E 52/4550
E 52/4550 is a pending exploration licence in the Shire of Meekatharra, Western Australia, applied for by Catalyst (Old Highway) Pty Ltd (part of Catalyst Metals Limited). The application was received on 19 Dec 2025 and is awaiting a decision. The ground is covered by 141 historical WAMEX reports.
Register summary
- Holder
- Catalyst (Old Highway) Pty Ltd
- Part of
- Catalyst Metals Limited (ASX:CYL) as at 2026-06-30
- Local government
- Shire of Meekatharra
- Application received
- 19 Dec 2025
The full record on E 52/4550
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (1 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148436 | 2025 | Bryah Resources Limited | Bryah Basin | 2.5% | Partial Surrender Report for E 52/3453 Bryah Basin for the period ending 17/01/2025. |
| A139257 | 2024 | Alchemy Resources (Three Rivers) Pty Ltd | Horseshoe | 35% | Horseshoe Project E 52/1810 Surrender Report for the period ending 01/02/2024. (C36/2015) |
| A133892 | 2023 | Bryah Resources Limited | Bryah Basin | 16% | Partial Surrender Report – E52/3401 Bryah Basin for the period ending 21/11/2022 |
| A134086 | 2023 | Bryah Resources Limited | Bryah Basin | 2.5% | Partial Surrender Report – E52/3453 Bryah Basin for the period ending 21/11/2022. |
| A135856 | 2023 | Bryah Resources Limited | Bryah Basin Project | 4.5% | EIS Co-funded drilling final report (R25) Windalah Deeps |
136 more reports
| A127741 | 2021 | Bryah Resources Limited | Bryah Basin | 3.6% | Partial Surrender Report E52/3236 & E52/3238 Bryah Basin Project for the period 31 March 2015 to 29 March 2021 |
| A128837 | 2021 | Sandfire Resources Limited | Horseshoe | 15% | Horseshoe Project P52/1467, P52/1468, P52/1469 and P52/1470 Final Surrender Report for the period ending 22/09 |
| A123202 | 2020 | Billabong Gold Pty Ltd | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 for the period 1 January 2019 to 31 Dec |
| A123395 | 2020 | Sandfire Resources Limited | Horseshoe | 27% | C36/2015 Horseshoe Project Combined Annual Report for the period ending 15/02/2020 |
| A124043 | 2020 | Bryah Resources Limited | Bryah Basin | 5.1% | Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020 |
| A123066 | 2020 | Austsino Resources Group Limited | Peak Hill | 1.5% | Annual Report for the Peak Hill Iron Project C230/2007 for the period ending 31/12/2019, E 52/01557, E 52/0186 |
| A119243 | 2019 | Billabong Gold Pty Ltd | Three Rivers | 5.7% | Annual Mineral Exploration Report for the Three Rivers Group C183/2005 For the Period 1 January 2018 to 31 Dec |
| A119276 | 2019 | Bryah Resources Limited | Aquarius | 3.1% | EIS Co-Funded Drilling Final Report (R#17) Aquarius Project C205/2017, Report Period: 1 January 2018 to 31 Dec |
| A119233 | 2019 | Austsino Resources Group Limited | Peak Hill | 1.5% | Annual Report for the Peak Hill Iron Project C230/2007 For the Period 1 January 2018 to 31 December 2018, E52/ |
| A120357 | 2019 | Bryah Resources Limited | Bryah Basin | 4.1% | Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03 |
| A115718 | 2018 | Bryah Resources Limited | Peak Hill | 16% | Annual Report E52/3401 Peak Hill Project for the period 28/11/2016 - 28/11/2016 |
| A116042 | 2018 | Billabong Gold Pty Ltd; Independence Group Nl | Three Rivers | 5.7% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 For the Period 1 January 2017 to 31 Dec |
| A115961 | 2018 | Desert Resources Ltd | Peak Hill | 1.5% | Peak Hill Iron Project C230/2007, E52/01557, E52/01860, E52/02368, E52/02993 Annual Report for the period 1 Ja |
| A117043 | 2018 | Bryah Resources Limited | Bryah Basin | 4.1% | Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323 |
| A112081 | 2017 | Billabong Gold Pty Ltd | Three Rivers | 5.9% | Annual Mineral Exploration Report for the Three Rivers Project C183/2009 For the Period 1 January 2016 to 31 D |
| A113942 | 2017 | Pet Fc Pty Ltd | Peak Hill | 4.5% | Peak Hill E52/3236 Annual Report for the period 01/04/2016 to 31/03/2017 |
| A107836 | 2016 | Woolmaton Pty Ltd | Jinglegunna Well | 27% | Final Surrender Report for Jinglegunna Well E52/3114 for the period 19 September 2014 to 18 September 2015 |
| A108743 | 2016 | Allkarri Holdings Pty Ltd | Peak Hill | 14% | Final Surrender Report for Peak Hill Project E52/02884 for the period 20/12/2013 to 13/01/2016 |
| A108092 | 2016 | Northern Star Resources Ltd | Three Rivers | 6% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 THREE RIVERS PROJECT C183/2009, E 52/01668.... |
| A108777 | 2016 | Padbury Mining Limited | Peak Hill | 1.5% | 2015 Combined Annual Mineral Exploration Report C230/2007, Peak Hill Project, Annual Report for the Period 1 J |
| A109209 | 2016 | Pet Fc Pty Ltd | Ravelstone | 4.5% | Annual Report for Ravelstone Project E52/03236 for the period 31/03/2015 to 30/03/2016 |
| A109853 | 2016 | Allkarri Holdings Pty Ltd | Milgun | 2.5% | Final Surrender Report for Milgun Project E52/2774 for the period 31 May 2012 to 30 May 2016 |
| A104522 | 2015 | Allkarri Holdings Pty Ltd | Peak Hill | 14% | Peak Hill E52/2884 Annual Report for the period 20/12/2013 to 19/12/2014 |
| A104861 | 2015 | Padbury Mining Ltd | Peak Hill | 1.7% | Peak Hill Project, Annual Report for the period 01/01/2014 to 31/12/2014, E52/1557, 1860, 2368, 2436; P52/1329 |
| A105824 | 2015 | Rni Nl | Horseshoe West | 100% | E52/2668 Annual Technical Report 2015 for the period 20/04/2014 to 19/04/2015 |
| A106053 | 2015 | Allkarri Holdings Pty Ltd | Peak Hill | 2.5% | Annual Report E52/2774 Peak Hill for the period ended 30/05/2015 |
| A106366 | 2015 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Dynamite Bore | 1.6% | Peak Hill - Doolgunna - Dynamite Bore Project E52/3112 Final Surrender Report for the period 19/09/2014 - 08/0 |
| A105098 | 2015 | Padbury Mining Ltd | E52/1557 | 3.8% | Partial Surrender Report for E52/1557 from 9/11/2004 to 11/12/2014 |
| A105246 | 2015 | Alchemy Resources (Three Rivers) Pty Ltd; Independence Group | Three Rivers | 5.1% | COMBINED ANNUAL REPORT ON C183/2009, BRYAH (THREE RIVERS) PROJECT, FOR THE PERIOD 1 JANUARY 2014 TO 31 DECEMBE |
| A102414 | 2014 | Resource And Investment Nl | Horseshoe West | 100% | E52/2668 Horseshoe West Annual Technical Report for the period 20th April 2013 to 19th April 2014 |
| A103091 | 2014 | Padbury Mining Ltd | Peak Hill | 27% | 2014 Final Surrender Report E52_2396 for the period 28 July 2009 - 21 July 2014 |
| A104597 | 2014 | Independence Group Nl | Bryah | 96% | Annual Report on P52/1468, Bryah Project for the period 17 October 2013 to 16 October 2014 |
| A100913 | 2014 | Padbury Mining Ltd | Peak Hill | 3.6% | 2013 Annual Repor t C230/2007 For the per iod 01/01/2013 to 31/12/2013 Peak Hi l l Project Western Australia, |
| A101219 | 2014 | Alchemy Resources (Three Rivers) Pty Ltd | Three Rivers | 5.1% | Three Rivers Project Combined Annual Report for the Period 1st January 2013 to 31st December 2013, C183/2009, |
| A102855 | 2014 | Allkarri Holdings Pty Ltd | Peak Hill | 2.5% | Peak Hill Project, Annual Report for the period 01/06/2012 to 31/05/2014, E52/2774. |
| A104599 | 2014 | Independence Group Nl | Bryah | <1% | Annual Report on P52/1467, Bryah Project, for the period 21 October 2013 to 20 October 2014 |
| A98693 | 2013 | Alchemy Resources Ltd | Three Rivers | 12% | Exploration Incentive Scheme: Final Report Bryah Basin Copper-Gold Project for the period 1st of July 2012 to |
| A96614 | 2013 | Alchemy Resources (Three Rivers) Pty Ltd | Three Rivers | 5.1% | Combined Annual Report for the Period 1st January 2012 to 31st December 2012, Three Rivers Project M52/685, M5 |
| A96988 | 2013 | Padbury Mining Ltd | Peak Hill | 4% | Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, |
| A97360 | 2013 | Auvex Manganese Limited | Buffs Lease | <1% | E52/2547, Buffs Lease, Annual Report for the period 6th April 2012 to 5th April 2013. |
| A97742 | 2013 | Padbury Mining Ltd | Peak Hill | 11% | E52/1518 Final Surrender for the period 17th November 2003 – 16th November 2012 |
| A98796 | 2013 | Allkarri Holdings Pty Ltd | Peak Hill | 2.5% | Annual Report Peak Hill E52/2774 for the period June 1, 2012 – May 31, 2013 |
| A99877 | 2013 | Alchemy Resources Ltd | Three Rivers | 1.8% | Three Rivers Project, Voluntary Partial Surrender Report, E52/1668, for the period 23rd February 2004 to 17th |
| A93081 | 2012 | Padbury Mining Ltd | Peak Hill - Telecom Hill | 4% | 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011 |
| A93971 | 2012 | Auvex Manganese Limited | Buffs Lease | <1% | E52/2547 Buffs Lease Annual Report for the period 6th April 2011 to 5th April 2012 |
| A93998 | 2012 | Padbury Mining Ltd | Peak Hill | 1.8% | Final Surrender Report E52/1481 Peak Hill Project Western Australia |
| A94110 | 2012 | Alchemy Resources (Three Rivers) Pty Ltd | Peak Hill | 9% | Peak Hill NWN Project Combined Annual Report for the Period 1st July 2011 to 30th June 2012 |
| A95587 | 2012 | Naracoota Resources Ltd | Horseshoe | 96% | Horseshoe P52/1397 Annual Report for the period 14th Sept 2011 to 13th Sept 2012 |
| A95582 | 2012 | Naracoota Resources Ltd | Horseshoe | <1% | P52/1402 Horseshoe project Annual Report for the period 14th September 2011 to 13th September 2012 |
| A89074 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | 9% | Peak Hill NWN Project 2010 Annual Report C17/2008, Report Period: 1 July 2009 – 30 June 2010, E52/1668, E52/16 |
| A89335 | 2011 | Padbury Mining Ltd | Peak Hill | 4% | Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010 |
| A91724 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill NWN | 9% | Peak Hill NWN Project CR17/2008 2010 Annual Report Report Period: 1 July 2010 – 30 June 2011 |
| A90190 | 2011 | Auvex Resources Ltd | Buff's Lease | <1% | ANNUAL REPORT FOR THE PERIOD 6th April 2010 to 5th April 2011 Buff’s Lease E52/2547 |
| A85953 | 2010 | Aurium Resources Ltd | Peak Hill | 2.9% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on |
| A81263 | 2009 | Aurium Resources Ltd | Peak Hill | 2.3% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52 |
| A82518 | 2009 | Grosvenor Gold Pty Ltd | BRYAH | 35% | BRYAH PROJECT E52/1810 Partial Surrender Report, For the period 3rd February 2005 to 31st March 2009 |
| A82100 | 2009 | Aurium Resources Ltd | PEAK HILL | 100% | FINAL SURRENDER REPORT FOR E52/1728 PEAK HILL, 30th January 2008 to 29th January 2009 |
| A84440 | 2009 | Grosvenor Gold Pty Ltd | Peak Hill NWN | 9% | Peak Hill NWN Project 2009 Annual Report, 1 July 2008 – 30 June 2009 |
| A77717 | 2008 | Haven Resources Ltd | Peak Hill | 100% | Annual Report E52/1728 Peak Hill For the period 30th January 2007 to 29th January 2008 |
| A79777 | 2008 | Eagle Gold Mines Pty Ltd | Peak Hill | 8% | PEAK HILL NWN PROJECT E52/1668, E52/1678, E52/1722, E52/1723, E52/1730, E52/1810, E52/1852, E52/1881 Combined |
| A77494 | 2008 | Greater Pacific Gold Ltd | Peak Hill | 3.8% | Annual Technical Report on Exploration Licence E52/1557 on the PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A77367 | 2008 | Eagle Gold Mines Pty Ltd | Peak Hill | 8.3% | Peak Hill Project 2006 Annual Report, 20 January 2007 - 19 January 2008, C21/2006 |
| A77729 | 2008 | Greater Pacific Gold Ltd | Peak Hill | 1.8% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1481 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A77730 | 2008 | Greater Pacific Gold Ltd | Peak Hill | 11% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1518 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A74693 | 2007 | Gleneagle Gold Ltd | Peak Hill | 8.2% | Peak Hill Project C21/2006 Annual Report for the Period 1 Dec 2005 to 19 Jan 2007 (Peak Hill) |
| A74651 | 2007 | Jamora Nominees Pty Ltd | Peak Hill | 100% | Annual Report E52/1782 Peak Hill for the period 30th January 2006 to 29th January 2007 (Peak Hill Project). |
| A71687 | 2006 | Greater Pacific Gold Ltd | Peak Hill | 1.8% | Annual Technical report on Exploration Licence E52/1481 on the Peak Hill Sheet, For the year ending November 2 |
| A71688 | 2006 | Greater Pacific Gold Nl | Peak Hill | 11% | Annual Report on Exploration Licence E52/1518 on the Peak Hill Sheet for the year ending November 2005, (Peak |
| A71689 | 2006 | Greater Pacific Gold Ltd | Peak Hill | 3.8% | Annual Report on Exploration Licence E52/1557 for the year ending November 2005. |
| A72248 | 2006 | Jamora Nominees Pty Ltd | Peak Hill | 100% | Annual Report, E52/1728 Peak Hill, For the Period 30 January 2005 to 29 January 2006. |
| A69882 | 2005 | Peak Hill Manganese Pty Ltd | Peak Hill | 11% | Annual report for the period 15/10/03 - 16/10/04 Peak Hill Project, E52/1518. |
| A70221 | 2005 | Jamora Nominees Pty Ltd | Peak Hill | 100% | Annual report, E52/1728, Peak Hill, for the period 30th January 2004 to 29th January 2005, Meekatharra |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A61900 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine Joint Venture Project, E52/697, M52/13,116,287,324,345,346,465,541,581-582, P52/5 |
| A57938 | 1999 | Zygot Ltd | Bryah | 35% | Final Report for 16/03/94-08/12/98 ,Bryah Project , E52/677. |
| A58699 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541,581-582 P52/51 |
| A58705 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596 Peak Hill Mine Joint Venture Project E52/697 Fifth Year and Final Relinquishment Report Period 24 |
| A54838 | 1998 | Troy Resources Nl | Orchard-Reefer | 17% | Orchard-Reefer Project, Peak Hill District, W.A. Annual Report 1997-1998 P52/845-856, ELA52/1093 |
| A55334 | 1998 | Troy Resources Nl | Wongawar Bore | 3.1% | Wongawar Bore Project, Filnal Surrender Report , June 1998, E52/1017. |
| A55346 | 1998 | Resolute Ltd | Marymia Hill JV | <1% | Marymia Hill Joint Venture, Annual Report 01/01/97 - 31/12/97 M52/185, 233-235, 269-276, 340-342, 365-366, 478 |
| A55789 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine Joint Venture Project E52/697 Fourth Year Partial Relinquishment Report Period 24/0 |
| A55845 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,581 582 P52 |
| A56556 | 1998 | St Barbara Mines Ltd | Bryah | 28% | Bryah Project Area E52/601, 677; M52/344, 350, 445, 463, for the period 01/10/1997 - 30/09/1998. |
| A50066 | 1997 | Plutonic Operations Ltd | Twin Rivers | <1% | Twin Rivers Joint Venture Horseshoe Range Project E52/771 Annual Report Period 12/12/1995 - 11/12/1996 |
| A50496 | 1997 | Plutonic Operations Ltd | Twin Rivers/Fraser Well | 6.8% | Twin Rivers/Fraser Well Project, Annual Report Period 18/01/1996 - 17/01/1997, P36/1350, E52/911. |
| A50497 | 1997 | Plutonic Operations Ltd | Twin Rivers/Horseshoe Range | 5.2% | Twin Rivers/Horseshoe Project, Annual Report Period 17/01/1996 to 16/01/1997, E52/912. |
| A51240 | 1997 | Plutonic Operations Ltd | Peak Hill | 3.1% | Peak Hill (JV) Project, Final Surrender Report for the period 16/03/1996 to 02/10/1996, E52/641. |
| A51016 | 1997 | Troy Resources Nl | Orchard-Reefer | 28% | Orchard-Reefer Project Peak Hill District W.A Annual Report 1996-1997 Tenements P's 52/845 - 52/856 ELA 52/109 |
| A51347 | 1997 | Troy Resources Nl | Bullgullan Bore SW | 95% | Bullgullan Bore SW, Prospecting Licences P 52/820-P52/824 Annual Report for period March 1996 to March 1997. |
| A51348 | 1997 | Troy Resources Nl | Peak Hill | 3.1% | Peak Hill Project, Annual Report for the period 01/02/1996 to 01/03/1997, E52/1017. |
| A51814 | 1997 | Mines & Resources Australia Pty Ltd | Bullgullan Bore | 1.9% | Bullgullan Bore Project, Annual Report for the period 03/06/1996 to 02/06/1997, E52/757, P52/807 & 808. |
| A52184 | 1997 | Plutonic Operations Ltd | Peak Hill | <1% | Project 596 Peak Hill Joint Venture Project E52/686,697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,5 |
| A52258 | 1997 | Plutonic Operations Ltd | Peak Hill | <1% | Third Year Partial Relinquishment Report Period 24/06/94 to 23/06/97 |
| A52798 | 1997 | St Barbara Mines Ltd | Bryah | 23% | Annual Report 01/10/96-30/09/97. Bryah Project Area. E52/601,628,677. M52/344,350,445,463. P52/550-555. |
| A52870 | 1997 | Plutonic Operations Ltd | Fraser Well North | 6.8% | Fraser Well North Project, Annual Report for the period 17/01/1997 to 16/01/1998, E52/911. |
| A52871 | 1997 | Plutonic Operations Ltd | Horseshoe Range | 5.2% | Horseshoe Range Project, Annual Report for the period 17/01/1997 to 16/01/1998, E52/912. |
| A53211 | 1997 | St Barbara Mines Ltd | Peak Hill | 13% | Peak Hill Project, Non-statutory Report: Geochemical Exploration Peak Hill/Glengarry Area W.A., 03/1996 - 03/ |
| A46896 | 1996 | Plutonic Operations Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 12/12/94 - 11/12/95, E52/771. |
| A46926 | 1996 | Plutonic Operations Ltd | Peak Hill | 1% | Peak Hill Project, Annual Technical Report for period 30/11/1994 - 29/11/1995, E52/737. |
| A47294 | 1996 | Plutonic Operations Ltd | Twin Rivers/Horseshoe Range | 5.2% | Twin Rivers Joint Venture/Horseshoe Range Project, Annual Report Period 17/01/1995 - 16/01/1996, E52/912. |
| A47293 | 1996 | Plutonic Operations Ltd | Twin Rivers/Fraser Well | 6.8% | Twin Rivers/Fraser Well North Project, Annual Report Period 17/01/1995 - 16/01/1996, E52/911. |
| A47593 | 1996 | Swan Gold Nl | Bryah | 90% | Bryah Project, Annual Report for the period 01/02/1995 to 31/01/1996, E52/794. |
| A47797 | 1996 | Plutonic Operations Ltd | Peak Hill | 7.8% | Annual Report. Period 16/03/1995-15/03/1996. |
| A47820 | 1996 | Solomon Pacific Resources Nl | Orchard-Reefer | 28% | Park Hill (Solomon Pacificferenco) Joint Venture Orchard Reefer project Annual report 1995-1996 Tenements: P52 |
| A48143 | 1996 | Mines & Resources Australia Pty Ltd | Bullgullan | 1.9% | Bullgullan Project, Annual Report for the period 3rd June 1995 to 2nd June 1996, E52/757, P52/807, P52/808. |
| A48742 | 1996 | Plutonic Operations Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine Joint Venture Project E52/442 E52/686 E52/697 M52/13 M52/35 M52/56 M52/116 M52/287 |
| A49652 | 1996 | Plutonic Operations Ltd | Bullgullan | 35% | Bullgullan E52/695 Final Report from 15/09/95- 14/09/96 |
| A44341 | 1995 | Mr Wilson Sw | Bryah | 90% | Bryah Project, Annual Report Exploration Licence E52/794 for the period 1st February 1994 to 31st January 1995 |
| A45019 | 1995 | Afmeco Pty Ltd | Bullgullan | 1.9% | Bullgullan Project, Annual Report E52/757, P52/807, & P52/808 for the period 03/06/1994 to 02/06/1995. |
| A44283 | 1995 | Plutonic Operations Ltd | Peak Hill | 9.6% | Peak Hill (JV) Project, Partial Surrender Report for the period 16/3/1988 to 16/2/1995, E52/260. |
| A44284 | 1995 | Plutonic Operations Ltd | Peak Hill | 3.1% | Peak Hill (JV) Project, Partial Tenement Relinquishment Report E52/641 for period 21/03/1992 to 20/03/1995. |
| A44395 | 1995 | Plutonic Operations Ltd | Peak Hill | 10% | Peak Hill (JV) Project, Annual Report for the period 16/03/1994 to 15/03/1995, E52/260, E52/404, E52/641, P52/ |
| A45313 | 1995 | Plutonic Operations Ltd | Peak Hill Mine Joint Venture | <1% | Project 596 Peak Hill Mine Joint Venture Project Annual report E52/442 E52/686 E52/697 E52/737 M52/13 M52/35 M |
| A45781 | 1995 | Plutonic Operations Ltd | Bullgullan | 35% | Bullgullan Project, Annual Report E52/695 for the period 15/09/1994 to 14/09/1995. |
| A40990 | 1994 | Newcrest Mining Ltd | St Crispin - Ravelstone | 17% | Ravelstone E52/672, St. Crispin - Ravelstone JV Project, . Final Report for the period ending March 1994 |
| A41117 | 1994 | Afmeco Pty Ltd | Peak Hill South | 10% | Peak Hill South (JV) Project, Annual Report, E52/260, E52/404, E52/641. P52/7272 (Group 1) for the period 16/0 |
| A41571 | 1994 | St Barbara Mines Ltd | Bryah | 2.3% | Annual report for the period 14/10/92-31/12/93, Bryah Project, E52/376 E52/601 M52/344 M52/350 M52/445 P52/55 |
| A42648 | 1994 | Dominion Mining Ltd | Divide | 5.9% | Divide Project, Final Surrender Report for the period 3rd July 1992 to 10th June 1994, E52/605. |
| A42607 | 1994 | St Barbara Mines Ltd | Bryah | 1.4% | Annual Report for the period 1st January 1994 to 31st October 1994, Bryah Project . |
| A38278 | 1993 | Afmeco Pty Ltd | M6077/14: Peak Hill gold exploration | 10% | Annual report Peak Hill South JV |
| A37286 | 1992 | Afmeco Pty Ltd | Peak Hill West | 16% | Partial Surrender Report, Peak Hill West Project, E52/404 for the period 25/10/89 to 24/10/92. |
| A35601 | 1992 | Afmeco Pty Ltd | Peak Hill South | 12% | Peak Hill South (JV) Project, E52/260 & 404; P52/475 (Group 1)for the period 17/03/1991 to 16/03/1992. |
| A36773 | 1992 | Afmeco Pty Ltd | Peak Hill South | 9.6% | Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 30/05/1992, E52/260. |
| A37368 | 1992 | Perilya Mines Nl | Reefer | 12% | Surrender Report, Reefer Project , for the period 19/1/92 to 26/10/92, E52/589. |
| A33821 | 1991 | Great Central Mines Nl | Plutonic West | 3% | Plutonic West Project, Annual Report for the period 9th July 1990 to 8th July 1991, E52/346, 348 & 362-365. |
| A33455 | 1991 | Afmeco Pty Ltd | Peak Hill South | 12% | Peak Hill South Project, Annual Report for the period 17/03/1990 to 16/03/1991, E52/260 & 404; P52/475-477. |
| A33947 | 1991 | Afmeco Pty Ltd | Peak Hill South | 9.6% | Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 15/03/1991, E52/260. |
| A29996 | 1990 | Afmeco Pty Ltd | Peak Hill South | 12% | Peak Hill South Project, Annual Report for the period 1st January 1989 to 31st December 1989, E52/260,404; P52 |
| A31666 | 1990 | Great Central Mines Nl | Plutonic West | 3% | Plutonic West Project, Annual Report for the period ending 25 September 1990, E52/346, 348 & 362-365. |
| A26830 | 1989 | Afmeco Pty Ltd | Peak Hill South | 9.6% | Annual Report for the period 16/03/88-16/03/89 Peak Hill South Project E52/260 |
| A11007 | 1982 | Western Mining Corporation Ltd | Horseshoe | 17% | Horseshoe Project, Final Surrender Report for the period 10th December 1980 to 23rd April 1982, MC52/4123-413 |
| A11347 | 1982 | Stockdale Prospecting Ltd | Horseshoe Townsite | 28% | Horseshoe Townsite, Non-statutory Report: Final Report for the period 18th December 1981 to 17th June 1982, TR |
| A8764 | 1980 | Broken Hill Pty Co Ltd | Peak Hill | <1% | Peak Hill Project, Final Surrender Report, February 1980, MC52/2617-2623 & 2651-2664. |
| A912 | 1967 | Electrolytic Zinc Company Of Australasia Ltd | Horseshoe Lights | 1.7% | Horseshoe Lights Project, Non-statutory Report: Geological Report, August 1967, TR70/3528H. |
| A911 | 1966 | Electrolytic Zinc Company Of Australasia Ltd | Horseshoe Lights | 1.7% | Horseshoe Lights Project, Non-statutory Report: Brief Exploration Report. March 1966, TR70/3528H. |
| A38012 | 1753 | Plutonic Operations Ltd | Plutonic West | 2% | Annual Report for Plutonic West Project,E52/346, 348, 362-365; M52/330-337.for the period 01/01/92 to 31/12/9 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 52/4550 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 52/4550? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-07. Compiled by NextMaps. Verify against primary sources before reliance.