, M4 |
| A105203 | 2015 | Baracus Pty Ltd | Bernts Project | 97% | Bernts Project - Annual Technical Report for Prospecting Licence 45/2883 |
| A105206 | 2015 | Baracus Pty Ltd | Bernts Project | <1% | Bernts Project - Annual Technical Report for Prospecting Licence 45/2886 |
| A105712 | 2015 | Fortescue Metals Group Ltd | Glacier Extended | <1% | C5/2012 Glacier Extended Project Combined Annual Report for the period 1 April 2014 to 31 March 2015, E45/2945 |
| A105939 | 2015 | Atlas Iron Ltd | Abydos | 1.4% | Abydos Project C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A107565 | 2015 | Baracus Pty Ltd | Bernts | 26% | Bernt Project P45/02885 Annual Technical Report for the period 5 November 2014 to 4 November 2015 |
| A107566 | 2015 | Baracus Pty Ltd | Bernts | <1% | Bernts Project Annual Technical Report P45/02886 for the period 5 November 2014 to 4 November 2015 |
| A101577 | 2014 | Venturex Sulphur Springs Pty Ltd | Sulphur Springs | 1.1% | Sulphur Springs Project, Annual Report for the period 01/01/2013 to 31/12/2013, M45/494,587 & 653;P45/2607, 2 |
| A101947 | 2014 | State Resources Pty Ltd | Strelley | <1% | Strelley Project Combined Annual Technical Report for Exploration Licences 45/3687-I, 45/3828 I, 45/3829-I & 4 |
| A102007 | 2014 | Fortescue Metals Group Ltd | Glacier Extended | <1% | Combined Mineral Exploration Report: C5/2012 Glacier Extended for the period 01 April 2013 to 31 March 2014, E |
| A102356 | 2014 | Atlas Iron Ltd; Altura Mining Ltd | Abydos | 1.5% | Abydos Project, Annual Report for the period 01/05/2013 to 30/04/2014, E45/2308,2362-2363, 2728,2899, 3298, 33 |
| A97715 | 2013 | State Resources Pty Ltd | Strelley | <1% | Strelley Project Combined Annual Technical Report E 45/3687-I, E 45/3828-I, E 45/3829-I & E 45/3830-I for the |
| A98064 | 2013 | Atlas Iron Ltd | Abydos | 1.4% | Abydos Project, Annual Report for the period ending 30th April 2013, E45/2308, 2362-2363, 2471, 2728, 2899, 32 |
| A97835 | 2013 | Fortescue Metals Group Ltd | Glacier Extended | <1% | Annual Report for C5/2012 - Glacier Extended for the period 1/4/2012 to 31/3/2013, E |
| A94018 | 2012 | Atlas Iron Ltd | Abydos | 1% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A90513 | 2011 | Atlas Iron Ltd | Abydos | <1% | Abydos Project, Annual Report for the period ending 30th April 2011,E45/2362, 2363, 2404, 2471, 2728, 2765, 28 |
| A85506 | 2010 | Sipa Resources Ltd | Panorama | 25% | Panorama Project: E45/2556 Partial Surrender Report for the Period 30 September 2005 to 29 September 2009 |
| A88938 | 2010 | Sipa Resources Ltd | Panorama | 4.7% | Panorama Project Annual Report for the Period 1 January 2010 to 31 December 2010, C137/1993, M45/587, E45/2300 |
| A81402 | 2009 | Sipa Resources Ltd | Panorama | 25% | Partial Surrender Report for the Period 30 September 2005 to 30 September 2008, Panorama Project, E45/2556 |
| A82826 | 2009 | Sipa Resources Ltd | Panorama | 25% | Panorama Project: E45/2300 Partial Surrender Report for the Period 4 May 2005 to 3 May 2009 |
| A81699 | 2009 | Sipa Resources Ltd | PANORAMA | 4.7% | Panorama Project Annual Report for the Period 1 January 2008 to 31 December 2009 |
| A85491 | 2009 | Sipa Resources Ltd | Panorama | 4.7% | Panorama Project C137/1993 M45/587, E45/2300, E45/2393, E45/2601,E45/2474, E45/2556, P45/2600-2617 Annual Repo |
| A77713 | 2008 | Sipa Resources Ltd | Panorama (Strelley) | 4.7% | Panorama Project Annual Report for the Period 1 January 2007 to 31 December 2007 |
| A74134 | 2007 | Sipa Resources Ltd | Panorama Project | 14% | Panorama Project C137/1993 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 (Marble Bar) |
| A73906 | 2006 | Uranium Equities Ltd | Strelley River | 25% | Strelley River Project E45/2556, Annual Report for the Period 30/09/2005 to 29/09/2006, (Marble Bar). |
| A71565 | 2005 | Sipa Resources Ltd | Panorama Exploration Project | 14% | Panorama Exploration Project, 2005 Annual report (Covering the period 1 January 2005 to 31 December 2005, C137 |
| A68293 | 2004 | Sipa Resources Ltd | Panorama (Strelley) | 6.4% | Annual Report for the period 01/01/2003-31/12/2003 Panorama JV Project(c137/1993), E45/1852, E45/2029, M45/494 |
| A69467 | 2004 | Sipa Resources Ltd | Panorama / Strelley | 3.5% | Panorama Project, Strelley Exploration Area, Surrender report Panorama Project, C137/1993, E45/1291, E45/1478 |
| A65798 | 2003 | Outokumpu Zinc Australia Pty Ltd | Panorama (Strelley) | 6.6% | Partial Surrender Report On The Strelley Exploration Area Panorama Project (Covering The Period 21 September 1 |
| A64887 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama (Strelley) | 2.8% | 2001 Annual Report On The Strelley Exploration Area Panorama Project (Covering The Period 1 January 2001 To 31 |
| A66373 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama (Strelley) | 2.9% | Annual Report on the Strelley Exploration Area Panorama Project covering the period 1 January 2002 to 31 Decem |
| A62548 | 2001 | Outokumpu Exp Aust Pty Ltd | Panorama - Strelley | 3.3% | Panorama - Strelley Project, Annual Report (Parts 1 & 2) for the period 1st January 2000 to 31st December 2000 |
| A59696 | 2000 | Sipa Resources Ltd | Panorama | 3.3% | Department of Minerals and Energy, 1999 Annual Report on the Strelley Exploration Area, Panorama Project, cove |
| A57799 | 1999 | Sipa Resources Ltd | Panorama (Strelley) | 1.7% | Department of Minerals and Energy 1998 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A57800 | 1999 | Sipa Resources Ltd | Panorama | <1% | SurrenderReport E45/825,1040,1207,1288,1290,1291,1351,1384,1423,1438,1478,1479,1564,1575,1592,1593,1646, 2029 |
| A56516 | 1998 | Sipa Resources Ltd | Panorama (Strelley) | 1.9% | Department of Minerals and Energy 1997 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A51765 | 1997 | Sipa Resources Ltd | Panorama (Strelley) | 1.8% | Department of Minerals and Energy 1996 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A48458 | 1996 | Sipa Resources Ltd | Panorama (Strelley) | 1.9% | Department of Mineral and Energy 1995 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A48457 | 1996 | Sipa Resources Ltd | Panorama (Strelley) | 1.9% | Department of Mineral and Energy 1995 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A46318 | 1995 | Sipa Resources Ltd | Panorama (Strelley) | 2% | Department of Mineral and Energy 1994 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A40986 | 1994 | Sipa Resources Ltd | Panorama - Strelley | 2.1% | Panorama - Strelley Project , Annual Report for the period 27th November 1992 to 31st December 1993, E45/715 |
| A42099 | 1994 | Sipa Resources Ltd | Panorama - Strelley | 12% | E45/1040 PARTIAL SURRENDER REPORT |
| A39115 | 1993 | Sipa Resources Ltd | Panorama - Strelley | 2.7% | Panorama - Strelley Project, Annual Report for the period 27th November 1991 to 26th November 1992, E45/825, |
| A39174 | 1993 | Sipa Resources Ltd | Panorama- Strelley | 2.5% | Panorama- Strelley Project, Annual Report for the period 27th November 1991 to 26th November 1992. E45/581, 71 |
| A32548 | 1991 | Sipa Resources Ltd | Panorama | 2.3% | Sipa-Ashling Joint Venture Panorama Project M45/494, E45/581 , 957, 971 Annual Technical Report - 1990 |
| A34908 | 1991 | Sipa Resources Ltd | Panorama | 1.6% | Sipa-Ashling Joint Venture Panorama Project Annual Report 1991 Volume 1 of 6 (E45/581, E45/715, E45/825, E45/9 |
| A31203 | 1990 | Miralga Mining Nl | Panorama | 5.9% | Panorama Project, Partial Surrender Report for the period 27/11/1988 to 26/11/1989 E45/581 (Strelley Gorge), E |
| A27601 | 1989 | Homestake Australia Ltd | SULPHUR SPRINGS | 5.9% | Sulphur Springs JV Report for period 01/05/88 to 30/12/88 Tenements E45/419 E45/532 E45/535 E45/581 Miralga Mi |
| A25326 | 1988 | Homestake Australia Ltd | SULPHUR SPRINGS | 5.9% | Sulphur Springs Joint Venture Annual Report as at 30 April 1988. E45/419, E45/532, E45/535, and E45/581. Homes |
| A13057 | 1984 | Anaconda Aust Inc | Shaw River | <1% | Shaw River Project, Annual Report for the year ending 12th November 1983, E45/1-3. |
| A14316 | 1984 | Anaconda Aust Inc | Shaw River | <1% | Shaw River Project, Final Surrender Report for the period ending 10/09/1984, E45/1-3. |
| A12172 | 1983 | Anaconda Aust Inc | Shaw River - Lallah Rookh - George Range | <1% | Shaw River - Lallah Rookh - George Range Project, Annual Report for the period ending 31/12/1982, TR70/7437-74 |
| A11184 | 1982 | Anaconda Aust Inc | Shaw River | <1% | Shaw River Project, Annual Report for the period 01/01/1981 to 31/12/1981, TR70/7437H ( Lallah Rookh), TR70/74 |
| A9832 | 1981 | Anaconda Aust Inc | Shaw River | <1% | Shaw River Project, Annual Report for the period ending 13th March 1981, TR70/7437-7439H. |
| A3711 | 1972 | Kennecott Exp Aust Pty Ltd | Marble Bar Two | 3% | Marble Bar Two Project, Non-statutory Report: Progress Report 1971 & Final Report for the year ending 31/12/19 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 45/7013 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 45/7013? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.