NextMaps›WA Tenements›E 45/7291

E 45/7291

PendingExploration LicenceTown of Port HedlandMarble Bar District

E 45/7291 is a pending exploration licence in the Town of Port Hedland, Western Australia, applied for by Tmb Nullagine Pty Ltd (part of Tambourah Metals Ltd). The application was received on 13 Apr 2026 and is awaiting a decision. The ground is covered by 27 historical WAMEX reports.

Area
6,729.626ha
Applied
Apr 2026
6 months ago
WAMEX reports
27
WA median is 53
Report drilling
5
of 27 reports
Free Tenure Pack for E 45/7291
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 45/7291 that covers 27 WAMEX reports · 7 open-file drillholes (480 m drilled) · 16 earlier titles on the ground since 1958 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Port Hedland Explore on the live map

Register summary

Holder
Tmb Nullagine Pty Ltd
Part of
Tambourah Metals Ltd (ASX:TMB) as at 2025-06-30
Local government
Town of Port Hedland, Shire of East Pilbara
Application received
13 Apr 2026

The full record on E 45/7291

The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.

Free account
  • Current holders and their shares (no change of holder on record)
  • Expenditure history, conditions and endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • Expenditure compliance, expiry and ownership signals, once the application is granted
  • Dealings, mortgages, caveats and transfer history
See Premium

Exploration history on this ground

27 historical WAMEX exploration reports intersect E 45/7291: 18 report geochemistry or sampling, 17 include a digital data package.
Work on record: Rock chip sampling 14 · Soil sampling 10 · Surface geochemistry 7 · Stream sediment sampling 6 · RC drilling 4 · Geological reconnaissance 3. Resource declared in A96750 (2013).
Rather than open these one by one on the DMPE site, have them read into one cited report on E 45/7291, free for new accounts.
When this ground was worked · 25 of 27 reports dated
11990s
22000s
122010s
102020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A147814 2025 De Grey Mining Ltd Turner River <1% E 45/4751 - Partial Surrender Report Turner River Base Metals Project for the period ending 22/11/2024.
A136939 2023 Woomera Mining Limited Magpie Range 60% Partial Surrender Report E45/4790 Magpie Range for thre period ending 6/6/2023
A137344 2023 Woomera Mining Limited Magpie Range 60% Surrender Report E45/4790 Magpie Range for the period ending 04/08/2023.
A137345 2023 Woomera Mining Limited Magpie Range 100% Surrender Report E45/4796 Magpie Range for the period ending 04/08/2023.
A132607 2022 Woomera Mining Limited Magpie range 72% Annual Combined Report Magpie Range project C83/2019 for the period ending 29/06/2022. E45/4790,E45/4796
22 more reports
A128262 2021 Woomera Mining Limited Magpie Range 72% Annual Report for Magpie Range Project (C83/2019) for the period 30 June 2020 to 29 June 2021
A123208 2020 De Grey Mining Ltd Turner River <1% C17/2013 Annual Report Turner River Base Metal Project period ending 31 December 2019
A125116 2020 Pacton Pilbara Pty Ltd Magpie Bore <1% Final Surrender Report Magpie Bore Project E45/5098 for the period 31 July 2018 to 6 January 2020
A125344 2020 Woomera Mining Limited Magpie Range 72% Annual Report for Magpie Range project (C83/2019) for the period ending 29/6/2020
A122863 2020 Fe Limited; Macarthur Lithium Pty Ltd Indee <1% Final Surrender Report for Indee E45/4693 for the period ending 19/11/2019
A119545 2019 De Grey Mining Ltd Turner River <1% Turner River Base Metals Project C17/2013 Annual Report for the period ending 31 December 2018
A121388 2019 Woomera Mining Limited Magpie Range 72% Annual Report for Magpie Range Project (C83/2019) for the period 7 June 2018 to 28 September 2019
A117376 2018 Woomera Mining Limited Magpie Range 60% Annual Report for the period 7 June 2017 to 6 June 2018 Magpie Range Project E45/4790
A117630 2018 Woomera Mining Limited Magpie Range 100% Annual Report for the period 5 July 2017 to 4 July 2018 Magpie Range Project E45/4796
A118141 2018 Strike Australian Operations Pty Ltd Tabba Tabba <1% E45/4800 Annual Technical Report
A118458 2018 Macarthur Lithium Pty Ltd E45/4693 <1% E45/4693 Annual Report For the Period 21 November 2017 to 20 November 2018
A105307 2015 Fortescue Metals Group Ltd Tabba Tabba 30% Tabba Tabba Project, Final Surrender Report for the period 13/03/2012 to 19/12/2014, E45/2851.
A105315 2015 Fmg Pilbara Pty Ltd Glacier Valley <1% Final Surrender Mineral Exploration Report: E45/2852 Turner River 4 Project for the period 13 February 2012 to
A101524 2014 Fortescue Metals Group Ltd Glacier Valley <1% Combined Report for the Period 1st December 2012 to 30th November 2013, C120/2008 Glacier Valley
A102272 2014 Fortescue Metals Group Ltd Tabba Tabba 15% Combined Mineral Exploration Report: C108/2012 Tabba Tabba Project for the period 13 March 2013 to 12 March 20
A96750 2013 Fortescue Metals Group Ltd Glacier Valley <1% Glacier Valley Combined Report (Iron Bridge Project) C120/2008 Annual Report for the period 1st December 2011
A98156 2013 Fortescue Metals Group Ltd Tabba Tabba 15% Tabba Tabba Project, Annual Report for the period 13/03/2012 to 12/03/2013, E45/2850 & 2851. [C108/2012]
A61721 2001 Stockdale Prospecting Ltd Pilton 5.3% C102/1999 Final report for exploration licences E45/1980, E45/1982, E45/1983 & E45/1993 January 2001.
A61323 2000 Stockdale Prospecting Ltd Pilton 3% C102/1999 Second Annual Report for Exploration Licences E45/1980, E45/1982, E45/1983, E45/1988, E45/1989, E45/
A59319 1999 Stockdale Prospecting Ltd Pilton 5.3% First Combined C102/1999 Annual Report for Exploration Licences E45/1980, 1982, 1983, 1993, November 1999
A121485 Strike Operations Pty Ltd Tabba Tabba <1% E45/4800 Tabba Tabba Annual Report For The Period Ended 10th August 2019
A122929 Strike Operations Pty Ltd Tabba Tabba <1% E45/4800 ‘Tabba Tabba’, Final Report for the period ending 30/01/2020

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 45/7291 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 45/7291? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.