NextMapsWA TenementsE 52/4306

E 52/4306

LiveExploration LicenceShire of MeekatharraPeak Hill M.F. District
Area
1,860ha
Expires
Jan 2029
in 2 years
WAMEX reports
98
WA median is 53
Report drilling
45
of 98 reports
Meekatharra Explore on the live map

Register summary

Holder
Cuvier Resources Pty Ltd
Local government
Shire of Meekatharra
Application received
20 Oct 2023
Commenced
4 Jan 2024
Expiry
3 Jan 2029
Term
5 Years

Exploration history on this ground

98 historical WAMEX exploration reports intersect E 52/4306: 61 report geochemistry or sampling, 74 include a digital data package.
When this ground was worked · 94 of 98 reports dated
11970s
1980s
161990s
272000s
372010s
132020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A147710 2025 Ausgold Exploration Pty Ltd Doolgunna <1% Final Surrender Report for Doolgunna E52/3031 for the Period 4 February 2014 to 30 January 2025
A138725 2024 Ausgold Exploration Pty Ltd Doolgunna <1% Annual Report for E52/3031: Doolgunna Project for the period 4 February 2023 to 3 February 2024
A135131 2023 Aic Mines Limited; Ausgold Exploration Pty Ltd Doolgunna <1% Annual Report for E52/3031: Doolgunna Project for the period 4 February 2022 to 3 February 2023
A137017 2023 Sandfire Resources Limited Doolgunna 75% E 52/2275 Doolgunna Project Final Surrender Report for the period ending 04/09/2023
A137909 2023 Sandfire Resources Limited Doolgunna <1% E52/2208, E52/2209, E52/2358 and E 52/2401 Doolgunna Project Final Surrender Report 2023
93 more reports
A130334 2022 Aic Mines Limited Doolgunna <1% E 52/03031 - Doolgunna Annual Report for the period ending 04/02/2022.
A131677 2022 Diversified Asset Holdings Pty Ltd Jenkins Fault <1% Jenkins Fault Project E 52/3495 Annual Exploration Report for the period ending 06/03/2022.
A126681 2021 Aic Mines Limited Doolgunna <1% Doolgunna E52/3031 Annual Report for the period ending 03/02/2021
A126846 2021 Strickland Metals Limited Doolgunna <1% Doolgunna Annual Technical Report E52/03495 for the period ending 06/03/2021
A123147 2020 Sandfire Resources Limited Doolgunna 3.8% Doolgunna C261/2011 Combined Annual Mineral Exploration Report 2019
A123282 2020 Aic Mines Limited Doolgunna <1% E52/3031 - Doolgunna Annual Technical Report - 4 February 2019 to 3 February 2020
A123283 2020 Aic Mines Limited Doolgunna <1% E52/3031 - Partial Surrender Report - Doolgunna AusGold JV - 4 February 2014 to 3 February 2020
A123758 2020 Diversified Asset Holdings Pty Ltd Doolgunna <1% Annual Report - Doolguna Project E52/3495 for the period ended 7/3/2020
A119488 2019 Ausgold Exploration Pty Ltd Doolgunna <1% Co-Funded Drilling Program Final Report (R#16) E52/03031 Doolgunna Project for the period 5 September 2018 to
A119580 2019 Sandfire Resources Nl Doolgunna 3.8% Doolgunna C261/2011 Annual Report for the period 1 January 2018 to 31 December 2018, E52/01698, E52/01699, E52
A120116 2019 Ausgold Exploration Pty Ltd; Intrepid Mines Limited Doolgunna <1% Annual Report for the Doolgunna Project E52/3031 for the period 4 February 2018 to 3 February 2019
A116351 2018 Sandfire Resources Nl Doolgunna 3.8% Doolgunna C261/2011 Combined Annual Mineral Exploration Report for the period 1 January 2017 to 31 December 20
A116397 2018 Ausgold Exploration Pty Ltd Doolgunna <1% Annual Report E52/3031 Doolgunna Project for the period 04/02/2017 - 03/02/2018
A112454 2017 Sandfire Resources Nl Doolgunna 3.8% Doolgunna Project C261/2011 Combined Annual Mineral Exploration Report 2016, E51/01582, E51/01583, E52/01698,
A112706 2017 Ausgold Exploration Pty Ltd Doolgunna <1% Doolgunna Project E52/3031 Annual Report for the period 7 January 2016 to 6 January 2017
A108242 2016 Sandfire Resources Nl Doolgunna <1% Doolgunna Project Co-Funded Government – Industry Drilling Program DAG2014/003266645 Final Report (round 8)
A108360 2016 Sandfire Resources Nl Doolgunna <1% Doolgunna Project E52/1712 Final Surrender Report 2016 Report Period 5/02/2004 to 22/01/2016
A108361 2016 Sandfire Resources Nl Doolgunna <1% Doolgunna Project E52/1928 Final Surrender Report 2016 Report Period 2/05/2006 to 22/01/2016
A108459 2016 Sandfire Resources Nl Doolgunna 3.8% Doolgunna Project C261/2011 Combined Mineral Exploration Annual Report 01/01/2015 to 31/12/2015, E51/1582, E51
A108849 2016 Ausgold Limited Doolgunna <1% Doolgunna E52/3031 Annual Report to the Department of Mines and Petroleum for the period 04/02/15 to 03/02/16
A105141 2015 Sandfire Resources Nl Doolgunna 3.8% Doolgunna Project 2014 Mineral Exploration Annual Report Combined Report Group C261/2011 for the period 01/01/
A105295 2015 Ausgold Limited Doolgunna <1% Doolgunna E52/3031 Annual Report to the Department of Mines and Petroleum for the period 04/02/14 to 03/02/15
A101509 2014 Sandfire Resources Nl Doolgunna <1% Doolgunna Project 2013 Mineral Exploration Annual Report Combined Report Group for the period 01/01/2013 to 3
A101132 2014 Ausgold Limited Doolgunna Station <1% Doolgunna Station Project, Final Surrender Report for the period 07/01/2009 to 30/12/2013, E52/2162.
A101593 2014 Talisman Mining Ltd Halloween West 75% Halloween West Joint Venture Project - Annual Exploration Report for the period 9 February 2013 to 8 February
A97283 2013 Talisman Mining Ltd Halloween West 75% Halloween West Joint Venture Project - Annual Exploration Report for the period 9 February 2012 to 8 February
A97970 2013 Sandfire Resources Nl Doolgunna <1% Annual Mineral Exploration Report Exploration Licence E52/1928 For the Period 2 May 2012 to 1 May 2013
A97184 2013 Sandfire Resources Ltd Doolgunna Hudson <1% Annual Mineral Exploration Report For the Period 5 February 2012 to 4 February 2013 Exploration Licence E52/17
A97521 2013 Sandfire Resources Nl Doolgunna <1% Doolgunna Project 2012 Mineral Exploration Annual Report Combined Report Group C261/2011 E52/1698, E52/1699,
A92617 2012 Ausgold Limited Doolgunna <1% Doolgunna Project, Annual Report for the period 07/01/2011 to 06/01/2012, E52/2162.
A93251 2012 Sandfire Resources Ltd Doolgunna <1% Doolgunna Project, Annual Report for the period 01/04/2011 to 31/12/2011, E52/1698-1699, 1715, 2208-2209, 2358
A93411 2012 Chrysalis Resources Limited Doolgunna West 75% Exploration completed in the Doolgunna West Project E52/2275 for the period 9th Feb 2011 to 8 Feb 2012
A93747 2012 Hudson J Doolgunna <1% Doolgunna Project E52/1928 for the period 2/5/2011 to 1/5/2012
A93162 2012 Hudson J Doolgunna <1% Doolgunna Project E52/1712 annual report for the period 5/2/2011 to 4/2/2012
A88977 2011 Peak Resources Ltd Three Rivers - Peak Hill East <1% Three Rivers Annual Report on Exploration 7th December 2009 to 6th December 2010, E52/1663 Peak Hill East Proj
A89042 2011 Ausgold Exploration Pty Ltd Doolgunna (Three Rivers) <1% Annual report for the period 7 January 2010 to 6 January 2011, Doolgunna Project, E52/2162
A89941 2011 Hudson J E52/1928 <1% ANNUAL REPORT FOR E52/1928 FOR PERIOD 2 / 5 / 2010 – 2 / 5 / 2011
A90310 2011 Chrysalis Resources Limited Doolgunna West 75% Doolgunna West Project, Annual Report for the period 09/02/2010 to 08/02/2011, E52/2275.
A90315 2011 Sandfire Resources Nl Doolgunna <1% Doolgunna Project, Annual Report for the period 31/03/2010 to 30/03/2011, E52/1698-1699, 1715, 2208-2209, 2358
A85600 2010 Hudson J E52/1712 <1% Annual Report, period 4/2/2009 – 4/2/2010
A85846 2010 Ausgold Exploration Pty Ltd Peak Hill East <1% Annual report for the period 7 January 2009 to 6 January 2010, Peak Hill East Project, E52/2162
A86253 2010 Peak Resources Ltd Three Rivers <1% Annual Report for E52/1663 For the Period 7th December 2008 to 6th December 2009
A86515 2010 Chrysalis Resources Limited Doolgunna West 75% Annual Report Doolgunna West Project Exploration Licence 52/2275, for the period 09/02/2009 TO 08/02/2010
A87341 2010 Sandfire Resources Nl Doolgunna <1% Combined Annual Mineral Exploration Report Doolgunna Project C164/2005 2010A, Report Period 31 March 2009 to 3
A86580 2010 Hudson J E52/1928 <1% Annual Report E52/1928, Reporting Period 2/5/2009 – 2/5/2010
A82285 2009 Sandfire Resources Nl DOOLGUNNA <1% COMBINED ANNUAL MINERAL EXPLORATION REPORT DOOLGUNNA PROJECT C164/2005, REPORTING PERIOD: 31 MARCH 2008 to 30
A84148 2009 Alchemy Resources Ltd THREE RIVERS <1% Three Rivers Gold Project, Final Surrender Report for the Period 18th November 1992 to 4th February 2009.
A80614 2009 Peak Resources Ltd Three Rivers / Peak Hill East <1% Three Rivers, Annual Report on Exploration, 7th December 2007 to 6th December 2008, E52/1663, Peak Hill East P
A80670 2009 Hudson J Doolgunna <1% Annual Report, Exploration E52/1712
A77519 2008 Barrick Gold Of Australia Ltd Three Rivers <1% Annual Report Three Springs Project Period 18 November 2006 to 17 November 2007 Technical Report No. 1252 E52/
A77611 2008 Peak Resources Ltd Peak Hill East <1% Three Rivers - Annual Report on Exploration, 7th December 2006 to 6th December 2007. E52/1663 Peak Hill East
A78846 2008 Sandfire Resources Nl Doolgunna <1% COMBINED ANNUAL MINERAL EXPLORATION REPORT REPORTING PERIOD: 31 MARCH 2007 TO 30 MARCH 2008 DOOLGUNNA PROJECT
A74148 2007 Peak Resources Ltd Three Rivers <1% Annual Report, the Period 7th Dec 2005 to 6th Dec 2006, Three Rivers, E52/1663 (Peak Hill)
A74865 2007 Barrick Gold Of Australia Ltd Pinnacle Bore 14% Pinnacle Bore E52/1500, Surrender Report, Period: 7 June 2002 - 10 January 2007, Technical Report No.1226
A75198 2007 Sandfire Resources Nl Doolgunna <1% Combined Annual Mineral Exploration Report Reporting Period: 31 March 2006 to 30 March 2007 Doolgunna Project
A71602 2006 Barrick Gold Of Australia Ltd Three Rivers / Central Bore <1% E52/698,E52/1139,E52/1363-1364,E52/1472,E52/1582,P52/906, Annual Report Three Rivers Project, Period 18 Novemb
A71724 2006 Mr Hudson J Three Rivers <1% Annual Report, Period 4/2/2005 - 4/2/2006, Tenement E52/1712 (Peak Hill).
A72155 2006 Mr Hocking Jc Doolgunna <1% Doolgunna Project, Annual Report for the Period 7 December 2004 to 6 December 2005, E52/1663, (Peak Hill).
A72536 2006 Sandfire Resources Nl Doolgunna <1% Combined Annual Mineral Exploration Report, 31 March 2005 to 30 March 2006, Doolgunna Project E52/1697-1699,17
A73277 2006 Barrick Gold Of Australia Ltd Pinnacle Bore 14% Pinnacle Bore E52/1500, Annual Report, Period 8 June 2005 to 7 June 2006, (Barrick Report No. 1196, Peak Hill)
A73323 2006 Barrick Gold Of Australia Ltd Pinnacle Bore 14% Pinnacle Bore E52/1500, Partial Surrender Report, Period 7 June 2002 to 6 June 2006, Combined Reporting No. C9
A74049 2006 Barrick Gold Of Australia Ltd Three Rivers / Central Bore <1% Three Rivers E52/698,1139,1363-1364,1472,1582,P52/906, Annual Report, Period 18 November 2005 to 17 November 2
A70656 2005 Mr Hudson J Three Rivers <1% Annual report (for the period 06/02/04 - 05/02/05, E52/1712 Glengarry).
A70903 2005 Barrick Gold Of Australia Ltd Pinnacle Bore 14% Project 6409, Pinnacle Bore, E52/1500, Annual report, Period 8 June 2004 - 7 June 2005, Technical report No. 1
A71013 2005 Barrick Gold Of Australia Ltd Pinnacle Bore 14% Project 6409, Pinnacle Bore, E52/1500, Surrender report, Period 7 June 2002 - 6 June 2005, Technical report No
A68153 2004 Troy Resources Nl Three Rivers <1% Three Rivers Project, Annual Report for the period 18/11/2002-17/11/2003, Tenements: E52/698, E52/1139, E52/13
A69757 2004 Barrick Gold Of Australia Ltd Three Rivers <1% Annual report for the period 18/11/03 - 17/11/04 Three Rivers Project 6525, C328/1996, E52/698, E52/1472, E52/
A67017 2003 Barrick Gold Of Australia Ltd Pinnacle Bore 14% Project 6409, Pinnacle Bore, E52/1500 Annual Report , Period 8 June 2002 to 7 June 2003, Project C94/1999: Ba
A65867 2003 Troy Resources Nl Three Rivers <1% Annual Report for the period 18th November 2001 to 17th November 2002. Three Rivers Project Tenements: E52/698
A64674 2002 Troy Resources Nl Three Rivers <1% Three Rivers Project, Partial Surrender Report Exploration Licence 52/698 November 1992 To November 2001.
A63884 2001 Troy Resources Nl Three Rivers <1% Annual Report , E52/698, E52/851 & E52/852 December 2000 to December 2001 Three Rivers Project, C328/1996.
A59908 2000 Troy Resources Nl Three Rivers <1% Three Rivers Project ,Annual Report for Exploration Licences E52/698,E52/851 & E52/852 December 1998 to Decemb
A59231 1999 Astro Mining Nl Doolgunna 2% Joint Annual/Surrender Report, Doolgunna, E51/395, E52/740- 742, for the Period 19 April 1998 to 18 April 1999
A55923 1998 Astro Mining Nl Doolgunna 2% Exploration Licences E51/395, E52/740-742 'C288/1997 - Doolgunna' Joint Annual Report for the Period 19 April
A54893 1998 Troy Resources Nl Gale Well 12% First Annual Report, Gale Well Project 18/04/97 to 17/04/98 Exploration Licence: E52/1138 Troy Resources NL Re
A56930 1998 Troy Resources Nl Three Rivers <1% Three Rivers Project. Peak Hill Mineral Field, WA. Combined Annual Report for E52/698,851,852. 12/97-12/98.
A53475 1997 Troy Resources Nl Three Rivers <1% Three Rivers Project - Peak Hill Mineral Field Annual Report, 12/1996 - 12/1996 Exploration Licence: E52/698,
A48134 1996 Mines & Resources Australia Pty Ltd Gale Bore 3.4% Gale Bore Project, Final Annual & Surrender Report for period 6th May 1995 to 24th May 1996, E52/630.
A48755 1996 Great Central Mines Nl Sorenson Bore 2.6% Exploration Licences E51/395 and E42/741-742 (Inclusive) Sorenson Bore Project Joint Report for the Period 30
A49954 1996 Troy Resources Nl Three Rivers <1% Three Rivers Project Peak Hill Mineral Field Western Australia Annual report November 1995 to November 1996 Ex
A44881 1995 Afmeco Pty Ltd Gale Bore 3.4% Gale Bore Project, Annual Report Exploration Licence E52/630 for period 06/05/1994 to 05/05/1995.
A44944 1995 Great Central Mines Nl Noonyareena Hill 2.2% Exploration Licences E51/395, E52/733 and E52/741-742 (Inclusive) Noonyareena Hill Annual Report for the Perio
A46611 1995 Troy Resources Nl Three Rivers <1% Three Rivers Project Peak Hill Mineral Field Western Australia Exploration Licence E52/698 Annual report Novem
A41104 1994 Great Central Mines Nl Noonyareena Hill 2% Exploration Licences E51/395 and E52/740 (inclusive) Noonyareena Hill, Annual Report for the Period 19 March 1
A41463 1994 Afmeco Pty Ltd Gale Bore 3.4% Gale Bore Project, Annual Report for the period 06805/1993 to 05/05/1994, E52/630.
A43205 1994 North Star Resources Nl Three Rivers <1% Exploration Licence E52/698,Three Rivers Gold and Diamond Prospect,Peak Hill Mineral Field Western Australia (
A38727 1993 Afmeco Pty Ltd Gale Bore 3.4% Gale Bore Project, Annual Report for the period 06/05/1992 to 05/05/1993, E52/630.
A39982 1993 North Star Resources Nl Three Rivers <1% Annual report for the period 11/92-11/93 Three Rivers Project E52/698
A124 1971 Western Mining Corporation Ltd Thaduna 1.6% Thaduna Report
A51931 1753 Astro Mining Nl Sorenson Bore 2.6% Exploration Licences: E51/395, E52/741-742 ,C347/1995, Sorenson Bore Project Joint Annual Report for the Perio
A88954 1753 Hudson J Doolgunna <1% Annual Report on E52/1712.
A82124 1753 Hudson J E52/1928 <1% E52/1928 ANNUAL REPORT, REPORTING PERIOD: 2/5/2008 – 2/5/2009
A131754 Sandfire Resources Limited Monty, Doolgunna <1% Downhole drilling data for donated drillholes
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
2 years · 3 Jan 2029
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 52/4306 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 52/4306? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.