E 52/1678
E 52/1678 is a live exploration licence in the Shire of Meekatharra, Western Australia, held by Jackson Minerals Pty Ltd and Alchemy Resources (Three Rivers) Pty Ltd (part of CuFe Ltd). Granted on 23 Feb 2004 for 5 years (extended), it expires on 22 Feb 2027. The ground is covered by 103 historical WAMEX reports.
Register summary
- Holders
- Jackson Minerals Pty Ltd, Alchemy Resources (Three Rivers) Pty Ltd
- Part of
- CuFe Ltd (ASX:CUF) as at 2026-06-30, Alchemy Resources Limited (ASX:ALY) as at 2026-06-30
- Local government
- Shire of Meekatharra
- Application received
- 3 Jan 2003
- Commenced
- 23 Feb 2004
- Expiry
- 22 Feb 2027
- Term
- 5 Years (Extended)
The full record on E 52/1678
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 7 changes of holder
- The full record: 24 years of expenditure, 20 conditions and 2 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (50 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A142865 | 2024 | Alchemy Resources (Three Rivers) Pty Ltd | Peak Hill | <1% | Peak Hill Project P52/1540 & P52/1541 Final Surrender (16 December 2016 to 30 April 2024) |
| A133892 | 2023 | Bryah Resources Limited | Bryah Basin | <1% | Partial Surrender Report – E52/3401 Bryah Basin for the period ending 21/11/2022 |
| A129389 | 2022 | Sandfire Resources Limited | Three Rivers | <1% | E52/1723 ‘Three Rivers’ Project Partial Surrender Report for the period ending 29 November 2021 |
| A123202 | 2020 | Billabong Gold Pty Ltd | Three Rivers | 6.8% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 for the period 1 January 2019 to 31 Dec |
| A124043 | 2020 | Bryah Resources Limited | Bryah Basin | <1% | Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020 |
98 more reports
| A119243 | 2019 | Billabong Gold Pty Ltd | Three Rivers | 5.7% | Annual Mineral Exploration Report for the Three Rivers Group C183/2005 For the Period 1 January 2018 to 31 Dec |
| A120357 | 2019 | Bryah Resources Limited | Bryah Basin | <1% | Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03 |
| A115718 | 2018 | Bryah Resources Limited | Peak Hill | <1% | Annual Report E52/3401 Peak Hill Project for the period 28/11/2016 - 28/11/2016 |
| A116042 | 2018 | Billabong Gold Pty Ltd; Independence Group Nl | Three Rivers | 5.7% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 For the Period 1 January 2017 to 31 Dec |
| A117043 | 2018 | Bryah Resources Limited | Bryah Basin | <1% | Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323 |
| A110804 | 2017 | Independence Group Nl | Bryah (Three Rivers) | <1% | P52/1199 FINAL SURRENDER REPORT 8 January 2009 to 16 December 2016 |
| A110834 | 2017 | Independence Group Nl | Bryah - Three Rivers | <1% | P52/1199 FINAL SURRENDER REPORT for the period 8 January 2009 to 16 December 2016 |
| A110835 | 2017 | Independence Group Nl | Bryah (Three Rivers) | <1% | P52/1200 FINAL SURRENDER REPORT 8 January 2009 to 16 December 2016 |
| A112081 | 2017 | Billabong Gold Pty Ltd | Three Rivers | 5.8% | Annual Mineral Exploration Report for the Three Rivers Project C183/2009 For the Period 1 January 2016 to 31 D |
| A108743 | 2016 | Allkarri Holdings Pty Ltd | Peak Hill | <1% | Final Surrender Report for Peak Hill Project E52/02884 for the period 20/12/2013 to 13/01/2016 |
| A108092 | 2016 | Northern Star Resources Ltd | Three Rivers | 6% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 THREE RIVERS PROJECT C183/2009, E 52/01668.... |
| A104522 | 2015 | Allkarri Holdings Pty Ltd | Peak Hill | <1% | Peak Hill E52/2884 Annual Report for the period 20/12/2013 to 19/12/2014 |
| A106366 | 2015 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Dynamite Bore | <1% | Peak Hill - Doolgunna - Dynamite Bore Project E52/3112 Final Surrender Report for the period 19/09/2014 - 08/0 |
| A105246 | 2015 | Alchemy Resources (Three Rivers) Pty Ltd; Independence Group | Three Rivers | 5.1% | COMBINED ANNUAL REPORT ON C183/2009, BRYAH (THREE RIVERS) PROJECT, FOR THE PERIOD 1 JANUARY 2014 TO 31 DECEMBE |
| A101219 | 2014 | Alchemy Resources (Three Rivers) Pty Ltd | Three Rivers | 5.1% | Three Rivers Project Combined Annual Report for the Period 1st January 2013 to 31st December 2013, C183/2009, |
| A96614 | 2013 | Alchemy Resources (Three Rivers) Pty Ltd | Three Rivers | 5.1% | Combined Annual Report for the Period 1st January 2012 to 31st December 2012, Three Rivers Project M52/685, M5 |
| A96988 | 2013 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, |
| A97742 | 2013 | Padbury Mining Ltd | Peak Hill | <1% | E52/1518 Final Surrender for the period 17th November 2003 – 16th November 2012 |
| A99877 | 2013 | Alchemy Resources Ltd | Three Rivers | <1% | Three Rivers Project, Voluntary Partial Surrender Report, E52/1668, for the period 23rd February 2004 to 17th |
| A93081 | 2012 | Padbury Mining Ltd | Peak Hill - Telecom Hill | <1% | 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011 |
| A94068 | 2012 | Grosvenor Gold Pty Ltd | Old Peak Hill | <1% | OLD PEAK HILL PROJECT ANNUAL REPORT P52/1199 ALCHEMY RESOURCES (THREE RIVERS) PTY LTD 8TH JANUARY 2011 – 7TH J |
| A93407 | 2012 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Annual Report E52/1731 for the period 30 January 2011 - 29 January 2012 |
| A94067 | 2012 | Alchemy Resources Ltd | Henry | <1% | HENRY PROJECT ANNUAL REPORT P52/1200 ALCHEMY RESOURCES (THREE RIVERS) PTY LTD 8TH JANUARY 2011 – 7TH JANUARY 2 |
| A94110 | 2012 | Alchemy Resources (Three Rivers) Pty Ltd | Peak Hill | 9% | Peak Hill NWN Project Combined Annual Report for the Period 1st July 2011 to 30th June 2012 |
| A88866 | 2011 | Pepinnini Minerals Ltd | Robinson Range - Peak Hill | <1% | Annual Technical Report for the Period Ending 30 November 2010, EL52/1723 'Peak Hill', Bryah-Padbury Basin, Pe |
| A89074 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | 9% | Peak Hill NWN Project 2010 Annual Report C17/2008, Report Period: 1 July 2009 – 30 June 2010, E52/1668, E52/16 |
| A89543 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Peak Hill Annual Report P52/7799, 8th January 2010 - 7th January 2011. |
| A89544 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Peak Hill Annual Report P52/1200, 8th January 2010 - 7th January 2011. |
| A89335 | 2011 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010 |
| A90045 | 2011 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum Project, Annual Report for the period 30th January 2010 to 29th January 2011, E52/1731. |
| A91724 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill NWN | 9% | Peak Hill NWN Project CR17/2008 2010 Annual Report Report Period: 1 July 2010 – 30 June 2011 |
| A92172 | 2011 | Pepinnini Robinson Range Pty Ltd | Peak Hill | <1% | Annual Technical Report for the Period Ending 30 November 2011, EL52/1723 ‘Peak Hill’, Bryah - Padbury Basin P |
| A85749 | 2010 | Grosvenor Gold Pty Ltd | Wilgeena East | <1% | Wilgeena East 2009 Annual Report E52/1723, 1 December 2008 – 30 November 2009 |
| A85953 | 2010 | Aurium Resources Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on |
| A86492 | 2010 | Pepinnini Minerals Ltd | Robinson Range | <1% | IronOre Farm-in, Technical Report Robinson Range E51/1033, E52/1613, E52/1670, E52/1672, E52/1723, E52/1910 an |
| A81263 | 2009 | Aurium Resources Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52 |
| A84148 | 2009 | Alchemy Resources Ltd | THREE RIVERS | <1% | Three Rivers Gold Project, Final Surrender Report for the Period 18th November 1992 to 4th February 2009. |
| A84440 | 2009 | Grosvenor Gold Pty Ltd | Peak Hill NWN | 9% | Peak Hill NWN Project 2009 Annual Report, 1 July 2008 – 30 June 2009 |
| A77519 | 2008 | Barrick Gold Of Australia Ltd | Three Rivers | <1% | Annual Report Three Springs Project Period 18 November 2006 to 17 November 2007 Technical Report No. 1252 E52/ |
| A79777 | 2008 | Eagle Gold Mines Pty Ltd | Peak Hill | 7.9% | PEAK HILL NWN PROJECT E52/1668, E52/1678, E52/1722, E52/1723, E52/1730, E52/1810, E52/1852, E52/1881 Combined |
| A79911 | 2008 | Pepinnini Minerals Ltd | Peak Hill | <1% | Annual Technical Report for the Period Ending 30th September 2008, EL52/1723 ‘Peak Hill’, Bryah-Padbury Basin, |
| A77367 | 2008 | Eagle Gold Mines Pty Ltd | Peak Hill | 8.3% | Peak Hill Project 2006 Annual Report, 20 January 2007 - 19 January 2008, C21/2006 |
| A77730 | 2008 | Greater Pacific Gold Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1518 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A79879 | 2008 | Pepinnini Minerals Ltd | Peak Hill | <1% | Annual Technical Report for the Period Ending 30th September 2008 EL52/1723 'Peak Hill', Bryah-Padbury Basin |
| A74693 | 2007 | Gleneagle Gold Ltd | Peak Hill | 8.2% | Peak Hill Project C21/2006 Annual Report for the Period 1 Dec 2005 to 19 Jan 2007 (Peak Hill) |
| A72984 | 2006 | Gleneagle Gold Ltd | Peak Hill | <1% | E52/1723 - Peak Hill Project 2005 Annual Report, 1 December 2004 to 30 November 2005. |
| A71602 | 2006 | Barrick Gold Of Australia Ltd | Three Rivers / Central Bore | <1% | E52/698,E52/1139,E52/1363-1364,E52/1472,E52/1582,P52/906, Annual Report Three Rivers Project, Period 18 Novemb |
| A71688 | 2006 | Greater Pacific Gold Nl | Peak Hill | <1% | Annual Report on Exploration Licence E52/1518 on the Peak Hill Sheet for the year ending November 2005, (Peak |
| A72061 | 2006 | Gleneagle Gold Ltd | Peak Hill | 34% | P52/1040 - Peak Hill Project 2005 Annual Report, 8 January 2005 to 7 January 2006. |
| A73190 | 2006 | Gleneagle Gold Ltd | Peak Hill | <1% | E52/1852 - Peak Hill Project 2005-2006 Annual Report; 14 June 2005 to 13 June 2006. |
| A74049 | 2006 | Barrick Gold Of Australia Ltd | Three Rivers / Central Bore | <1% | Three Rivers E52/698,1139,1363-1364,1472,1582,P52/906, Annual Report, Period 18 November 2005 to 17 November 2 |
| A69882 | 2005 | Peak Hill Manganese Pty Ltd | Peak Hill | <1% | Annual report for the period 15/10/03 - 16/10/04 Peak Hill Project, E52/1518. |
| A68153 | 2004 | Troy Resources Nl | Three Rivers | <1% | Three Rivers Project, Annual Report for the period 18/11/2002-17/11/2003, Tenements: E52/698, E52/1139, E52/13 |
| A68478 | 2004 | Troy Resources Nl | Three Rivers / Central Bore | <1% | Partial Surrender report for the period 10/04/2000-16/9/2003 Central Bore Project E52/1364 |
| A69757 | 2004 | Barrick Gold Of Australia Ltd | Three Rivers | <1% | Annual report for the period 18/11/03 - 17/11/04 Three Rivers Project 6525, C328/1996, E52/698, E52/1472, E52/ |
| A65867 | 2003 | Troy Resources Nl | Three Rivers | 6.3% | Annual Report for the period 18th November 2001 to 17th November 2002. Three Rivers Project Tenements: E52/698 |
| A66461 | 2003 | Troy Resources Nl | Peak Hill- Three Rivers | 24% | Peak Hill - Three Rivers Project, Partial Surrender Report for the period 3rd January 1996 to 2nd January 2003 |
| A64305 | 2002 | Troy Resources Nl | Peak Hill | 7.4% | Final Surrender Report 26 March 1997 to 27 October 2001 Peak Hill Project Orchard-Reefer Well, prospecting lic |
| A64477 | 2002 | Troy Resources Nl | Central Bore | <1% | Central Bore Exploration Licence 52/1365 Peak Hill Mineral Field Western Australia 27 th October 2000 to 26th |
| A61869 | 2001 | Troy Resources Nl | Central Bore | <1% | Central Bore Project exploration licence 52/1365 First Annual Report 27th October 1999 to 26th December 2000, |
| A62914 | 2001 | Troy Resources Nl | Peak Hill | <1% | Central Bore Exploration Licence 52/1364 Peak Hill Mineral Western Field Western Australia 10th April 2000 to |
| A63884 | 2001 | Troy Resources Nl | Three Rivers | 11% | Annual Report , E52/698, E52/851 & E52/852 December 2000 to December 2001 Three Rivers Project, C328/1996. |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A59908 | 2000 | Troy Resources Nl | Three Rivers | 11% | Three Rivers Project ,Annual Report for Exploration Licences E52/698,E52/851 & E52/852 December 1998 to Decemb |
| A61900 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine Joint Venture Project, E52/697, M52/13,116,287,324,345,346,465,541,581-582, P52/5 |
| A58699 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541,581-582 P52/51 |
| A58705 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596 Peak Hill Mine Joint Venture Project E52/697 Fifth Year and Final Relinquishment Report Period 24 |
| A60122 | 1999 | Troy Resources Nl | Three Rivers | 24% | Three Rivers Project, Peak Hill Mineral Field, Partial Surre Surrender Report, Exploration Licence E52/851, 01 |
| A54838 | 1998 | Troy Resources Nl | Orchard-Reefer | 1.1% | Orchard-Reefer Project, Peak Hill District, W.A. Annual Report 1997-1998 P52/845-856, ELA52/1093 |
| A55257 | 1998 | Troy Resources Nl | Reefer-Stalley | 4.1% | Reefer-Stalley Project, Peak Hill District W.A. Annual Report 1997-1998 P52/855-856, 560, 862 |
| A55789 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine Joint Venture Project E52/697 Fourth Year Partial Relinquishment Report Period 24/0 |
| A55845 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,581 582 P52 |
| A56072 | 1998 | Troy Resources Nl | Old Peak Hill | 13% | Old Peak Hill (JV) Project, Annual Report for the period 1st July 1997 to 1st July 1998 M52/484, M52/487 & M5 |
| A56930 | 1998 | Troy Resources Nl | Three Rivers | 11% | Three Rivers Project. Peak Hill Mineral Field, WA. Combined Annual Report for E52/698,851,852. 12/97-12/98. |
| A51016 | 1997 | Troy Resources Nl | Orchard-Reefer | 1.2% | Orchard-Reefer Project Peak Hill District W.A Annual Report 1996-1997 Tenements P's 52/845 - 52/856 ELA 52/109 |
| A51993 | 1997 | Plutonic Operations Ltd | Old Peak Hill | 11% | Old Peak Hill (JV) Project, M52/307, M52/483 - M52/487, Annual Report for the period 01/07/1996 - 30/06/1997. |
| A52184 | 1997 | Plutonic Operations Ltd | Peak Hill | <1% | Project 596 Peak Hill Joint Venture Project E52/686,697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,5 |
| A52258 | 1997 | Plutonic Operations Ltd | Peak Hill | <1% | Third Year Partial Relinquishment Report Period 24/06/94 to 23/06/97 |
| A52651 | 1997 | Perilya Mines Nl | St Crispin | <1% | Annual report for the St Crispin Project for period 27/09/96-19/09/97 E52/661,662 & 671 P52/928-931 P52/728-7 |
| A53475 | 1997 | Troy Resources Nl | Three Rivers | 11% | Three Rivers Project - Peak Hill Mineral Field Annual Report, 12/1996 - 12/1996 Exploration Licence: E52/698, |
| A49449 | 1996 | Newcrest Mining Ltd | Glengarry | <1% | Glengarry Joint Venture Combined Annual Exploration Report for E52/661 to E52/662 and E52/671 for the period f |
| A46926 | 1996 | Plutonic Operations Ltd | Peak Hill | 2.4% | Peak Hill Project, Annual Technical Report for period 30/11/1994 - 29/11/1995, E52/737. |
| A47820 | 1996 | Solomon Pacific Resources Nl | Orchard-Reefer | 1.2% | Park Hill (Solomon Pacificferenco) Joint Venture Orchard Reefer project Annual report 1995-1996 Tenements: P52 |
| A48742 | 1996 | Plutonic Operations Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine Joint Venture Project E52/442 E52/686 E52/697 M52/13 M52/35 M52/56 M52/116 M52/287 |
| A48789 | 1996 | North Ltd | Old Peak Hill | 11% | Old Peak Hill (JV) Project, Annual Report ,M52/307, M52/483 to M52/487 for the period 01/07/1995 to 30/06/199 |
| A49954 | 1996 | Troy Resources Nl | Three Rivers | 11% | Three Rivers Project Peak Hill Mineral Field Western Australia Annual report November 1995 to November 1996 Ex |
| A45105 | 1995 | Newcrest Mining Ltd | Glengarry | <1% | Glengarry Joint Venture Combined Annual Exploration report for the period from September 1993 to September 199 |
| A45291 | 1995 | North Ltd | Old Peak Hill | 11% | Old Peak Hill (JV) Project, Annual Report for the period 01/07/1994 to 30/06/1995 ,M52/307, M52/483 - 487. |
| A45313 | 1995 | Plutonic Operations Ltd | Peak Hill Mine Joint Venture | <1% | Project 596 Peak Hill Mine Joint Venture Project Annual report E52/442 E52/686 E52/697 E52/737 M52/13 M52/35 M |
| A45715 | 1995 | Newcrest Mining Ltd | Glengarry | <1% | Glengarry Joint Venture Combined Annual Exploration Report for E52/661-662 and 671 for the period fromSeptembe |
| A39924 | 1993 | Newcrest Mining Ltd | Glengarry | <1% | Annual report for the period 09/92-09/93 Glengarry JV Project E52/661 E52/662 E52/671 |
| A37368 | 1992 | Perilya Mines Nl | Reefer | 27% | Surrender Report, Reefer Project , for the period 19/1/92 to 26/10/92, E52/589. |
| A33821 | 1991 | Great Central Mines Nl | Plutonic West | 9.1% | Plutonic West Project, Annual Report for the period 9th July 1990 to 8th July 1991, E52/346, 348 & 362-365. |
| A31666 | 1990 | Great Central Mines Nl | Plutonic West | 9.1% | Plutonic West Project, Annual Report for the period ending 25 September 1990, E52/346, 348 & 362-365. |
| A10229 | 1980 | Goldfields Exploration Pty Ltd | Peak Hill | 3.1% | Peak Hill Project, Non-statutory Report: Report for the period 16/11/1977 to 01/10/1980, October 1980, MC52/31 |
| A9184 | 1753 | Amoco Minerals Aust Co | Horseshoe | 7.6% | Final Report on Temporary Reserve 7059H for Period 8th June 1979 to 7th June 1980 |
| A38012 | 1753 | Plutonic Operations Ltd | Plutonic West | 6% | Annual Report for Plutonic West Project,E52/346, 348, 362-365; M52/330-337.for the period 01/01/92 to 31/12/9 |
| A96476 | 1753 | Pepinnini Robinson Range Pty Ltd | Peak Hill | <1% | Annual Technical Report for the Period Ending 30 November 2012, EL52/1723 ‘Peak Hill’, Bryah-Padbury Basin Pea |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 52/1678 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 52/1678? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.