E 52/4414
Register summary
- Holder
- Tambourah Metals Ltd
- Local government
- Shire of Meekatharra
- Application received
- 28 Nov 2024
- Commenced
- 18 Feb 2025
- Expiry
- 17 Feb 2030
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A142865 | 2024 | Alchemy Resources (Three Rivers) Pty Ltd | Peak Hill | 100% | Peak Hill Project P52/1540 & P52/1541 Final Surrender (16 December 2016 to 30 April 2024) |
| A133892 | 2023 | Bryah Resources Limited | Bryah Basin | 23% | Partial Surrender Report – E52/3401 Bryah Basin for the period ending 21/11/2022 |
| A123202 | 2020 | Billabong Gold Pty Ltd | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 for the period 1 January 2019 to 31 Dec |
| A124043 | 2020 | Bryah Resources Limited | Bryah Basin | 5.1% | Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020 |
| A124560 | 2020 | Westgold Resources Limited | Peak Hill | 1.8% | Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2019 to 2 June 2020.E 52 |
125 more reports
| A124725 | 2020 | Billabong Gold Pty Ltd | P52/1429 | 100% | Final Surrender report P52/1429 for the period 26 July 2012 to 24 July 2020 |
| A119946 | 2019 | Billabong Gold Pty Ltd | Exploration Licence E52/3499 | <1% | Exploration Licence E52/3499 Annual Mineral Exploration Report For the Period 7 March 2018 to 6 March 2019 |
| A120357 | 2019 | Bryah Resources Limited | Bryah Basin | 4.1% | Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03 |
| A120860 | 2019 | Westgold Resources Limited | Peak Hill | 1.7% | Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2018 to 2 June 2019 |
| A119243 | 2019 | Billabong Gold Pty Ltd | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2005 For the Period 1 January 2018 to 31 Dec |
| A117043 | 2018 | Bryah Resources Limited | Bryah Basin | 4.1% | Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323 |
| A115718 | 2018 | Bryah Resources Limited | Peak Hill | 23% | Annual Report E52/3401 Peak Hill Project for the period 28/11/2016 - 28/11/2016 |
| A116042 | 2018 | Billabong Gold Pty Ltd; Independence Group Nl | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 For the Period 1 January 2017 to 31 Dec |
| A116837 | 2018 | Billabong Gold Pty Ltd | Peak Hill | <1% | E52/3499 Annual Report For the Period 7 March 2017 to 6 March 2018 |
| A117397 | 2018 | Westgold Resources Limited | Peak Hill | 1.7% | Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2017 to 2 June 2018, E52 |
| A112081 | 2017 | Billabong Gold Pty Ltd | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Project C183/2009 For the Period 1 January 2016 to 31 D |
| A114753 | 2017 | Westgold Resources Limited | Fortnum | 1.7% | Combined Annual Mineral Exploration Report, Fortnum C152/2015, For the Period 3 June 2016 to 2 June 2017, E52/ |
| A110804 | 2017 | Independence Group Nl | Bryah (Three Rivers) | 100% | P52/1199 FINAL SURRENDER REPORT 8 January 2009 to 16 December 2016 |
| A110834 | 2017 | Independence Group Nl | Bryah - Three Rivers | 100% | P52/1199 FINAL SURRENDER REPORT for the period 8 January 2009 to 16 December 2016 |
| A110835 | 2017 | Independence Group Nl | Bryah (Three Rivers) | 100% | P52/1200 FINAL SURRENDER REPORT 8 January 2009 to 16 December 2016 |
| A108092 | 2016 | Northern Star Resources Ltd | Three Rivers | <1% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 THREE RIVERS PROJECT C183/2009, E 52/01668.... |
| A108743 | 2016 | Allkarri Holdings Pty Ltd | Peak Hill | 21% | Final Surrender Report for Peak Hill Project E52/02884 for the period 20/12/2013 to 13/01/2016 |
| A109650 | 2016 | Metals X Limited | Peak Hill | 2.1% | Peak Hill Project Combined Mineral Exploration Report |
| A109989 | 2016 | Metals X Limited | Peak Hill | 5.6% | C152/2015 Final Surrender Report, P52/1189, P52/1190, P52/1191, P52/1192, P52/1193, P52/1234, P52/1343, P52/13 |
| A104522 | 2015 | Allkarri Holdings Pty Ltd | Peak Hill | 21% | Peak Hill E52/2884 Annual Report for the period 20/12/2013 to 19/12/2014 |
| A105246 | 2015 | Alchemy Resources (Three Rivers) Pty Ltd; Independence Group | Three Rivers | <1% | COMBINED ANNUAL REPORT ON C183/2009, BRYAH (THREE RIVERS) PROJECT, FOR THE PERIOD 1 JANUARY 2014 TO 31 DECEMBE |
| A105824 | 2015 | Rni Nl | Horseshoe West | <1% | E52/2668 Annual Technical Report 2015 for the period 20/04/2014 to 19/04/2015 |
| A106536 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | 2.2% | Combined Annual Technical Report C164/1995 Peak Hill Project for the period 1 July 2014 to 30 June 2015, E52/2 |
| A107467 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | 2% | Partial Surrender Technical Report E52/2471 (Peak Hill) for the period 16 October 2009 to 9 October 2015 |
| A101219 | 2014 | Alchemy Resources (Three Rivers) Pty Ltd | Three Rivers | <1% | Three Rivers Project Combined Annual Report for the Period 1st January 2013 to 31st December 2013, C183/2009, |
| A102414 | 2014 | Resource And Investment Nl | Horseshoe West | <1% | E52/2668 Horseshoe West Annual Technical Report for the period 20th April 2013 to 19th April 2014 |
| A103133 | 2014 | Grosvenor Gold Pty Ltd | Peak Hill | 2.2% | COMBINED ANNUAL TECHNICAL REPORT C164/1995 PEAK HILL TENEMENT NUMBERS E52/2237, E52/2413, E52/2471, E52/2472, |
| A96614 | 2013 | Alchemy Resources (Three Rivers) Pty Ltd | Three Rivers | <1% | Combined Annual Report for the Period 1st January 2012 to 31st December 2012, Three Rivers Project M52/685, M5 |
| A96988 | 2013 | Padbury Mining Ltd | Peak Hill | 2.5% | Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, |
| A97742 | 2013 | Padbury Mining Ltd | Peak Hill | 13% | E52/1518 Final Surrender for the period 17th November 2003 – 16th November 2012 |
| A99088 | 2013 | Grosvenor Gold Pty Ltd | Peak Hill | 2.2% | Combined Annual Technical Report C164/1995 Peak Hill Project for the period 1 July 2012 to 30 June 2013, E52/2 |
| A99877 | 2013 | Alchemy Resources Ltd | Three Rivers | 1.8% | Three Rivers Project, Voluntary Partial Surrender Report, E52/1668, for the period 23rd February 2004 to 17th |
| A93081 | 2012 | Padbury Mining Ltd | Peak Hill - Telecom Hill | 2.5% | 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011 |
| A94067 | 2012 | Alchemy Resources Ltd | Henry | 100% | HENRY PROJECT ANNUAL REPORT P52/1200 ALCHEMY RESOURCES (THREE RIVERS) PTY LTD 8TH JANUARY 2011 – 7TH JANUARY 2 |
| A94068 | 2012 | Grosvenor Gold Pty Ltd | Old Peak Hill | 100% | OLD PEAK HILL PROJECT ANNUAL REPORT P52/1199 ALCHEMY RESOURCES (THREE RIVERS) PTY LTD 8TH JANUARY 2011 – 7TH J |
| A94110 | 2012 | Alchemy Resources (Three Rivers) Pty Ltd | Peak Hill | <1% | Peak Hill NWN Project Combined Annual Report for the Period 1st July 2011 to 30th June 2012 |
| A94652 | 2012 | Montezuma Mining Company Ltd | Peak Hill | 2.2% | Annual Report on Peak Hill Project Combined Annual Report C164/1995 For the Period 01/07/2011 to 30/06/2012, M |
| A89074 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Peak Hill NWN Project 2010 Annual Report C17/2008, Report Period: 1 July 2009 – 30 June 2010, E52/1668, E52/16 |
| A91216 | 2011 | Montezuma Mining Company Ltd | Peak Hill | 2.2% | Annual Report on Peak Hill Project Combined Annual Report C164/1995 For the Period 01/07/2010 to 30/06/2011 |
| A91724 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill NWN | <1% | Peak Hill NWN Project CR17/2008 2010 Annual Report Report Period: 1 July 2010 – 30 June 2011 |
| A89335 | 2011 | Padbury Mining Ltd | Peak Hill | 2.5% | Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010 |
| A89543 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | 100% | Peak Hill Annual Report P52/7799, 8th January 2010 - 7th January 2011. |
| A89544 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | 100% | Peak Hill Annual Report P52/1200, 8th January 2010 - 7th January 2011. |
| A85953 | 2010 | Aurium Resources Ltd | Peak Hill | 1.8% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on |
| A87662 | 2010 | Montezuma Mining Company Ltd | Peak Hill | 2.2% | Combined Annual Report C164_1995, Peak Hill Project, for the Period 1/07/2009 to 30/06/2010 |
| A80439 | 2009 | Peak Resources Ltd | PEAK HILL WEST | 1.8% | Peak Hill West – Annual Report on Exploration, 18th November 2007 to 17th November 2008, C84/2004 |
| A81263 | 2009 | Aurium Resources Ltd | Peak Hill | 1.8% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52 |
| A82100 | 2009 | Aurium Resources Ltd | PEAK HILL | <1% | FINAL SURRENDER REPORT FOR E52/1728 PEAK HILL, 30th January 2008 to 29th January 2009 |
| A84440 | 2009 | Grosvenor Gold Pty Ltd | Peak Hill NWN | <1% | Peak Hill NWN Project 2009 Annual Report, 1 July 2008 – 30 June 2009 |
| A76998 | 2008 | Peak Resources Ltd | Peak Hill West | 1.8% | Peak Hill West - Annual Report on Exploration Report 18th November 2006 to 17th November 2007 C84/2004 E52/16 |
| A77367 | 2008 | Eagle Gold Mines Pty Ltd | Peak Hill | <1% | Peak Hill Project 2006 Annual Report, 20 January 2007 - 19 January 2008, C21/2006 |
| A77730 | 2008 | Greater Pacific Gold Ltd | Peak Hill | 13% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1518 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A77717 | 2008 | Haven Resources Ltd | Peak Hill | <1% | Annual Report E52/1728 Peak Hill For the period 30th January 2007 to 29th January 2008 |
| A79777 | 2008 | Eagle Gold Mines Pty Ltd | Peak Hill | <1% | PEAK HILL NWN PROJECT E52/1668, E52/1678, E52/1722, E52/1723, E52/1730, E52/1810, E52/1852, E52/1881 Combined |
| A74150 | 2007 | Peak Resources Ltd | Peak Hill | 1.8% | Peak Hill West Project C84/2004 Annual Report for the Period 17th Nov 2005 to 16th Nov 2006 (Peak Hill) |
| A74693 | 2007 | Gleneagle Gold Ltd | Peak Hill | <1% | Peak Hill Project C21/2006 Annual Report for the Period 1 Dec 2005 to 19 Jan 2007 (Peak Hill) |
| A74651 | 2007 | Jamora Nominees Pty Ltd | Peak Hill | <1% | Annual Report E52/1782 Peak Hill for the period 30th January 2006 to 29th January 2007 (Peak Hill Project). |
| A72248 | 2006 | Jamora Nominees Pty Ltd | Peak Hill | <1% | Annual Report, E52/1728 Peak Hill, For the Period 30 January 2005 to 29 January 2006. |
| A71629 | 2006 | Goldstar Resources Nl | Bryah | 2.4% | M52/548, M52/588, E52/1621,P52/990 and P52/991, Bryah Reporting Group(Group Reporting No. C84/2004), 2004-2005 |
| A71688 | 2006 | Greater Pacific Gold Nl | Peak Hill | 13% | Annual Report on Exploration Licence E52/1518 on the Peak Hill Sheet for the year ending November 2005, (Peak |
| A69882 | 2005 | Peak Hill Manganese Pty Ltd | Peak Hill | 13% | Annual report for the period 15/10/03 - 16/10/04 Peak Hill Project, E52/1518. |
| A70221 | 2005 | Jamora Nominees Pty Ltd | Peak Hill | <1% | Annual report, E52/1728, Peak Hill, for the period 30th January 2004 to 29th January 2005, Meekatharra |
| A64305 | 2002 | Troy Resources Nl | Peak Hill | 85% | Final Surrender Report 26 March 1997 to 27 October 2001 Peak Hill Project Orchard-Reefer Well, prospecting lic |
| A64477 | 2002 | Troy Resources Nl | Central Bore | 1% | Central Bore Exploration Licence 52/1365 Peak Hill Mineral Field Western Australia 27 th October 2000 to 26th |
| A61869 | 2001 | Troy Resources Nl | Central Bore | 1% | Central Bore Project exploration licence 52/1365 First Annual Report 27th October 1999 to 26th December 2000, |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | 7.3% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A61900 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | 18% | Project 6596, Peak Hill Mine Joint Venture Project, E52/697, M52/13,116,287,324,345,346,465,541,581-582, P52/5 |
| A58699 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | 16% | Project 6596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541,581-582 P52/51 |
| A58705 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | 56% | Project 6596 Peak Hill Mine Joint Venture Project E52/697 Fifth Year and Final Relinquishment Report Period 24 |
| A54838 | 1998 | Troy Resources Nl | Orchard-Reefer | 11% | Orchard-Reefer Project, Peak Hill District, W.A. Annual Report 1997-1998 P52/845-856, ELA52/1093 |
| A55845 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | 15% | Project 596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,581 582 P52 |
| A54839 | 1998 | Troy Resources Nl | Stalley Well | 62% | Stallley Well Project, Peak Hill District Western Australia, Annual Report 1997-1998, P52/857-862 (inclusive). |
| A55257 | 1998 | Troy Resources Nl | Reefer-Stalley | 53% | Reefer-Stalley Project, Peak Hill District W.A. Annual Report 1997-1998 P52/855-856, 560, 862 |
| A55789 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | 56% | Project 596 Peak Hill Mine Joint Venture Project E52/697 Fourth Year Partial Relinquishment Report Period 24/0 |
| A52184 | 1997 | Plutonic Operations Ltd | Peak Hill | 12% | Project 596 Peak Hill Joint Venture Project E52/686,697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,5 |
| A52258 | 1997 | Plutonic Operations Ltd | Peak Hill | 56% | Third Year Partial Relinquishment Report Period 24/06/94 to 23/06/97 |
| A52651 | 1997 | Perilya Mines Nl | St Crispin | 1.4% | Annual report for the St Crispin Project for period 27/09/96-19/09/97 E52/661,662 & 671 P52/928-931 P52/728-7 |
| A50066 | 1997 | Plutonic Operations Ltd | Twin Rivers | 79% | Twin Rivers Joint Venture Horseshoe Range Project E52/771 Annual Report Period 12/12/1995 - 11/12/1996 |
| A51015 | 1997 | Troy Resources Nl | Stalley Well | 62% | Stalley Well Project, Annual Report 1996-1997 P52/857-862 (inclusive) March 1997. |
| A51016 | 1997 | Troy Resources Nl | Orchard-Reefer | 37% | Orchard-Reefer Project Peak Hill District W.A Annual Report 1996-1997 Tenements P's 52/845 - 52/856 ELA 52/109 |
| A49449 | 1996 | Newcrest Mining Ltd | Glengarry | 1.3% | Glengarry Joint Venture Combined Annual Exploration Report for E52/661 to E52/662 and E52/671 for the period f |
| A46896 | 1996 | Plutonic Operations Ltd | Horseshoe Range | 79% | Horseshoe Range Project, Annual Report for the period 12/12/94 - 11/12/95, E52/771. |
| A46926 | 1996 | Plutonic Operations Ltd | Peak Hill | 65% | Peak Hill Project, Annual Technical Report for period 30/11/1994 - 29/11/1995, E52/737. |
| A47797 | 1996 | Plutonic Operations Ltd | Peak Hill | 4.8% | Annual Report. Period 16/03/1995-15/03/1996. |
| A47820 | 1996 | Solomon Pacific Resources Nl | Orchard-Reefer | 37% | Park Hill (Solomon Pacificferenco) Joint Venture Orchard Reefer project Annual report 1995-1996 Tenements: P52 |
| A47821 | 1996 | Qestore Pty Ltd | Stalley | 62% | Stalley Project, Annual Report February 1995 to February 1996, P52/857-862.( Peak Hill ( Solomon Pacific - Fer |
| A48742 | 1996 | Plutonic Operations Ltd | Peak Hill | 12% | Project 596 Peak Hill Mine Joint Venture Project E52/442 E52/686 E52/697 M52/13 M52/35 M52/56 M52/116 M52/287 |
| A50691 | 1996 | Plutonic Operations Ltd | Peak Hill Mine | 4% | Peak Hill Mine Project, First and Final Relinquishment Report E52/686 for period 20/04/1996 to 19/04/1997. |
| A44283 | 1995 | Plutonic Operations Ltd | Peak Hill | 6.7% | Peak Hill (JV) Project, Partial Surrender Report for the period 16/3/1988 to 16/2/1995, E52/260. |
| A45105 | 1995 | Newcrest Mining Ltd | Glengarry | 1.3% | Glengarry Joint Venture Combined Annual Exploration report for the period from September 1993 to September 199 |
| A44395 | 1995 | Plutonic Operations Ltd | Peak Hill | 3.4% | Peak Hill (JV) Project, Annual Report for the period 16/03/1994 to 15/03/1995, E52/260, E52/404, E52/641, P52/ |
| A45313 | 1995 | Plutonic Operations Ltd | Peak Hill Mine Joint Venture | 11% | Project 596 Peak Hill Mine Joint Venture Project Annual report E52/442 E52/686 E52/697 E52/737 M52/13 M52/35 M |
| A45715 | 1995 | Newcrest Mining Ltd | Glengarry | 1.3% | Glengarry Joint Venture Combined Annual Exploration Report for E52/661-662 and 671 for the period fromSeptembe |
| A40476 | 1994 | Peko Gold Ltd | Peak Hill | 49% | Annual report for the period 1 July 1992 to 30 June 1993, M52/287. Peak Hill Project Part 4, Pipeline Tenement |
| A41885 | 1994 | Peko Gold Ltd | Peak Hill | 6.8% | Annual report for the period 1 July 1993 to 30 June 1994, P52/665. Peak Hill Project Part 8, Mount Pleasant Ea |
| A40293 | 1994 | Peko Gold Ltd | Peak Hill | 6.8% | Annual report for the period ending 30 June 1993, P52/665. Peak Hill Project Part 8, Mount Pleasant East Tenem |
| A41117 | 1994 | Afmeco Pty Ltd | Peak Hill South | 3.4% | Peak Hill South (JV) Project, Annual Report, E52/260, E52/404, E52/641. P52/7272 (Group 1) for the period 16/0 |
| A41882 | 1994 | Peko Gold Ltd | Peak Hill | 49% | Annual report for the period 1 July 1993 to 30 June 1994, M52/287. Peak Hill Project Part 4, Pipeline Tenement |
| A41891 | 1994 | Peko Gold Ltd | Peak Hill | 2% | Annual report for the period 1 July 1993 to 30 June 1994, P52/514 to P52/524. Peak Hill Project Part 14, Fence |
| A42180 | 1994 | Afmeco Pty Ltd | Peak Hill South | 44% | Peak Hill South Project, Final Surrender Report for the period 12/08/1992 to 11/08/1994, P52/727. |
| A38278 | 1993 | Afmeco Pty Ltd | M6077/14: Peak Hill gold exploration | 3.4% | Annual report Peak Hill South JV |
| A38551 | 1993 | Capricorn Resources Aust Nl | Peak Hill | 96% | Peak Hill Project, Final Surrender Report for period ending 14/05/1993, E52/290. |
| A39924 | 1993 | Newcrest Mining Ltd | Glengarry | 1.3% | Annual report for the period 09/92-09/93 Glengarry JV Project E52/661 E52/662 E52/671 |
| A37892 | 1993 | Peko Gold Ltd | Peak Hill | 10% | Annual report for the period ending 30 June 1992, P52/665 and M52/199. Peak Hill Project Part 8, Mount Pleasan |
| A37939 | 1993 | Peko Gold Ltd | Peak Hill | 49% | Annual report for the period ending 30 June 1992, P52/335 to P52/358, and M52/287. Peak Hill Project Part 4, P |
| A39413 | 1993 | Peko Gold Ltd | Peak Hill | 3.1% | Report on reprocessing of aeromagnetic survey data, Peak Hill Project Western Australia. 1993. |
| A39416 | 1993 | Peko Gold Ltd | Peak Hill | 2% | Annual report for the period ending 30 June 1993, P52/514 to P52/524. Peak Hill Project Part 14, Fence Hill Te |
| A35601 | 1992 | Afmeco Pty Ltd | Peak Hill South | 4.3% | Peak Hill South (JV) Project, E52/260 & 404; P52/475 (Group 1)for the period 17/03/1991 to 16/03/1992. |
| A36592 | 1992 | Afmeco Pty Ltd | Capricorn | 96% | Capricorn Project, Annual Report for the period 15/05/1991 to 14/05/1992, E52/290. |
| A37191 | 1992 | Peko Gold Ltd | Peak Hill - Fence Hill | 2% | Annual Report for the period 01/07/91-30/06/92 Peak Hill Project Fence Hill Tenements P52/514-524 |
| A37368 | 1992 | Perilya Mines Nl | Reefer | 12% | Surrender Report, Reefer Project , for the period 19/1/92 to 26/10/92, E52/589. |
| A36593 | 1992 | Afmeco Pty Ltd | Capricorn | 96% | Capricorn Project, Report on Area Relinquished 15/05/1988 to 14/05/1992, E52/290. |
| A36773 | 1992 | Afmeco Pty Ltd | Peak Hill South | 6.7% | Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 30/05/1992, E52/260. |
| A34529 | 1991 | Afmeco Pty Ltd | Capricorn | 96% | Capricorn Project, Partial Surrender Report for the period 15/05/1988 to 14/05/1991, E52/290. |
| A36568 | 1991 | Peko Gold Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 01/06/1991 to 01/06/1992, E52/255, 263, 393, & 405; M52/13.... |
| A33455 | 1991 | Afmeco Pty Ltd | Peak Hill South | 4.3% | Peak Hill South Project, Annual Report for the period 17/03/1990 to 16/03/1991, E52/260 & 404; P52/475-477. |
| A33946 | 1991 | Afmeco Pty Ltd | Capricorn | 96% | Capricorn Project, Annual Report for the period 16/05/1990 to 15/05/1991, E52/290. |
| A33947 | 1991 | Afmeco Pty Ltd | Peak Hill South | 6.7% | Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 15/03/1991, E52/260. |
| A29996 | 1990 | Afmeco Pty Ltd | Peak Hill South | 4.3% | Peak Hill South Project, Annual Report for the period 1st January 1989 to 31st December 1989, E52/260,404; P52 |
| A26402 | 1989 | Geopeko | Peak Hill | 3.9% | Report No:89/6 on Exploration work carried out on tenement M52/127 at Peak Hill during 08/88-10/88 |
| A26830 | 1989 | Afmeco Pty Ltd | Peak Hill South | 6.7% | Annual Report for the period 16/03/88-16/03/89 Peak Hill South Project E52/260 |
| A29335 | 1989 | Geopeko | Fence Hill | 2% | Fence Hill Prospect, Peak Hill, W.A. 04/1989 - 08/1989 Report No: WA89/37P E52/88, M52/127-128 |
| A107628 | 1989 | Capricorn Resources Aust Nl | Peak Hill | 96% | Geological reconnaissance report, Peak Hill, E52/290 |
| A11347 | 1982 | Stockdale Prospecting Ltd | Horseshoe Townsite | <1% | Horseshoe Townsite, Non-statutory Report: Final Report for the period 18th December 1981 to 17th June 1982, TR |
| A10229 | 1980 | Goldfields Exploration Pty Ltd | Peak Hill | 1% | Peak Hill Project, Non-statutory Report: Report for the period 16/11/1977 to 01/10/1980, October 1980, MC52/31 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 17 Feb 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4414 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4414? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.