E 51/1217
Register summary
- Holder
- Andy Well Mining Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 6 Feb 2007
- Commenced
- 22 Jan 2008
- Expiry
- 21 Jan 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A144524 | 2024 | Meeka Metals Ltd | Andy Well | <1% | Final Surrender E51/1626 Andy Well Project for the period ending 16/07/2024 |
| A138465 | 2024 | Big Rocks Mining Pty Ltd | Banjo Well | <1% | Annual report – E51/1916 – Banjo Wellperiod ending 17/11/2023. |
| A139128 | 2024 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Final Surrender Report for E 51/1491 Mistletoe Project for the period ending 06/12/2023. (C100/2020) |
| A135104 | 2023 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Combined Annual Report (C100/2020) Mistletoe Project for the period ending 31/12/2022. E 51/1491,E 51/1894,E 5 |
| A133666 | 2023 | Big Rocks Mining Pty Ltd | Banjo Well | <1% | Annual Report E51/1916 – Banjo Well Project for the period ending 17/11/2022 |
94 more reports
| A134750 | 2023 | Andy Well Mining Pty Ltd | Andy Well | <1% | E51/1625 Final Surrender Report Andy Well for the period ending 23/01/2023. |
| A130160 | 2022 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Combined Annual Report C100/2020 Mistletoe Project for the period ending 31/12/2021 |
| A130976 | 2022 | Gascoyne Resources (Wa) Pty Ltd | Andy Well North | <1% | E51/1648 Partial Surrender Andy Well North Project for the period 21/03/2021 to 20/03/2022 |
| A131296 | 2022 | Gascoyne Resources Limited | Andy Well North | <1% | Andy Well North E51/01648 Annual Report for the period ending 20/03/2022 |
| A133047 | 2022 | Gascoyne Resources (Wa) Pty Ltd | Andy Well North | <1% | Final surrender Report Andy Well North E51/1648 for the period ending 20/03/2022. |
| A129603 | 2022 | Big Rocks Mining Pty Ltd | Banjo Well | <1% | Annual report – E51/1916 – Banjo Well for the period ending 17/11/2021. |
| A125832 | 2021 | Big Rocks Mining Pty Ltd | Banjo Well | <1% | Annual Report E51/1916 Banjo Well for the period ending 17/11/2020 |
| A126641 | 2021 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Combined Annual Report C100/2020 Mistletoe Project, 1 January 2020 to 31 December 2020 |
| A127161 | 2021 | Gascoyne Resources (Wa) Ltd | Andy Well North | <1% | Andy Well North Annual Technical Report E51/1648 for the period 21 March 2020 to 20 March 2021 |
| A122739 | 2020 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Annual Report for Mistletoe E 51/1491 for the period 16 December 2018 to 15 December 2019 |
| A123511 | 2020 | Silver Lake Resources Limited | Andy Well | 15% | Andy Well Combined Annual Report for year ending 31/12/2019, C48/2013 |
| A123720 | 2020 | Goldsmith S J | Quartz Well | <1% | Quartz Well E51/1648 Annual Report for the period ending 20/3/2020 |
| A124802 | 2020 | Mindax Limited | Meekatharra North | <1% | Meekatharra North Project E51/1705 Annual Report for the period ending 26/07/2020 |
| A118995 | 2019 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Annual Report for Mistletoe E51/1491 for the period 6 November 2017 to 15 November 2018 |
| A119518 | 2019 | Doray Minerals Limited | Andy Well | 15% | Meekatharra North, Andy Well Project Combined Report C48/2013 For the Period 1 January 2018 to 31 December 201 |
| A119967 | 2019 | Doray Minerals Limited | Quartz Well | <1% | Annual Technical Report – E51/1648 Quartz Well for the period 21 March 2018 to 20 April 2019 |
| A121236 | 2019 | Mindax Limited | Meekatharra North | <1% | Meekatharra North Project Annual Report E51/1705 for the period 27/07/2018-26/07/2019 |
| A115852 | 2018 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | MISTLETOE PROJECT, E51/1491, ANNUAL TECHNICAL REPORT FOR 16/12/2016 TO 15/12/2017 |
| A116164 | 2018 | Doray Minerals Limited | Andy Well | 15% | C48/2013 Meekatharra North Andy Well Project Combined Report For the Period 1 January 2017 to 31 December 2017 |
| A117711 | 2018 | Mindax Ltd | Meekatharra North | <1% | Annual Mineral Exploration Report for Meekatharra North Project E51/1705 for the Period 27 July 2017 to 26 Jul |
| A116131 | 2018 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Partial Surrender Report for Mistletoe Project E51/01491 for the period 16 December 2011 to 13 December 2017 |
| A116732 | 2018 | Doray Minerals Limited | Quartz Well | <1% | Quartz Well E51/1648 Annual Report for the period 21 March 2017 to 20 March 2018 |
| A113862 | 2017 | Gascoyne Resources (Wa) Pty Ltd | Andy Well North | <1% | Annual Report for E51/1648 Andy Well North Project for the period 21/03/2016 - 21/03/2017 |
| A114738 | 2017 | Mindax Limited | Meekatharra North | <1% | Exploration Report for E51/1705 Meekatharra North Project for the period 27/07/2016 - 26/07/2017 |
| A111938 | 2017 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | MISTLETOE PROJECT E51/1491 Annual Technical Report for the period 16/12/2015 to 15/12/2016 |
| A112435 | 2017 | Doray Minerals Limited; Andy Well Mining Pty Ltd | Andy Well | 15% | Meekatharra North, Andy Well Project C48/2013 Combined Report for the period 01/01/2016 to 31/12/2016, E51/012 |
| A108017 | 2016 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | ANNUAL REPORT For the Period 16 December 2014 to 15 December 2015 MISTLETOE PROJECT E51/01491 |
| A108458 | 2016 | Doray Minerals Ltd | Meekatharra North - Andy Well | 15% | Meekatharra North Andy Well Project Combined Report (C48/2013) M51/870, E51/1217, E51/1596, E51/1625 & E51/162 |
| A110432 | 2016 | Murchison Gold Mines Pty Ltd | Banjo Well | <1% | Annual Technical Report for Banjo Well E51/1512 For the period 2nd October 2015 to the 1st October 2016 |
| A104314 | 2015 | Murchison Gold Mines Pty Ltd | Banjo Bore | <1% | Banjo Bore Project, Annual Report for the period 02/10/2013 to 01/10/2014, E51/1512. |
| A106113 | 2015 | Doray Minerals Ltd | Meekatharra North - Andy Well | 45% | Meekatharra North - Andy Well Project Combined Report - C48/2013, M51/870 & E51/1217 for the period 1st Januar |
| A107545 | 2015 | Murchison Gold Mines Pty Ltd | Banjo Well | <1% | Annual Technical Report for Banjo Well E51/1512 For the period 2nd October 2014 to the 1st October 2015 |
| A100946 | 2014 | Murchison Gold Mines Pty Ltd | Banjo Bore | <1% | Banjo Bore Project, Annual Report for the period 02/10/2012 to 01/10/2013, E51/1512. |
| A102100 | 2014 | Mindax Ltd | Meekathara North - Banjo Bore | <1% | Meekathara North Project Annual Report for Exploration License E51/1034 (Banjo Bore) For the period 18th Augus |
| A102522 | 2014 | Doray Minerals Ltd | Andy Well | 21% | Andy Well Project M51/870 Final Report for the period 01/07/2013 – 31/06/2014 (DAG2013/00255432 Round 7) |
| A103723 | 2014 | Rubianna Resources Ltd | Killara | <1% | Surrender Report for E51/1246 Killara for the period 4th August 2008 to 9th July 2014 |
| A105296 | 2014 | Velox Mining Services Pty Ltd | Mistletoe | <1% | Mistletoe Project Annual Report for period 16/12/2013 to 15/12/2014, E51/1491 |
| A100917 | 2014 | Velox Mining Services Pty Ltd | Mistletoe | <1% | Mistletoe Project, Annual Report for the period 16/12/2012 to 15/12/2013, E51/1491. |
| A101187 | 2014 | Andy Well Mining Pty Ltd | Andy Well | 45% | Partial Surrender Report, E51/1217, Meekatharra North, Andy Well Project 22/01/2008 – 02/02/2014 |
| A101578 | 2014 | Doray Minerals Ltd | Andy Well | 45% | Andy Well Project, Annual Report for the period 27/04/2013 to 31/12/2013, E51/1217 ; M51/870. [C48/2013] |
| A97379 | 2013 | Velox Mining Services Pty Ltd | Mistletoe | <1% | Annual Report E51/1491 Mistletoe for the period 16 December 2011 to 15 December 2012 |
| A99789 | 2013 | Rubianna Resources Ltd | Killara | <1% | Killara Combined Project, C215/2010, Annual Report for the period 3rd August 2012 to 2nd August 2013, E51/1244 |
| A97164 | 2013 | Doray Minerals Ltd | Andy Well | 45% | Andy Well Project, Annual Report for the period 22/01/2012 to 21/01/2013, E51/1217. |
| A98284 | 2013 | Andy Well Mining Pty Ltd | Andy Well | 21% | Andy Well Project, Annual Report for the period 27/04/2012 to 26/04/2013, M51/870. |
| A99560 | 2013 | Mindax Ltd | Meekathara North | <1% | Meekathara North Project Annual Report for Exploration License E51/1034 (Banjo Bore) For the period 18th Augus |
| A100317 | 2013 | Abbotts Exploration Pty Ltd | Garden Gully North | <1% | Final Surrender Report E51/1428 Garden Gully North Project to 15th Feb 2013 |
| A93100 | 2012 | Doray Minerals Ltd | Meekatharra North - Andy Well | 45% | Meekatharra North Andy Well Project Annual Report E51/1217 1st March 2011 to 29th February 2012 |
| A93656 | 2012 | Abbotts Exploration Pty Ltd | Garden Gully North | <1% | Combined Annual Report C346/2011 Garden Gully North Project E51/1427, E51/1428, E51/1429 for the period 16th F |
| A95203 | 2012 | Rubianna Resources Ltd | Killara | <1% | Killara Combined Project, C215/2010, Annual Report for the period 3rd August 2011 to 2nd August 2012, E51/1244 |
| A95394 | 2012 | Mindax Ltd | Meekathara North | <1% | Meekatharra North Project - Annual Report E51/1034 – Banjo Bore, for the period 18th August 2011 to the 17th A |
| A89672 | 2011 | Doray Minerals Ltd | Andy Well | 45% | Meekatharra North, Andy Well Project Annual Report, E51/1217 Report Period: 01/03/2010 – 28/02/2011 |
| A91683 | 2011 | Rubianna Resources Ltd | Killara | <1% | Killara Combined Project, C215/2010, Annual Report 3rd August 2010 to 2nd August 2011, E51/1244, E51/1246, E51 |
| A91921 | 2011 | Mindax Ltd | Meekathara North - Banjo Bore | <1% | Meekathara North Project Annual Report for Exploration Licence E51/1034 (Banjo Bore) for the period 18th Augus |
| A85579 | 2010 | Mindax Ltd | Meekatharra North | <1% | Meekatharra North Project, Partial Relinquishment Report for exploration licence E51/1034 (Banjo Bore), 18 Aug |
| A86228 | 2010 | Doray Minerals Ltd | Andy Well | 45% | Annual Report E51/1217 - March 2009 to February 2010 |
| A87938 | 2010 | Rubianna Resources Ltd | Quartz Well | <1% | Quartz Well Project, E 51/1246, Annual Report for the period 4th August 2009 to 3rd August 2010 |
| A88322 | 2010 | Mindax Ltd | Meekatharra North | <1% | Meekatharra North Project, Annual Report for Exploration License E51/1034 (Banjo Bore) For the period 18th Aug |
| A84435 | 2009 | Everett Smith & Co Pty Ltd | RUBY WELL - QUARTZ WELL | <1% | RUBY WELL PROJECT, QUARTZ WELL PROSPECT E 51/1246, ANNUAL REPORT FOR THE PERIOD 4th AUG 2008 to 3rd AUG 2009 |
| A84690 | 2009 | Mindax Ltd | MEEKATHARRA NORTH / Banjo Bore | <1% | MEEKATHARRA NORTH PROJECT, Annual Report for Exploration License E51/1034 (Banjo Bore), Reporting Period – 18 |
| A81428 | 2009 | Accent Resources Nl | Andy Well | 45% | Annual Report for Exploration Licence E 51/1217, Andy Well for the period ending 21 January 2009 |
| A77941 | 2008 | Mulgara Minerals Ltd | Andy Well | 9.7% | Andy Well, Meekatharra E51/290 Surrender Report |
| A81003 | 2008 | Mindax Ltd | MEEKATHARA NORTH (Banjo Bore) | <1% | MEEKATHARA NORTH PROJECT Partial Surrender Report for Exploration License E51/1034 (Banjo Bore), Murchison Min |
| A76191 | 2007 | Mindax Ltd | Meekatharra North/ Banjo Bore | <1% | Annual Report for Exploration License E51/1034 (Banjo Bore) For the period 18th August 2006 to the 17th August |
| A72487 | 2006 | Accent Resources Nl | Andy Well | 9.7% | Andy Well, Meekatharra North Joint Venture E51/290, Annual Report for the Period Ending 04/06/2005, Combined R |
| A73167 | 2006 | Accent Resources Nl | Andy Well | 9.7% | Andy Well, Meekatharra North Joint Venture E51/290, Annual Report for the Period Ending 4/6/2006, Combined Rep |
| A73450 | 2006 | Mindax Ltd | Meekatharra North/ Banjo Bore | <1% | Meekatharra North Project, Annual Report for E51/1034 Banjo Bore, For the Period 18 August 2005 to 17 August 2 |
| A69730 | 2005 | Tantalum Australia Nl | Meekatharra North | 9.7% | Annual Report for the period 01/02/04 - 31/01/05, Meekatharra North JV, C147/1999, E51/290. |
| A70032 | 2005 | Perilya Ltd | Ruby Well | <1% | Annual Report for Ruby Well Project, for the period 12/12/03 - 31/12/04, C91/2004, E51/996, E51/998 (Meekathar |
| A72577 | 2005 | Perilya Ltd | Ruby Well | <1% | Annual Report for Ruby Well Project, Period 1 January 2005 to 31 December 2005, Combined Reporting No. C91/200 |
| A66002 | 2003 | Australasian Gold Mines Nl | Meekatharra North JV | 20% | Annual Report for the period 01/01/02 to 31/12/02 Meekatharra North JV E51/290, 473 and 880. GSWA Ref: C147/19 |
| A65938 | 2003 | Australasian Gold Mines Nl | Meekatharra North JV | 20% | Annual Report for the period 01/01/02 to 31/12/02 Meekatharra North JV E51/290, 473 and 880 GSWA Ref C147/1999 |
| A64050 | 2002 | Australasian Gold Mines Nl | Meekatharra North | 19% | Meekatharra North JV E51/290, 473, 880, M51/663 & 664 Annual Report for the period 01/01/01 to 31/12/01. |
| A61698 | 2001 | Australasian Gold Mines Nl | Meekatharra North | 9.7% | Meekatharra North Joint Venture Partial Surrender Report 2000 E51/290. |
| A59787 | 2000 | Australasian Gold Mines Nl | Meekatharra North | 5.5% | Meekatharra North Joint Venture Project, Annual Report for period ending 31/12/1999 .E51/290,E51/408-409,E51/4 |
| A57717 | 1999 | Australian Gold Resources Ltd | Gnaweeda | <1% | Gnaweeda Project, Annual Report for the period 11th November 1997 to 10th November 1998, E51/425-426, 468 & 76 |
| A58905 | 1999 | Newcrest Mining Ltd | Gnaweeda | <1% | Gnaweeda Project,Final Report to the Dept of Minerals and Energy for the period 10/11/93 to 20/07/99, Explorat |
| A53426 | 1998 | Australian Gold Resources Ltd | Gnaweeda | <1% | Gnaweeda Project, Annual Report for the period 11th November 1996 to 10th November 1997, E51/425,426 & 468. |
| A56148 | 1998 | Wmc Resources Ltd | Meekatharra North | 4.6% | Annual Report for the period 30/06/97-30/06/98, Meekatharra North (JV) Project. E51/290,408,409,473. M51/663,6 |
| A55764 | 1998 | Wmc Resources Ltd | Meekatharra North | 2.9% | Meekatharra North Project, Exploration Licence: E51/409 Surrender Report, 08/10/93 - 17/03/98 |
| A52216 | 1997 | Wmc Resources Ltd | Meekatharra North | 4.5% | Annual report for the period 30/06/96-30/06/97 Meekatharra North Project Exploration Licences E51/290 E51/408 |
| A49843 | 1997 | Newcrest Mining Ltd | Gnaweeda gold exploration | <1% | Gnaweeda Project E51/425- Erivilla Partial Surrender Report |
| A49998 | 1997 | Newcrest Mining Ltd | Gnaweeda | <1% | Gnaweeda Project E51/425 -Erivilla, E51/426- Chiddle Well, E51/468-Poplar wekk Annual Report on Exploration fo |
| A48769 | 1996 | Wmc Resources Ltd | Meekatharra North | 4.5% | Annual Report for the period 30/06/1995 to 30/06/1996, Meekatharra North Project , E51/290 E51/408 E51/409 E51 |
| A43736 | 1995 | Dominion Mining Ltd | Andy Well | 9.7% | Annual report , Andy Well Project, E51/290, for the period 1 January 1994 to 31 December 1994. |
| A43798 | 1995 | Dominion Mining Ltd | Nichols | 2.9% | Annual Report ,Nichols Project, E51/409, for the period from 1 January 1994 to 31 December 1994. |
| A45964 | 1995 | Newcrest Mining Ltd | Gnaweeda | <1% | Gnaweeda Project, Annual Report Exploration Licences E51/468, 425 & 426 for the period 10/11/1994 to 09/11/199 |
| A49130 | 1995 | Mr Wilson Sw | Karalundi | 35% | ANNUAL REPORT FOR E51/277 ORD WELL, KARALUNDI FOR THE PERIOD ENDING 25/9/92 Karalundi prospect, exploration li |
| A41045 | 1994 | Dominion Mining Ltd | Andy Well | 9.7% | 1993 Annual Report Andy Well Project E51/290 From 1 January 1993 to 31 December 1993 Murchison Mineral Field |
| A42583 | 1994 | Dominion Mining Ltd | Andy Well | 9.7% | Andy Well Project, Partial Surrender Report for the period 05/06/1991 to 04/06/1994, E51/290. |
| A41194 | 1994 | Dominion Mining Ltd | Nichols | 2.9% | Annual Report Nichols Project, E51/409 From 8 October 1993 to 31 December 1993 |
| A42989 | 1994 | Newcrest Mining Ltd | Gnaweeda | <1% | Gnaweeda Project, Annual Report for the period 10/11/1993 to 09/11/1994, E51/425,426, & 468. |
| A38542 | 1993 | Dominion Mining Ltd | Andy Well | 9.7% | Annual Report From 5 June 1991 to 31 December 1992, Andy Well Project, E51/290. |
| A8545 | 1979 | Esso Australia Ltd | Karalundi | 8.2% | Karalundi Project, Non-statutory Report : Final Report, August 1979, TR70/6959H. |
| A79751 | 1753 | Mindax Ltd | MEEKATHARA NORTH (Banjo Bore) | <1% | MEEKATHARA NORTH PROJECT Annual Report for Exploration License E51/1034 (Banjo Bore), Murchison Mineral Field, |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 17 months · 21 Jan 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 51/1217 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 51/1217? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.