NextMapsWA TenementsE 52/1678

E 52/1678

LiveExploration LicenceShire of MeekatharraPeak Hill M.F. District
Area
3,720ha
Expires
Feb 2027
in 6 months
WAMEX reports
103
WA median is 53
Report drilling
54
of 103 reports
Meekatharra Explore on the live map

Register summary

Holders
Jackson Minerals Pty Ltd, Alchemy Resources (Three Rivers) Pty Ltd
Local government
Shire of Meekatharra
Application received
3 Jan 2003
Commenced
23 Feb 2004
Expiry
22 Feb 2027
Term
5 Years (Extended)

Exploration history on this ground

103 historical WAMEX exploration reports intersect E 52/1678: 58 report geochemistry or sampling, 63 include a digital data package.
When this ground was worked · 100 of 103 reports dated
11980s
291990s
302000s
352010s
52020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A142865 2024 Alchemy Resources (Three Rivers) Pty Ltd Peak Hill <1% Peak Hill Project P52/1540 & P52/1541 Final Surrender (16 December 2016 to 30 April 2024)
A133892 2023 Bryah Resources Limited Bryah Basin <1% Partial Surrender Report – E52/3401 Bryah Basin for the period ending 21/11/2022
A129389 2022 Sandfire Resources Limited Three Rivers <1% E52/1723 ‘Three Rivers’ Project Partial Surrender Report for the period ending 29 November 2021
A123202 2020 Billabong Gold Pty Ltd Three Rivers 6.8% Annual Mineral Exploration Report for the Three Rivers Group C183/2009 for the period 1 January 2019 to 31 Dec
A124043 2020 Bryah Resources Limited Bryah Basin <1% Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020
98 more reports
A120357 2019 Bryah Resources Limited Bryah Basin <1% Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03
A119243 2019 Billabong Gold Pty Ltd Three Rivers 5.7% Annual Mineral Exploration Report for the Three Rivers Group C183/2005 For the Period 1 January 2018 to 31 Dec
A117043 2018 Bryah Resources Limited Bryah Basin <1% Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323
A115718 2018 Bryah Resources Limited Peak Hill <1% Annual Report E52/3401 Peak Hill Project for the period 28/11/2016 - 28/11/2016
A116042 2018 Billabong Gold Pty Ltd; Independence Group Nl Three Rivers 5.7% Annual Mineral Exploration Report for the Three Rivers Group C183/2009 For the Period 1 January 2017 to 31 Dec
A112081 2017 Billabong Gold Pty Ltd Three Rivers 5.8% Annual Mineral Exploration Report for the Three Rivers Project C183/2009 For the Period 1 January 2016 to 31 D
A110804 2017 Independence Group Nl Bryah (Three Rivers) <1% P52/1199 FINAL SURRENDER REPORT 8 January 2009 to 16 December 2016
A110834 2017 Independence Group Nl Bryah - Three Rivers <1% P52/1199 FINAL SURRENDER REPORT for the period 8 January 2009 to 16 December 2016
A110835 2017 Independence Group Nl Bryah (Three Rivers) <1% P52/1200 FINAL SURRENDER REPORT 8 January 2009 to 16 December 2016
A108092 2016 Northern Star Resources Ltd Three Rivers 6% ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 THREE RIVERS PROJECT C183/2009, E 52/01668....
A108743 2016 Allkarri Holdings Pty Ltd Peak Hill <1% Final Surrender Report for Peak Hill Project E52/02884 for the period 20/12/2013 to 13/01/2016
A104522 2015 Allkarri Holdings Pty Ltd Peak Hill <1% Peak Hill E52/2884 Annual Report for the period 20/12/2013 to 19/12/2014
A105246 2015 Alchemy Resources (Three Rivers) Pty Ltd; Independence Group Three Rivers 5.1% COMBINED ANNUAL REPORT ON C183/2009, BRYAH (THREE RIVERS) PROJECT, FOR THE PERIOD 1 JANUARY 2014 TO 31 DECEMBE
A106366 2015 Lodestar Minerals Ltd Peak Hill - Doolgunna - Dynamite Bore <1% Peak Hill - Doolgunna - Dynamite Bore Project E52/3112 Final Surrender Report for the period 19/09/2014 - 08/0
A101219 2014 Alchemy Resources (Three Rivers) Pty Ltd Three Rivers 5.1% Three Rivers Project Combined Annual Report for the Period 1st January 2013 to 31st December 2013, C183/2009,
A96614 2013 Alchemy Resources (Three Rivers) Pty Ltd Three Rivers 5.1% Combined Annual Report for the Period 1st January 2012 to 31st December 2012, Three Rivers Project M52/685, M5
A96988 2013 Padbury Mining Ltd Peak Hill <1% Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557,
A97742 2013 Padbury Mining Ltd Peak Hill <1% E52/1518 Final Surrender for the period 17th November 2003 – 16th November 2012
A99877 2013 Alchemy Resources Ltd Three Rivers <1% Three Rivers Project, Voluntary Partial Surrender Report, E52/1668, for the period 23rd February 2004 to 17th
A93081 2012 Padbury Mining Ltd Peak Hill - Telecom Hill <1% 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011
A94067 2012 Alchemy Resources Ltd Henry <1% HENRY PROJECT ANNUAL REPORT P52/1200 ALCHEMY RESOURCES (THREE RIVERS) PTY LTD 8TH JANUARY 2011 – 7TH JANUARY 2
A94068 2012 Grosvenor Gold Pty Ltd Old Peak Hill <1% OLD PEAK HILL PROJECT ANNUAL REPORT P52/1199 ALCHEMY RESOURCES (THREE RIVERS) PTY LTD 8TH JANUARY 2011 – 7TH J
A94110 2012 Alchemy Resources (Three Rivers) Pty Ltd Peak Hill 9% Peak Hill NWN Project Combined Annual Report for the Period 1st July 2011 to 30th June 2012
A93407 2012 Grosvenor Gold Pty Ltd Fortnum <1% Annual Report E52/1731 for the period 30 January 2011 - 29 January 2012
A88866 2011 Pepinnini Minerals Ltd Robinson Range - Peak Hill <1% Annual Technical Report for the Period Ending 30 November 2010, EL52/1723 'Peak Hill', Bryah-Padbury Basin, Pe
A89074 2011 Grosvenor Gold Pty Ltd Peak Hill 9% Peak Hill NWN Project 2010 Annual Report C17/2008, Report Period: 1 July 2009 – 30 June 2010, E52/1668, E52/16
A90045 2011 Grosvenor Gold Pty Ltd Fortnum <1% Fortnum Project, Annual Report for the period 30th January 2010 to 29th January 2011, E52/1731.
A91724 2011 Grosvenor Gold Pty Ltd Peak Hill NWN 9% Peak Hill NWN Project CR17/2008 2010 Annual Report Report Period: 1 July 2010 – 30 June 2011
A92172 2011 Pepinnini Robinson Range Pty Ltd Peak Hill <1% Annual Technical Report for the Period Ending 30 November 2011, EL52/1723 ‘Peak Hill’, Bryah - Padbury Basin P
A89335 2011 Padbury Mining Ltd Peak Hill <1% Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010
A89543 2011 Grosvenor Gold Pty Ltd Peak Hill <1% Peak Hill Annual Report P52/7799, 8th January 2010 - 7th January 2011.
A89544 2011 Grosvenor Gold Pty Ltd Peak Hill <1% Peak Hill Annual Report P52/1200, 8th January 2010 - 7th January 2011.
A85749 2010 Grosvenor Gold Pty Ltd Wilgeena East <1% Wilgeena East 2009 Annual Report E52/1723, 1 December 2008 – 30 November 2009
A85953 2010 Aurium Resources Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on
A86492 2010 Pepinnini Minerals Ltd Robinson Range <1% IronOre Farm-in, Technical Report Robinson Range E51/1033, E52/1613, E52/1670, E52/1672, E52/1723, E52/1910 an
A81263 2009 Aurium Resources Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52
A84148 2009 Alchemy Resources Ltd THREE RIVERS <1% Three Rivers Gold Project, Final Surrender Report for the Period 18th November 1992 to 4th February 2009.
A84440 2009 Grosvenor Gold Pty Ltd Peak Hill NWN 9% Peak Hill NWN Project 2009 Annual Report, 1 July 2008 – 30 June 2009
A77367 2008 Eagle Gold Mines Pty Ltd Peak Hill 8.3% Peak Hill Project 2006 Annual Report, 20 January 2007 - 19 January 2008, C21/2006
A77730 2008 Greater Pacific Gold Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1518 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series
A77519 2008 Barrick Gold Of Australia Ltd Three Rivers <1% Annual Report Three Springs Project Period 18 November 2006 to 17 November 2007 Technical Report No. 1252 E52/
A79777 2008 Eagle Gold Mines Pty Ltd Peak Hill 7.9% PEAK HILL NWN PROJECT E52/1668, E52/1678, E52/1722, E52/1723, E52/1730, E52/1810, E52/1852, E52/1881 Combined
A79879 2008 Pepinnini Minerals Ltd Peak Hill <1% Annual Technical Report for the Period Ending 30th September 2008 EL52/1723 'Peak Hill', Bryah-Padbury Basin
A79911 2008 Pepinnini Minerals Ltd Peak Hill <1% Annual Technical Report for the Period Ending 30th September 2008, EL52/1723 ‘Peak Hill’, Bryah-Padbury Basin,
A74693 2007 Gleneagle Gold Ltd Peak Hill 8.2% Peak Hill Project C21/2006 Annual Report for the Period 1 Dec 2005 to 19 Jan 2007 (Peak Hill)
A71602 2006 Barrick Gold Of Australia Ltd Three Rivers / Central Bore <1% E52/698,E52/1139,E52/1363-1364,E52/1472,E52/1582,P52/906, Annual Report Three Rivers Project, Period 18 Novemb
A72061 2006 Gleneagle Gold Ltd Peak Hill 34% P52/1040 - Peak Hill Project 2005 Annual Report, 8 January 2005 to 7 January 2006.
A73190 2006 Gleneagle Gold Ltd Peak Hill <1% E52/1852 - Peak Hill Project 2005-2006 Annual Report; 14 June 2005 to 13 June 2006.
A71688 2006 Greater Pacific Gold Nl Peak Hill <1% Annual Report on Exploration Licence E52/1518 on the Peak Hill Sheet for the year ending November 2005, (Peak
A72984 2006 Gleneagle Gold Ltd Peak Hill <1% E52/1723 - Peak Hill Project 2005 Annual Report, 1 December 2004 to 30 November 2005.
A74049 2006 Barrick Gold Of Australia Ltd Three Rivers / Central Bore <1% Three Rivers E52/698,1139,1363-1364,1472,1582,P52/906, Annual Report, Period 18 November 2005 to 17 November 2
A69882 2005 Peak Hill Manganese Pty Ltd Peak Hill <1% Annual report for the period 15/10/03 - 16/10/04 Peak Hill Project, E52/1518.
A68153 2004 Troy Resources Nl Three Rivers <1% Three Rivers Project, Annual Report for the period 18/11/2002-17/11/2003, Tenements: E52/698, E52/1139, E52/13
A69757 2004 Barrick Gold Of Australia Ltd Three Rivers <1% Annual report for the period 18/11/03 - 17/11/04 Three Rivers Project 6525, C328/1996, E52/698, E52/1472, E52/
A68478 2004 Troy Resources Nl Three Rivers / Central Bore <1% Partial Surrender report for the period 10/04/2000-16/9/2003 Central Bore Project E52/1364
A65867 2003 Troy Resources Nl Three Rivers 6.3% Annual Report for the period 18th November 2001 to 17th November 2002. Three Rivers Project Tenements: E52/698
A66461 2003 Troy Resources Nl Peak Hill- Three Rivers 24% Peak Hill - Three Rivers Project, Partial Surrender Report for the period 3rd January 1996 to 2nd January 2003
A64305 2002 Troy Resources Nl Peak Hill 7.4% Final Surrender Report 26 March 1997 to 27 October 2001 Peak Hill Project Orchard-Reefer Well, prospecting lic
A64477 2002 Troy Resources Nl Central Bore <1% Central Bore Exploration Licence 52/1365 Peak Hill Mineral Field Western Australia 27 th October 2000 to 26th
A61869 2001 Troy Resources Nl Central Bore <1% Central Bore Project exploration licence 52/1365 First Annual Report 27th October 1999 to 26th December 2000,
A62914 2001 Troy Resources Nl Peak Hill <1% Central Bore Exploration Licence 52/1364 Peak Hill Mineral Western Field Western Australia 10th April 2000 to
A63884 2001 Troy Resources Nl Three Rivers 11% Annual Report , E52/698, E52/851 & E52/852 December 2000 to December 2001 Three Rivers Project, C328/1996.
A61060 2000 Homestake Gold Of Australia Ltd Peak Hill <1% Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5
A59908 2000 Troy Resources Nl Three Rivers 11% Three Rivers Project ,Annual Report for Exploration Licences E52/698,E52/851 & E52/852 December 1998 to Decemb
A61900 2000 Homestake Gold Of Australia Ltd Peak Hill <1% Project 6596, Peak Hill Mine Joint Venture Project, E52/697, M52/13,116,287,324,345,346,465,541,581-582, P52/5
A58699 1999 Homestake Gold Of Australia Ltd Peak Hill <1% Project 6596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541,581-582 P52/51
A58705 1999 Homestake Gold Of Australia Ltd Peak Hill <1% Project 6596 Peak Hill Mine Joint Venture Project E52/697 Fifth Year and Final Relinquishment Report Period 24
A60122 1999 Troy Resources Nl Three Rivers 24% Three Rivers Project, Peak Hill Mineral Field, Partial Surre Surrender Report, Exploration Licence E52/851, 01
A54838 1998 Troy Resources Nl Orchard-Reefer 1.1% Orchard-Reefer Project, Peak Hill District, W.A. Annual Report 1997-1998 P52/845-856, ELA52/1093
A55845 1998 Homestake Gold Of Australia Ltd Peak Hill <1% Project 596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,581 582 P52
A56072 1998 Troy Resources Nl Old Peak Hill 13% Old Peak Hill (JV) Project, Annual Report for the period 1st July 1997 to 1st July 1998 M52/484, M52/487 & M5
A55257 1998 Troy Resources Nl Reefer-Stalley 4.1% Reefer-Stalley Project, Peak Hill District W.A. Annual Report 1997-1998 P52/855-856, 560, 862
A55789 1998 Homestake Gold Of Australia Ltd Peak Hill <1% Project 596 Peak Hill Mine Joint Venture Project E52/697 Fourth Year Partial Relinquishment Report Period 24/0
A56930 1998 Troy Resources Nl Three Rivers 11% Three Rivers Project. Peak Hill Mineral Field, WA. Combined Annual Report for E52/698,851,852. 12/97-12/98.
A52184 1997 Plutonic Operations Ltd Peak Hill <1% Project 596 Peak Hill Joint Venture Project E52/686,697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,5
A52258 1997 Plutonic Operations Ltd Peak Hill <1% Third Year Partial Relinquishment Report Period 24/06/94 to 23/06/97
A52651 1997 Perilya Mines Nl St Crispin <1% Annual report for the St Crispin Project for period 27/09/96-19/09/97 E52/661,662 & 671 P52/928-931 P52/728-7
A51016 1997 Troy Resources Nl Orchard-Reefer 1.2% Orchard-Reefer Project Peak Hill District W.A Annual Report 1996-1997 Tenements P's 52/845 - 52/856 ELA 52/109
A51993 1997 Plutonic Operations Ltd Old Peak Hill 11% Old Peak Hill (JV) Project, M52/307, M52/483 - M52/487, Annual Report for the period 01/07/1996 - 30/06/1997.
A53475 1997 Troy Resources Nl Three Rivers 11% Three Rivers Project - Peak Hill Mineral Field Annual Report, 12/1996 - 12/1996 Exploration Licence: E52/698,
A49449 1996 Newcrest Mining Ltd Glengarry <1% Glengarry Joint Venture Combined Annual Exploration Report for E52/661 to E52/662 and E52/671 for the period f
A46926 1996 Plutonic Operations Ltd Peak Hill 2.4% Peak Hill Project, Annual Technical Report for period 30/11/1994 - 29/11/1995, E52/737.
A47820 1996 Solomon Pacific Resources Nl Orchard-Reefer 1.2% Park Hill (Solomon Pacificferenco) Joint Venture Orchard Reefer project Annual report 1995-1996 Tenements: P52
A48742 1996 Plutonic Operations Ltd Peak Hill <1% Project 596 Peak Hill Mine Joint Venture Project E52/442 E52/686 E52/697 M52/13 M52/35 M52/56 M52/116 M52/287
A48789 1996 North Ltd Old Peak Hill 11% Old Peak Hill (JV) Project, Annual Report ,M52/307, M52/483 to M52/487 for the period 01/07/1995 to 30/06/199
A49954 1996 Troy Resources Nl Three Rivers 11% Three Rivers Project Peak Hill Mineral Field Western Australia Annual report November 1995 to November 1996 Ex
A45105 1995 Newcrest Mining Ltd Glengarry <1% Glengarry Joint Venture Combined Annual Exploration report for the period from September 1993 to September 199
A45291 1995 North Ltd Old Peak Hill 11% Old Peak Hill (JV) Project, Annual Report for the period 01/07/1994 to 30/06/1995 ,M52/307, M52/483 - 487.
A45313 1995 Plutonic Operations Ltd Peak Hill Mine Joint Venture <1% Project 596 Peak Hill Mine Joint Venture Project Annual report E52/442 E52/686 E52/697 E52/737 M52/13 M52/35 M
A45715 1995 Newcrest Mining Ltd Glengarry <1% Glengarry Joint Venture Combined Annual Exploration Report for E52/661-662 and 671 for the period fromSeptembe
A39924 1993 Newcrest Mining Ltd Glengarry <1% Annual report for the period 09/92-09/93 Glengarry JV Project E52/661 E52/662 E52/671
A37368 1992 Perilya Mines Nl Reefer 27% Surrender Report, Reefer Project , for the period 19/1/92 to 26/10/92, E52/589.
A33821 1991 Great Central Mines Nl Plutonic West 9.1% Plutonic West Project, Annual Report for the period 9th July 1990 to 8th July 1991, E52/346, 348 & 362-365.
A31666 1990 Great Central Mines Nl Plutonic West 9.1% Plutonic West Project, Annual Report for the period ending 25 September 1990, E52/346, 348 & 362-365.
A10229 1980 Goldfields Exploration Pty Ltd Peak Hill 3.1% Peak Hill Project, Non-statutory Report: Report for the period 16/11/1977 to 01/10/1980, October 1980, MC52/31
A9184 1753 Amoco Minerals Aust Co Horseshoe 7.6% Final Report on Temporary Reserve 7059H for Period 8th June 1979 to 7th June 1980
A38012 1753 Plutonic Operations Ltd Plutonic West 6% Annual Report for Plutonic West Project,E52/346, 348, 362-365; M52/330-337.for the period 01/01/92 to 31/12/9
A96476 1753 Pepinnini Robinson Range Pty Ltd Peak Hill <1% Annual Technical Report for the Period Ending 30 November 2012, EL52/1723 ‘Peak Hill’, Bryah-Padbury Basin Pea
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
6 months · 22 Feb 2027
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 52/1678 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 52/1678? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.