NextMapsWA TenementsE 57/1031

E 57/1031

LiveExploration LicenceShire of SandstoneBlack Range District
Area
12,400ha
Expires
Sept 2026
in 27 days
WAMEX reports
155
WA median is 53
Report drilling
102
of 155 reports
Sandstone Explore on the live map

Register summary

Holder
Sandstone Exploration Pty Ltd
Local government
Shire of Sandstone
Application received
26 May 2015
Commenced
20 Sept 2016
Expiry
19 Sept 2026
Term
5 Years (Extended)

Exploration history on this ground

155 historical WAMEX exploration reports intersect E 57/1031: 100 report geochemistry or sampling, 102 include a digital data package.
When this ground was worked · 153 of 155 reports dated
81970s
111980s
381990s
522000s
352010s
92020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A149596 2025 Brightstar Resources Limited Sandstone <1% 2025 Partial Surrender Report for E57/1101 Sandstone for the period ending 06/06/2025.
A149832 2025 Brightstar Resources Limited Sandstone <1% Partial Surrender Report for E57/1108 Sandstone for the period ending 30/06/2025.
A129532 2022 Alto Metals Limited Edale Shear Zone 51% Alto Metals Edale Co-funded Drilling Report, R22
A133003 2022 Alto Metals Limited Sandstone <1% Sandstone Gold Project E57/1029 Partial Surrender Report 2022.
A133046 2022 Alto Metals Limited Sandstone <1% Sandstone Gold Project E57/1030 Partial surrender report for the period ending 07/10/2022.
150 more reports
A133108 2022 Alto Metals Limited Sandstone 51% Sandstone Gold Project E57/1031 Partial Surrender report for the period ending 06/10/2022.
A133180 2022 Alto Metals Limited Sandstone <1% Sandstone Gold Project E57/1033 Partial Surrender report for the period ending 07/10/2022.
A124089 2020 Alto Metals Limited Black Hill <1% Sandstone Gold Project Black Hill E57/01101 Annual Report for the period ending 06/06/2020
A125025 2020 Gateway Mining Limited Gidgee <1% Annual Report – E57/1108 – Mt Dwyer, 1 July 2019 to 30 June 2020
A121869 2019 Alto Metals Limited Sandstone Group 2 30% Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2018 to 19 September 2019
A121731 2019 Alto Metals Limited Sandstone <1% Sandstone Project C139/2016 Combined Annual Report For the Period 20 September 2018 to 19 September 2019, E 57
A118569 2018 Alto Metals Limited Sandstone 30% Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/0
A118570 2018 Alto Metals Limited Sandstone <1% Sandstone Project C139/2016 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/
A115490 2017 Alto Metals Limited Sandstone <1% Sandstone Project C139/2016 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/
A115491 2017 Alto Metals Limited Sandstone 2 30% Sandstone Project C24/2017 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/0
A108818 2016 Black Oak Minerals Limited Sandstone 4.7% SANDSTONE PROJECT C28/2005 Combined Annual Report for the period 1 January 2015 to 31 December 2015, E57/580,
A105480 2015 Black Oak Minerals Limited Sandstone 4.7% Combined Annual Report for the Sandstone Project C281/2005 for the period 1 January 2014 to 31 December 2014,
A102287 2014 Southern Goldfields Ltd Sandstone <1% Partial Surrender Report, Sandstone Project, E57/704, for the period 20 February 2008 to 19 February 2014.
A101260 2014 Southern Cross Goldfields Ltd Sandstone 11% Sandstone Project E57/703-I Partial Surrender Report for the period 7/01/2008 to 06/01/2014
A101991 2014 Southern Cross Goldfields Ltd Sandstone 3.9% Combined annual report for the Sandstone Project, East Murchison Mineral Field, for the period 1 January 2013
A103800 2014 Southern Cross Goldfields Ltd Sandstone 11% SANDSTONE PROJECT E57/703-I East Murchison Mineral Field Final Surrender Report for the period 7/01/2008 to 21
A103801 2014 Southern Cross Goldfields Ltd Sandstone <1% SANDSTONE PROJECT E57/704-I East Murchison Mineral Field Final Surrender Report for the period 20/02/2008 to 2
A98390 2013 Southern Cross Goldfields Ltd Sandstone <1% Final Surrender Report for the Sandstone Project, E57/877, for the period 20 October 2011 to 15 March 2013
A97309 2013 Troy Resources Ltd.; Western Areas Limited Sandstone 5.9% Sandstone Project, Annual Report for the period 1st January 2012 to 31st December 2012, E57/485......E57/877;
A98763 2013 Southern Cross Goldfields Ltd Sandstone 3.3% Final Surrender Report for the Sandstone Project, E57/576 (C28/2005), for the period 13 February 2006 to 29 Ap
A99603 2013 Aphex Minerals Pty Ltd Dandaraga <1% Annual Report – 19th May 2012 to 18th May 2013 Dandaraga Project – C92/2012 E57/839, E57/845, E57/869
A100211 2013 Southern Cross Goldfields Ltd Sandstone <1% Final Surrender Report for the Sandstone Project, E57/642-I, for the period 5 September 2007 to 25 September 2
A100212 2013 Southern Cross Goldfields Ltd Sandstone 52% Final Surrender Report for the Sandstone Project, E57/641-I, for the period 30 October 2008 to 29 October 2013
A92795 2012 Mithril Resources Ltd East Sandstone 2 <1% East Sandstone 2, Year 1 Annual Report for the period 21/12/2010 – 20/12/2011
A92796 2012 Mithril Resources Ltd East Sandstone 1 <1% E57/829 - East Sandstone 1, Year 1 Annual Report for the period 21/12/2010 – 20/12/2011
A95260 2012 Troy Resources Ltd. Sandstone 45% Surrender Report For the Period 28 March 2008 to 27 March 2012 P57/1205; P57/1219 & P57/1223
A96061 2012 Troy Resources Ltd. Sandstone <1% Sandstone Project, E57/877, Annual Report for the period 20 October 2011 to 19 October 2012.
A96124 2012 Mithril Resources Ltd East Sandstone <1% East Sandstone Project, Final Surrender Report for the period 20/12/2011 to 20/12/2012, E57/828 & 829. [C30/20
A96222 2012 Troy Resources Ltd. Sandstone <1% Sandstone Project, Nickel Exploration Drillhole WADD0002, for the period 1st January 2010 to 31st December 201
A96259 2012 Western Areas Nl Sandstone <1% Report for 2012 Drill Campaign Sandstone stratigraphic hole WADD0013 E57/0704, Report Period: 1st June 2012 to
A93563 2012 Troy Resources Nl Sandstone 5.6% Sandstone Project Combined Annual Report for the period 1 January 2011 to 31 December 2011, C28/2005
A94842 2012 West Peak Iron Ltd Dandaraga <1% Annual Report - 19 May 2011 to 18 May 2012, Dandaraga Project - C 92/2012 E57/839, E57/845, E57/869
A89872 2011 Troy Resources Nl; Western Areas Nl Sandstone 5.7% Sandstone Project Combined Annual Report: C28/2005_2010A 1 January 2010 to 31 December 2010
A88331 2010 Mindax Ltd Maynard Hills <1% Maynard Hills Project Annual Report for Exploration License E57/555 (Weiro Bore) for the period 20th August 20
A86313 2010 Troy Resources Nl Sandstone 5.7% Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the period 1 january 2009 to 31 De
A86765 2010 Troy Resources Nl Sandstone 3.3% E57/576 Sandstone Partial Surrender Report - For the Period 13 February 2006 to 12 February 2010
A88048 2010 Troy Resources Nl Sandstone 17% E57/581 Sandstone WA Surrender Report For the Period 26 July 2005 to 25 July 2010
A88678 2010 Mindax Ltd Maynard Hills – Weiro Bore <1% MAYNARD HILLS PROJECT, Surrender Report for Exploration License E57/555 (Weiro Bore). For the Period of 30th D
A88680 2010 Mindax Ltd Maynard Hills – Black Hill Bore <1% Combined Annual-Surrender Report for Exploration License E57/787 (Black Hill Bore). For the Period of 15th Oct
A85214 2009 Mindax Ltd Maynard Hills <1% Maynard Hills Project: Partial Relinquishment Report for Exploration License E57/555 - Weiro Bore
A84838 2009 Mindax Ltd Maynard Hills <1% Maynard Hills Project: 2009 Combined Annual Report for Exploration Licenses E57/552 (Everett Creek), E57/555 (
A84882 2009 Troy Resources Nl Sandstone 17% E57/581 Sandstone PARTIAL SURRENDER REPORT For the Period26 July 2005 to 25 July 2009
A79844 2008 Mindax Ltd Maynard Hills <1% MAYNARD HILLS PROJECT, Combined Annual Report for Exploration Licenses E57/552 (Everett Creek), E57/555 (Weiro
A77701 2008 Troy Resources Nl Sandstone Project 5.8% SANDSTONE PROJECT WESTERN AUSTRALIA COMBINED ANNUAL REPORT C28/2005 For the Period 1 January 2007 to 31 Decemb
A78205 2008 Mindax Ltd Maynard Hills <1% MAYNARD HILLS PROJECT Partial Surrender Report for Exploration License E57/555 - Weiro Bore FOR THE PERIOD 30t
A80107 2008 Troy Resources Nl Sandstone 17% E57/581 SANDSTONE WESTERN AUSTRALIA PARTIAL SURRENDER REPORT For the Period 26 July 2005 to 25 July 2008
A76192 2007 Mindax Ltd Maynard Hills (Rocky Creek) <1% Maynard Hills Project, Combined Annual Report for Exploration Licenses, E57/552 (Everett Creek), E57/555 (Weir
A74299 2007 Mindax Ltd Maynard Hills <1% Maynard Hills Project, Partial Surrender Report for Exploration licence E57/555 - Weiro Bore, Black Range Dis
A74809 2007 Troy Resources Nl Sandstone 6.7% Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 Jan 2006 to 31 Decemb
A73496 2006 Troy Resources Nl Sandstone 61% Sandstone Project, Surrender Report, For the Period 14 May 1984 to 8 June 2006, (Troy Resources Report No. SS/
A71821 2006 Mindax Ltd Maynard Hills <1% Maynard Hills Project, Annual Report for Exploration Licence E57/555(Wiero Bore), Black Range District, East M
A72098 2006 Troy Resources Nl Sandstone/Clackline/Black Hill 7.6% Sandstone Project, Sandstone, Western Australia, Combined Annual Report For Period 1 January 2005 to 31 Decemb
A73452 2006 Mindax Ltd Maynard Hills (Rocky Creek) <1% Maynard Hills Project, Combined Annual Report for E57/552 Everett Creek,E57/555 Weiro Bore,E57/556 Rocky Creek
A74463 2006 Troy Resources Nl Sandstone 23% Sandstone Project, Non-statutory Report: Drilling Report on Caravan Park Reserve, December 2006, E57/202. {C28
A69776 2005 Troy Resources Nl Sandstone 43% Annual report for the period 4th July 2003 to 5th July 2004 Sandstone Project, E57/422, Youanmi, Report number
A70072 2005 Troy Resources Nl Raffertys Patch 12% Combined annual report for the period 01/01/04 - 31/12/04 Wirraminna Group Project, C179/1996, E57/202, E57/25
A70162 2005 Mindax Ltd Wiero Bore <1% Annual report, Wiero Bore Exploration licence E57/555, Black Range District, East Murchison Goldfield, Period
A70220 2005 Troy Resources Nl Sandstone 9.2% Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 January 2004 to 31 De
A70610 2005 Troy Resources Nl Hancock 20% Combined annual report for the period 07/02/04 - 06/02/05 Edale Project, C82/1994, E57/196, M57/01, 22, 23, 68
A68177 2004 Troy Resources Nl Sandstone 43% Partial Surrender Report for the period 4th July 2000 to 3rd July 2003 Sandstone Project E57/422 Report No. SS
A68178 2004 Troy Resources Nl Sandstone <1% Annual Report for the period 26th July 2002 to 25th July 20 03 Sandstone E57/424 Report No SST/04/1/1.1
A68179 2004 Troy Resources Nl Sandstone <1% Partial Surrender Report for the period 26th July 2000 to 25 th July 2003 Sandstone E57/424 Report No SST/04/4
A68295 2004 Troy Resources Nl Edale 20% EDALE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 7TH FEBRUARY 2003 to 6TH FEBRU
A68176 2004 Troy Resources Nl Sandstone 43% Annual Report for the period 4th July 2002 to 5th July 2003 Sandstone Project E57/422.
A68294 2004 Troy Resources Nl Sandstone 9.2% Annual Report for the period 01/01/2003-31/12/2003 Sandstone Project(C1/1999), E57/189, E57/267, M57/254, M57/
A68574 2004 Troy Resources Nl Wirraminna Group 12% Annual report for the period 01/01/2003-31/12/2003 Wirraminna Group (C179/1996), E57/426, M57/2, M57/191, M57/
A69551 2004 Troy Resources Nl Lightning Well / Magnet Road 1.1% Magnet Road Project, E57/208, E57/429, E57/430, Lightning Well Project E57/220, Annual report for the period 2
A69860 2004 Troy Resources Nl Black Hill <1% Annual report for the period 26th July 2003 to 25th July 20 04 E57/424 Sandstone Report No SSV/05/1/1.1
A66349 2003 Troy Resources Nl Sandstone 9.2% Combined Annual Report for the period 1st January 2002 to 31st December 2002 Sandstone Project C1/1999: Dairy
A66340 2003 Troy Resources Nl Raffertys Patch 12% Wirraminna Group, Sandstone, Combined Annual Report for the period 1st January 2002 to 31st December 2002 C179
A66401 2003 Troy Resources Nl Edale 20% Edale Project, Annual Report for the period 7th February 2002 to 6th February 2003, E57/196, M57/1, 22 -23, 68
A67237 2003 Troy Resources Nl Magnet Road - Lighning Well 1.1% Annual Report for the period 29 July 2002 to 28 July 2003, Magnet Road Project, E57/208,429,430 & Lighning W
A65315 2002 Croesus Mining Nl Black Hill 43% Black Hill Project Annual Report For The Period 4 July 2001 to 3 July 2002 On The Tenement E57/422
A64333 2002 Troy Resources Nl Wirraminna 20% Combined Annual Report for the period 1st January 2001 to 31st December 2001 exploration licences 57/309 & 310
A64598 2002 Troy Resources Nl Sandstone 9.2% Sandstone Project Combined Annual For The Period 1st January 2001 to 31st December 2001. Tenements: Newtown: M
A64672 2002 Troy Resources Nl Edale 20% Edale Project , Annual Report for the period 7th February 2001 to 6th February 2002, E57/196; M57/1, 22-23, 68
A65080 2002 Croesus Mining Nl Black Hill <1% Black Hill Project Annual Report For The Period 26 April 2001 to 25 April 2002 On The Tenement E57/424.
A65186 2002 Troy Resources Nl Magnet Road - Lighting Well 1.1% Magnet Road Project E57/208, 57/429 & 57/430 & Lighting Well Project E57/220 ,Annual Report for the period 29t
A62172 2001 Troy Resources Nl Sandstone 6.8% Sandstone Project Combined Annual Report for the period 1st January 2000 to 31st December 2000. Tenements Newt
A62664 2001 Troy Resources Nl Edale 20% Annual Report E57/196, M57/1,22,23,68,87-88 Edale Project,for period covering 07/02/2000-06/02/2001 (C82/1994
A63210 2001 Croesus Mining Nl Black Hill 43% Black Hill Project Annual Report For The Period 4 July 2000 3 July 2001 On The Tenement E57/422
A63271 2001 Troy Resources Nl Jade Creek 23% Annual Report, E57/202 ,Jade Creek Project , for the period 30 April 2000 - 29 April 2001.
A62024 2001 Troy Resources Nl Wirraminna 20% Wirraminna Project, East Murchison Mineral Field, Western Australia. Combined Annual Report exploration licen
A62677 2001 Croesus Mining Nl Black Hill <1% Black Hill Project Annual Report For The Period 26 April 2000 to 25 April 2001 On The Tenement E57/424.
A63559 2001 Troy Resources Nl Magnet Road - Lightning Well 1.1% Combined Annual Report Magnet Road Project E57/208, 57/429 & 57/430 and Lightning Well Project E57/220 Sandsto
A60928 2000 Troy Resources Nl Wirraminna 20% Wirraminna Project East Murchison Mineral Field Western Australia Combined Annual Report Exploration Licences
A61180 2000 Troy Resources Nl Magnet Road - Lightning Well 1.1% Annual Report, Magnet Road Project, E57/208,429,430 & Lightning Well Project E57/220, for the period 29th Jul
A60116 2000 Troy Resources Nl Sandstone 6.8% Annual Report, Sandstone Project, East Murchison Mineral Field, Western Australia 01/01/1999 to 31/12/1999. Te
A60307 2000 Troy Resources Nl Sandstone Edale 20% Sandstone Edale Project, Annual Report , E57/196; M57/1,22,23,68,87 & 88 , for the period 07/02/1999 to 06/02/
A61179 2000 Troy Resources Nl Jade Creek 23% Annual Report, Exploration Licence 57/202, Jade Creek Project , 30 April 1999- 29 April 2000.
A61492 2000 Herald Resources Ltd Lightning Well 1.5% Lightning Well Project, Partial Surrender Report for the period 16th September 1993 to 17th June 1998, E57/220
A57655 1999 Herald Resources Ltd Sandstone 6.8% Exploration Activites Sandstone Project 01/1999 East Murchison Mineral Field M57/40, 128-130, 179, 192,
A57913 1999 Herald Resources Ltd Hancocks 20% Annual technical report on mineral exploration activities Edale JV Project for the year ending 06/02/99. E57/1
A58043 1999 Troy Resources Nl Wirraminna 20% Combined annual report E57/309 to 310, M57/111, 134, 234, 239, 249, 262 to 264, 266, P57/652, 683, 684, 685, 6
A58542 1999 Troy Resources Nl Jade Creek 23% Annual Report Exploration Licence 57/202 Jade Creek Project, Sandstone Region, W.A. 30/04/1998 - 29/04/1999
A58816 1999 Herald Resources Ltd Magnet Road - Lightning Well 1.1% Annual Report, Magnet Road/Lightning Well Project, E57/208 and E57/220, 29 July 1998 to 28 July 1999, [C379/19
A53669 1998 Herald Resources Ltd Edale 20% 1997 Annual Technical Report on Mineral Exploration Activities Edale JV Project M57/1,22,23,68,88 and E57/196.
A53855 1998 Herald Resources Ltd Sandstone 97% 1997 Annual Technical Report, Sandstone Project P57/872, East Murchison Mineral Field 02/1997 - 02/1998
A54231 1998 Battle Mountain Australia Inc Wirraminna 20% Wirraminna JV Project, W.A. 01/01/97 - 31/12/97 Exploration Licence: 57/309-310, Mining Lease: 57/111, 134,
A54281 1998 Battle Mountain Australia Inc Jade Creek 23% Jade Creek JV Project W.A. Exploration Licence: Annual mineral exploration report for the period 30 April 1997
A56100 1998 Herald Resources Ltd Sandstone - Lightning Well 1.5% Sandstone - Lightning Well Project, Annual Report , E57/220, for the period 16/09/97-15/09/98.
A50701 1997 Herald Resources Ltd Sandstone 20% 1997 Annual Techncial Report on Mineral Exploration Activities Sandstone Project M57/1 M57/22 M57/23 M57/68 M5
A52359 1997 Battle Mountain Australia Inc Jade Creek 23% Jade Creek (JV) Project, Annual Report for the period 30/04/1996 to 29/04/1997, E57/202.
A52752 1997 Herald Resources Ltd Sandstone- Lightning Well 1.5% 1997 Annual Report for the period 16/09/1966 to 15/09/1997, Sandstone- Lightning Wel lProject, E57/220.
A47759 1996 Jade Creek Resources Nl Sandstone 23% Sandstone Project E57/202 Annual report for the year ended 30 Arpril 1996
A49128 1996 Herald Resources Ltd Maninga Marley 1.5% Annual Technical Report E57/220 16 September 1995 to 15 September 1996 (Maninga Marley)
A49722 1996 Elmina Nl Sandstone 20% Sandstone Project , Annual Report on Exploration & Development for the period 7th Febuary 1995 to 6th Febuary
A45775 1995 Mt Kersey Mining Nl Sandstone 1.1% Exploration licences E57/208 & 220 Prospecting Licences P57/769 & 803-5. Sandstone Project, Annual Report for
A46539 1995 Elmina Nl Sandstone -Ladybird 83% Sandstone -Ladybird Project, Annual Report for the period 12th July 1994 to 11th July 1995, M57/88.
A44766 1995 Jade Creek Resources Nl Sandstone 23% Sandstone Project E57/202 Annual Report for the year ended 30 April 1995
A46351 1995 Gold Mines Of Australia Ltd Raffertys 100% Youanmi Project - Raffertys E57/201, P57/733 SH50-04 Youanmi WA. Annual report on exploration for the period 1
A46400 1995 Elmina Nl Sandstone- Hancocks East 16% Sandstone- Hancocks East Project, E57/196, Annual report on Exploration for the period 10 September 1994 to 9
A46540 1995 Elmina Nl Sandstone- Ironknob 99% Sandstone- Ironknob Project , Mining Lease M57/87,Annual report for the period 12th July 1994 to 11th July 19
A41337 1994 Jade Creek Exploration Nl Sandstone 23% Annual report for the period ending 30/04/94 Sandstone Project E57/202
A42887 1994 Mt Kersey Mining Nl Maninga Marley 1.5% E57/220,Maninga Marley Project, Annual report for the period 16 September 1993 to 15 September 1994.
A43127 1994 Elmina Nl Sandstone 16% Sandstone Project Hancocks East Prospect Exploration Licence E57/196 East Murchison Mineral Field, Western Aus
A41073 1994 Gold Mines Of Australia Ltd Raffertys 100% Raffertys Project, E57/201, P57/733 SH50-04 Youanmi WA. Annual report on exploration for the period 1st April
A41938 1994 Elmina Nl Sandstone 99% Annual Report for the period 12/07/93-11/07/94 Ironknob/Sandstone Project M57/87
A41939 1994 Elmina Nl Sandstone 83% Annual Report for the period 12/07/93-11/07/94 Ladybird/Sandstone Project M57/88
A38958 1993 Elmina Nl Sandstone 99% Annual Report for the period 12/07/92-11/07/93 Iron Knob Project M57/87
A35522 1992 Western Mining Corporation Ltd Mount Breen 83% Mount Breen Project, Partial Surrender Report for the period 12th July 1988 to 11th October 1989, M57/88.
A35755 1992 Western Mining Corporation Ltd Sandstone 99% Annual Report for the Period 12/07/90 - 11/07/91 Iron Knob Project M57/87
A35756 1992 Western Mining Corporation Ltd Sandstone 83% Annual Report for the Period 12/07/90 - 11/07/91 Mount Breen/Ladybird Project M57/88 at Sandstone
A36537 1992 Western Mining Corporation Ltd Sandstone 83% Annual Report for the period 12/07/91-11/07/92 Mt Breen Project M57/88
A36572 1992 Western Mining Corporation Ltd Sandstone 99% Annual Report for the Period 12/07/91 - 11/07/92 Sandstone Project M57/87
A33136 1991 Western Mining Corporation Ltd Sandstone -Mt Breen 83% Sandstone -Mt Breen Project, [Bi] Annual Report for the period 12th July 1988 to 11th July 1990, M57/88.
A31222 1990 Western Mining Corporation Ltd Sandstone - Iron Knob 99% Sandstone - Iron Knob Project, Annual Report for the period 12th July 1988 to 11th July 1989, M57/87.
A31223 1990 Western Mining Corporation Ltd Iron Knob - Sandstone 99% Iron Knob - Sandstone Project, Partial Surrender Report for the period 12th July 1988 to 3rd July 1989, M57/87
A31344 1990 Western Mining Corporation Ltd Sandstone - Iron Knob 99% Sandstone - Iron Knob Project, Annual Report for the period 12th July 1989 to 11th July 1990, M57/87.
A28199 1989 Western Mining Corporation Ltd Sandstone 28% Terminal Report, Mining Lease 57/56, Sandstone, 25th September 1987 to 9th March 1988.
A30119 1989 Western Mining Corporation Ltd Sandstone - Bulletin 100% Sandstone - Bulletin Project, Partial Surrender Report for the period 20th December 1987 to 1st June 1989, M57
A14906 1985 Western Mining Corporation Ltd Sandstone - Black Hill <1% Annual report Sandstone/Black Hill Minerals Joint Venture 7 December 1983 to 2 November 1984 Gold Mining Lease
A15425 1985 Western Mining Corporation Ltd Sandstone - Black Hill <1% Terminal Report Sandstone/Black Hill Minerals Joint Venture 3 November 1984 to 17 April 1985 Exploration Licen
A16809 1985 Western Mining Corporation Ltd Sandstone 100% Sandstone Project, Annual Report for the period 7th September 1984 to 19th September 1985, M57/20. ( Little Ra
A16940 1985 Black Hill Minerals Ltd Sandstone 13% The Sandstone Project A Remote Sensing and Geological Evaluation 1985
A13356 1984 Western Mining Corporation Ltd Sandstone/Black Hill <1% Annual Report, Sandstone/Black Hills Minerals Joint Venture, GMLS: 57/1348-1350, 1352, 1353, 1374, 1387, 1388,
A11862 1983 Western Mining Corporation Ltd Sandstone 58% Annual Report Temporary Reserve 7380H Sandstone East Murchis on Mineral Field - Black Range District 18 Januar
A12104 1983 Western Mining Corporation Ltd Sandstone - Blackhill 17% Progress Report Sandstone / Black Hill Minerals JV East Murchison Mineral Field - Black Range District 23 June
A10963 1982 Western Mining Corporation Ltd Sandstone 58% Annual report Temporary reserve 7380H Sandstone East Murchison mineral field Black Range division 18th January
A9683 1981 Western Mining Corporation Ltd Sandstone 19% Annual Report Temporary Reserve 7378H East Murchison Goldfield, Black Range Division 18 January 1980 to 17 Jan
A5826 1975 Seeko Nickel Nl Sandstone 27% Geological report [non-statutory] on six claim groups in the Sandstone area, MC57/379 ... 57/2388.
A3591 1972 Kennecott Exp Aust Pty Ltd Youanmi One <1% Youanmi One Project, Non-statutory Report: Stratigraphic Facing at Youanmi One, April 1972, MC57/165-170......
A2455 1971 Kennecott Exp Aust Pty Ltd Youanmi Four Block 61% Youanmi Four Block Project, Annual Report for the period ending 31/12/1971, MC57/1183-1186, 1189-1190 & 1196.
A10529 1971 Kennecott Exp Aust Pty Ltd Boolygoo 5.2% Boolygoo Project, Non-statutory Report: 1970 Progress Report on Boolygoo Examination, February 1971, MC57/165-
A11458 1971 Kennecott Exp Aust Pty Ltd Boolygoo Examination 7% Boolygoo Examination Project, Annual (Progress) Report , 1970, MC57/ 396-399,400-411, 165-170, 173-177, 200-20
A3371 1971 Kennecott Exp Aust Pty Ltd Youanmi 1 & 2 <1% Youanmi 1 & 2 Project, Non-statutory Report:Final Report, Boolygoo Examination for period ending June1971, MC
A6936 1971 Kennecott Exp Aust Pty Ltd Wiluna One (Boolygoo) 5.2% Wiluna One (Boolygoo) Project, Non-statutory Report: Exploration Data: Survey Datum Log, Geophysical Surveys,
A2567 1970 Kennecott Exp Aust Pty Ltd Youanmi One <1% Youanmi One Project, Annual Report ( Ground Geopysical Survey) for the period ending 31/12/1970, MC57/165-170
A82122 1753 Troy Resources Nl SANDSTONE 5.8% SANDSTONE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 1 January 2008 to 31 Decem
A50673 1753 Battle Mountain Australia Inc Wirraminna 20% Wirraminna JV Project E57/309, E57/310, M57/111, M57/134, M57/234, M57/239, M57/249, M57/262 to M57/264, M57/2
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
27 days · 19 Sept 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 57/1031 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 57/1031? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.