E 52/4573 is a pending exploration licence in the Shire of Meekatharra, Western Australia, applied for by Coolgardie Mineral Rights Pty Ltd (part of Corazon Mining Limited). The application was received on 17 Feb 2026 and is awaiting a decision. The ground is covered by 183 historical WAMEX reports.
Register summary
- Holder
- Coolgardie Mineral Rights Pty Ltd
- Part of
- Corazon Mining Limited (ASX:CZN) as at 2026-06-30
- Local government
- Shire of Meekatharra
- Application received
- 17 Feb 2026
The full record on E 52/4573
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Dealings, mortgages, caveats and transfer history
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149785 | 2025 | Aic Mines Limited | Thaddona Hill | 5.9% | Final Surrender Report forThaddona Hill Project E52/3317, E52/3318 and E52/3319 (C53/2017) for the period endi |
| A148173 | 2025 | Aic Mines Limited | Beyondie | <1% | C148/2017 Beyondie 2024 Annual Technical Report for the period ending 31/12/2024 |
| A138434 | 2024 | Lodestar Minerals Limited | Marymia | 100% | Annual Report for E52/3798 Marymia for the period ending 20/09/2023. |
| A139342 | 2024 | Aic Mines Limited | Beyondie | <1% | C148/2017 Beyondie 2023 Annual Technical Report for the period ending 31 December 2023 |
| A134894 | 2023 | Aic Mines Limited | Three Rivers | 18% | E52/3397 – Partial Surrender Report Three Rivers Project for the period ending 22/03/2023. |
178 more reports
| A133761 | 2023 | Aic Mines Limited | Thaddona Hill | 13% | Compulsory Partial Surrender E52/3317 Thaddona Hill for the period 4 October 2016 to 3 October 2022 |
| A134603 | 2023 | Aic Mines Limited | Beyondie | <1% | Annual Technical Report C148/2017 Beyondie for the period ending 31/12/2022. E 52/2943,E 52/2944,E 52/2973,E 6 |
| A130127 | 2022 | Aic Mines Limited | Stetson | 13% | Final Report- EIS Co-Funded Exploration Drilling Application DAG2020/00138575 Stetson (Round 22) |
| A130229 | 2022 | Aic Mines Limited | Beyondie | <1% | Beyondie C148/2017 - Annual Technical Report for the period ending 31/12/2021 |
| A130547 | 2022 | Gladiator Resources Limited | MARYMIA | <1% | Annual Report for E52/3104 MARYMIA for the period ending 11/03/2022. |
| A132401 | 2022 | Norwest Minerals Limited | Bulgera | <1% | Bulgera Project Partial Surrender Report E52/3316 for the period 08/08/2016 to 08/08/2022 |
| A132572 | 2022 | Aic Mines Limited | Thaddona Hill | 2.5% | Annual Technical Report C53/2017 Thaddona Hill Project for the period ending 25/07/2022 |
| A133027 | 2022 | Lodestar Minerals Limited | Marymia | 100% | Annual Report for E52/3798 Marymia for the period ending 20/09/2022. |
| A126649 | 2021 | Aic Mines Limited | Beyondie | <1% | Beyondie Annual Technical Report - C148/2017 - 1 January 2020 to 31 December 2020 |
| A126768 | 2021 | Gladiator Resources Limited | MARYMIA | <1% | Annual Report for Marymia E52/3104 for the period ending 11/3/32021 |
| A127133 | 2021 | Aic Mines Limited | Beyondie | 4.5% | Beyondie - Partial Surrender Report - E52/2973 for the period 29/4/2015 to 4/4/2021 |
| A128652 | 2021 | Aic Mines Limited | Thaddona Hill | 2.5% | Thaddona Hill C53/2017 Annual Technical Report for the period ending 25/07/2021 |
| A123111 | 2020 | Aic Mines Limited | Beyondie | <1% | 2019 Annual Technical Report on Beyondie, C148/2017, 01 January 2019 to 31 December 2019 |
| A123106 | 2020 | Vango Mining Limited | Marymia | 1.9% | Annual Report for the Marymia Gold Project C93/2018 for the period 1 January 2019 to 31 December 2019 |
| A123289 | 2020 | Gladiator Resources Limited | MARYMIA | <1% | ANNUAL REPORT for EXPLORATION LICENCE E52/3104, MARYMIA, 12 MARCH 2019 TO 11 MARCH 2020 |
| A124816 | 2020 | Norwest Minerals Limited | Marymia | 7.9% | Annual Technical Report C144/2010, E52/02394, E52/02395 for the period ending 15 June 2020 |
| A124965 | 2020 | Aic Resources Limited | Three Rivers | 4.5% | Three Rivers - Annual Technical Report C84/2016 for the period ending 30 June 2020 |
| A125207 | 2020 | Aic Mines Limited | Thaddona Hill | 2.5% | Thaddona Hill C53/2017 Annual Report for the period ending 9 August 2020 |
| A121615 | 2019 | Vango Mining Limited | Ned's Creek | <1% | Ned's Creek C212/2010 Annual report for the period 12 September 2018 to 11 September 2019, E 52/02440, E 52/02 |
| A122179 | 2019 | Norwest Minerals Limited | Bulgera | <1% | Annual Report C115/2016 Bulgera project for the period 18 August 2018 to 17 August 2019. E 52/03276,E 52/03316 |
| A118807 | 2019 | Aic Resources Limited | Beyondie | <1% | Annual Report Beyondie C148/2017 for the period 1 January 2018 to 31 December 2018, E52/02943, E52/02944, E52/ |
| A119558 | 2019 | Vango Mining Limited | Marymia | 1.9% | Annual Report for the Marymia Gold Project C93/2018 for the period 1 January 2018 to 31 December 2018 |
| A120555 | 2019 | Aic Resources Limited | Three Rivers | 4.5% | Annual report Three Rivers project (C84/2016) for the period 1 July 2018 to 30 June 2019 E 52/03027,E 52/03154 |
| A120703 | 2019 | Aic Resources Limited | Thadoona | 2.5% | Annual Report for C53/2017 Thadoona project for the period 27 July 2018 to 26 July 2019 |
| A120762 | 2019 | Australian Mines Limited | Marymia | 7.9% | Annual Technical Report C144/2010 Marymia Project for the period 16 June 2018 to 15 June 2019, E52/02394, E52/ |
| A118264 | 2018 | Accelerate Resources Limited | Bulgera | <1% | Bulgera Project C115/2016, Annual Report for the period ending 17th August 2018, E52/03316, E52/03276 |
| A116367 | 2018 | Aic Resources Limited | Beyondie | <1% | C148/2017 Beyondie Project Annual Report for the period 01/01/2017 - 31/12/2017, E 52/02943, E 52/02944, E 52/ |
| A116602 | 2018 | Dampier (Plutonic) Pty Ltd | Plutonic Dome | 2.3% | Plutonic Dome Project - Combined Annual Report - C226/2011, 01 January 2017 to 31 December 2017 |
| A116674 | 2018 | Flinders Exploration Ltd | Marymia | <1% | E52/3104 Marymia Annual Technical Report for the year ended 11 March 2018 |
| A117257 | 2018 | Aic Resources Limited | Three Rivers | 4.6% | Three Rivers Project Combined Reporting Number C84/2016 Annual Report for the period 01/07/2017 - 30/06/2018, |
| A117485 | 2018 | Aic Resources Limited | Thadoona | 2.5% | Annual Report on Explorations Activies for C53/2017, Thadoona, 27 July 2017 - 26 August 2018 |
| A117685 | 2018 | Australian Mines Limited | Marymia | 7.9% | Australian Mines Limited, Annual Technical Report, C 144/2010, Marymia Project, 16 June 2017 - 15 June 2018 |
| A118596 | 2018 | Lodestar Minerals Limited | Ned's Creek | <1% | Annual Report for the Ned's Creek Project, C212/2010, 12 September 2017 - 11 September 2018 |
| A113993 | 2017 | Flinders Exploration Limited | Marymia | <1% | Annual Technical Report Marymia E52/3104 for the period 12/03/2016 to 11/03/2017 |
| A115009 | 2017 | Aic Resources Limited | Marymia | 2.5% | Annual Report for Thadoona Group of Tenements C53/2017, E52/03317, E52/03318, E52/03319, E52/03346 for the per |
| A115412 | 2017 | Poz Minerals Limited | Bulgera | <1% | Bulgera C115/2016 Annual Report for the period 18 August 2016 to 17 August 2017, E52/03276, E52/03316 |
| A112759 | 2017 | Dampier (Plutonic) Pty Ltd | Plutonic Dome | 2.2% | Combined Annual Report - C226/2011 Plutonic Dome Gold Project for the period 01/01/2016 to 31/12/2016 |
| A114187 | 2017 | Aic Resources Limited | Beyondie | <1% | C85/2016 Beyondie Project Annual Report for the period 27 April 2016 to 28 April 2017, E52/02943, E52/02944, E |
| A114343 | 2017 | Aic Resources Limited | Three Rivers | 4.6% | Three Rivers Project C84/2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A114385 | 2017 | Australian Mines Limited | Yowereena Hill | 7.9% | Yowereena Hill Project C144/2010 Annual Report for the period 16 June 2016 to 15 June 2017, E52/02395, E52/023 |
| A115417 | 2017 | Lodestar Minerals Ltd | Neds Creek | <1% | Neds Creek C212/2010 Annual Report for the period 12 September 2016 to 11 September 2017, E52/02440, E52/02456 |
| A108800 | 2016 | Flinders Exploration Ltd | Marymia | <1% | Marymia Project Annual Technical Report E52/3104 Period Ending 11 March 2016 |
| A109190 | 2016 | Cosmopolitan Minerals Ltd | Marymia | 4.5% | Marymia Project E52/02973 Annual Report for the period 29/04/2015 to 28/04/2016 |
| A109237 | 2016 | Australian Mines Limited | Marymia | 7.9% | Marymia Project Partial Surrender Report C144/2010, E52/02394, E52/02395 for the period 16 June 2010 to 15 Jun |
| A107915 | 2016 | Emergent Resources Ltd | Beyondie | 4.7% | E52/1806 and E52/2559 Surrender Report Beyondie South C60/2011 for the period 15 November 2006 to 08 December |
| A108642 | 2016 | Vango Mining Limited | Plutonic Dome | 2% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2015 to 31/12/2015 |
| A108920 | 2016 | Emergent Resources Ltd | Beyondie | 1.8% | E52/1806, E52/2215, E52/2559 Beyondie South (C60/2011) group 2015 Annual Technical Report for the period 01 Ja |
| A109587 | 2016 | Australian Mines Limited | Marymia | 7.9% | Marymia Project C144/2010, E52/02394, E52/02395 Annual Report for the period 16 June 2015 to 15 June 2016 |
| A109904 | 2016 | Australian Mines Limited | Marymia | 16% | MARYMIA PROJECT E52/2395 Partial Surrender Report For the Period 31 August 2010 to 30 August 2016 |
| A109909 | 2016 | Cosmopolitan Minerals Ltd | Beyondie | <1% | Beyondie Project C85/2016 Combined Annual Exploration Report for the period 29/04/20154 to 28/04/2016, E52/029 |
| A110087 | 2016 | Lodestar Minerals Limited | Marymia | 56% | Final Surrender Report for E52/2492 Marymia Project for the period 20/08/2010 to 15/08/2016 |
| A110507 | 2016 | Lodestar Minerals Limited | Ned's Creek | <1% | Ned's Creek Project C212 Annual Report for the period 12 September 2015 to 11 September 2016, E52/02440, E52/0 |
| A105239 | 2015 | Vango Mining Limited | Plutonic Dome | 1.3% | Annual Exploration Report for C226/2011, The Plutonic Dome Project from 01/01/2014 to 31/12/2014, E52/2071.... |
| A106261 | 2015 | Australian Mines Ltd | Marymia | 7.9% | Marymia Project Annual Report Combined Reporting Group C144/2010 (E52/2394-I and E52/2395) For the period 16-J |
| A107487 | 2015 | Lodestar Minerals Limited | Peak Hill - Doolgunna - Neds Creek | 11% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12/09/2014 to 11/09/2015, E5 |
| A104392 | 2015 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Neds Creek | 9.4% | Peak Hill - Doolgunna - Neds Creek Project C212/2010 Annual Report for the period 12th September 2013 to 11th |
| A105569 | 2015 | Emergent Resources Ltd | Beyondie | 1.8% | Beyondie South (C60/2011) group 2014 Annual Technical Report for the period 01 January 2014 to 31 December 201 |
| A102572 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 38% | Plutonic Project, Final Surrender Report for the period 04/11/1991 to 26/02/2013, M52/276. |
| A102576 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 3.5% | Plutonic Project, Final Surrender Report for the period 04/11/1991 to 26/02/2013, M52/275. |
| A101167 | 2014 | Lodestar Minerals Ltd | Maymia | <1% | Partial Surrender Report for Marymia Project E52/2493 for the period 17th September 2012 to 25th October 2013 |
| A101193 | 2014 | Emergent Resources Ltd | Beyondie | 1.8% | Beyondie South (C60/2011) 2013 Annual Technical Report for the period 01 January 2013 to 31 December 2013, E52 |
| A101194 | 2014 | Emergent Resources Ltd | Beyondie | 11% | Beyondie Iron Project E52/2559 Partial Relinquishment Report for the period 28 July 2010 to 24 January 2014. |
| A102567 | 2014 | Dampier (Plutonic) Pty Ltd | Plutonic | 50% | Plutonic Project, Final Surrender Report for the period 12/02/1993 - 26/02/2013, M52/356. |
| A103054 | 2014 | Riedel Resources Ltd | Marymia | 7.9% | Marymia Project, Annual Report for the period 16/06/2013 to 15/06/2014, E52/2394 & 2395. |
| A97953 | 2013 | Emergent Resources Ltd | Beyondie | 3% | Beyondie Project, Annual Report for the period 14/11/2011 to 13/11/2013, E52/1806, 2474 & 2559. |
| A99439 | 2013 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Marymia | <1% | Peak Hill - Doolgunna Project C213/2012 Final Surrender Report for 17th August 2010 to 25th July 2013, E69/266 |
| A97128 | 2013 | Dampier Gold Ltd | Plutonic Dome | 1.7% | Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/ |
| A97675 | 2013 | Dampier Gold Ltd | Plutonic Dome | 4.1% | Combined Surrender Report Plutonic Dome Project C226/2011 for the period ending 26/02/2013 |
| A98761 | 2013 | Riedel Resources Ltd | Marymia | 7.9% | Marymia Project, Annual Report for the peiod 16th June 2012 to 15th June 2013, E52/2394 & 2395. [C144/2010] |
| A98881 | 2013 | Emergent Resources Ltd | Beyondie | 4.1% | Surrender Report E52/2474 for the period ended 29 July 2013 |
| A99878 | 2013 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Marymia | 27% | Peak Hill - Doolgunna - Marymia (C213/2010) E52/2492, E52/2493, E52/2505, E52/2734 Annual Report for the perio |
| A101570 | 2013 | Ord River Resources Ltd | Plutonic Dome | 1.3% | C226/2011 ANNUAL EXPLORATION REPORT Reporting Period 01/01/2013 to 31/12/2013 |
| A94622 | 2012 | Riedel Resources Ltd | Marymia | 7.9% | Marymia Project, Annual Report for the period 16th June 2011 to 15th June 2012, E52/2394 & 2395. [C144/2010] |
| A93152 | 2012 | Dampier Gold Ltd | Plutonic Dome | 1.7% | Combined Annual Report for the period 1 January 2011 to 31 December 2011 Plutonic Dome Project C226/2011 |
| A96076 | 2012 | Lodestar Minerals Ltd | Marymia | 14% | Marymia Project, C213/2010, Annual Report for period 12th September 2011 to 1th September 2012. |
| A89778 | 2011 | Barrick (Plutonic) Ltd | Plutonic - Marymia | 1.4% | Marymia Project, Plutonic Project, Plutonic Extended Project, Freshwater Project, Annual Report, Period 1 Janu |
| A91159 | 2011 | Riedel Resources Ltd | Marymia | 7.9% | Combined Annual Report Marymia Project C144/2010 For the period 16 June 2010 to 15 June 2011 |
| A91899 | 2011 | Emergent Resources Ltd | Beyondie South | 3% | Annual report for the period 1st January 2011 to 31 December 2011, Beyondie South C60/2011, E52/2474, E52/2559 |
| A92371 | 2011 | Lodestar Minerals Ltd | Marymia | 14% | MARYMIA PROJECT TENEMENTS E52/2492, E52/2493, E52/2505, E69/2662, 52/2544, 52/2558 ANNUAL TECHNICAL REPORT YEA |
| A86710 | 2010 | Barrick (Plutonic) Ltd | Plutonic / Marymia | 1.4% | 6490 MARYMIA PROJECT 6520 PLUTONIC PROJECT 6523 PLUTONIC EXTENDED Project 6530 FRESHWATER PROJECT ANNUAL REPO |
| A81575 | 2009 | Legacy Iron Ore Ltd | Marymia Gold | <1% | E52/1649 – Marymia Gold Project 2008 Annual Report, 5th January 2008 – 4th January 2009 |
| A81899 | 2009 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 4.7% | PROJECT 6490 MARYMIA PROJECT, PROJECT 6520 PLUTONIC PROJECT, PROJECT 6523 PLUTONIC EXTENDED PROJECT, PROJECT 6 |
| A84711 | 2009 | Magellan Metals Pty Ltd | Pool Dam | 72% | FINAL SURRENDER REPORT E52/2050: POOL DAM |
| A77142 | 2008 | Mr Wozniak F | Marymia | <1% | Annual Report Tenement - E52/1649 Marymia Gold Project For Reporting Period 05/01/2007 to 04/01/2008. |
| A77831 | 2008 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 4.8% | Annual Report Period 1 January 2007 - 31 December 2007 Technical Report No. 1257 Plutonic/ Marymia Project |
| A74085 | 2007 | Barrick Gold Of Australia Ltd | Gregory Project | <1% | Gregory Project, E52/1680-1684, E52/1706, E69/1879, (C121/2004), Annual Report for the Period 16 August 2005 t |
| A74697 | 2007 | Barrick Gold Of Australia Ltd | Marymia/ Plutonic | 4.8% | Marymia/ Plutonic Project C94/1999 Annual Report Period 1 January 2006 - 31 December 2006 (Peak Hill) |
| A73877 | 2006 | Falcon Minerals Ltd | Marymia | 7.9% | Marymia Project E52/1687-1688 Annual Report for the Period 17th Oct 2005 to 16th Oct 2006 C197/2006 (Peak Hill |
| A72015 | 2006 | Barrick Gold Of Australia Ltd | Marymia, Plutonic, Plutonic Extended & F | 4% | Marymia, Plutonic, Plutonic Extended & Freshwater Projects, Annual Report, Period 1 January 2005 to 31 Decembe |
| A70185 | 2005 | Barrick Gold Of Australia Ltd | Plutonic/ Marymia | 4% | Annual Report Period 1 January 2004 to 31 December 2004 Technical Report No. 1152 Projects 6490 - Marymia, 652 |
| A71168 | 2005 | Placer Dome Asia Pacific Ltd | Gregory | <1% | Gregory Project, Annual Technical Report for the period 16/08/2004 to 15/08/2005, on tenements E52/1680-1684 E |
| A68298 | 2004 | Barrick Gold Of Australia Ltd | Marymia / Plutonic / Plutonic Extended / | 4% | Annual Report for the period 01/01/2003-31/12/2003 Marymia Project,Plutonic Project,Plutonic Extended Project, |
| A66308 | 2003 | Barrick Gold Of Australia Ltd | Plutonic | 4% | Annual Report period 1 January 2002 - 31 December 2002 Project 6490 Marymia Project 6520 Plutonic Project 6523 |
| A64505 | 2002 | Barrick Gold Of Australia Ltd | Plutonic / Marymia | 3.9% | Annual Report Period 1 January 2001 - 31 December 2001. Vertification Report Technical Report No. 1024. Projec |
| A64818 | 2002 | Barrick Gold Of Australia Ltd | Plutonic - Marymia | 3.9% | Plutonic/Marymia M52/148-150, M52/170-171, M52/183, M52/185 M52/217-220, M52/222-223, M52/226-235, M52/246-247 |
| A62465 | 2001 | Homestake Gold Of Australia Ltd | Marymia | 3.9% | Project 6490 Marymia Project 6520 Plutonic Project 6523 Plutonic Extended Project 6530 Freshwater M52/148-150, |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | 16% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A59871 | 2000 | Astro Mining Nl | Nabberu | <1% | Exploration Licence E69/1046-1048,1212-1213,Mining Lease M52/519, C172/1995 Nabberu, Joint Annual Report for t |
| A60012 | 2000 | Homestake Gold Of Australia Ltd | Plutonic/ Marymia | 4% | Project 6490,Marymia, Project 6520, Plutonic, Project 6523, Plutonic Extended, Project 6530, Freshwater, M52/1 |
| A60102 | 2000 | Homestake Gold Of Australia Ltd | Marymia | 10% | Project 6490 Marymia M52/272,273,274,340 and Part M52/275, 276 & 365 Surrender Report Period up to January 200 |
| A60572 | 2000 | Homestake Gold Of Australia Ltd | Marymia | 18% | Project 6490, Marymia, Surrender report for M52/355,475, E52/634,747, Partial Surrender Report for M52/356,635 |
| A58048 | 1999 | Astro Mining Nl | Nabberu | 1.9% | E 52/439-40,420-424,426,428,1046,1212-1213 M69/8-9,12,22-25, Nabberu Project, For the Period 01/01/1998 to 31/ |
| A58969 | 1999 | Astro Mining Nl | Nabberu | 4.7% | Exploration Licences :E52/439-440, E69/420-424, 426, 428 " Nabberu" Surrender Report for the periods:- 28th F |
| A57727 | 1999 | Homestake Gold Of Australia Ltd | Marymia | 6% | Marymia Exploration - Project 6490 - Technical Report No.812 01/01/98 - 31/12/98 M52/183, 185, 217-220, 226-23 |
| A58927 | 1999 | Homestake Gold Of Australia Ltd | Pinnyriny | 22% | (Project 6540) Pinnyriny E52/533 Surrender and Final Annual Report for period 03/07/92 to 02/07/99. |
| A59537 | 1999 | Homestake Gold Of Australia Ltd | Marymia | 66% | Project 6490, Marymia, M 52/341,342,, Final Surrender Report, Period 06/10/1992 to 30/06/1999, Technical Repor |
| A54416 | 1998 | Astro Mining Nl | Nabberu | 1.7% | Nabberu Project C172/1995 Joint Annual Report Exploration Licence: E52/439-440, E69/420-424, 426, 428,etc. |
| A55921 | 1998 | Homestake Gold Of Australia Ltd | Pinnyriny | 22% | Pinnyriny E52/533 Annual Report For Period 03/07/97- 02/07/98. |
| A54199 | 1998 | Resolute Ltd | Thaduna | 16% | Thaduna Project. E52/634-635,747. M52/355-356,475-477,488-489. Annual report for the period 01/01/97-31/12/97. |
| A54913 | 1998 | Resolute Ltd | Pinnyrinny East | 23% | Pinnyrinny East Joint Venture, E52/723 Final Report On Exploration, 01/01/97 - 31/03/98 |
| A55346 | 1998 | Resolute Ltd | Marymia Hill JV | 9.5% | Marymia Hill Joint Venture, Annual Report 01/01/97 - 31/12/97 M52/185, 233-235, 269-276, 340-342, 365-366, 478 |
| A55502 | 1998 | Resolute Ltd | Thaduna | <1% | Thaduna Project, Partial Surrender Report for the period 20/05/1993 to 20/05/1998, E52/634. |
| A55849 | 1998 | Resolute Ltd | Marymia | 6.1% | Marymia Gold Project - 06/1998 Three Year Proposed Exploration Program E52/634-635, 747, 823-826, 1052 |
| A56373 | 1998 | Galtrad Pty Ltd | Yadgymurrin/Simpson Well | <1% | Combined Surrender Report for Exploration Licences E52/592 and E52/594 Marymia/Neds Creek Prospect. |
| A51480 | 1997 | Resolute Resources Ltd | Mulga Yard East | 100% | Mulga Yard East Project, Surrender Report M52/515, 516, 517,12th February 1997. |
| A52172 | 1997 | Plutonic Operations Ltd | Pinnyriny | 22% | Pinnyriny Project, Annual Report for period 03/07/1996 to 02/07/1997, E52/533. |
| A53324 | 1997 | Cyprus Gold Australia Corporation | Ned's Creek | <1% | Ned's Creek E52/592, 594, and P52/799 (MLA52/669) Combined Annual Report for the period 01/12/96 to 30/11/97. |
| A50295 | 1997 | Great Central Mines Nl | Nabberu | <1% | Exploration Licences E52/413 to E52/415 E52/431 E52/432 E52/439 E52/440 E52/547 E52/572 to E52/574 E52/577 to |
| A47126 | 1996 | Great Central Mines Nl | Greater Nabberu | 1.5% | Greater Nabberu Project, Annual Report for the Period 1 January 1995 to 31 December 1995, E52/413-415, 439-440 |
| A47128 | 1996 | Great Central Mines Nl | Marymia Two Pools | 10% | Marymia Two Pools Project, Annual Report Jan 1995 - Dec 1995, E52/439/440, M52/428-443. |
| A47590 | 1996 | Resolute Samantha Ltd | Thaduna | <1% | Thaduna Project Exploration Licence E52/747 Annual report 1993-1994 |
| A48792 | 1996 | Plutonic Operations Ltd | Pinnyriny | 22% | Pinnyriny Project, Annual Report for the period 03/07/1995 to 02/07/1996, E52/533. |
| A44225 | 1995 | Resolute Resources Ltd | Marymia | 22% | Marymia Gold Project Mining Leases M52/185, M52/271 to M52/276, M52/340 to M52/342, Exploration Licence E52/31 |
| A45329 | 1995 | Plutonic Operations Ltd | Pinnyrinny | 22% | Partial Surrender Report for the period ending 02/07/1995 Pinnyrinny Project E52/533. |
| A45945 | 1995 | Galtrad Pty Ltd | Marymia / Neds Creek | <1% | Marymia / Neds Creek Project, Annual Report E52/592, P52/797-799 inc for the period ending 25th September 1995 |
| A43524 | 1995 | Resolute Resources Ltd | Nabberu | 1.6% | Nabberu Project, Final Report E52/ 374, 375,395, E69/329,E69/507- 515, and Annual Report E69/330, E69/331, Feb |
| A43195 | 1995 | Great Central Mines Nl | Marymia Two Pools | 10% | Mining Leases M52/428-443 (inclusive) Exploration Licences E52/439 and E52/440.'Marymia Two Pools Project' Ann |
| A43480 | 1995 | Great Central Mines Nl | Nabberu | <1% | Annual report for the period 02/01/94-01/01/95 Nabberu Project E69/420-424 E69/426-428 |
| A45328 | 1995 | Plutonic Operations Ltd | Pinnyriny | 22% | Pinnyriny Project, Annual Report Exploration Licence E52/533 for period 03/07/1994 to 02/07/1995. |
| A44228 | 1994 | Resolute Resources Ltd | Marymia - Sparrow | 19% | Marymia Gold Project Exploration Licence E52/322 Sparrow Prospect RAB Drilling November 1993 |
| A39911 | 1994 | Plutonic Operations Ltd | Pinnyriny | 22% | Pinnyriny Project, Annual Report for the period 03/07/1992 to 02/07/1993, E52/533. |
| A40231 | 1994 | Great Central Mines Nl | Nabberu | <1% | Annual report for the period 02/01/93-01/01/94 Nabberu Project E69/420-424 E69/426-428 |
| A40811 | 1994 | Great Central Mines Nl | Marymia | 33% | Annual Report for the period 28/02/93 to 27/02/94, Marymia Project, E52/439 to E52/440 . |
| A40975 | 1994 | Resolute Resources Ltd | Nabberu | 1.6% | Nabberu Project, Annual Report for the period 01/08/1993 to 01/12/1993, E52/374-375, E52/ 395; E69/329-331, E6 |
| A42427 | 1994 | Plutonic Operations Ltd | Pinnyriny | 22% | Pinnyriny Project, Annual Report for the period 03/07/1993 to 02/07/1994, E52/533. |
| A42446 | 1994 | Stockdale Prospecting Ltd | Lake Nabberu | 19% | Lake Nabberu Project, Final Surrender Report for the period 29/08/1989 to 28/08/1994, E52/395. |
| A42680 | 1994 | Plutonic Operations Ltd | 12 Mile Bore | <1% | 12 Mile Bore Project, Non-statutory Report: Report for the period 10/09/1993 to 31/12/1993, E52/592. |
| A42681 | 1994 | Growth Resources Nl | Neds Creek | <1% | Neds Creek Project, Annual Report for the period 01/09/1993 to 31/08/1994, E52/592; P52/797-799. |
| A43108 | 1994 | Great Central Mines Nl | Nabberu | <1% | Nabberu Project, Partial Relinquishment Report, Exploration Licences E69/420-424, 426-428, December 1994 |
| A37880 | 1993 | Stockdale Prospecting Ltd | Nabberu | 5.2% | Nabberu Project, Annual Report for the period 30th August 1991 - 29th August 1992, E52/374-375, 395; E69/329-3 |
| A38054 | 1993 | Resolute Resources Ltd | Marymia | 6.4% | Annual report for the period 01/92-12/92 Marymia Project |
| A39336 | 1993 | Stockdale Prospecting Ltd | Lake Nabberu | 5.2% | Lake Nabberu Project, Annual Report for the period 30th August 1992 to 29th August 1993, E52/374-375, 395; & E |
| A42682 | 1993 | Growth Resources Nl | Ned's Creek | <1% | Ned's Creek Project, Non-statutory Report: Results of Geochemical Survey & Drillling Programme, Ned's Creek Pr |
| A37679 | 1993 | Stockdale Prospecting Ltd | Marymia | 19% | Annual report for the period Jan 1991-Jan 1992 Marymia Project E52/322 |
| A37758 | 1993 | Stockdale Prospecting Ltd | Lake Nabberu | 12% | Lake Nabberu Project, Partial Surrender Report for the period 29/08/1989 to 28/08/1992, E52/395, & 05/10/1989 |
| A37808 | 1993 | Growth Resources Nl | Ned's Creek | <1% | Ned's Creek Project, Non-statutory Report: Results of a Geochemical Survey, Ned's Creek Project , WA, E52/592. |
| A37882 | 1993 | Stockdale Prospecting Ltd | Methwin | <1% | Annual report for the period 02/01/92-01/01/93 Methwin Project E69/420-424 E69/426-428 |
| A38127 | 1993 | Great Central Mines Nl | Marymia | 33% | Annual report for the period 28/02/92-27/02/93 Marymia Project E52/439 E52/440 |
| A39398 | 1993 | Stockdale Prospecting Ltd | Lake Nabberu | 19% | Lake Nabberu Project, Partial Surrender Report for the period 29/08/1989 to 28/08/1993, E52/395. |
| A39464 | 1993 | Growth Resources Nl | Ned's Creek | <1% | Ned's Creek Project, Annual Report, June 1993, E52/592. (Results of Drilling Programme- Area 1). |
| A41775 | 1993 | Stockdale Prospecting Ltd | Peak Hill | 11% | Annual Report for the period 01/01/92-11/10/93 Peak Hill Project E52/322,342,633-635 |
| A35448 | 1992 | Great Central Mines Nl | Marymia | 33% | Annual report for the period 28/02/91 to 27/02/92 Marymia Project E52/439 E52/440 Great Central Mines NL |
| A35069 | 1992 | Stockdale Prospecting Ltd | Methwin | <1% | Annual report for the period 02/01/91-01/01/92 Methwin Project E69/420-424 E69/426-428 |
| A35260 | 1992 | Resolute Resources Ltd | Marymia | 5.4% | Titan Resources NL MArymia Joint Venture ML's 52/183,269,270,234,235,185,271,275,276 Progress Report September |
| A35287 | 1992 | Resolute Resources Ltd | Marymia South | 19% | PARTIAL SURRENDER REPORT |
| A37307 | 1992 | Galtrad Pty Ltd | Marymia | <1% | Marymia Project, Annual Report for period ending September 1992, E52/592. |
| A38042 | 1992 | Resolute Resources Ltd | Marymia | 19% | Marymia Project. E52/322. Report 4th year partial surrender section 95 relinquishment |
| A32637 | 1991 | Resolute Resources Ltd | Marymia | 19% | Marymia Gold Project Exploration License52/322 (R Report for 1990) |
| A33219 | 1991 | Great Central Mines Nl | Marymia | 33% | Exploration Licence E52/439, E52/440 Peak Hill; Annual Report for Period Ending 27/02/91. |
| A34790 | 1991 | Resolute Resources Ltd | Marymia - Keillor | 15% | Non-statutory Report : R Report for the period 01/01/1991 to 31/12/1991, Interpretation of Aeromagnetic Data , |
| A38051 | 1991 | Resolute Resources Ltd | Marymia | 17% | R Report for the period ending 07/91 Marymia Gold Project E52/317 E52/322 M52/183 M52/233-235 M52/269-276 M52/ |
| A34508 | 1991 | Stockdale Prospecting Ltd | Lake Nabberu | 5.2% | Lake Nabberu Project, Annual Report for the period 30th August 1990 to 29th August 1991, E52/374,375, 395, E69 |
| A31900 | 1990 | Stockdale Prospecting Ltd | Lake Nabberu | 5.2% | Lake Nabberu Project, Annual Report for the period 30th August 1989 to 29th August 1990, E52/374,375,395; E69/ |
| A32633 | 1990 | Resolute Resources Ltd | Marymia | 9.1% | Marymia Area WA Interpretation of Aeromagnetic (1990) Data (R Report for 1990; E52/158,320,322,342,352; M52/18 |
| A28050 | 1989 | Resolute Resources Ltd | Marymia | 8.3% | Marymia Gold Project : Regional review February 1989 E52/288, E52/317, E52/320, E52/322, E52/342 and E52/352 R |
| A29038 | 1989 | Resolute Resources Ltd | Plutonic Bore | 15% | Report on Aeromagnetic Survey at Plutonic Bore, Aug 1989 E77/135, E77/364, M77/431, M77/432, P77/1451 to P77/1 |
| A9837 | 1981 | Dampier Mining Co Ltd | Miss Fairburn Hills | 8.2% | Miss Fairburn Hills Project, Non-statutory Report: Final Report, April 1981, TR70/7800-7804H. |
| A6794 | 1977 | International Nickel Aust Ltd | Crows Nest Well | <1% | Crows Nest Well Project, Non-statutory Report: Final Report, March 1977, MC52/253-272, 282, 298-305, 309-310, |
| A5785 | 1975 | International Nickel Aust Ltd | Crows Nest Well | <1% | Annual report, Crows Nest Well Claim Group (including Macdonald Option), For the period 1st January 1974 to 31 |
| A5301 | 1974 | International Nickel Aust Ltd | Nabberu - Crows Nest Well | <1% | Nabberu Project - Crows Nest Well, [Annual report] for the period 1st January - 31st December 1973, MC52/253 . |
| A4080 | 1973 | International Nickel Aust Ltd | Crows Nest Well | <1% | Crows Nest Well Project, Annual Report for the period 1st January 1972 to 31st December 1972, MC52/253-272, 28 |
| A28047 | 1753 | Resolute Resources Ltd | Marymia | 13% | Marymia Gold Project : Regional overview 18 November 1988 Resolute Resources E52/157, E52/158, E52/184, E52/19 |
| A48351 | 1753 | Galtrad Pty Ltd | Marymia / Neds Creek | <1% | Marymia / Neds Creek Project, Annual Report for period ending September 1996, E52/592, P52/797 -799 incl. |
| A51328 | 1753 | Resolute Limited | Pinnyrinny East | 23% | Pinnyrinny East Joint Venture E52/723 Annual report 26th May 1994 to 31st December 1996 |
| A51627 | 1753 | Resolute Ltd | Thaduna | 19% | Thaduna Project E52/635 M52/356 E52/634 Annual report 1st September 1995 to 31st December 1996 |
| A51647 | 1753 | Resolute Ltd | Marymia Hill | 12% | Marymia Hill Joint Venture M52/185 M52/233 to M52/235 M52/269 to M52/276 M52/340 to M52/342 M52/365 M52/366 M5 |
| A43577 | 1753 | Resolute Resources Ltd | Pinnyrinny | 23% | Exploration Licence E52/723 (Pinnyrinny) Annual report 1994 |
| A51239 | 1753 | Resolute Ltd | Marymia Hill | 12% | Marymia Hill Joint Venture M52/185 M52/233 to M52/235 M52/269 to M52/276 M52/340 to M52/342 M52/365 M52/366 M5 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 52/4573 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 52/4573? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.