E 52/4334
Register summary
- Holder
- Stanifer Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 16 Jan 2024
- Commenced
- 10 June 2026
- Expiry
- 9 June 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A139300 | 2024 | Aic Mines Limited | Curara Well | <1% | C14/2019 Curara Well Annual Technical Reporthe period ending 31/12/2023. E 52/3069,E 52/3743,E 52/3768 |
| A144349 | 2024 | Enterprise Metals Limited | Doolgunna | <1% | Final Surrender Report E52/3347 for the Period 2 June 2016 to 30 May 2024 |
| A144521 | 2024 | Aic Mines Limited | Curara Well | <1% | Curara Well E52/3743 Final Surrender Report for the period 11 September 2020 to 3 April 2024 |
| A138794 | 2024 | Sandfire Resources Limited | Ned’s Creek | 25% | E 52/1858, E 52/2356 and E 52/2405 ‘Ned’s Creek” Surrender Report for the period ending 16/01/2024 |
| A138905 | 2024 | Sandfire Resources Limited | Springfield | 79% | E 52/2466 Springfield Project Surrender Report for the period ending 16/01/2024. |
157 more reports
| A143184 | 2024 | Sandfire Resources Limited | Ned’s Creek | <1% | E 52/1673, E 52/2357, E 52/3187, E 52/3188 ‘Ned’s Creek” Surrender Report 2024 |
| A144835 | 2024 | Aic Mines Limited | Curara Well | <1% | E52/3768 Final Surrender Report Curara Well Project for the period ending 01/08/2024. |
| A134604 | 2023 | Aic Mines Limited | Curara Well | 2.1% | Annual Technical Report C14/2019 Curara Well for the period ending 31/12/2022. E 52/3069,E 52/3488,E 52/3489,E |
| A135032 | 2023 | Sandfire Resources Ltd | Springfield | <1% | Springfield E52/3467 Partial Surrender Report 10 March 2017 to 9 May 2023 |
| A135030 | 2023 | Sandfire Resources Ltd | Springfield | 42% | Springfield E52/3466 Partial Surrender Report for the period ending 09/03/2023 |
| A136986 | 2023 | Sandfire Resources Limited | Neds Creek | <1% | E 52/1674 Neds Creek Project Surrender Report for the period ending 30/08/2023. |
| A137181 | 2023 | Aic Mines Limited | Curara Well | 50% | Curara Well E52/3488-3489 Final Surrender Report for the period ending 14/05/2023 |
| A132572 | 2022 | Aic Mines Limited | Thaddona Hill | <1% | Annual Technical Report C53/2017 Thaddona Hill Project for the period ending 25/07/2022 |
| A130019 | 2022 | Aic Mines Limited | Three Rivers | <1% | Final Surrender Report - E52/3320 Three Rivers Project for the period ending 19/12/2021. |
| A130291 | 2022 | Aic Mines Limited | Curara Well | 2% | C14/2019 Annual Technical Report Curara Well Project for the period ending 31/12/2021. |
| A130908 | 2022 | Aic Mines Limited | Marymia | <1% | E52/3346 - Final Surrender Report Marymia project for the period ending 19/05/2022. |
| A131442 | 2022 | Sandfire Resources Limited | Doolgunna | <1% | E52/3347 Doolgunna EFI Project Partial Surrender Report for the period 15 July 2016 to 14 July 2022 |
| A126651 | 2021 | Aic Mines Limited | Beyondie | 3.1% | Curara Well Annual Report C14/2019 for the period ending 31 December 2020 |
| A128652 | 2021 | Aic Mines Limited | Thaddona Hill | <1% | Thaddona Hill C53/2017 Annual Technical Report for the period ending 25/07/2021 |
| A128763 | 2021 | Aic Mines Limited | Marymia | <1% | E52/3743 – Annual Technical Report Marymia project for the period 10 September 2020 to 9 September 2021. |
| A122285 | 2020 | Paranoid Enterprises Pty Ltd | Doolgunna | <1% | Surrender Report on Doolgunna Project E52/3576, 21 November 2018 to 29 August 2019 |
| A122726 | 2020 | Sandfire Resources Nl | Springfield | 13% | C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2018 to 24 November 2019, E52/0 |
| A123075 | 2020 | Aic Mines Limited | Curara Welll | 3.1% | Curara Well C14/2019 Annual Technical Report for the period 1 January 2019 to 31 December 2019 |
| A124404 | 2020 | Sandfire Resources Limited | Neds Creek | 12% | C144/2005 Ned’s Creek Project Combined Annual Technical Report for the period ending 11/05/2020 |
| A124910 | 2020 | Sandfire Resources Limited | Doolgunna | <1% | Doolgunna EFI Project E52/3347 Partial Surrender Mineral Report for the period ending 21/07/2020 |
| A125205 | 2020 | Sandfire Resources Limited | Doolgunna EFI | <1% | Doolgunna EFI Project C213/2008 Annual Report for the period ending 09/09/2020 |
| A125207 | 2020 | Aic Mines Limited | Thaddona Hill | <1% | Thaddona Hill C53/2017 Annual Report for the period ending 9 August 2020 |
| A121641 | 2019 | Sandfire Resources Nl | Doolgunna EFI | <1% | Doolgunna EFI Project C213/2008 Annual Report for the period 10 September 2018 to 9 September 2019 |
| A119132 | 2019 | Sandfire Resources Nl | Springfield | 13% | Springfield Project C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2017 to 24 |
| A119455 | 2019 | Aic Resources Limited | Curara Well | 3.1% | Annual Report CR14/2019 Curara Well Project for the period 1 January 2018 to 31 December 2018, E52/03069, E52/ |
| A120649 | 2019 | Sandfire Resources Nl | Ned's Creek | 12% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the period 12 May 2018 to 11 May 2019 |
| A120703 | 2019 | Aic Resources Limited | Thadoona | <1% | Annual Report for C53/2017 Thadoona project for the period 27 July 2018 to 26 July 2019 |
| A121615 | 2019 | Vango Mining Limited | Ned's Creek | <1% | Ned's Creek C212/2010 Annual report for the period 12 September 2018 to 11 September 2019, E 52/02440, E 52/02 |
| A122156 | 2019 | Ora Gold Limited | Curara Well | 3.7% | Surrender Report on E52/2402 (Curara Well Project) for the period 11 June 2010 to 15 November 2019 |
| A115945 | 2018 | Sandfire Resources Nl; Talisman Mining Ltd | Springfield | 13% | C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2016 to 24 November 2017, E52/0 |
| A117323 | 2018 | Sandfire Resources Nl | Ned's Creek | 12% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the Period 12 May 2017 to 11 May 2018, E52/ |
| A117485 | 2018 | Aic Resources Limited | Thadoona | <1% | Annual Report on Explorations Activies for C53/2017, Thadoona, 27 July 2017 - 26 August 2018 |
| A118149 | 2018 | Sandfire Resources Nl | Doolgunna EFI | <1% | Annual Report for the Doolgunna EFI Project C213/2008 For the Period 10 September 2017 to 9 September 2018 |
| A118596 | 2018 | Lodestar Minerals Limited | Ned's Creek | <1% | Annual Report for the Ned's Creek Project, C212/2010, 12 September 2017 - 11 September 2018 |
| A116451 | 2018 | Venus Metals Corporation Limited | Curara Well West | <1% | Annual Report E52/3320 Curara Well West Project for the period 20/12/2016 - 19/12/2017 |
| A117246 | 2018 | Thundelarra Exploration Ltd | Curara Well | 3.7% | Annual Technical Report on E52/2402 Curara Well Project for the period 11 June 2017 to 10 June 2018, Peak Hil |
| A118039 | 2018 | Attgold Pty Ltd | Corktree West | <1% | Corktree West Project E52/02868 Annual Report for the period 25 July 2017 to 24 July 2018 |
| A112045 | 2017 | Attgold Pty Ltd | Corktree West | <1% | Annual Technical Report E52/02868 Corktree West Project for the period 25 July 2015 to 24 July 2016 |
| A112046 | 2017 | Sandfire Resources Nl | Springfield | 13% | Springfield C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2015 to 24 November |
| A114356 | 2017 | Sandfire Resources Nl | Ned's Creek | 12% | C144/2005 Ned’s Creek Project Combined Annual Technical Report For the Period 12 May 2016 to 11 May 2017, E52/ |
| A115159 | 2017 | Sandfire Resources Nl | Doolgunna - EFI | <1% | Doolgunna - EFI C213/2008 Combined Annual Mineral Exploration Report for the period 10 September 2016 to 9 Sep |
| A115417 | 2017 | Lodestar Minerals Ltd | Neds Creek | <1% | Neds Creek C212/2010 Annual Report for the period 12 September 2016 to 11 September 2017, E52/02440, E52/02456 |
| A114237 | 2017 | Thundelarra Limited | Curara Well | 3.7% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11 June 2016 to 10 June 2017, Peak Hi |
| A114877 | 2017 | Attgold Pty Ltd | Corktree West | <1% | Annual Technical Report, Corktree West Project, E52/2868 for the period 25/07/2016 - 24/07/2017 |
| A115009 | 2017 | Aic Resources Limited | Marymia | <1% | Annual Report for Thadoona Group of Tenements C53/2017, E52/03317, E52/03318, E52/03319, E52/03346 for the per |
| A107735 | 2016 | Sandfire Resources Nl | Springfield | 15% | Springfield E52/2282 Partial Surrender Report for the period 25 November 2009 to 20 November 2015 |
| A108249 | 2016 | Top Iron Pty Ltd | Doolgunna | <1% | Annual Report on Doolgunna Project E52/3006 For the Period 25/11/2014 to 24/11/2015 |
| A108310 | 2016 | Sandfire Resources Nl | Ned’s Creek | 14% | Ned’s Creek Project E52/2405 Partial Surrender Report 06/04/2010 to 11/02/2016 |
| A108910 | 2016 | Thundelarra Limited | Curara Well | 3.7% | PARTIAL SURRENDER REPORT For the Period 11 June 2009 to 10 June 2016 CURARA WELL Partial Surrender Report on E |
| A108944 | 2016 | Sandfire Resources Nl | Springfield | 79% | Springfield Project E52/2466 Partial Surrender Report for the Period 06/04/2010 to 31/03/2016 |
| A109553 | 2016 | Thundelarra Limited | Curara Well | 3.7% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2015 to 10 June 2016, Peak Hil |
| A110507 | 2016 | Lodestar Minerals Limited | Ned's Creek | <1% | Ned's Creek Project C212 Annual Report for the period 12 September 2015 to 11 September 2016, E52/02440, E52/0 |
| A110777 | 2016 | Top Minerals Ltd | Doolgunna | <1% | Annual Report on Doolgunna Project 52/3006 25 November 2015 to 24 November 2016 |
| A107989 | 2016 | Sandfire Resources Nl | Springfield | 13% | Springfield C97/2010, E52/2313, E52/2466, E52/2282 Combined Annual Mineral Exploration Report for the period 2 |
| A109385 | 2016 | Sandfire Resources Nl | Ned's Creek | 12% | C144/2005 Ned’s Creek Project Combined Annual Technical Report for the period 12/05/2015 to 11/05/2016, E52/01 |
| A104392 | 2015 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Neds Creek | <1% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12th September 2013 to 11th |
| A104797 | 2015 | Sandfire Resources Nl | Springfield | 13% | Springfield Project (C97/2010) E52/2313, E52/2466, E52/2282 Annual Mineral Exploration Report for the period 2 |
| A105932 | 2015 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404, E52/2406 Combined Surrender Report C166/2012 for the period 10th June 2010 to 9th |
| A106213 | 2015 | Sandfire Resources Nl | Ned’s Creek | 12% | Ned’s Creek C144/2005, E52/1673, E52/1674. E52/1858, E52/2356, E52/2357, E52/2405 Combined Annual Report for t |
| A107126 | 2015 | Attgold Pty Ltd | Corktree West | <1% | Annual Technical Report, Corktree West Project, E52/2868, for the period 25 July 2014 to 24 July 2015, Peak Hi |
| A107487 | 2015 | Lodestar Minerals Limited | Peak Hill - Doolgunna - Neds Creek | <1% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12/09/2014 to 11/09/2015, E5 |
| A106182 | 2015 | Thundelarra Limited | Curara Well | 3.7% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2014 to 10 June 2015, Peak Hil |
| A101119 | 2014 | Talisman Mining Ltd | Springfield | 13% | Springfield Project, Annual Report for the period 25/11/2012 to 24/11/2013, E52/2282, 2313, 2466. [C97/2010] |
| A101168 | 2014 | Lodestar Minerals Ltd | Peak - Doolgunna - Marymia | <1% | Peak / Doolgunna / Marymia Project (C213/2010) Final Surrender Report E52/2505 for the period 12th September 2 |
| A102561 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 5.4% | Plutonic Project, Final Surrender Report for M52/657 from 21/01/1998 to 26/02/2013 |
| A102562 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 6.5% | Plutonic Project, Final Surrender Report for the period 21/01/1998 - 26/01/2013, M52/658. |
| A102869 | 2014 | Thundelarra Exploration Ltd | Curara Well | 3.7% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11 June 2013 to 10 June 2014, Peak Hi |
| A103001 | 2014 | Sipa Exploration Nl | Thaduna | 12% | THADUNA PROJECT E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 ANNUAL REPORT COVERING THE PERIOD |
| A103095 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404, E52/2406 Combined Annual Report C166/2012 for the period 1st July 2013 to 30th Jun |
| A101167 | 2014 | Lodestar Minerals Ltd | Maymia | <1% | Partial Surrender Report for Marymia Project E52/2493 for the period 17th September 2012 to 25th October 2013 |
| A103886 | 2014 | Sipa Exploration Nl | Thaduna | <1% | Partial Surrender Report for the Period 17 November 2009 to 27 October 2014, Thaduna Project E52/2357, C144/20 |
| A96999 | 2013 | Thundelarra Exploration Ltd | Doolgunna | 3.6% | Doolgunna (JV) Project, Annual Report for the period 6th November 2011 to 5th November 2012, E52/2402 ; M52/59 |
| A97128 | 2013 | Dampier Gold Ltd | Plutonic Dome | <1% | Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/ |
| A97675 | 2013 | Dampier Gold Ltd | Plutonic Dome | <1% | Combined Surrender Report Plutonic Dome Project C226/2011 for the period ending 26/02/2013 |
| A98659 | 2013 | Sipa Exploration Nl | Thaduna | 12% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 Annual Report covering the report |
| A98732 | 2013 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404, E52/2406 Combined Annual Report (C166/2012) for the period 10th June 2012 to 9th J |
| A98809 | 2013 | Thundelarra Exploration Ltd | Curara Well | 3.7% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2012 to 10 June 2013, Peak Hil |
| A99878 | 2013 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Marymia | <1% | Peak Hill - Doolgunna - Marymia (C213/2010) E52/2492, E52/2493, E52/2505, E52/2734 Annual Report for the perio |
| A92542 | 2012 | Thunderlarra Exploration Ltd | Doolgunna | 3.6% | Doolgunna Project, Annual Report for the period 6th November 2010 to 5th November 2011, M52/597; E52/2402. ( |
| A92783 | 2012 | Talisman Mining Ltd | Springfield | 13% | Annual Exploration Report for the period 25 November 2010 to 24 November 2011, Springfield Combined Reporting |
| A93152 | 2012 | Dampier Gold Ltd | Plutonic Dome | <1% | Combined Annual Report for the period 1 January 2011 to 31 December 2011 Plutonic Dome Project C226/2011 |
| A94113 | 2012 | Sipa Exploration Nl | Thaduna | 12% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 annual report covering the period |
| A96076 | 2012 | Lodestar Minerals Ltd | Marymia | <1% | Marymia Project, C213/2010, Annual Report for period 12th September 2011 to 1th September 2012. |
| A96770 | 2012 | Talisman Mining Ltd | Springfield | 13% | Springfield Project, Annual Report for the period 25th November 2011 to 24th November 2012, E52/2313, E52/2466 |
| A94824 | 2012 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404 Annual Report For the Period 10th June 2011 to 9th June 2012 |
| A89066 | 2011 | Thunderlarra Exploration Ltd | Doolgunna | 3.6% | Annual Technical Report, Doolgunna Project, Combined Annual Report C102/2010, M52/597 & E52/2402, For the peri |
| A89154 | 2011 | Talisman Mining Ltd | Springfield | 13% | Springfield, Annual Exploration Report for the period 25 November 2009 to 24 November 2010 (C97/2010) |
| A89778 | 2011 | Barrick (Plutonic) Ltd | Plutonic - Marymia | <1% | Marymia Project, Plutonic Project, Plutonic Extended Project, Freshwater Project, Annual Report, Period 1 Janu |
| A90160 | 2011 | Sipa Exploration Nl | Thaduna | 12% | Thaduna Project, Co-Funded Drilling Report for the period ending 30/06/2011, E52/1673,1674, 1858, 2356, 2357,& |
| A90896 | 2011 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404 Annual Report for the period 10th June 2010 to 9th June 2011 |
| A90997 | 2011 | Sipa Exploration Nl | Thaduna | 12% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356 (provisional inclusion), E52/2357 (provisional inclusio |
| A92371 | 2011 | Lodestar Minerals Ltd | Marymia | <1% | MARYMIA PROJECT TENEMENTS E52/2492, E52/2493, E52/2505, E69/2662, 52/2544, 52/2558 ANNUAL TECHNICAL REPORT YEA |
| A86710 | 2010 | Barrick (Plutonic) Ltd | Plutonic / Marymia | <1% | 6490 MARYMIA PROJECT 6520 PLUTONIC PROJECT 6523 PLUTONIC EXTENDED Project 6530 FRESHWATER PROJECT ANNUAL REPO |
| A87651 | 2010 | Sipa Exploration Nl | Thaduna | 12% | Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356 (provisional inclusion), E52/2357 (provisional inclusio |
| A81452 | 2009 | Peak Resources Ltd | DOOLGUNNA | 7.6% | Doolgunna Project Surrender Report on Exploration 29th October 2004 to 24th October 2008 E52/1650, E52/1661 & |
| A82894 | 2009 | Sipa Exploration Nl | THADUNA | 19% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 (C144/2005) ANNUAL REPORT COVERING THE PERIOD MAY 12 2008 TO MAY |
| A81899 | 2009 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | <1% | PROJECT 6490 MARYMIA PROJECT, PROJECT 6520 PLUTONIC PROJECT, PROJECT 6523 PLUTONIC EXTENDED PROJECT, PROJECT 6 |
| A78498 | 2008 | Peak Resources Ltd | Doolgunna | 7.6% | Doolgunna - Annual Report on Exploration Report Period:1st March 2007 to 28th February 2008 E52/1650, E52/1661 |
| A79008 | 2008 | Sipa Exploration Nl | Thaduna | 19% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 PARTIAL SURRENDER REPORT C144/2005 (Peak Hill) |
| A77831 | 2008 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | <1% | Annual Report Period 1 January 2007 - 31 December 2007 Technical Report No. 1257 Plutonic/ Marymia Project |
| A78193 | 2008 | Sipa Exploration Nl | Thaduna | 19% | THADUNA PROJECT E52/1673, E52/1674 & E52/1858 ANNUAL REPORT COVERING THE PERIOD MAY 12 2007 TO MAY 11 2008 |
| A78511 | 2008 | Peak Resources Ltd | Doolgunna | 14% | Doolgunna Project, Partial Surrender Report for the period 29th October 2004 to 28th October 2007, E52/1650. |
| A74149 | 2007 | Peak Resources Ltd | Doolgunna | 2.7% | Doolgunna Project E52/1661 Annual Report for the Period 27th Oct 2005 to 26th Oct 2007 (Peak Hill) |
| A74147 | 2007 | Peak Resources Ltd | Doolgunna | 14% | Doolgunna Project E52/1650 Annual Report for the Period 29th Oct 2005 - 28th Oct 2006 (Peak Hill) |
| A74697 | 2007 | Barrick Gold Of Australia Ltd | Marymia/ Plutonic | <1% | Marymia/ Plutonic Project C94/1999 Annual Report Period 1 January 2006 - 31 December 2006 (Peak Hill) |
| A75173 | 2007 | Sipa Exploration Nl | Thaduna | 19% | Thaduna Project, E52/1673, E52/1674 & E52/1858, Annual Report, Covering the Period May 12 2006 to May 11 2007. |
| A75252 | 2007 | Peak Resources Ltd | Doolgunna | 7.6% | Annual Report - C6/2007, 1st Anniversary - 28th February 2007, Doolgunna, E52/1650, E52/1661, E52/1838. |
| A72015 | 2006 | Barrick Gold Of Australia Ltd | Marymia, Plutonic, Plutonic Extended & F | <1% | Marymia, Plutonic, Plutonic Extended & Freshwater Projects, Annual Report, Period 1 January 2005 to 31 Decembe |
| A72784 | 2006 | Sipa Exploration Nl | Thaduna | 19% | Thaduna Project E52/1673,1674,1858, Annual Report Covering the Period 12 May 2005 to 11 May 2006(but including |
| A72154 | 2006 | Mr Hocking Jc | Doolgunna | 14% | Doolgunna Project, Annual Report for the Period 29 October 2004 to 28 October 2005, E52/1650, (Peak Hill). |
| A70185 | 2005 | Barrick Gold Of Australia Ltd | Plutonic/ Marymia | <1% | Annual Report Period 1 January 2004 to 31 December 2004 Technical Report No. 1152 Projects 6490 - Marymia, 652 |
| A70948 | 2005 | Sipa Exploration Nl | Thaduna | <1% | Thaduna Project, E52/1673 & E52/1674, Annual report (covering the period May 12 2004 to May 11 2005). (Peak Hi |
| A68298 | 2004 | Barrick Gold Of Australia Ltd | Marymia / Plutonic / Plutonic Extended / | <1% | Annual Report for the period 01/01/2003-31/12/2003 Marymia Project,Plutonic Project,Plutonic Extended Project, |
| A66308 | 2003 | Barrick Gold Of Australia Ltd | Plutonic | <1% | Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523 |
| A64818 | 2002 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | <1% | Plutonic/Marymia M52/148-150, M52/170-171, M52/183, M52/185 M52/217-220, M52/222-223, M52/226-235, M52/246-247 |
| A65476 | 2002 | Rio Tinto Exploration Pty Ltd | Doolgunna | 52% | Annual And Final Report For The Period Ending 7 December 2001 E52/1420 Doolgunna, Peak Hill SG50-08 Western Au |
| A64505 | 2002 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | <1% | Annual Report Period 1 January 2001 - 31 December 2001. Vertification Report Technical Report No. 1024. Projec |
| A63961 | 2001 | Rio Tinto Exploration Pty Ltd | Kayak | 2.3% | Fourth Annual Report for the period ending 10th September 2001 E52/1239, Kayak, Diamonds programme. Peak Hill |
| A62434 | 2001 | Rio Tinto Exploration Pty Ltd | Doolgunna | 52% | First Annual Report for the Period ending 12th December 2000 E52/1420, Doolgunna Peak Hill SG50-08, Western Au |
| A62465 | 2001 | Homestake Gold Of Australia Ltd | Marymia | <1% | Project 6490 Marymia Project 6520 Plutonic Project 6523 Plutonic Extended Project 6530 Freshwater M52/148-150, |
| A63820 | 2001 | Rio Tinto Exploration Pty Ltd | Northern Star | 7.1% | Fourth Annual Report on the North Star JV exploration licence E52/1226 (Sakaldis) for the period ending 27/07/ |
| A60012 | 2000 | Homestake Gold Of Australia Ltd | Plutonic/ Marymia | <1% | Project 6490,Marymia, Project 6520, Plutonic, Project 6523, Plutonic Extended, Project 6530, Freshwater, M52/1 |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A60985 | 2000 | Rio Tinto Exploration Pty Ltd | North Star | 7.1% | Partial Relinquishment Report on the North Star JV Exploration Licence E52/1226(Sakaldis) for the Period endin |
| A61219 | 2000 | Rio Tinto Exploration Pty Ltd | Sakaldis | 7.1% | Third Annual Report on the North Star JV Exploration Licence E52/1226 (Sakaldis) for the Period Ending 27/07/2 |
| A61570 | 2000 | Rio Tinto Exploration Pty Ltd | North Star | 2.3% | Third Annual report for the period ending 10/09/2000, E52/1239, Kayak, Peak Hill SG50-08, Western Australia, P |
| A57727 | 1999 | Homestake Gold Of Australia Ltd | Marymia | <1% | Marymia Exploration - Project 6490 - Technical Report No.812 01/01/98 - 31/12/98 M52/183, 185, 217-220, 226-23 |
| A59117 | 1999 | Haoma Mining Nl | Marymia | 3.1% | Tenement E52/1153 Marymia Region Annual Report for the period June 1998 to June 1999 |
| A59104 | 1999 | Rio Tinto Exploration Pty Ltd | Doolgunna | 7.1% | Second Annual Report on Exploration for Diamonds on North Star JV Exploration Licence E51/1225 (Sakalidis) for |
| A59118 | 1999 | Haoma Mining Nl | Marymia | 3.1% | Tenement E52/1153-Marymia Region Partial Relinquishment Report-June 1999 |
| A59248 | 1999 | Rio Tinto Exploration Pty Ltd | North Star | 2.3% | Second Annual Report on Exploration for Diamods on North Star Joint Venture, Exploration Licence E52/1239 (Kay |
| A54915 | 1998 | Resolute Ltd | Orient Well | <1% | Orient Well JV E52/824 E52/826 M52/572 M52/657 M52/658 MLA52/697 Annual report on Exploration for the period |
| A55849 | 1998 | Resolute Ltd | Marymia | <1% | Marymia Gold Project - 06/1998 Three Year Proposed Exploration Program E52/634-635, 747, 823-826, 1052 |
| A55893 | 1998 | Haoma Mining Nl | Marymia/Yandal | 3.1% | Marymia/Yandal, Exploration Licence: 52/1153, 04/06/97 - 03/06/98 |
| A56279 | 1998 | North Star Resources Nl | Doolgunna | 2.3% | Doolgunna Project Exploration Licence E52/1239 :Kayak", Peak Hill Mineral Field Western Australia. |
| A56320 | 1998 | North Star Resources Nl | Doolgunna | 7.1% | North Star Resources N.L., Doolgunna project, Exploration Licence E52/1226, Sakalidis, Peak Hill Mineral Field |
| A50980 | 1997 | Plutonic Operations Ltd | Mystery Well | 48% | Mystery Well Project, Surrender Report E52/1067, April 1997. |
| A47535 | 1996 | Resolute Samantha Ltd | Orient Well | 15% | Orient Well Joint Venture E52/614 E52/824 E52/825 E52/826 Annual report December 1995 |
| A44223 | 1995 | Resolute Resources Ltd | Orient Well | 15% | Orient Well Joint Venture E52/614 E52/823 E52/824 E52/825 E52/826 Report on Exploration to December 1994 |
| A45100 | 1995 | Marymia Exploration Nl | Orient Well | 28% | Orient Well Prospect Exploration Licence 52/614 Annual Report on Exploration For the year ended 26th March 199 |
| A38270 | 1993 | Marymia Exploration Nl | Orient Well | 28% | Annual Report for the period 27/03/93-26/03/93 Orient Well Project E52/614 |
| A9871 | 1981 | Chevron Exploration Corp | Ned's Creek | 9.5% | Ned's Creek Project, Non-statutory Report: Final Report, September 1981, TR70/7492H. |
| A7406 | 1977 | Amax Exploration Aust Inc | Beering Unna Tank | 7.2% | Beering Unna Tank Project, Non-statutory Report: Final Report , December 1977, TR70/6405H. |
| A1747 | 1971 | Western Mining Corporation Ltd | Thaduna | 8.2% | Thaduna Project, Non-statutory Report: Pecussion Drill Assay & Log Sheets, June 1971, TR70/5439 & 5440H. |
| A1735 | 1971 | Western Mining Corporation Ltd | Thaduna | 9.9% | Thaduna Project, Non-statutory Report: Vacuum Drill Assay Sheets, File 2, June 1971, TR70/5439H. ( Vol 2) |
| A1744 | 1971 | Western Mining Corporation Ltd | Thaduna | 9.9% | Thaduna Project, Non-statutory Report: Vacuum Drill Hole Assay Sheets MJV612- MJV646 inc., June 1971, TR70/543 |
| A1734 | 1971 | Western Mining Corporation Ltd | Thaduna | 9.9% | Thaduna Project, Non-statutory Report: Soil Sampling at Well 8, June 1971, TR70/5439H. |
| A1746 | 1971 | Western Mining Corporation Ltd | Thaduna - Good Pool | 8.2% | Thaduna - Good Pool Project, Non-statutory Report: Soil Sampling at Good Pool, June 1971, TR70/5439 & 5440H. |
| A1748 | 1971 | Western Mining Corporation Ltd | Thaduna | 8.2% | Thaduna Project, Non-statutory Report: Geochemical Data Plans, June 1971, TR70/5439 & 5440H. |
| A1749 | 1971 | Western Mining Corporation Ltd | Thaduna - Red Bore | 8.2% | Thaduna - Red Bore Project, Non-statutory Report: Vacuum Drillilng Traverses,for period ending 01/03/1971, TR7 |
| A1750 | 1971 | Western Mining Corporation Ltd | Thaduna | 8.2% | Thaduna Project, Non-statutory Report: Final Report for the period 01/02/1969 to 31/01/1970, TR70/5439 & 5440H |
| A9473 | 1971 | Western Mining Corporation Ltd | Thaduna | 7.2% | Thaduna Project, Non-statutory Report: Terminal Report for the period 21/02/1969 to 30/03/1971, TR70/5439 & 54 |
| A124 | 1971 | Western Mining Corporation Ltd | Thaduna | 6.9% | Thaduna Report |
| A9504 | 1970 | Western Mining Corporation Ltd | Thaduna | 7.2% | Thaduna Project, Non-statutory Report:Report on Rock & Ironstone Assays, September 1970, Tr70/5439-5440H; MC5 |
| A47550 | 1753 | Marymia Exploration Nl | Orient/ Marymia | 28% | Annual report for Exploration Licence E52/614 Orient Well for the period 27th March 1995 to 26th March 1996 |
| A51329 | 1753 | Resolute Ltd | Orient Well | 15% | Orient Well Joint Venture E52/1018 E52/614 E52/823 to E52/826 Annual report 1st January 1996 to 31st December |
| A131754 | Sandfire Resources Limited | Monty, Doolgunna | 9.3% | Downhole drilling data for donated drillholes |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 9 June 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4334 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4334? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.