E 52/4469
E 52/4469 is a pending exploration licence in the Shire of Meekatharra, Western Australia, applied for by Pingem Metals Pty Ltd (part of Catalyst Metals Limited). The application was received on 26 May 2025 and is awaiting a decision. The ground is covered by 84 historical WAMEX reports.
Register summary
- Holder
- Pingem Metals Pty Ltd
- Part of
- Catalyst Metals Limited (ASX:CYL) as at 2026-06-30
- Local government
- Shire of Meekatharra
- Application received
- 26 May 2025
The full record on E 52/4469
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (4 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149785 | 2025 | Aic Mines Limited | Thaddona Hill | 9.8% | Final Surrender Report forThaddona Hill Project E52/3317, E52/3318 and E52/3319 (C53/2017) for the period endi |
| A133761 | 2023 | Aic Mines Limited | Thaddona Hill | 22% | Compulsory Partial Surrender E52/3317 Thaddona Hill for the period 4 October 2016 to 3 October 2022 |
| A130127 | 2022 | Aic Mines Limited | Stetson | 22% | Final Report- EIS Co-Funded Exploration Drilling Application DAG2020/00138575 Stetson (Round 22) |
| A132401 | 2022 | Norwest Minerals Limited | Bulgera | <1% | Bulgera Project Partial Surrender Report E52/3316 for the period 08/08/2016 to 08/08/2022 |
| A132572 | 2022 | Aic Mines Limited | Thaddona Hill | 4.2% | Annual Technical Report C53/2017 Thaddona Hill Project for the period ending 25/07/2022 |
79 more reports
| A128652 | 2021 | Aic Mines Limited | Thaddona Hill | 4.2% | Thaddona Hill C53/2017 Annual Technical Report for the period ending 25/07/2021 |
| A128939 | 2021 | Aic Mines Limited | Three Rivers | <1% | Three Rivers E52/3154 - Partial Surrender Report For the Period 20 October 2014 to 19 October 2021 |
| A123106 | 2020 | Vango Mining Limited | Marymia | 3.1% | Annual Report for the Marymia Gold Project C93/2018 for the period 1 January 2019 to 31 December 2019 |
| A124965 | 2020 | Aic Resources Limited | Three Rivers | <1% | Three Rivers - Annual Technical Report C84/2016 for the period ending 30 June 2020 |
| A125207 | 2020 | Aic Mines Limited | Thaddona Hill | 4.2% | Thaddona Hill C53/2017 Annual Report for the period ending 9 August 2020 |
| A122179 | 2019 | Norwest Minerals Limited | Bulgera | <1% | Annual Report C115/2016 Bulgera project for the period 18 August 2018 to 17 August 2019. E 52/03276,E 52/03316 |
| A119558 | 2019 | Vango Mining Limited | Marymia | 3.1% | Annual Report for the Marymia Gold Project C93/2018 for the period 1 January 2018 to 31 December 2018 |
| A120555 | 2019 | Aic Resources Limited | Three Rivers | <1% | Annual report Three Rivers project (C84/2016) for the period 1 July 2018 to 30 June 2019 E 52/03027,E 52/03154 |
| A120703 | 2019 | Aic Resources Limited | Thadoona | 4.2% | Annual Report for C53/2017 Thadoona project for the period 27 July 2018 to 26 July 2019 |
| A118264 | 2018 | Accelerate Resources Limited | Bulgera | <1% | Bulgera Project C115/2016, Annual Report for the period ending 17th August 2018, E52/03316, E52/03276 |
| A116602 | 2018 | Dampier (Plutonic) Pty Ltd | Plutonic Dome | 3.6% | Plutonic Dome Project - Combined Annual Report - C226/2011, 01 January 2017 to 31 December 2017 |
| A116603 | 2018 | Vango Mining Limited | Plutonic Dome | 1.2% | C89/2015 Combined Annual Report for the Plutonic Dome Gold Project, 01 January 2017 to 31 December 2017 |
| A117257 | 2018 | Aic Resources Limited | Three Rivers | <1% | Three Rivers Project Combined Reporting Number C84/2016 Annual Report for the period 01/07/2017 - 30/06/2018, |
| A117485 | 2018 | Aic Resources Limited | Thadoona | 4.2% | Annual Report on Explorations Activies for C53/2017, Thadoona, 27 July 2017 - 26 August 2018 |
| A115009 | 2017 | Aic Resources Limited | Marymia | 4.2% | Annual Report for Thadoona Group of Tenements C53/2017, E52/03317, E52/03318, E52/03319, E52/03346 for the per |
| A115412 | 2017 | Poz Minerals Limited | Bulgera | <1% | Bulgera C115/2016 Annual Report for the period 18 August 2016 to 17 August 2017, E52/03276, E52/03316 |
| A112758 | 2017 | Vango Mining Limited | Plutonic | 1.5% | C89/2015 Combined Annual Report for the period 1 January 2016 to 31 December 2016, M52/00230, M52/00217, M52/0 |
| A112759 | 2017 | Dampier (Plutonic) Pty Ltd | Plutonic Dome | 3.4% | Combined Annual Report - C226/2011 Plutonic Dome Gold Project for the period 01/01/2016 to 31/12/2016 |
| A114343 | 2017 | Aic Resources Limited | Three Rivers | <1% | Three Rivers Project C84/2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A108643 | 2016 | Vango Mining Limited | Plutonic Dome | 1.5% | Annual Exploration Report for C89/2015, The Plutonic Dome Project from 01/01/2015 to 31/12/2015 |
| A108642 | 2016 | Vango Mining Limited | Plutonic Dome | 3.1% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2015 to 31/12/2015 |
| A110421 | 2016 | Cosmopolitan Minerals Limited | Three Rivers | <1% | Three Rivers E52/03171, E52/03154, E52/03027 Annual Report for the period 20 October 2015 to 19 October 2016 |
| A105239 | 2015 | Vango Mining Limited | Plutonic Dome | 2.1% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2014 to 31/12/2014, E52/2071.... |
| A102566 | 2014 | Dampier (Plutonic) Pty Ltd | M52/365 | 16% | M52/365 FINAL SURRENDER REPORT Reporting Period 14/05/1993 – 26/02/2013 |
| A97128 | 2013 | Dampier Gold Ltd | Plutonic Dome | 1.8% | Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/ |
| A97675 | 2013 | Dampier Gold Ltd | Plutonic Dome | 2.9% | Combined Surrender Report Plutonic Dome Project C226/2011 for the period ending 26/02/2013 |
| A101570 | 2013 | Ord River Resources Ltd | Plutonic Dome | 2.1% | C226/2011 ANNUAL EXPLORATION REPORT Reporting Period 01/01/2013 to 31/12/2013 |
| A93152 | 2012 | Dampier Gold Ltd | Plutonic Dome | 1.8% | Combined Annual Report for the period 1 January 2011 to 31 December 2011 Plutonic Dome Project C226/2011 |
| A89778 | 2011 | Barrick (Plutonic) Ltd | Plutonic - Marymia | 1.5% | Marymia Project, Plutonic Project, Plutonic Extended Project, Freshwater Project, Annual Report, Period 1 Janu |
| A86710 | 2010 | Barrick (Plutonic) Ltd | Plutonic / Marymia | 1.5% | 6490 MARYMIA PROJECT 6520 PLUTONIC PROJECT 6523 PLUTONIC EXTENDED Project 6530 FRESHWATER PROJECT ANNUAL REPO |
| A81899 | 2009 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 1.3% | PROJECT 6490 MARYMIA PROJECT, PROJECT 6520 PLUTONIC PROJECT, PROJECT 6523 PLUTONIC EXTENDED PROJECT, PROJECT 6 |
| A77831 | 2008 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 1.3% | Annual Report Period 1 January 2007 - 31 December 2007 Technical Report No. 1257 Plutonic/ Marymia Project |
| A74697 | 2007 | Barrick Gold Of Australia Ltd | Marymia/ Plutonic | 1.3% | Marymia/ Plutonic Project C94/1999 Annual Report Period 1 January 2006 - 31 December 2006 (Peak Hill) |
| A72015 | 2006 | Barrick Gold Of Australia Ltd | Marymia, Plutonic, Plutonic Extended & F | 1.1% | Marymia, Plutonic, Plutonic Extended & Freshwater Projects, Annual Report, Period 1 January 2005 to 31 Decembe |
| A70185 | 2005 | Barrick Gold Of Australia Ltd | Plutonic/ Marymia | 1.1% | Annual Report Period 1 January 2004 to 31 December 2004 Technical Report No. 1152 Projects 6490 - Marymia, 652 |
| A68298 | 2004 | Barrick Gold Of Australia Ltd | Marymia / Plutonic / Plutonic Extended / | 1.1% | Annual Report for the period 01/01/2003-31/12/2003 Marymia Project,Plutonic Project,Plutonic Extended Project, |
| A66308 | 2003 | Barrick Gold Of Australia Ltd | Plutonic | 1.1% | Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523 |
| A67806 | 2003 | Barrick Gold Of Australia Ltd | Marymia | 2% | Marymia Project, Partial Surrender Report for the period 19th November 1999 to 18th November 2003, E52/1444. |
| A64505 | 2002 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 1.1% | Annual Report Period 1 January 2001 - 31 December 2001. Vertification Report Technical Report No. 1024. Projec |
| A64818 | 2002 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 1.1% | Plutonic/Marymia M52/148-150, M52/170-171, M52/183, M52/185 M52/217-220, M52/222-223, M52/226-235, M52/246-247 |
| A65892 | 2002 | Barrick Gold Of Australia Ltd | Marymia | 2% | Marymia Project, Partial Surrender Report for the period 19th November 1999 to 18th November 2002, E52/1444. |
| A62465 | 2001 | Homestake Gold Of Australia Ltd | Marymia | 1.1% | Project 6490 Marymia Project 6520 Plutonic Project 6523 Plutonic Extended Project 6530 Freshwater M52/148-150, |
| A60012 | 2000 | Homestake Gold Of Australia Ltd | Plutonic/ Marymia | 1% | Project 6490,Marymia, Project 6520, Plutonic, Project 6523, Plutonic Extended, Project 6530, Freshwater, M52/1 |
| A60102 | 2000 | Homestake Gold Of Australia Ltd | Marymia | 3.3% | Project 6490 Marymia M52/272,273,274,340 and Part M52/275, 276 & 365 Surrender Report Period up to January 200 |
| A60572 | 2000 | Homestake Gold Of Australia Ltd | Marymia | <1% | Project 6490, Marymia, Surrender report for M52/355,475, E52/634,747, Partial Surrender Report for M52/356,635 |
| A57727 | 1999 | Homestake Gold Of Australia Ltd | Marymia | 1.4% | Marymia Exploration - Project 6490 - Technical Report No.812 01/01/98 - 31/12/98 M52/183, 185, 217-220, 226-23 |
| A54199 | 1998 | Resolute Ltd | Thaduna | <1% | Thaduna Project. E52/634-635,747. M52/355-356,475-477,488-489. Annual report for the period 01/01/97-31/12/97. |
| A55342 | 1998 | Resolute Ltd | Plutonic Bore | <1% | Plutonic Bore Joint Venture, 01/01/97 - 31/03/98 M52/217-220, 226-232, 246-247, 257, 259, 303-304, 320-323 |
| A55346 | 1998 | Resolute Ltd | Marymia Hill JV | 6.1% | Marymia Hill Joint Venture, Annual Report 01/01/97 - 31/12/97 M52/185, 233-235, 269-276, 340-342, 365-366, 478 |
| A55849 | 1998 | Resolute Ltd | Marymia | 1.4% | Marymia Gold Project - 06/1998 Three Year Proposed Exploration Program E52/634-635, 747, 823-826, 1052 |
| A47590 | 1996 | Resolute Samantha Ltd | Thaduna | <1% | Thaduna Project Exploration Licence E52/747 Annual report 1993-1994 |
| A48393 | 1996 | Resolute Samantha Ltd | Plutonic Bore | <1% | Plutonic Bore( JV) Project, Annual Report for period 01/01/1995 to 31/12/1995, M52/218-220, M52/226-232 M52/24 |
| A44225 | 1995 | Resolute Resources Ltd | Marymia | 1.1% | Marymia Gold Project Mining Leases M52/185, M52/271 to M52/276, M52/340 to M52/342, Exploration Licence E52/31 |
| A40062 | 1994 | Battle Mountain Australia Inc | Plutonic Bore | <1% | Annual Report for the period 01/01/93-31/12/93 Plutonic Bore JV Project M52/217-220,225-232,246-247,257-259 M5 |
| A40367 | 1994 | Marymia Canteen Pty Ltd | Marymia | 43% | Annual report for the period 02/92-02/93 Marymia Project E52/428 |
| A41182 | 1994 | Resolute Resources Ltd | Marymia - Hermes - Pythagoras - Apollo | 17% | (Annual Report for the period 01/93-03/94) Marymia Gold Project Mining Lease M52/269 Hermes/Pythagoras/ Apollo |
| A37565 | 1993 | Battle Mountain Australia Inc | Plutonic Bore | <1% | Annual Report for the Period 01/01/92 - 31/12/92 Plutonic Bore Project |
| A38047 | 1993 | Resolute Resources Ltd | Marymia | 5.6% | R Report for the period ending 12/92 Hermes/Prickley's/Colossus Project M52/183 M52/235 M52/269 Exploration pr |
| A38054 | 1993 | Resolute Resources Ltd | Marymia | <1% | Annual report for the period 01/92-12/92 Marymia Project |
| A35168 | 1992 | Battle Mountain Australia Inc | Plutonic Bore | <1% | Annual Report for the period 01/01/89-31/12/91 Plutonic Bore Project E52/184,195 M52/217-220,225-232,246-247,2 |
| A35261 | 1992 | Resolute Resources Ltd | Marymia - Colossus - Prickley's Trend | 5.6% | Mining Leases 52/183,235 and 269 November 1991 Marymia Gold Project Detailed Geological Mapping 1:1000 serie |
| A35260 | 1992 | Resolute Resources Ltd | Marymia | 7.4% | Titan Resources NL MArymia Joint Venture ML's 52/183,269,270,234,235,185,271,275,276 Progress Report September |
| A34790 | 1991 | Resolute Resources Ltd | Marymia - Keillor | <1% | Non-statutory Report : R Report for the period 01/01/1991 to 31/12/1991, Interpretation of Aeromagnetic Data , |
| A38051 | 1991 | Resolute Resources Ltd | Marymia | 2% | R Report for the period ending 07/91 Marymia Gold Project E52/317 E52/322 M52/183 M52/233-235 M52/269-276 M52/ |
| A32648 | 1991 | Resolute Resources Ltd | Marymia | 9.5% | Progress Report; Marymia Gold Project Mining Leases M52/183-184; Exploration Licence E52/158 RAB drilling pro |
| A33092 | 1991 | Hucorp Pty Ltd | Marymia | 43% | Marymia Project E52/428 Annual report, 01/01/1990 to 01/01/1991. |
| A35131 | 1991 | Marymia Canteen Pty Ltd | Marymia | 43% | Marymia Project , Non-statutory Report : E52/428, RAB Drilling Programme (R Report for 1991) |
| A32205 | 1990 | Resolute Resources Ltd | Marymia | 27% | Marymia Gold Project, Prickly Zone Exploration Licence E52/184; Mining Lease M52/184 (R Report for 1990) |
| A32624 | 1990 | Resolute Resources Ltd | Marymia | 9.5% | Progress Report Marymia Gold Project M52/183-184 E52/158. 1990. |
| A32633 | 1990 | Resolute Resources Ltd | Marymia | <1% | Marymia Area WA Interpretation of Aeromagnetic (1990) Data (R Report for 1990; E52/158,320,322,342,352; M52/18 |
| A6794 | 1977 | International Nickel Aust Ltd | Crows Nest Well | 3.3% | Crows Nest Well Project, Non-statutory Report: Final Report, March 1977, MC52/253-272, 282, 298-305, 309-310, |
| A5785 | 1975 | International Nickel Aust Ltd | Crows Nest Well | 3.6% | Annual report, Crows Nest Well Claim Group (including Macdonald Option), For the period 1st January 1974 to 31 |
| A5301 | 1974 | International Nickel Aust Ltd | Nabberu - Crows Nest Well | 3.6% | Nabberu Project - Crows Nest Well, [Annual report] for the period 1st January - 31st December 1973, MC52/253 . |
| A4080 | 1973 | International Nickel Aust Ltd | Crows Nest Well | 3.5% | Crows Nest Well Project, Annual Report for the period 1st January 1972 to 31st December 1972, MC52/253-272, 28 |
| A43695 | 1753 | Battle Mountain Australia Inc | Plutonic Bore | <1% | Plutonic Bore Joint Venture Project, M52/217-220, M52/225-232, M52/246-247, M52/257-259, M52/303-304 M52/320-3 |
| A47532 | 1753 | Resolute Samantha Ltd | Apollo | 18% | Exploration Progress Report M52/233 M52/234 M52/269 M52/270 January to December 1994 |
| A51647 | 1753 | Resolute Ltd | Marymia Hill | 10% | Marymia Hill Joint Venture M52/185 M52/233 to M52/235 M52/269 to M52/276 M52/340 to M52/342 M52/365 M52/366 M5 |
| A51858 | 1753 | Resolute Ltd | Plutonic Bore | <1% | Plutonic Bore Joint Venture M52/217 to M52/220 M52/226 to M52/232 M52/246 M52/247 M52/257 M52/259 M52/303 M52/ |
| A51239 | 1753 | Resolute Ltd | Marymia Hill | 10% | Marymia Hill Joint Venture M52/185 M52/233 to M52/235 M52/269 to M52/276 M52/340 to M52/342 M52/365 M52/366 M5 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 52/4469 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 52/4469? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.