E 52/2394-I
E 52/2394-I is a live exploration licence in the Shire of Meekatharra, Western Australia, held by Audax Minerals Pty Ltd and Norwest Minerals Limited (part of Riedel Resources Limited). Granted on 16 June 2010 for 5 years (extended), it expires on 15 June 2028. The ground is covered by 110 historical WAMEX reports.
Register summary
- Holders
- Audax Minerals Pty Ltd, Norwest Minerals Limited
- Part of
- Riedel Resources Limited (ASX:RIE) as at 2025-06-30
- Local government
- Shire of Meekatharra
- Application received
- 28 Apr 2009
- Commenced
- 16 June 2010
- Expiry
- 15 June 2028
- Term
- 5 Years (Extended)
The full record on E 52/2394-I
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 5 changes of holder
- The full record: 17 years of expenditure, 6 conditions and 11 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (24 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A144475 | 2024 | Norwest Minerals Limited | Marymia | <1% | Final Surrender Report E52/4164 Marymia Project for the period ending 14/06/2024 |
| A144790 | 2024 | Rumble Resources Limited | Earaheedy | <1% | Final Surrender Report - E69/3889 Earaheedy for the period ending 11/07/2024. |
| A132033 | 2022 | Lodestar Minerals Limited | Ned's Creek | <1% | Final Surrender Report for E52/2440 Ned's Creek for the period ending 16/08/2022 |
| A133155 | 2022 | Sultan Resources Ltd | Thaduna | <1% | Annual Technical Report - Thaduna Project C131/2018 for the period ending 31/07/2022 |
| A133157 | 2022 | Sultan Resources Ltd | Thaduna | <1% | Final Surrender Report for E52/3461 Thaduna Project for the period ending 14/09/2022 |
105 more reports
| A128980 | 2021 | Sultan Resources Ltd | Thaduna | <1% | Annual Exploration Report: Thaduna Project C131/2018 for the period 1 August 2020 to 31 July 2021, E 52/03481, |
| A125597 | 2020 | Sultan Resources Ltd | Thaduna | <1% | Annual Exploration Report Thaduna Project C131/2018 for nthe period ending 31/7/2020 |
| A124816 | 2020 | Norwest Minerals Limited | Marymia | 30% | Annual Technical Report C144/2010, E52/02394, E52/02395 for the period ending 15 June 2020 |
| A118747 | 2019 | Sultan Resources Ltd | Thaduna | <1% | Annual Report, Thaduna, E52/3461 for the period 31 October 2017 to 30 October 2018 |
| A121615 | 2019 | Vango Mining Limited | Ned's Creek | <1% | Ned's Creek C212/2010 Annual report for the period 12 September 2018 to 11 September 2019, E 52/02440, E 52/02 |
| A121820 | 2019 | Sultan Resources Ltd | Thaduna | <1% | Combined Annual Technical Report for E52/3481, E52/3461 Thaduna project for the period 1 August 2018 to 31 Jul |
| A120762 | 2019 | Australian Mines Limited | Marymia | 30% | Annual Technical Report C144/2010 Marymia Project for the period 16 June 2018 to 15 June 2019, E52/02394, E52/ |
| A118635 | 2018 | Lodestar Minerals Limited | Ned's Creek - Contessa | <1% | E52/02456 (Contessa) EIS Co-Funded Drilling Report for the period 1 January 2018 to 31 December 2018 (R#16) |
| A117685 | 2018 | Australian Mines Limited | Marymia | 30% | Australian Mines Limited, Annual Technical Report, C 144/2010, Marymia Project, 16 June 2017 - 15 June 2018 |
| A118596 | 2018 | Lodestar Minerals Limited | Ned's Creek | <1% | Annual Report for the Ned's Creek Project, C212/2010, 12 September 2017 - 11 September 2018 |
| A110839 | 2017 | Lodestar Minerals Limited | Neds Creek | <1% | Partial Surrender Report for E52/2456 17 September 2010 to 18 October 2016 |
| A110788 | 2017 | Lodestar Minerals Limited | Ned's Creek | <1% | Partial Surrender Report for E52/2440 20 August 2010 to 14 November 2016 |
| A114385 | 2017 | Australian Mines Limited | Yowereena Hill | 30% | Yowereena Hill Project C144/2010 Annual Report for the period 16 June 2016 to 15 June 2017, E52/02395, E52/023 |
| A115417 | 2017 | Lodestar Minerals Ltd | Neds Creek | <1% | Neds Creek C212/2010 Annual Report for the period 12 September 2016 to 11 September 2017, E52/02440, E52/02456 |
| A115529 | 2017 | Lodestar Minerals Limited | Neds Creek - Contessa | <1% | EIS Co-funded drilling - Final Report 2017 (R 14) NEDS CREEK - CONTESSA E52/02456 for the period 12 September |
| A109237 | 2016 | Australian Mines Limited | Marymia | 30% | Marymia Project Partial Surrender Report C144/2010, E52/02394, E52/02395 for the period 16 June 2010 to 15 Jun |
| A108647 | 2016 | Vango Mining Limited | Plutonic Dome | 8.5% | E52/527 Final Surrender Report for the period 03/07/1992 to 31/12/2015 |
| A109587 | 2016 | Australian Mines Limited | Marymia | 30% | Marymia Project C144/2010, E52/02394, E52/02395 Annual Report for the period 16 June 2015 to 15 June 2016 |
| A109904 | 2016 | Australian Mines Limited | Marymia | <1% | MARYMIA PROJECT E52/2395 Partial Surrender Report For the Period 31 August 2010 to 30 August 2016 |
| A110507 | 2016 | Lodestar Minerals Limited | Ned's Creek | <1% | Ned's Creek Project C212 Annual Report for the period 12 September 2015 to 11 September 2016, E52/02440, E52/0 |
| A105239 | 2015 | Vango Mining Limited | Plutonic Dome | 2.2% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2014 to 31/12/2014, E52/2071.... |
| A106261 | 2015 | Australian Mines Ltd | Marymia | 30% | Marymia Project Annual Report Combined Reporting Group C144/2010 (E52/2394-I and E52/2395) For the period 16-J |
| A107487 | 2015 | Lodestar Minerals Limited | Peak Hill - Doolgunna - Neds Creek | <1% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12/09/2014 to 11/09/2015, E5 |
| A104392 | 2015 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Neds Creek | <1% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12th September 2013 to 11th |
| A103054 | 2014 | Riedel Resources Ltd | Marymia | 30% | Marymia Project, Annual Report for the period 16/06/2013 to 15/06/2014, E52/2394 & 2395. |
| A100336 | 2013 | Lodestar Minerals Ltd | Neds Creek | <1% | Neds Creek Project, Annual Report for the period 12th September 2012 to 11th September 2013, E52/2440, 2444, 2 |
| A97128 | 2013 | Dampier Gold Ltd | Plutonic Dome | 1.9% | Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/ |
| A98761 | 2013 | Riedel Resources Ltd | Marymia | 30% | Marymia Project, Annual Report for the peiod 16th June 2012 to 15th June 2013, E52/2394 & 2395. [C144/2010] |
| A101570 | 2013 | Ord River Resources Ltd | Plutonic Dome | 2.2% | C226/2011 ANNUAL EXPLORATION REPORT Reporting Period 01/01/2013 to 31/12/2013 |
| A94622 | 2012 | Riedel Resources Ltd | Marymia | 30% | Marymia Project, Annual Report for the period 16th June 2011 to 15th June 2012, E52/2394 & 2395. [C144/2010] |
| A93152 | 2012 | Dampier Gold Ltd | Plutonic Dome | 1.9% | Combined Annual Report for the period 1 January 2011 to 31 December 2011 Plutonic Dome Project C226/2011 |
| A95982 | 2012 | Lodestar Minerals Ltd | Ned's Creek | <1% | Ned's Creek Project, Annual Report for the period 12th September 2011 to 11th September 2012, E52/2440, 2444, |
| A89778 | 2011 | Barrick (Plutonic) Ltd | Plutonic - Marymia | 1.6% | Marymia Project, Plutonic Project, Plutonic Extended Project, Freshwater Project, Annual Report, Period 1 Janu |
| A91159 | 2011 | Riedel Resources Ltd | Marymia | 30% | Combined Annual Report Marymia Project C144/2010 For the period 16 June 2010 to 15 June 2011 |
| A92493 | 2011 | Lodestar Minerals Ltd | Neds Creek | <1% | Neds Creek Project E52/2440, E52/2444, E52/2456, E52/2468 Annual Technical Report Year 1 period 12th September |
| A86710 | 2010 | Barrick (Plutonic) Ltd | Plutonic / Marymia | 1.6% | 6490 MARYMIA PROJECT 6520 PLUTONIC PROJECT 6523 PLUTONIC EXTENDED Project 6530 FRESHWATER PROJECT ANNUAL REPO |
| A81899 | 2009 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 1.4% | PROJECT 6490 MARYMIA PROJECT, PROJECT 6520 PLUTONIC PROJECT, PROJECT 6523 PLUTONIC EXTENDED PROJECT, PROJECT 6 |
| A84710 | 2009 | Magellan Metals Pty Ltd | McDonald Well | <1% | FINAL SURRENDER REPORT - E52/2052: MCDONALD WELL |
| A77831 | 2008 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 1.5% | Annual Report Period 1 January 2007 - 31 December 2007 Technical Report No. 1257 Plutonic/ Marymia Project |
| A74085 | 2007 | Barrick Gold Of Australia Ltd | Gregory Project | <1% | Gregory Project, E52/1680-1684, E52/1706, E69/1879, (C121/2004), Annual Report for the Period 16 August 2005 t |
| A76290 | 2007 | Australian Mineral Fields Pty Ltd | Gregory | <1% | Gregory Project, Annual Report for the period 16th August 2006 to 15th August 2007 , E52/1682-1684 & E52/1706 |
| A74697 | 2007 | Barrick Gold Of Australia Ltd | Marymia/ Plutonic | 1.5% | Marymia/ Plutonic Project C94/1999 Annual Report Period 1 January 2006 - 31 December 2006 (Peak Hill) |
| A73877 | 2006 | Falcon Minerals Ltd | Marymia | 30% | Marymia Project E52/1687-1688 Annual Report for the Period 17th Oct 2005 to 16th Oct 2006 C197/2006 (Peak Hill |
| A72015 | 2006 | Barrick Gold Of Australia Ltd | Marymia, Plutonic, Plutonic Extended & F | 1.2% | Marymia, Plutonic, Plutonic Extended & Freshwater Projects, Annual Report, Period 1 January 2005 to 31 Decembe |
| A70185 | 2005 | Barrick Gold Of Australia Ltd | Plutonic/ Marymia | 1.2% | Annual Report Period 1 January 2004 to 31 December 2004 Technical Report No. 1152 Projects 6490 - Marymia, 652 |
| A71168 | 2005 | Placer Dome Asia Pacific Ltd | Gregory | <1% | Gregory Project, Annual Technical Report for the period 16/08/2004 to 15/08/2005, on tenements E52/1680-1684 E |
| A68298 | 2004 | Barrick Gold Of Australia Ltd | Marymia / Plutonic / Plutonic Extended / | 1.2% | Annual Report for the period 01/01/2003-31/12/2003 Marymia Project,Plutonic Project,Plutonic Extended Project, |
| A66308 | 2003 | Barrick Gold Of Australia Ltd | Plutonic | 1.2% | Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523 |
| A64505 | 2002 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 1.2% | Annual Report Period 1 January 2001 - 31 December 2001. Vertification Report Technical Report No. 1024. Projec |
| A64818 | 2002 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 1.2% | Plutonic/Marymia M52/148-150, M52/170-171, M52/183, M52/185 M52/217-220, M52/222-223, M52/226-235, M52/246-247 |
| A62465 | 2001 | Homestake Gold Of Australia Ltd | Marymia | 1.2% | Project 6490 Marymia Project 6520 Plutonic Project 6523 Plutonic Extended Project 6530 Freshwater M52/148-150, |
| A63545 | 2001 | Homestake Gold Of Australia Ltd | Marymia | 8.5% | Marymia Project, Partial Surrender Report for the period ending 3rd July 2001, E52/527. [C226/2011] |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | 1.3% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A60012 | 2000 | Homestake Gold Of Australia Ltd | Plutonic/ Marymia | 1.1% | Project 6490,Marymia, Project 6520, Plutonic, Project 6523, Plutonic Extended, Project 6530, Freshwater, M52/1 |
| A58242 | 1999 | Audax Resources Nl | Marymia | 13% | Marymia Project , Surrender Report E52/423,E52/448,E52/621,E52/623,E52/767,M52 /506 to M52/508 inclusive and M |
| A56373 | 1998 | Galtrad Pty Ltd | Yadgymurrin/Simpson Well | 21% | Combined Surrender Report for Exploration Licences E52/592 and E52/594 Marymia/Neds Creek Prospect. |
| A56426 | 1998 | Cyprus Gold Australia Corporation | Neds Creek | 33% | Neds Creek E52/1254 Final Surrender Report for the Period 22/09/97 to 03/07/98. |
| A51137 | 1997 | Marymia Exploration Nl | No 5 Bore | <1% | No. 5 Bore Exploration Licence E52/615 Annual report 1997 period 17th March 1996 to 16th March 1997 |
| A51536 | 1997 | Marymia Exploration Nl | Yowerreena Hill | 8.5% | Yowerreena Hill Joint Venture Exploration Licence E52/527 (Sector B) Annual report for the year ending July 19 |
| A51598 | 1997 | Resolute Ltd | Marymia | 8.5% | [ Marymia base metals - gold - diamond exploration, Annual report for period 1/8/1994 - 1/12/1996, E52/527 ] |
| A52298 | 1997 | Audax Resources Nl | Marymia | 13% | MArymia Project Peak Hill Mineral Field Western Australia Annual Report E52/423,E52/448,E52/621,E52/623,E52/76 |
| A53324 | 1997 | Cyprus Gold Australia Corporation | Ned's Creek | 21% | Ned's Creek E52/592, 594, and P52/799 (MLA52/669) Combined Annual Report for the period 01/12/96 to 30/11/97. |
| A47551 | 1996 | Marymia Exploration Nl | No. 5 Bore | <1% | Annual report for Exploration Licence E52/615 No. 5 Bore for the period 17th March 1995 to 16th March 1996 |
| A48841 | 1996 | Galtrad Pty Ltd | Seven Mile Well | 6% | Seven Mile Well Project, Annual Report for the period 27/9/1995 to 26/09/1996, E52/594. |
| A48842 | 1996 | Galtrad Pty Ltd | Simpson Well | 9.7% | Simpson Well Project, Final & Annual Report for the period 26/09/1995 to 25/09/1996, E52/593. |
| A49537 | 1996 | Audax Resources Nl | Marymia | 13% | Marymia Project Peak Hill Mineral Field Western Australia Annual Reprot E52/423,E52/448,E52/621,E52/623,E52/76 |
| A44229 | 1995 | Resolute Resources Ltd | Yowereena | 8.5% | Exploration Licence E52/527 'Sector A' Yowereena Hill Report on Exploration to July 1994 |
| A45945 | 1995 | Galtrad Pty Ltd | Marymia / Neds Creek | 29% | Marymia / Neds Creek Project, Annual Report E52/592, P52/797-799 inc for the period ending 25th September 1995 |
| A46022 | 1995 | Audax Resources Nl | Marymia | 13% | Marymia Project ,Annual Report E52/423,E52/448,E52/621,E52/623,M52/506 to M52/508 , 01/09/1994 to 01/09/1995. |
| A43989 | 1995 | Northling Pty Ltd | Peak Hill | 27% | Peak Hill Project, Annual Report Exploration Licence E52/767 for period 16/03/1994 to 15/03/1995. |
| A45520 | 1995 | Cra Exploration Pty Ltd | Ruby Bore gold exploration | 8.5% | E52/527 Ruby Bore 24 Annual Report to 2nd July 1995 Peak Hill SG 50-08,Western Australia. |
| A45944 | 1995 | Galtrad Pty Ltd | Simpson Well | 9.7% | Simpson Well Project, Annual Report Exploration Licence E52/593 for the period 26/09/1994 to 25/09/1995. |
| A45946 | 1995 | Galtrad Pty Ltd | Seven Mile Well | 6% | Seven Mile Well Project, Annual Report 1995 E52/594 for the period 27/09/1994 to 26/09/1995. |
| A41787 | 1994 | Marymia Exploration Nl | Yowerreena Hill | 8.5% | Yowerreena Hill Project, Non-statutory Report : R Report for the period ending 12/93 , E52/527 |
| A42710 | 1994 | Plutonic Operations Ltd | Seven Mile Well | 6% | Seven Mile Well Project, Annual Report for the period 01/01/1994 to 25/09/1994, E52/594. |
| A40088 | 1994 | Plutonic Operations Ltd | Seven Mile Well | 6% | Seven Mile Well Project, Annual Report for the period 26/09/1992 to 25/09/1993, E52/594. |
| A40211 | 1994 | Cra Exploration Pty Ltd | Ruby Bore | 8.5% | Annual report for the period 03/07/92-02/07/93 Ruby Bore Project E52/527 |
| A41601 | 1994 | Marymia Exploration Nl | No 5 Bore | <1% | Annual Report for the period 17/03/93-16/03/94 No.5 Bore Project ,E52/615. |
| A41650 | 1994 | Cra Exploration Pty Ltd | Ruby Bore | 8.5% | Annual Report for the period 03/07/93-02/07/94 Ruby Bore Project E52/527 |
| A41789 | 1994 | Marymia Exploration Nl | Yowerreena Hill | 8.5% | Annual Report for the period 01/94-04/94 Yowerreena Hill Project E52/527 |
| A42680 | 1994 | Plutonic Operations Ltd | 12 Mile Bore | 30% | 12 Mile Bore Project, Non-statutory Report: Report for the period 10/09/1993 to 31/12/1993, E52/592. |
| A42681 | 1994 | Growth Resources Nl | Neds Creek | 29% | Neds Creek Project, Annual Report for the period 01/09/1993 to 31/08/1994, E52/592; P52/797-799. |
| A42709 | 1994 | Plutonic Operations Ltd | Seven Mile Well | 6% | Seven Mile Well Project, Partial Surrender Report for the period 23/06/1993 to 26/09/1994, E52/594. |
| A43133 | 1994 | Audax Resources Nl | Marymia | 9.3% | Marymia Project Annual Report E52/423,E52/448,E52/621 and E52/623 Period 01/07/1993 to 30/06/1994 |
| A43255 | 1994 | Galtrad Pty Ltd | Yadgymurrin/ Simpson Well | 9.7% | Yadgymurrin/ Simpson Well Project, Annual Report E52/593 for the period 26/09/1993 to 26/09/1994. |
| A38054 | 1993 | Resolute Resources Ltd | Marymia | 2.1% | Annual report for the period 01/92-12/92 Marymia Project |
| A38912 | 1993 | Audax Resources Nl | Baumgarten | 56% | Baumgarten Project , Annual Report ,E52/423 and 52/448, 01/06/1992 to 01/06/1993. |
| A39402 | 1993 | Marymia Exploration Nl | Yowerreena Hill | 8.5% | Annual Report for the period 07/92-07/93 Yowerreena Hill Project E52/527 |
| A42682 | 1993 | Growth Resources Nl | Ned's Creek | 30% | Ned's Creek Project, Non-statutory Report: Results of Geochemical Survey & Drillling Programme, Ned's Creek Pr |
| A37808 | 1993 | Growth Resources Nl | Ned's Creek | 30% | Ned's Creek Project, Non-statutory Report: Results of a Geochemical Survey, Ned's Creek Project , WA, E52/592. |
| A38124 | 1993 | Cra Exploration Pty Ltd | Ruby Bore | 1.6% | Annual report for the period 09/91-09/92 Ruby Bore Project E51/321 E52/220 E52/222 E52/224 E52/226 E52/527 E52 |
| A39238 | 1993 | Resolute Resources Ltd | Area A - Yowereena Hill | 8.5% | Area A - Yowereena Hill, Annual report to July 1993, E52/527 |
| A39464 | 1993 | Growth Resources Nl | Ned's Creek | 30% | Ned's Creek Project, Annual Report, June 1993, E52/592. (Results of Drilling Programme- Area 1). |
| A40142 | 1993 | Alkane Exploration Nl | Yadgymurrin - Simpson Well | 9.7% | Yadgymurrin - Simpson Well Project, Annual Report for period ending 25/09/1993, E52/593. |
| A37308 | 1992 | Galtrad Pty Ltd | Lake Gregory | 6% | Lake Gregory Project, Annual Report for period ending November 1992, E52/594. |
| A39716 | 1992 | Audax Resources Nl | Plutonic | 9% | Plutonic Project, Non-statutory Report: Grid Layout Plan, September 1992, E52/621. |
| A37164 | 1992 | Galtrad Pty Ltd | Yadgymurrin - Simpson Well | 9.7% | Yadgymurrin - Simpson Well Project, Annual Report, November 1992, E52/593. |
| A37307 | 1992 | Galtrad Pty Ltd | Marymia | 30% | Marymia Project, Annual Report for period ending September 1992, E52/592. |
| A38295 | 1991 | Audax Resources Nl | Baumgarten | 56% | Baumgarten Project, 1991/ 1992 Annual Report, November 1991, |
| A33353 | 1989 | Audax Resources Nl | Plutonic | 24% | Plutonic Project, Non-statutory Report: Preliminary Assessment of the Plutonic Prospect Peak Hill Region, Nov |
| A9896 | 1976 | International Nickel Aust Ltd | Baumgarten | 48% | Baumgarten(JV) Project, Final Surrender Report, May 1976,MCs 52/2070-2100, 2109-2118, 2392-2395, & 2398-2404. |
| A5816 | 1975 | International Nickel Aust Ltd | Baumgarten | 48% | Annual report, Baumgarten Claim Group, For the period 1 January - 31 December 1974, MC52/2070 ... 52/2404 |
| A5118 | 1974 | International Nickel Aust Ltd | Baumgarten | 48% | Report [non-statutory], MC52/2070 ... 52/2404, Baumgarten Claim Group, For the period 21st December 1972 to 31 |
| A48351 | 1753 | Galtrad Pty Ltd | Marymia / Neds Creek | 29% | Marymia / Neds Creek Project, Annual Report for period ending September 1996, E52/592, P52/797 -799 incl. |
| A45224 | 1753 | Marymia Exploration Nl | Number 5 Bore | <1% | Number 5 Bore. Exploration licence 52/615 Annual report for the year ending 16 March, 1995. |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 52/2394-I into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 52/2394-I? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.