NextMaps›WA Tenements›E 52/4394

E 52/4394

LiveExploration LicenceShire of MeekatharraPeak Hill M.F. District

E 52/4394 is a live exploration licence in the Shire of Meekatharra, Western Australia, held by Core Value Australia Nl. Granted on 3 July 2026 for 5 years, it expires on 2 July 2031. The ground is covered by 129 historical WAMEX reports.

Area
5,579.339ha
Expires
July 2031
in 5 years
WAMEX reports
129
WA median is 53
Report drilling
73
of 129 reports
Free Tenure Pack for E 52/4394
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 52/4394 that covers 129 WAMEX reports · 876 open-file drillholes (25,717 m drilled) · 38 earlier titles on the ground since 1958 · 2 native title claims and 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Meekatharra Explore on the live map

Register summary

Holder
Core Value Australia Nl
Local government
Shire of Meekatharra
Application received
25 Sept 2024
Commenced
3 July 2026
Expiry
2 July 2031
Term
5 Years

The full record on E 52/4394

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares (no change of holder on record)
  • The full record: 1 year of expenditure, 8 conditions and 16 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (1 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

129 historical WAMEX exploration reports intersect E 52/4394: 71 report geochemistry or sampling, 88 include a digital data package.
Work on record: RC drilling 42 · Rock chip sampling 42 · Aircore drilling 29 · Soil sampling 29 · Diamond drilling 25 · Aerial magnetic surveys 21. Resource declared in A105239 (2015), A101570 (2013), A81899 (2009), A77831 (2008) and 4 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on E 52/4394, free for new accounts.
When this ground was worked · 126 of 129 reports dated
21980s
341990s
232000s
512010s
162020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A146194 2025 Sultan Resources Ltd Thaduna <1% Annual Technical Report for Thaduna E52/3481 for the period 1 August 2023 to 31 July 2024
A138794 2024 Sandfire Resources Limited Ned’s Creek 9% E 52/1858, E 52/2356 and E 52/2405 ‘Ned’s Creek” Surrender Report for the period ending 16/01/2024
A143184 2024 Sandfire Resources Limited Ned’s Creek <1% E 52/1673, E 52/2357, E 52/3187, E 52/3188 ‘Ned’s Creek” Surrender Report 2024
A143960 2024 Sandfire Resources Limited Neds Creek 33% E52/3479 Ned’s Creek Surrender Report 3 July 2017 to 10 July 2024
A133977 2023 Lodestar Minerals Limited; Vango Mining Limited Ned's Creek 42% Combined Annual Report C181/2017 Ned's Creek Project for the period ending 30/12/2022
124 more reports
A137075 2023 Sultan Resources Ltd Thaduna <1% Annual Technical Report for the Thaduna Project E52/3481 for the period ending 31/07/2023.
A129941 2022 Vango Mining Limited Yowereena 42% Combined Annual Report for the Yowereena C181/2017 for the period ending 30/12/2021
A132387 2022 Sandfire Resources Ltd Neds Creek 33% E52/3479 Neds Creek Project Partial Surrender Report 3 July 2017 to 5 August 2022
A133103 2022 Sandfire Resources Limited Neds Creek 33% E52/3479 Neds Creek Project Partial Surrender Report for the period 3/7/2017 to 11/10/2022
A133155 2022 Sultan Resources Ltd Thaduna <1% Annual Technical Report - Thaduna Project C131/2018 for the period ending 31/07/2022
A126206 2021 Vango Mining Limited Yowereena 42% Combined Annual Report for the Yowereena tenements C181/2017 for the period ending 30/12/2020
A128980 2021 Sultan Resources Ltd Thaduna <1% Annual Exploration Report: Thaduna Project C131/2018 for the period 1 August 2020 to 31 July 2021, E 52/03481,
A123275 2020 Vango Mining Limited Yowereena 42% Combined Annual Report for the Yowereena tenements, C181/2017, 31 December 2018 to 30 December 2019
A124404 2020 Sandfire Resources Limited Neds Creek 4.4% C144/2005 Ned’s Creek Project Combined Annual Technical Report for the period ending 11/05/2020
A125597 2020 Sultan Resources Ltd Thaduna <1% Annual Exploration Report Thaduna Project C131/2018 for nthe period ending 31/7/2020
A124816 2020 Norwest Minerals Limited Marymia <1% Annual Technical Report C144/2010, E52/02394, E52/02395 for the period ending 15 June 2020
A120649 2019 Sandfire Resources Nl Ned's Creek 4.4% C144/2005 Ned’s Creek Project Combined Annual Technical Report For the period 12 May 2018 to 11 May 2019
A121615 2019 Vango Mining Limited Ned's Creek <1% Ned's Creek C212/2010 Annual report for the period 12 September 2018 to 11 September 2019, E 52/02440, E 52/02
A121820 2019 Sultan Resources Ltd Thaduna <1% Combined Annual Technical Report for E52/3481, E52/3461 Thaduna project for the period 1 August 2018 to 31 Jul
A119249 2019 Lodestar Minerals Ltd Yowereena 42% Combined Annual Report for the Yowereena tenements C181/2017 for the period 31 December 2017 to 30 December 20
A120762 2019 Australian Mines Limited Marymia <1% Annual Technical Report C144/2010 Marymia Project for the period 16 June 2018 to 15 June 2019, E52/02394, E52/
A118635 2018 Lodestar Minerals Limited Ned's Creek - Contessa <1% E52/02456 (Contessa) EIS Co-Funded Drilling Report for the period 1 January 2018 to 31 December 2018 (R#16)
A115939 2018 Lodestar Minerals Limited Yowereena 42% Combined Annual Report for Yowereena C181/2017 For the Period 31 December 2016 to 30 December 2017, M52/00779,
A117323 2018 Sandfire Resources Nl Ned's Creek 4.4% C144/2005 Ned’s Creek Project Combined Annual Technical Report For the Period 12 May 2017 to 11 May 2018, E52/
A117685 2018 Australian Mines Limited Marymia <1% Australian Mines Limited, Annual Technical Report, C 144/2010, Marymia Project, 16 June 2017 - 15 June 2018
A118596 2018 Lodestar Minerals Limited Ned's Creek <1% Annual Report for the Ned's Creek Project, C212/2010, 12 September 2017 - 11 September 2018
A110839 2017 Lodestar Minerals Limited Neds Creek <1% Partial Surrender Report for E52/2456 17 September 2010 to 18 October 2016
A114248 2017 Gswa P729 and P779 <1% Petrophysical Measurements P729 and P779
A114356 2017 Sandfire Resources Nl Ned's Creek 4.4% C144/2005 Ned’s Creek Project Combined Annual Technical Report For the Period 12 May 2016 to 11 May 2017, E52/
A114385 2017 Australian Mines Limited Yowereena Hill <1% Yowereena Hill Project C144/2010 Annual Report for the period 16 June 2016 to 15 June 2017, E52/02395, E52/023
A115417 2017 Lodestar Minerals Ltd Neds Creek <1% Neds Creek C212/2010 Annual Report for the period 12 September 2016 to 11 September 2017, E52/02440, E52/02456
A115529 2017 Lodestar Minerals Limited Neds Creek - Contessa <1% EIS Co-funded drilling - Final Report 2017 (R 14) NEDS CREEK - CONTESSA E52/02456 for the period 12 September
A108309 2016 Sandfire Resources Nl Ned’s Creek 38% Ned’s Creek Project E52/2356 Partial Surrender Report for the period 15/02/2010 to 11/02/2016
A109237 2016 Australian Mines Limited Marymia <1% Marymia Project Partial Surrender Report C144/2010, E52/02394, E52/02395 for the period 16 June 2010 to 15 Jun
A109385 2016 Sandfire Resources Nl Ned's Creek 4.4% C144/2005 Ned’s Creek Project Combined Annual Technical Report for the period 12/05/2015 to 11/05/2016, E52/01
A108310 2016 Sandfire Resources Nl Ned’s Creek <1% Ned’s Creek Project E52/2405 Partial Surrender Report 06/04/2010 to 11/02/2016
A108647 2016 Vango Mining Limited Plutonic Dome 23% E52/527 Final Surrender Report for the period 03/07/1992 to 31/12/2015
A109587 2016 Australian Mines Limited Marymia <1% Marymia Project C144/2010, E52/02394, E52/02395 Annual Report for the period 16 June 2015 to 15 June 2016
A109904 2016 Australian Mines Limited Marymia <1% MARYMIA PROJECT E52/2395 Partial Surrender Report For the Period 31 August 2010 to 30 August 2016
A110507 2016 Lodestar Minerals Limited Ned's Creek <1% Ned's Creek Project C212 Annual Report for the period 12 September 2015 to 11 September 2016, E52/02440, E52/0
A105239 2015 Vango Mining Limited Plutonic Dome 6.1% Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2014 to 31/12/2014, E52/2071....
A106261 2015 Australian Mines Ltd Marymia <1% Marymia Project Annual Report Combined Reporting Group C144/2010 (E52/2394-I and E52/2395) For the period 16-J
A107394 2015 Ord Resources Pty Ltd Plutonic 55% Plutonic Gold Project M52/780 Annual Report for the period 27/09/2014 to 26/09/2015
A107395 2015 Vango Mining Limited Plutonic 13% [Plutonic Project] M52/779 Annual Exploration Report for the period 27/9/2014 – 26/9/2015
A107487 2015 Lodestar Minerals Limited Peak Hill - Doolgunna - Neds Creek <1% Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12/09/2014 to 11/09/2015, E5
A104392 2015 Lodestar Minerals Ltd Peak Hill - Doolgunna - Neds Creek <1% Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12th September 2013 to 11th
A106213 2015 Sandfire Resources Nl Ned’s Creek 4.4% Ned’s Creek C144/2005, E52/1673, E52/1674. E52/1858, E52/2356, E52/2357, E52/2405 Combined Annual Report for t
A104286 2014 Ord River Resources Ltd Plutonic Dome 13% Plutonic Dome Project,  M52/779 ANNUAL EXPLORATION REPORT Reporting Period 27/09/2013 to 26/09/2014
A103001 2014 Sipa Exploration Nl Thaduna 4.4% THADUNA PROJECT E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 ANNUAL REPORT COVERING THE PERIOD
A103054 2014 Riedel Resources Ltd Marymia <1% Marymia Project, Annual Report for the period 16/06/2013 to 15/06/2014, E52/2394 & 2395.
A104287 2014 Ord River Resources Ltd Plutonic 55% Plutonic Project, M52/780 ANNUAL EXPLORATION REPORT Reporting Period 27/09/2013 to 26/09/2014
A100336 2013 Lodestar Minerals Ltd Neds Creek <1% Neds Creek Project, Annual Report for the period 12th September 2012 to 11th September 2013, E52/2440, 2444, 2
A97128 2013 Dampier Gold Ltd Plutonic Dome 5.2% Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/
A98659 2013 Sipa Exploration Nl Thaduna 4.4% Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 Annual Report covering the report
A98761 2013 Riedel Resources Ltd Marymia <1% Marymia Project, Annual Report for the peiod 16th June 2012 to 15th June 2013, E52/2394 & 2395. [C144/2010]
A101570 2013 Ord River Resources Ltd Plutonic Dome 6.1% C226/2011 ANNUAL EXPLORATION REPORT Reporting Period 01/01/2013 to 31/12/2013
A94622 2012 Riedel Resources Ltd Marymia <1% Marymia Project, Annual Report for the period 16th June 2011 to 15th June 2012, E52/2394 & 2395. [C144/2010]
A93152 2012 Dampier Gold Ltd Plutonic Dome 5.2% Combined Annual Report for the period 1 January 2011 to 31 December 2011 Plutonic Dome Project C226/2011
A94113 2012 Sipa Exploration Nl Thaduna 4.4% Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 annual report covering the period
A95982 2012 Lodestar Minerals Ltd Ned's Creek <1% Ned's Creek Project, Annual Report for the period 12th September 2011 to 11th September 2012, E52/2440, 2444,
A89778 2011 Barrick (Plutonic) Ltd Plutonic - Marymia 4.4% Marymia Project, Plutonic Project, Plutonic Extended Project, Freshwater Project, Annual Report, Period 1 Janu
A90160 2011 Sipa Exploration Nl Thaduna 4.4% Thaduna Project, Co-Funded Drilling Report for the period ending 30/06/2011, E52/1673,1674, 1858, 2356, 2357,&
A90997 2011 Sipa Exploration Nl Thaduna 4.4% Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356 (provisional inclusion), E52/2357 (provisional inclusio
A91159 2011 Riedel Resources Ltd Marymia <1% Combined Annual Report Marymia Project C144/2010 For the period 16 June 2010 to 15 June 2011
A92493 2011 Lodestar Minerals Ltd Neds Creek <1% Neds Creek Project E52/2440, E52/2444, E52/2456, E52/2468 Annual Technical Report Year 1 period 12th September
A86710 2010 Barrick (Plutonic) Ltd Plutonic / Marymia 4.4% 6490 MARYMIA PROJECT 6520 PLUTONIC PROJECT 6523 PLUTONIC EXTENDED Project 6530 FRESHWATER PROJECT ANNUAL REPO
A87651 2010 Sipa Exploration Nl Thaduna 4.4% Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356 (provisional inclusion), E52/2357 (provisional inclusio
A82894 2009 Sipa Exploration Nl THADUNA <1% THADUNA PROJECT E52/1673, E52/1674 & E52/1858 (C144/2005) ANNUAL REPORT COVERING THE PERIOD MAY 12 2008 TO MAY
A81899 2009 Barrick Gold Of Australia Ltd Plutonic - Marymia 3.9% PROJECT 6490 MARYMIA PROJECT, PROJECT 6520 PLUTONIC PROJECT, PROJECT 6523 PLUTONIC EXTENDED PROJECT, PROJECT 6
A84710 2009 Magellan Metals Pty Ltd McDonald Well 6.2% FINAL SURRENDER REPORT - E52/2052: MCDONALD WELL
A77831 2008 Barrick Gold Of Australia Ltd Plutonic / Marymia 4.1% Annual Report Period 1 January 2007 - 31 December 2007 Technical Report No. 1257 Plutonic/ Marymia Project
A78193 2008 Sipa Exploration Nl Thaduna <1% THADUNA PROJECT E52/1673, E52/1674 & E52/1858 ANNUAL REPORT COVERING THE PERIOD MAY 12 2007 TO MAY 11 2008
A79008 2008 Sipa Exploration Nl Thaduna <1% THADUNA PROJECT E52/1673, E52/1674 & E52/1858 PARTIAL SURRENDER REPORT C144/2005 (Peak Hill)
A74085 2007 Barrick Gold Of Australia Ltd Gregory Project <1% Gregory Project, E52/1680-1684, E52/1706, E69/1879, (C121/2004), Annual Report for the Period 16 August 2005 t
A75173 2007 Sipa Exploration Nl Thaduna <1% Thaduna Project, E52/1673, E52/1674 & E52/1858, Annual Report, Covering the Period May 12 2006 to May 11 2007.
A74697 2007 Barrick Gold Of Australia Ltd Marymia/ Plutonic 4.1% Marymia/ Plutonic Project C94/1999 Annual Report Period 1 January 2006 - 31 December 2006 (Peak Hill)
A73877 2006 Falcon Minerals Ltd Marymia <1% Marymia Project E52/1687-1688 Annual Report for the Period 17th Oct 2005 to 16th Oct 2006 C197/2006 (Peak Hill
A72015 2006 Barrick Gold Of Australia Ltd Marymia, Plutonic, Plutonic Extended & F 3.4% Marymia, Plutonic, Plutonic Extended & Freshwater Projects, Annual Report, Period 1 January 2005 to 31 Decembe
A72784 2006 Sipa Exploration Nl Thaduna <1% Thaduna Project E52/1673,1674,1858, Annual Report Covering the Period 12 May 2005 to 11 May 2006(but including
A70185 2005 Barrick Gold Of Australia Ltd Plutonic/ Marymia 3.4% Annual Report Period 1 January 2004 to 31 December 2004 Technical Report No. 1152 Projects 6490 - Marymia, 652
A70948 2005 Sipa Exploration Nl Thaduna <1% Thaduna Project, E52/1673 & E52/1674, Annual report (covering the period May 12 2004 to May 11 2005). (Peak Hi
A71168 2005 Placer Dome Asia Pacific Ltd Gregory <1% Gregory Project, Annual Technical Report for the period 16/08/2004 to 15/08/2005, on tenements E52/1680-1684 E
A68298 2004 Barrick Gold Of Australia Ltd Marymia / Plutonic / Plutonic Extended / 3.4% Annual Report for the period 01/01/2003-31/12/2003 Marymia Project,Plutonic Project,Plutonic Extended Project,
A66308 2003 Barrick Gold Of Australia Ltd Plutonic 3.4% Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523
A64505 2002 Barrick Gold Of Australia Ltd Plutonic / Marymia 3.3% Annual Report Period 1 January 2001 - 31 December 2001. Vertification Report Technical Report No. 1024. Projec
A64818 2002 Barrick Gold Of Australia Ltd Plutonic - Marymia 3.3% Plutonic/Marymia M52/148-150, M52/170-171, M52/183, M52/185 M52/217-220, M52/222-223, M52/226-235, M52/246-247
A62465 2001 Homestake Gold Of Australia Ltd Marymia 3.3% Project 6490 Marymia Project 6520 Plutonic Project 6523 Plutonic Extended Project 6530 Freshwater M52/148-150,
A63545 2001 Homestake Gold Of Australia Ltd Marymia 23% Marymia Project, Partial Surrender Report for the period ending 3rd July 2001, E52/527. [C226/2011]
A60012 2000 Homestake Gold Of Australia Ltd Plutonic/ Marymia 3.2% Project 6490,Marymia, Project 6520, Plutonic, Project 6523, Plutonic Extended, Project 6530, Freshwater, M52/1
A60572 2000 Homestake Gold Of Australia Ltd Marymia 2.9% Project 6490, Marymia, Surrender report for M52/355,475, E52/634,747, Partial Surrender Report for M52/356,635
A57727 1999 Homestake Gold Of Australia Ltd Marymia 1.2% Marymia Exploration - Project 6490 - Technical Report No.812 01/01/98 - 31/12/98 M52/183, 185, 217-220, 226-23
A59117 1999 Haoma Mining Nl Marymia 1.8% Tenement E52/1153 Marymia Region Annual Report for the period June 1998 to June 1999
A59118 1999 Haoma Mining Nl Marymia 1.8% Tenement E52/1153-Marymia Region Partial Relinquishment Report-June 1999
A59535 1999 Homestake Gold Of Australia Ltd Marymia 3.8% Marymia Project, Final Surrender Report for the period 16/03/1994 to 02/08/1999, E52/826.[Johnson's Cairn]
A54199 1998 Resolute Ltd Thaduna 2.7% Thaduna Project. E52/634-635,747. M52/355-356,475-477,488-489. Annual report for the period 01/01/97-31/12/97.
A54915 1998 Resolute Ltd Orient Well 2.8% Orient Well JV E52/824 E52/826 M52/572 M52/657 M52/658 MLA52/697 Annual report on Exploration for the period
A55502 1998 Resolute Ltd Thaduna 4.7% Thaduna Project, Partial Surrender Report for the period 20/05/1993 to 20/05/1998, E52/634.
A55635 1998 Mr Milne P Neds Creek <1% Ned's Creek Project E52/1127 Annual Report 27/03/1997 to 26/03/1998
A55849 1998 Resolute Ltd Marymia 1.2% Marymia Gold Project - 06/1998 Three Year Proposed Exploration Program E52/634-635, 747, 823-826, 1052
A55893 1998 Haoma Mining Nl Marymia/Yandal 1.8% Marymia/Yandal, Exploration Licence: 52/1153, 04/06/97 - 03/06/98
A55995 1998 Resolute Ltd Marymia 3.8% Orient Well Joint Venture Exploration Licence E52/826 Partial Surrender Report.
A51536 1997 Marymia Exploration Nl Yowerreena Hill 23% Yowerreena Hill Joint Venture Exploration Licence E52/527 (Sector B) Annual report for the year ending July 19
A51598 1997 Resolute Ltd Marymia 23% [ Marymia base metals - gold - diamond exploration, Annual report for period 1/8/1994 - 1/12/1996, E52/527 ]
A52247 1997 Resolute Ltd Orient Well 3.8% Orient Well (JV) Project, Partial Surrender Report , September 1997, E52/826.
A47535 1996 Resolute Samantha Ltd Orient Well 1.8% Orient Well Joint Venture E52/614 E52/824 E52/825 E52/826 Annual report December 1995
A44223 1995 Resolute Resources Ltd Orient Well 1.7% Orient Well Joint Venture E52/614 E52/823 E52/824 E52/825 E52/826 Report on Exploration to December 1994
A44229 1995 Resolute Resources Ltd Yowereena 23% Exploration Licence E52/527 'Sector A' Yowereena Hill Report on Exploration to July 1994
A46986 1995 Resolute Samantha Ltd Orient Well 3.8% Orient Well Project, Partial Surrender Report February 1995, E52/826.
A45520 1995 Cra Exploration Pty Ltd Ruby Bore gold exploration 23% E52/527 Ruby Bore 24 Annual Report to 2nd July 1995 Peak Hill SG 50-08,Western Australia.
A41787 1994 Marymia Exploration Nl Yowerreena Hill 23% Yowerreena Hill Project, Non-statutory Report : R Report for the period ending 12/93 , E52/527
A40211 1994 Cra Exploration Pty Ltd Ruby Bore 23% Annual report for the period 03/07/92-02/07/93 Ruby Bore Project E52/527
A41650 1994 Cra Exploration Pty Ltd Ruby Bore 23% Annual Report for the period 03/07/93-02/07/94 Ruby Bore Project E52/527
A41789 1994 Marymia Exploration Nl Yowerreena Hill 23% Annual Report for the period 01/94-04/94 Yowerreena Hill Project E52/527
A38054 1993 Resolute Resources Ltd Marymia 6% Annual report for the period 01/92-12/92 Marymia Project
A38549 1993 Resolute Resources Ltd Marymia 2% Marymia Project, E52/352. Partial Surrender Report for the period 16/03/1989 to 12/03/1993, E52/352.
A39402 1993 Marymia Exploration Nl Yowerreena Hill 23% Annual Report for the period 07/92-07/93 Yowerreena Hill Project E52/527
A38124 1993 Cra Exploration Pty Ltd Ruby Bore 4.3% Annual report for the period 09/91-09/92 Ruby Bore Project E51/321 E52/220 E52/222 E52/224 E52/226 E52/527 E52
A38354 1993 Stockdale Prospecting Ltd Peak Hill 2% Annual report for the period 16/03/92-16/03/93 Peak Hill Project E52/352
A39238 1993 Resolute Resources Ltd Area A - Yowereena Hill 23% Area A - Yowereena Hill, Annual report to July 1993, E52/527
A41775 1993 Stockdale Prospecting Ltd Peak Hill 1.9% Annual Report for the period 01/01/92-11/10/93 Peak Hill Project E52/322,342,633-635
A35334 1992 Resolute Resources Ltd Marymia 2% PARTIAL SURRENDER REPORT
A32635 1991 Resolute Resources Ltd Thadoona Hill 2% Progress Report - Thadoona Hill E52/352 Period May 1990 - December 1990
A30779 1990 Resolute Resources Ltd Thadoona Hill 2% Thadoona Hill Exploration Licence E52/352 Technical Report No:10 May 1990. Resoulte Resources Ltd
A32633 1990 Resolute Resources Ltd Marymia <1% Marymia Area WA Interpretation of Aeromagnetic (1990) Data (R Report for 1990; E52/158,320,322,342,352; M52/18
A28050 1989 Resolute Resources Ltd Marymia <1% Marymia Gold Project : Regional review February 1989 E52/288, E52/317, E52/320, E52/322, E52/342 and E52/352 R
A9871 1981 Chevron Exploration Corp Ned's Creek <1% Ned's Creek Project, Non-statutory Report: Final Report, September 1981, TR70/7492H.
A51329 1753 Resolute Ltd Orient Well 1.7% Orient Well Joint Venture E52/1018 E52/614 E52/823 to E52/826 Annual report 1st January 1996 to 31st December
A51627 1753 Resolute Ltd Thaduna 3.3% Thaduna Project E52/635 M52/356 E52/634 Annual report 1st September 1995 to 31st December 1996
A153637 Cr1 Energy Pty Ltd Organic petrography, maturity and gas-co <1% EIS Co-Funded Energy Analysis Program - Analysis and Processing Final Report (Series 8)

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 52/4394 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 52/4394? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.