NextMapsWA TenementsE 57/1033

E 57/1033

LiveExploration LicenceShire of SandstoneBlack Range District
Area
6,200ha
Expires
Sept 2026
in 27 days
WAMEX reports
117
WA median is 53
Report drilling
81
of 117 reports
Sandstone Explore on the live map

Register summary

Holder
Sandstone Exploration Pty Ltd
Local government
Shire of Sandstone
Application received
2 June 2015
Commenced
20 Sept 2016
Expiry
19 Sept 2026
Term
5 Years (Extended)

Exploration history on this ground

117 historical WAMEX exploration reports intersect E 57/1033: 77 report geochemistry or sampling, 67 include a digital data package.
When this ground was worked · 113 of 117 reports dated
81970s
171980s
301990s
342000s
182010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A137242 2023 Sls Exploration Pty. Ltd. Dandaraga <1% Final Surrender Report E57/1028 - Dandaraga Project for the period ending 13/07/2023
A129532 2022 Alto Metals Limited Edale Shear Zone <1% Alto Metals Edale Co-funded Drilling Report, R22
A133108 2022 Alto Metals Limited Sandstone <1% Sandstone Gold Project E57/1031 Partial Surrender report for the period ending 06/10/2022.
A133180 2022 Alto Metals Limited Sandstone 32% Sandstone Gold Project E57/1033 Partial Surrender report for the period ending 07/10/2022.
A128149 2021 Sls Exploration Pty. Ltd. Dandaraga <1% Dandaraga Project E57/1028 Annual Report for the period ending 14/07/2021
112 more reports
A124638 2020 Sls Exploration Pty. Ltd. Dandaraga <1% Annual report E57/1028 Dandaraga project for the period 15 July 2019 to 14 July 2020
A120744 2019 Sls Exploration Pty Ltd Dandaraga <1% Annual Technical Report Dandaraga Project E57/1028 For the Period 15 July 2018 to 14 July 2019
A121869 2019 Alto Metals Limited Sandstone Group 2 9.1% Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2018 to 19 September 2019
A117626 2018 Sls Exploration Pty Ltd Dandaraga <1% Annual Report Dandaraga project, Sandstone SLS Exploration, 15 July 2017 - 14 July 2018
A118569 2018 Alto Metals Limited Sandstone 9.1% Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/0
A115491 2017 Alto Metals Limited Sandstone 2 9.1% Sandstone Project C24/2017 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/0
A114488 2017 Sls Exploration Pty Ltd Dandaraga <1% Annual Technical Report E57/1028 Dandaraga Project for the period 15/07/2016 - 14/07/2017
A108818 2016 Black Oak Minerals Limited Sandstone <1% SANDSTONE PROJECT C28/2005 Combined Annual Report for the period 1 January 2015 to 31 December 2015, E57/580,
A105480 2015 Black Oak Minerals Limited Sandstone <1% Combined Annual Report for the Sandstone Project C281/2005 for the period 1 January 2014 to 31 December 2014,
A101259 2014 Southern Cross Goldfields Ltd Sandstone 26% Final Surrender Report for the Sandstone Project, P57/1236 and P57/1237, for the period 28 July 2009 to 13 Nov
A101260 2014 Southern Cross Goldfields Ltd Sandstone <1% Sandstone Project E57/703-I Partial Surrender Report for the period 7/01/2008 to 06/01/2014
A101991 2014 Southern Cross Goldfields Ltd Sandstone <1% Combined annual report for the Sandstone Project, East Murchison Mineral Field, for the period 1 January 2013
A103800 2014 Southern Cross Goldfields Ltd Sandstone <1% SANDSTONE PROJECT E57/703-I East Murchison Mineral Field Final Surrender Report for the period 7/01/2008 to 21
A97309 2013 Troy Resources Ltd.; Western Areas Limited Sandstone 1.9% Sandstone Project, Annual Report for the period 1st January 2012 to 31st December 2012, E57/485......E57/877;
A100211 2013 Southern Cross Goldfields Ltd Sandstone 32% Final Surrender Report for the Sandstone Project, E57/642-I, for the period 5 September 2007 to 25 September 2
A100212 2013 Southern Cross Goldfields Ltd Sandstone <1% Final Surrender Report for the Sandstone Project, E57/641-I, for the period 30 October 2008 to 29 October 2013
A93563 2012 Troy Resources Nl Sandstone 1.7% Sandstone Project Combined Annual Report for the period 1 January 2011 to 31 December 2011, C28/2005
A89872 2011 Troy Resources Nl; Western Areas Nl Sandstone 1.7% Sandstone Project Combined Annual Report: C28/2005_2010A 1 January 2010 to 31 December 2010
A86313 2010 Troy Resources Nl Sandstone 1.7% Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the period 1 january 2009 to 31 De
A77701 2008 Troy Resources Nl Sandstone Project 1.8% SANDSTONE PROJECT WESTERN AUSTRALIA COMBINED ANNUAL REPORT C28/2005 For the Period 1 January 2007 to 31 Decemb
A74809 2007 Troy Resources Nl Sandstone 2.1% Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 Jan 2006 to 31 Decemb
A73496 2006 Troy Resources Nl Sandstone <1% Sandstone Project, Surrender Report, For the Period 14 May 1984 to 8 June 2006, (Troy Resources Report No. SS/
A72098 2006 Troy Resources Nl Sandstone/Clackline/Black Hill 2.3% Sandstone Project, Sandstone, Western Australia, Combined Annual Report For Period 1 January 2005 to 31 Decemb
A73473 2006 Troy Resources Nl Sandstone 28% Sandstone Project, Sandstone, Western Australia, Surrender Report For the Period 23 August 1994 to 6 October
A70072 2005 Troy Resources Nl Raffertys Patch <1% Combined annual report for the period 01/01/04 - 31/12/04 Wirraminna Group Project, C179/1996, E57/202, E57/25
A70144 2005 Troy Resources Nl Maninga Marley 42% Maninga Marley Project,Sandstone, Western Australia Annual Report For the Period 1 January 2004 to 31 December
A70610 2005 Troy Resources Nl Hancock <1% Combined annual report for the period 07/02/04 - 06/02/05 Edale Project, C82/1994, E57/196, M57/01, 22, 23, 68
A68178 2004 Troy Resources Nl Sandstone <1% Annual Report for the period 26th July 2002 to 25th July 20 03 Sandstone E57/424 Report No SST/04/1/1.1
A68179 2004 Troy Resources Nl Sandstone <1% Partial Surrender Report for the period 26th July 2000 to 25 th July 2003 Sandstone E57/424 Report No SST/04/4
A68295 2004 Troy Resources Nl Edale <1% EDALE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 7TH FEBRUARY 2003 to 6TH FEBRU
A68296 2004 Troy Resources Nl Maninga Marley 42% Maninga Marley Project, Sandstone, Western Australia, Annual Report for Period 1 January 2003 to 31 December 2
A68574 2004 Troy Resources Nl Wirraminna Group <1% Annual report for the period 01/01/2003-31/12/2003 Wirraminna Group (C179/1996), E57/426, M57/2, M57/191, M57/
A69551 2004 Troy Resources Nl Lightning Well / Magnet Road 12% Magnet Road Project, E57/208, E57/429, E57/430, Lightning Well Project E57/220, Annual report for the period 2
A69860 2004 Troy Resources Nl Black Hill <1% Annual report for the period 26th July 2003 to 25th July 20 04 E57/424 Sandstone Report No SSV/05/1/1.1
A66339 2003 Troy Resources Nl Maninga Marley 42% Maninga Marley Project, Annual Report for the period 1st January 2002 to 31st December 2002, M57/301.
A66340 2003 Troy Resources Nl Raffertys Patch <1% Wirraminna Group, Sandstone, Combined Annual Report for the period 1st January 2002 to 31st December 2002 C179
A66401 2003 Troy Resources Nl Edale <1% Edale Project, Annual Report for the period 7th February 2002 to 6th February 2003, E57/196, M57/1, 22 -23, 68
A67237 2003 Troy Resources Nl Magnet Road - Lighning Well 12% Annual Report for the period 29 July 2002 to 28 July 2003, Magnet Road Project, E57/208,429,430 & Lighning W
A64333 2002 Troy Resources Nl Wirraminna 1.2% Combined Annual Report for the period 1st January 2001 to 31st December 2001 exploration licences 57/309 & 310
A64401 2002 Troy Resources Nl Maninga Marley 42% Maninga Marley Project, Annual Report for the period 1st January 2001 to 31st December 2001, M57/301.
A64672 2002 Troy Resources Nl Edale <1% Edale Project , Annual Report for the period 7th February 2001 to 6th February 2002, E57/196; M57/1, 22-23, 68
A65080 2002 Croesus Mining Nl Black Hill <1% Black Hill Project Annual Report For The Period 26 April 2001 to 25 April 2002 On The Tenement E57/424.
A65186 2002 Troy Resources Nl Magnet Road - Lighting Well 12% Magnet Road Project E57/208, 57/429 & 57/430 & Lighting Well Project E57/220 ,Annual Report for the period 29t
A62664 2001 Troy Resources Nl Edale <1% Annual Report E57/196, M57/1,22,23,68,87-88 Edale Project,for period covering 07/02/2000-06/02/2001 (C82/1994
A62024 2001 Troy Resources Nl Wirraminna 1.2% Wirraminna Project, East Murchison Mineral Field, Western Australia. Combined Annual Report exploration licen
A62661 2001 Troy Resources Nl Maninga Marley 42% Maninga Marley Project, Annual Report, P57/690-692 ,for the period 1st January 2000 to 31st December 2000 [C12
A62677 2001 Croesus Mining Nl Black Hill <1% Black Hill Project Annual Report For The Period 26 April 2000 to 25 April 2001 On The Tenement E57/424.
A63559 2001 Troy Resources Nl Magnet Road - Lightning Well 12% Combined Annual Report Magnet Road Project E57/208, 57/429 & 57/430 and Lightning Well Project E57/220 Sandsto
A60928 2000 Troy Resources Nl Wirraminna 1.2% Wirraminna Project East Murchison Mineral Field Western Australia Combined Annual Report Exploration Licences
A61180 2000 Troy Resources Nl Magnet Road - Lightning Well 12% Annual Report, Magnet Road Project, E57/208,429,430 & Lightning Well Project E57/220, for the period 29th Jul
A60015 2000 Herald Resources Ltd Raffertys Patch 42% Block Model Mineral Resource Estimates for the Havilah and Maninga Marley Prospects P57/690-692 (Period from 1
A60307 2000 Troy Resources Nl Sandstone Edale <1% Sandstone Edale Project, Annual Report , E57/196; M57/1,22,23,68,87 & 88 , for the period 07/02/1999 to 06/02/
A61492 2000 Herald Resources Ltd Lightning Well 16% Lightning Well Project, Partial Surrender Report for the period 16th September 1993 to 17th June 1998, E57/220
A57797 1999 Herald Resources Ltd Maninga Marley 42% Maninga Marley Project Year End 31/12/1998 Prospecting Licence: 57/690-692
A57913 1999 Herald Resources Ltd Hancocks <1% Annual technical report on mineral exploration activities Edale JV Project for the year ending 06/02/99. E57/1
A58043 1999 Troy Resources Nl Wirraminna 1.2% Combined annual report E57/309 to 310, M57/111, 134, 234, 239, 249, 262 to 264, 266, P57/652, 683, 684, 685, 6
A58816 1999 Herald Resources Ltd Magnet Road - Lightning Well 12% Annual Report, Magnet Road/Lightning Well Project, E57/208 and E57/220, 29 July 1998 to 28 July 1999, [C379/19
A53669 1998 Herald Resources Ltd Edale <1% 1997 Annual Technical Report on Mineral Exploration Activities Edale JV Project M57/1,22,23,68,88 and E57/196.
A53670 1998 Herald Resources Ltd Maninga Marley 42% 1997 Annual Technical Report Maninga Marley Project, P57/690-692 for the period 12/1996 - 12/1997.
A53678 1998 Herald Resources Ltd Sandstone 1.9% Sandstone Project - Annual Report M57/40, 128-130, 179, 192, 248, P57/686-687,, 698-700, etc. Year Ending: 31/
A54231 1998 Battle Mountain Australia Inc Wirraminna 1.2% Wirraminna JV Project, W.A. 01/01/97 - 31/12/97 Exploration Licence: 57/309-310, Mining Lease: 57/111, 134,
A56100 1998 Herald Resources Ltd Sandstone - Lightning Well 16% Sandstone - Lightning Well Project, Annual Report , E57/220, for the period 16/09/97-15/09/98.
A50701 1997 Herald Resources Ltd Sandstone <1% 1997 Annual Techncial Report on Mineral Exploration Activities Sandstone Project M57/1 M57/22 M57/23 M57/68 M5
A52752 1997 Herald Resources Ltd Sandstone- Lightning Well 16% 1997 Annual Report for the period 16/09/1966 to 15/09/1997, Sandstone- Lightning Wel lProject, E57/220.
A50555 1997 Herald Resources Ltd Raffertys Patch 42% Maninga Marley Project P57/690, P57/691, P57/692 Annual Technical Report for the Year Ending 31 December 1996
A46988 1996 Herald Resources Ltd Sandstone - Maninga Marley 42% Sandstone -Maninga Marley Project, P57/690, P57/691 and P57/692 ,Annual Report for the period 1st January 1
A49128 1996 Herald Resources Ltd Maninga Marley 16% Annual Technical Report E57/220 16 September 1995 to 15 September 1996 (Maninga Marley)
A49722 1996 Elmina Nl Sandstone <1% Sandstone Project , Annual Report on Exploration & Development for the period 7th Febuary 1995 to 6th Febuary
A45775 1995 Mt Kersey Mining Nl Sandstone 12% Exploration licences E57/208 & 220 Prospecting Licences P57/769 & 803-5. Sandstone Project, Annual Report for
A46539 1995 Elmina Nl Sandstone -Ladybird 2.3% Sandstone -Ladybird Project, Annual Report for the period 12th July 1994 to 11th July 1995, M57/88.
A46351 1995 Gold Mines Of Australia Ltd Raffertys <1% Youanmi Project - Raffertys E57/201, P57/733 SH50-04 Youanmi WA. Annual report on exploration for the period 1
A40465 1994 Gold & Mineral Exploration Nl Maninga Marley 42% Annual report for the period 11/92-12/93 Maninga Marley Project P57/690 P57/691 P57/692
A42406 1994 Elmina Nl Sandstone <1% Annual Report for the Period 07/09/93 - 06/09/94 The Vanguard Project M57/22
A42887 1994 Mt Kersey Mining Nl Maninga Marley 16% E57/220,Maninga Marley Project, Annual report for the period 16 September 1993 to 15 September 1994.
A41073 1994 Gold Mines Of Australia Ltd Raffertys <1% Raffertys Project, E57/201, P57/733 SH50-04 Youanmi WA. Annual report on exploration for the period 1st April
A41939 1994 Elmina Nl Sandstone 2.3% Annual Report for the period 12/07/93-11/07/94 Ladybird/Sandstone Project M57/88
A35522 1992 Western Mining Corporation Ltd Mount Breen 2.3% Mount Breen Project, Partial Surrender Report for the period 12th July 1988 to 11th October 1989, M57/88.
A35753 1992 Western Mining Corporation Ltd Sandstone <1% Annual Report for the Period 07/09/90 - 06/09/91 Vanguard Project M57/22
A35756 1992 Western Mining Corporation Ltd Sandstone 2.3% Annual Report for the Period 12/07/90 - 11/07/91 Mount Breen/Ladybird Project M57/88 at Sandstone
A36537 1992 Western Mining Corporation Ltd Sandstone 2.3% Annual Report for the period 12/07/91-11/07/92 Mt Breen Project M57/88
A36876 1992 Western Mining Corporation Ltd Sandstone <1% Annual Report for the period 07/09/91-06/09/92 Vanguard Project M57/22
A33136 1991 Western Mining Corporation Ltd Sandstone -Mt Breen 2.3% Sandstone -Mt Breen Project, [Bi] Annual Report for the period 12th July 1988 to 11th July 1990, M57/88.
A32233 1990 Carpentaria Exp Co Pty Ltd Maninga Marley 42% Technical report No:1419, Maninga Marley Project Exploration completed between March and November 1990
A28089 1989 Western Mining Corporation Ltd Sandstone <1% Vanguard Prospect at Sandstone Mining lease M57/22 07/09/87 to 06/09/88
A29123 1989 Western Mining Corporation Ltd Sandstone <1% Mining lease M57/22 (Vanguard Prospect) at Sandstone 07/09/88 to 06/09/89
A28526 1989 Gold & Mineral Exploration Nl Maninga Marley 42% Maninga Marley Project - Gold and Mineral Exploration NL Progress Report to 07/89 (E57/50, E57/148, M57/25 and
A22273 1988 Western Mining Corporation Ltd Vanguard <1% Annual report Mining Lease M57/22 (Vanguard Prospect) at Sandstone 07/09/86 to 06/09/87
A24821 1988 Black Horse Mining Nl Lightning Patch <1% Summary progress report on exploration activities at Lightning Patch up to 1/6/88
A21190 1987 Homestake Australia Ltd Maninga Marley 42% Maninga Marley Joint Venture progress report 1 October, 1986 to 31 July, 1987 (HAL Report No. 1987/25)
A22683 1987 Litex Contractors Pty Ltd Maninga Marley 42% Maninga Marley Joint Venture Progress report 01/10/86-31/07/87 (Tenements E57/50 M57/25 M57/43)
A19597 1986 Homestake Australia Ltd Maninga Marley 42% Maninga Marley Joint Venture Annual report to 30 September, 1986 (HAL Report No. 1986/35)
A19135 1986 Western Mining Corporation Ltd Sandstone <1% Annual report Mining Lease M57/22 (Vanguard Prospect) at Sandstone 7 September 1985 to 6 September 1986
A16446 1985 Western Mining Corporation Ltd Vanguard <1% Annual report Mining Lease M57/22 (Vanguard Prospect) at Sandstone 7 September 1984 to 6 September 1985 WMC
A16621 1985 Homestake Australia Ltd Maninga Marley 39% Maninga Marley Joint Venture Annual report to 30 September, 1985 (HAL Report NO. 1985/26)
A14547 1984 Clackline Refractories Ltd Dandaraga 57% Dandaraga Project, Final Surrender Report for theperiod ending 23/11/1984, MC57/5045 & 5046; P57/153.
A11862 1983 Western Mining Corporation Ltd Sandstone 9.1% Annual Report Temporary Reserve 7380H Sandstone East Murchis on Mineral Field - Black Range District 18 Januar
A12104 1983 Western Mining Corporation Ltd Sandstone - Blackhill 2.6% Progress Report Sandstone / Black Hill Minerals JV East Murchison Mineral Field - Black Range District 23 June
A10963 1982 Western Mining Corporation Ltd Sandstone 9.1% Annual report Temporary reserve 7380H Sandstone East Murchison mineral field Black Range division 18th January
A9683 1981 Western Mining Corporation Ltd Sandstone 3% Annual Report Temporary Reserve 7378H East Murchison Goldfield, Black Range Division 18 January 1980 to 17 Jan
A13372 1981 Christopher Stevens Pty Ltd Murchison/Eastern Mineral Fields 2.6% Murchison/Eastern Mineral Fields Project, Non-statutory Report: A Geological Appraisal, December 1981, CML12/8
A5852 1975 Pennzoil Of Australia Ltd Dandaranga - Black Range 38% Dandaraga Prospect - Black Range Project, [Non-statutory report], Summary report, July 1975, MC57/4114-4116 &
A3591 1972 Kennecott Exp Aust Pty Ltd Youanmi One 8.6% Youanmi One Project, Non-statutory Report: Stratigraphic Facing at Youanmi One, April 1972, MC57/165-170......
A2455 1971 Kennecott Exp Aust Pty Ltd Youanmi Four Block 12% Youanmi Four Block Project, Annual Report for the period ending 31/12/1971, MC57/1183-1186, 1189-1190 & 1196.
A10529 1971 Kennecott Exp Aust Pty Ltd Boolygoo 7.1% Boolygoo Project, Non-statutory Report: 1970 Progress Report on Boolygoo Examination, February 1971, MC57/165-
A11458 1971 Kennecott Exp Aust Pty Ltd Boolygoo Examination 7.5% Boolygoo Examination Project, Annual (Progress) Report , 1970, MC57/ 396-399,400-411, 165-170, 173-177, 200-20
A3371 1971 Kennecott Exp Aust Pty Ltd Youanmi 1 & 2 9.3% Youanmi 1 & 2 Project, Non-statutory Report:Final Report, Boolygoo Examination for period ending June1971, MC
A6936 1971 Kennecott Exp Aust Pty Ltd Wiluna One (Boolygoo) 7.1% Wiluna One (Boolygoo) Project, Non-statutory Report: Exploration Data: Survey Datum Log, Geophysical Surveys,
A2567 1970 Kennecott Exp Aust Pty Ltd Youanmi One 8.6% Youanmi One Project, Annual Report ( Ground Geopysical Survey) for the period ending 31/12/1970, MC57/165-170
A9685 1753 Western Mining Corporation Ltd Sandstone 2.2% Sandstone Project, Non-statutory Report: Terminal Report for the period 18th January 1980 to 17th January 1981
A82122 1753 Troy Resources Nl SANDSTONE 1.8% SANDSTONE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 1 January 2008 to 31 Decem
A50673 1753 Battle Mountain Australia Inc Wirraminna 1.2% Wirraminna JV Project E57/309, E57/310, M57/111, M57/134, M57/234, M57/239, M57/249, M57/262 to M57/264, M57/2
A33646 1753 Western Mining Corporation Ltd Sandstone <1% Sixth annual report Mining Lease M57/22 (Vanguard Prospect) at Sandstone 07/09/89 to 06/09/90 WMC
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
27 days · 19 Sept 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 57/1033 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 57/1033? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.