E 45/7131
E 45/7131 is a pending exploration licence in the Shire of East Pilbara, Western Australia, applied for by Antipa Resources Pty Ltd (part of Antipa Minerals Limited). The application was received on 25 June 2025 and is awaiting a decision. The ground is covered by 119 historical WAMEX reports.
Register summary
- Holder
- Antipa Resources Pty Ltd
- Part of
- Antipa Minerals Limited (ASX:AZY) as at 2026-06-30
- Local government
- Shire of East Pilbara
- Application received
- 25 June 2025
The full record on E 45/7131
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (1 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A154555 | 2026 | Antipa Minerals Ltd. | Paterson South | <1% | E45/5462 - Partial Surrender Report Paterson South for the period ending 11/03/2026. (C74/2025) |
| A149593 | 2025 | Greatland Exploration Pty Ltd | Pascalle | 39% | Partial Surrender Report for Tenement E45/5316 Pascalle for the period 6 June 2019 to 5 June 2025 |
| A145048 | 2024 | South Telfer Mining Pty Ltd | South Telfer | <1% | Partial Surrender Report - E45/5359 South Telfer for the period 14 November 2019 to 9 August 2024 |
| A129493 | 2022 | Newcrest Mining Limited | Telfer Regional | 38% | Telfer Regional Exploration Licence 45/4303 Partial Surrender Report for the period 14 January 2016 to 13 Janu |
| A123532 | 2020 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project C108/2015 Annual Technical Report 1 April 2019 to 31 March 2020 for Exploration Licences E45/ |
114 more reports
| A122760 | 2020 | Newcrest Mining Limited | Telfer | 3% | C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2019 |
| A124225 | 2020 | Rincon Resources Limited | South Telfer | <1% | Combined Annual Technical Report C24/2020 South Telfer Project for the period ending 09/04/2020 |
| A124365 | 2020 | Vanatech Pty Ltd | Pascalle | 39% | Pascalle Project E45/05316 Annual Report for the period ending 06/06/2020 |
| A119140 | 2019 | Newcrest Mining Limited | Telfer | 3% | C348/1995 Telfer Mine Group Annual Report for C348/1995 for the period 1 January 2018 to 31 December 2018 |
| A120217 | 2019 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project - E45/2529 - voluntary partial surrender for the Period 1 April 2015 to 31 March 2019 |
| A120583 | 2019 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project - 2018 Annual Report (C108/2015) for the period 01/04/2018-31/03/2019 |
| A115962 | 2018 | Newcrest Mining Limited | Telfer | 3% | C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2017. |
| A116999 | 2018 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project C108/2015 Annual Report for the period 01/04/2017 - 31/03/2018, E45/02524, E45/02525, E45/025 |
| A117008 | 2018 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project - C108/2015 - Partial Surrender Report For the Period 15 April 2015 to 11 April 2018, E45/025 |
| A118228 | 2018 | Reward Minerals Ltd | Dora West | <1% | Annual Report on Exploration for Period Ended 17 June 2018, E45/4292, Dora West, Pilbara, Western Australia |
| A113851 | 2017 | Newcrest Mining Ltd | Telfer Regional | 36% | E45/2726 FINAL REPORT TO THE WA DEPARTMENT OF MINES AND PETROLEUM FOR THE PERIOD ENDING 22 FEBRUARY 2017 |
| A112026 | 2017 | Newcrest Mining Limited | Telfer Regional | 36% | Telfer Regional E45/2726 Annual Report to the WA Department of Mines and Petroleum for the period ending 11 Ju |
| A112122 | 2017 | Newcrest Mining Limited | Telfer | 3% | C348/1995 - Telfer Mine Project Combined Annual Technical Report For the Period 1 January 2016 to 31 December |
| A114183 | 2017 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project C108/2015 Annual Report For the Period 1 April 2016 to 31 March 2017, E45/02524, E45/02525, E |
| A114671 | 2017 | Reward Minerals Ltd | Dora West | <1% | Annual Report for E45/4292 Dora West For the Period 18 June 2016 to 17 June 2017 |
| A108067 | 2016 | Newcrest Mining Limited | Telfer | 5.6% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 TELFER C348/1995 - TELFER MINE GROUP - COMBINE |
| A109118 | 2016 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project - Annual Report C108/2015, E45/2524-2529 for the period 01 April 2015 to 31 March 2016 |
| A109744 | 2016 | Reward Minerals Ltd | Dora West | <1% | Annual Report For E45/4292 Dora West Project for the period 18/06/2015 to 17/06/2016 |
| A104881 | 2015 | Newcrest Mining Ltd | Telfer | 4.5% | C348/1995 - Telfer Mine Group Annual Technical Report for the year ending 31/12/2014, E45/975.....P45/2861 |
| A106201 | 2015 | Newcrest Mining Ltd | Cape Lambert | 2.9% | Cape Lambert E45/3100, Partial Surrender Report to the WA Department of Mines and Petroleum, period ending 8th |
| A106582 | 2015 | Reward Minerals Ltd | Lake Dora West | <1% | First Annual Report for E45/4292 “Dora West” for the period 18/06/2014 to 17/06/2015 |
| A106036 | 2015 | Reward Minerals Ltd | Lake Dora West | <1% | Partial Relinquishment Report for E45/4292 “Dora West” for the period 18/06/2014 to 20/03/2015 |
| A101199 | 2014 | Newcrest Mining Ltd | Telfer | <1% | C348/1995 - TELFER MINE GROUP ANNUAL TECHNICAL REPORT YEAR ENDING 31ST DECEMBER 2013 E45/975, E45/1070, E45/11 |
| A97052 | 2013 | Newcrest Mining Ltd | Telfer | <1% | Telfer Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/975.......E45/3255; M |
| A99427 | 2013 | Ram Resources Ltd | Dome Triangle [Telfer Dome] | 36% | Dome Triangle [Telfer Dome] Project, Annual Report forthe period 13/07/2012 to 12/07/2013, E45/2726. |
| A99388 | 2013 | Ram Resources Ltd | Dome Triangle | 36% | Dome Triangle Project, Partial Surrender Report for the period 12/07/2010 to 26/09/2013, E45/2726. |
| A94431 | 2012 | Ram Resources Ltd | Dome Triangle | 36% | DEPARTMENT OF MINES AND PETROLEUM ANNUAL GEOLOGY REPORT DOME TRIANGLE PROJECT ALSO REFERRED TO AS TELFER DOME |
| A93130 | 2012 | Newcrest Mining Ltd | Telfer | <1% | Telfer Project, Annual Report for the period 1st January 2011 to 31st December 2011, E45/975.................. |
| A89730 | 2011 | Newcrest Mining Ltd | Telfer | <1% | C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2010 |
| A91314 | 2011 | Acebell Holdings Pty Ltd; Ram Resources Ltd | Telfer Dome - Dome Triangle | 36% | E45/2726 Annual Report on Telfer Dome (Dome Triangle) Project, for the period 13 July 2010 to 12 July 2011 |
| A86296 | 2010 | Newcrest Mining Ltd | Telfer | <1% | C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2009, E45/975, E45/1070 |
| A81226 | 2009 | Newcrest Mining Ltd | TELFER | <1% | C348/1995 - TELFER MINE GROUP ANNUAL TECHNICAL REPORT YEAR ENDING 31ST DECEMBER 2008. E45/1070, 1168, E45/170 |
| A77262 | 2007 | Newcrest Mining Ltd | Telfer Regional | <1% | Telfer Regional Project, Exploration Licences: E45/975, E45/1070................and E45/2616, Mineral Leases: |
| A74420 | 2006 | Newcrest Mining Ltd | Parallel Range | <1% | Telfer Regional Project Exploration Licences E45/975, 985.... Mining Leases M45/394, 399....Annual Report Peri |
| A70040 | 2005 | Newcrest Mining Ltd | Trotmans Dome | 3% | Annual report for the period 01/01/04 - 31/12/04 Trotmans Dome Project, C355/1995, E45/975, E45/1957, M45/399 |
| A72044 | 2005 | Newcrest Mining Ltd | Telfer Regional | <1% | Telfer Regional Project, Exploration Licences E45/975, 985, 1070, 1308, 1383, 1392, 1553, 1571, 1699, 1701, E4 |
| A68047 | 2004 | Newcrest Mining Ltd | Back Door | 3% | Annual Report for the period ending 31/12/2003 Back Door Project M45/975,M45/1957,M45/399,M45/580,M45/581, M45 |
| A66297 | 2003 | Mount Burgess Mining Nl | Telfer | 3.3% | Telfer Project, Annual Report for the period 1 January 2002 to 31 December 2002 Telfer C348/1993: South Camp D |
| A64338 | 2002 | Mount Burgess Mining Nl | Telfer | 3.3% | Annual Report, Telfer Project, Period 1 January 2001 - 31 December 2001. South Camp Dome E45/ 1654, 1218 East |
| A65745 | 2002 | Mount Burgess Mining Nl | Wilki | 9.2% | Surrender Report E45/1535 Wilki Project, Combined Report: C348/93 for the period 06/02/1995 to 05/08/2002. |
| A66038 | 2002 | Newcrest Mining Ltd | Trotmans Dome | 3% | Annual Report period ending 31st December 2002 Trotmans Dome Group E45/975, 45/1957, M45/399, 45/580, 45/581, |
| A61905 | 2001 | Normandy Gold Exploration Pty Ltd | Yeneena | 3.5% | Annual Report on exploration for the period 1 January 2000 to 31 December 2000 Yeneena Project Combined Annual |
| A61909 | 2001 | Normandy Gold Exploration Pty Ltd | Yeneena | 3.2% | Final Surrender Report on exploration for the period 7 August 1998 to 23 January 2001 Yeneena Project - Lamil |
| A64310 | 2001 | Newcrest Mining Ltd | Trotmans Dome | 3% | Annual Report to the Department of Minerals & Petroleum Resources period ending 31st December 2001 Trotmans Do |
| A60197 | 2000 | Normandy Gold Ltd | Yeneena | 3.5% | Annual Report on Exploration for the Period 01/01/1999 to 31/12/1999 Yeneena Project Combined Annual Report Is |
| A61284 | 2000 | Normandy Gold Exploration Pty Ltd | Yeneena | 2.4% | Annual Report on Exploration for the Period 1 August 1999 to 31 July 2000, Yeneena Project, Lamil Group Combin |
| A62075 | 2000 | Newcrest Mining Ltd | Trotmans Dome | 1.8% | Trotmans Dome Group exploration licences 45/975, 45/980, 45/1958, 45/2113; mining leases 45/399, 45/580, 45/58 |
| A57277 | 1999 | Newcrest Mining Ltd | Trotmans Dome | 2.9% | Annual report period ending 31/12/98. E45/975,980,1703. M45/399,580-581,612,620-622. Trotmans Dome Group. |
| A57759 | 1999 | Newcrest Mining Ltd | Triangle | 62% | Surrender Report for the Period Ending November 30, 1998 Exploration Licence 45/1573 Hexangle Triangle Dome Gr |
| A57776 | 1999 | Normandy Gold Ltd | Paterson | 3.5% | Combined Annual Report - Isdell Joint Venture 01/01/98 - 31/12/98 E45/1217-1218, 1227, 1234 |
| A59049 | 1999 | Normandy Exploration Ltd | Wilki | 9.2% | Partial surrender report on Exploration for the period 06/02/95-19/06/99 Wilki Project, E45/1535, Paterson Ra |
| A59310 | 1999 | Newcrest Mining Ltd | Triangle Dome | 16% | Triangle Dome Group, Exploration Licence 45/1542, Mining Leases 45/274, 390-391, 626, Final Report to the Depa |
| A59339 | 1999 | Normandy Gold Ltd | Yeneena | 1.4% | Annual Report on Exploration for the Period 1 August 1998 to 31 July 1999, Yeneena Project, Lamil Group Combin |
| A59437 | 1999 | Normandy Gold Ltd | Yeneena | 11% | Partial Surrender Report on Exploration for the Period 7 August 1998 to 26 November 1999, North Wilki, E45/201 |
| A62903 | 1999 | Newcrest Mining Ltd | Trotmans Dome | 3.1% | Annual Report Period Ending 31st December 1999 Exploration Licences 45/975, 45/980 Mining Leases 45/399, 45/58 |
| A53702 | 1998 | Newcrest Mining Ltd | Trotmans Dome | 2.9% | Annual report for period ending 31/12/97 Trotmans Dome Group Exploration Licences 45/975 45/980 45/1703 Mining |
| A53740 | 1998 | Newcrest Mining Ltd | Triangle Dome | 33% | Annual Technical Report to the Dept of Minerals & Energy for the Period ending 31st December 1997 Exploration |
| A54531 | 1998 | Mount Burgess Mining Nl | South Camp Dome | 3.5% | Camp Dome South: E45/1218, Kaliranu: E45/1234, East Tim's Dome: E45/1217, Arrowhead: E45/1227, Wilki: E45/1535 |
| A55534 | 1998 | Newcrest Mining Ltd | Hexangle /Triangle Dome | 62% | Partial Surrender Report to the Dept of Minerals & Energy for the period ending August 14th 1998, Exploration |
| A57329 | 1998 | Newcrest Mining Ltd | Triangle Dome | 34% | Annual technical Report for the Period Ending 31st December 1998 Exploration Licences 45/1542, 45/1573 Mining |
| A50509 | 1997 | Mount Burgess Mining Nl | Camp Dome South | 4.2% | Annual technical report for the year ending December 1996 Camp Dome South Project: E45/1218, 1654; P45/2367,23 |
| A51534 | 1997 | Newcrest Mining Ltd | Triangle Dome / Flower | 18% | Triangle Dome / Flower Project, Partial Relinquishment Report Exploration Licence E45/1248A for the period end |
| A50458 | 1997 | Newcrest Mining Ltd | Trotmans Dome | 2.9% | Annual report period ending 31st December 1996 Exploration Licences E45/975 E45/980 E45/1703 Mining Leases M45 |
| A50486 | 1997 | Newcrest Mining Ltd | Triangle Dome | 32% | Triangle Dome Project, Annual Technical Report Period Ending 31st December 1996 Exploration Licencs 45/1248A, |
| A51031 | 1997 | Newcrest Mining Ltd | Great Sandy | 22% | Great Sandy Project, 1997 Surrender Report Exploration Licence E45/1130,April 1997. |
| A52219 | 1997 | Newcrest Mining Ltd | Flower | 18% | Flower Project, Final Surrender Report for period ending 9th September 1997, E45/1248A. |
| A49955 | 1996 | Newcrest Mining Ltd | Great Sandy | 3.5% | Annual technical report to the Department of Minerals and Energy Period ending 27th December 1996 Exploration |
| A46866 | 1996 | Newcrest Mining Ltd | Trotmans Dome | 3.1% | Annual technical report period ending 31st December 1995 Exploration Licences E45/975 E45/980 Mining Leases M4 |
| A46878 | 1996 | Newcrest Mining Ltd | Valley/Triangle Dome | 32% | Valley/Triangle Dome Project, Annual Report, Period ending 31st December 1995, Exploration Licences 45/1542, 4 |
| A43717 | 1995 | Newcrest Mining Ltd | Trotmans Hills | 2.4% | Annual Technical Report period ending 31st December,1994 Trotman Hills Group, E45/868, E45/916, E45/975, E45/9 |
| A44250 | 1995 | Mim Exploration Pty Ltd | Cove | <1% | Cove (JV) Project, Annual Report for the period ending 1st December 1994, E45/854; M45/542-545. |
| A44333 | 1995 | Mim Exploration Pty Ltd | Cove | <1% | Cove (JV) Project, Surrender Report for the period to 1994 E45/855. [Wilki Range East] |
| A46252 | 1995 | Placer Exploration Ltd | Great Sandy | 3.5% | Fourth annual report on exploration E45/1129 E45/1130 E45/1358 and E45/1462 Great Sandy Project Pilbara Minera |
| A43038 | 1994 | Placer Exploration Ltd | Great Sandy | 3.5% | Great Sandy Project, Annual Report for the year ending 1st December 1994, E45/1129-1130, 1358 & 1462. |
| A40666 | 1994 | Mim Exploration Pty Ltd | Cove | <1% | Cove (JV) Project, Annual Report for the period 01/93-12/93, E45/855.[Wilki Range East] |
| A39967 | 1994 | Placer Exploration Ltd | Great Sandy | 8.7% | Annual report for the period 27/10/92-26/10/93 Great Sandy Project E45/1129 E45/1130 E45/1358 |
| A43718 | 1994 | Newcrest Mining Ltd | Triangle Dome | 2.6% | Triangle Dome Project, Annual Report M45/274, 390, 391, 626, E45/1248 for period ending 31st December 1994. |
| A38719 | 1993 | Newcrest Mining Ltd | Backdoor North | 18% | Partial surrender report period ending 10/5/93. E45/980, Backdoor North |
| A37545 | 1993 | Newcrest Mining Ltd | Trotmans Hills | <1% | Annual Report for the period 01/01/92 to 31/12/92 Trotman Hills Group Project E45/836-837,868,915-916,975 E45/ |
| A37720 | 1993 | Placer Exploration Ltd | Great Sandy | 3.7% | Great Sandy Project,1992 Partial Surrender Report for E45/1129-1130, & 1992 Final Surrender Report for E45/113 |
| A39143 | 1993 | Newcrest Mining Ltd | Triangle South | 57% | Partial Surrender Report for the period ending 10th May, 1993, E45/979 Triangle South Project, |
| A39178 | 1993 | Mim Exploration Pty Ltd | Cove | <1% | Cove (JV) Project, Annual Report for the period 12/91-12/92 , E45/855.[ Wilki Range East] |
| A39179 | 1993 | Mim Exploration Pty Ltd | Cove | <1% | Cove (JV) Project, Partial Surrender Report for the period 21/12/1991 to 20/12/1992, E45/855. |
| A40307 | 1993 | Newcrest Mining Ltd | Triangle Dome | 5.9% | Triangle Dome Project, Annual Report for the period ending 31st December 1993, E45/979 & 1248; M45/274,390 & 3 |
| A35114 | 1992 | Newcrest Mining Ltd | Trotman Hills | <1% | Annual Technical Report Period Ending 31st December 1991 Trotman Hills Group E45/836,E45/837,E45/868,E45/915,E |
| A36530 | 1992 | Mim Exploration Pty Ltd | Wilki/Karakutikati Ranges | <1% | Wilki/Karakutikati Ranges Project, Annual Technical Report, E45/855. |
| A37492 | 1992 | Placer Exploration Ltd | Great Sandy | 3.4% | Great Sandy Project, Annual Report for the year ending 26th October 1992, E45/1129-1131. |
| A36531 | 1992 | Mim Exploration Pty Ltd | Cove | <1% | Annual Report for the period 12/90-12/91, Cove JV Project,[Wilkie Range East] E45/855. |
| A37527 | 1992 | Newcrest Mining Ltd | Carr Boyd | <1% | Annual Report for the Period 19/12/92 - 18/12/93 Carr Boyd/Bills Claim/Black Hills/Seventeen Mile Hill/Triang |
| A37600 | 1992 | Newcrest Mining Ltd | Malu West | 11% | Annual Technical Report for Period ending 31/12/92 Miscelaneous Group E45/1248A,979,1168; M45/460 |
| A35202 | 1991 | Newcrest Mining Ltd | Carr Boyd | <1% | Annual Technical Report Period Ending 31/12/91 Carr Boyd Group-Black Hills/Triangle/Seventeen Mile/Bill's Clai |
| A35179 | 1991 | Newcrest Mining Ltd | Lamil South/Malu West/Triangle South/Val | 22% | Annual Technical Report For Period ending 31/12/91 Miscellaneous Group(Lamil South/Malu West/Triangle South/Va |
| A32313 | 1990 | Newmont Australia Ltd | Triangle | 1.3% | Triangle Project, Annual Report for the period 15th July 1989 to 14th July 1990, M45/274, 390 & 391. |
| A26728 | 1989 | Newmont Australia Ltd | Telfer North | 5.1% | Telfer North, relinquishment report, EL45/36, period ending 17th December 1988. |
| A27847 | 1989 | Newmont Australia Ltd | Trotmans | 1.9% | Trotmans Project, Non-statutory Report; Final Report, June 1989, E45/104. |
| A28358 | 1989 | Newmont Australia Ltd | Triangle | <1% | Triangle Project, Annual Report for the period ending 15/05/1989, M45/274, 390 & 391. |
| A29866 | 1989 | Cove Mining Nl | Telfer- Paterson Province | <1% | Telfer-Paterson Province Project, Non-statutory Report: Geological Data Review & Assessment of Exploration Pot |
| A24465 | 1988 | Newmont Australia Ltd | Telfer - Trotmans, Connaughtons, Grace | 1.9% | Trotmans Dome, Annual report for period ending 28 June 1988, E45/104 |
| A21351 | 1987 | Newmont Australia Ltd | Trotmans | 1.9% | Trotmans Project, Annual Report for the period ending 28th June 1987, E45/104. |
| A23041 | 1987 | Newmont Australia Ltd | Telfer North | 5.1% | Annual Technical Report for period ended 18/12/87 Exploration Licence45/36 (Telfer North) |
| A19759 | 1987 | Newmont Holdings Pty Ltd | Telfer Dome | 5.1% | Final Technical Report on Area Relinquished Under Section65 of the Mining Act of Western Australia Exploration |
| A21352 | 1987 | Newmont Australia Ltd | McKays - Trotmans | 1.9% | Partial Surrender Report to the Department of Mines E45/104 Trotmans |
| A18677 | 1986 | Newmont Holdings Pty Ltd | Trotmans Stockwork, Grace & Connaughtons | 1.9% | Trotmans Stockwork, Grace & Connaughtons Prospects, Annual report for period ended June 28, 1986, E45/104 |
| A19284 | 1986 | Battle Mountain Australia Inc | Trotman Hills | 1.7% | Trotman Hills Project, Third progress [annual] report, From January 1 1986 to December 31 1986, E45/328...471 |
| A19758 | 1986 | Newmont Holdings Pty Ltd | Telfer | 5.1% | Annual report period ended 18/12/86 Exploration Licence E45/36 Telfer Project |
| A15907 | 1985 | Newmont Holdings Pty Ltd | Telfer | 1.9% | Telfer Project, Annual Report for the period ending 28th June 1985, E45/104. |
| A16605 | 1985 | Duval Mining Australia Ltd | Trotman Hills | 1.7% | Trotman Hills Project, Annual Report for the period 01/01/1985 to 31/12/1985, E45/328-331, 333-34, 349 ,367, 3 |
| A16740 | 1985 | Newmont Holdings Pty Ltd | Telfer Dome | 5.1% | Final Technical Report on area relinquished under section 65 of the Mining Act of Western Australia Exploratio |
| A14770 | 1985 | Newmont Pty Ltd | Telfer Dome | 5.1% | Telfer Dome Project, Annual Report for the period 01/12/1983 to 01/12/1984, E45/36. |
| A15374 | 1985 | Duval Mining Australia Ltd | Trotman Hills- Carr Boyd | 1.8% | Trotman Hills - Carr Boyd (JV) Project [s], Non-statutory Report: First Progress Report for the period ending |
| A16900 | 1985 | Newmont Holdings Pty Ltd | Telfer Dome | 5.1% | Annual report period ended 18/12/85 Exploration Licence E45/36 Telfer Dome |
| A16599 | 1984 | Duval Mining Australia Ltd | Trotman Hills | 1.8% | Trotman Hills Project, Annual Report for the period ending 31st December 1984, (Field Seasons), E45/328-331, 3 |
| A16301 | 1753 | Occidental Minerals Corp | M2415/0: Paterson Province uranium/coppe | <1% | M2415/0: Paterson Province uranium/copper-lead-zinc exploration |
| A25990 | 1753 | Freeport Of Australia Inc | Trotman Hills | 6.2% | Annual report, Trotman Hills 1987 - 1988, For period 31/10/87 to 30/10/88 (E45/328, 329, 340-342, 344, Paterso |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 45/7131 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 45/7131? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.