E 57/1033
Register summary
- Holder
- Sandstone Exploration Pty Ltd
- Local government
- Shire of Sandstone
- Application received
- 2 June 2015
- Commenced
- 20 Sept 2016
- Expiry
- 19 Sept 2026
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A137242 | 2023 | Sls Exploration Pty. Ltd. | Dandaraga | <1% | Final Surrender Report E57/1028 - Dandaraga Project for the period ending 13/07/2023 |
| A129532 | 2022 | Alto Metals Limited | Edale Shear Zone | <1% | Alto Metals Edale Co-funded Drilling Report, R22 |
| A133108 | 2022 | Alto Metals Limited | Sandstone | <1% | Sandstone Gold Project E57/1031 Partial Surrender report for the period ending 06/10/2022. |
| A133180 | 2022 | Alto Metals Limited | Sandstone | 32% | Sandstone Gold Project E57/1033 Partial Surrender report for the period ending 07/10/2022. |
| A128149 | 2021 | Sls Exploration Pty. Ltd. | Dandaraga | <1% | Dandaraga Project E57/1028 Annual Report for the period ending 14/07/2021 |
112 more reports
| A124638 | 2020 | Sls Exploration Pty. Ltd. | Dandaraga | <1% | Annual report E57/1028 Dandaraga project for the period 15 July 2019 to 14 July 2020 |
| A120744 | 2019 | Sls Exploration Pty Ltd | Dandaraga | <1% | Annual Technical Report Dandaraga Project E57/1028 For the Period 15 July 2018 to 14 July 2019 |
| A121869 | 2019 | Alto Metals Limited | Sandstone Group 2 | 9.1% | Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2018 to 19 September 2019 |
| A117626 | 2018 | Sls Exploration Pty Ltd | Dandaraga | <1% | Annual Report Dandaraga project, Sandstone SLS Exploration, 15 July 2017 - 14 July 2018 |
| A118569 | 2018 | Alto Metals Limited | Sandstone | 9.1% | Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/0 |
| A115491 | 2017 | Alto Metals Limited | Sandstone 2 | 9.1% | Sandstone Project C24/2017 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/0 |
| A114488 | 2017 | Sls Exploration Pty Ltd | Dandaraga | <1% | Annual Technical Report E57/1028 Dandaraga Project for the period 15/07/2016 - 14/07/2017 |
| A108818 | 2016 | Black Oak Minerals Limited | Sandstone | <1% | SANDSTONE PROJECT C28/2005 Combined Annual Report for the period 1 January 2015 to 31 December 2015, E57/580, |
| A105480 | 2015 | Black Oak Minerals Limited | Sandstone | <1% | Combined Annual Report for the Sandstone Project C281/2005 for the period 1 January 2014 to 31 December 2014, |
| A101259 | 2014 | Southern Cross Goldfields Ltd | Sandstone | 26% | Final Surrender Report for the Sandstone Project, P57/1236 and P57/1237, for the period 28 July 2009 to 13 Nov |
| A101260 | 2014 | Southern Cross Goldfields Ltd | Sandstone | <1% | Sandstone Project E57/703-I Partial Surrender Report for the period 7/01/2008 to 06/01/2014 |
| A101991 | 2014 | Southern Cross Goldfields Ltd | Sandstone | <1% | Combined annual report for the Sandstone Project, East Murchison Mineral Field, for the period 1 January 2013 |
| A103800 | 2014 | Southern Cross Goldfields Ltd | Sandstone | <1% | SANDSTONE PROJECT E57/703-I East Murchison Mineral Field Final Surrender Report for the period 7/01/2008 to 21 |
| A97309 | 2013 | Troy Resources Ltd.; Western Areas Limited | Sandstone | 1.9% | Sandstone Project, Annual Report for the period 1st January 2012 to 31st December 2012, E57/485......E57/877; |
| A100211 | 2013 | Southern Cross Goldfields Ltd | Sandstone | 32% | Final Surrender Report for the Sandstone Project, E57/642-I, for the period 5 September 2007 to 25 September 2 |
| A100212 | 2013 | Southern Cross Goldfields Ltd | Sandstone | <1% | Final Surrender Report for the Sandstone Project, E57/641-I, for the period 30 October 2008 to 29 October 2013 |
| A93563 | 2012 | Troy Resources Nl | Sandstone | 1.7% | Sandstone Project Combined Annual Report for the period 1 January 2011 to 31 December 2011, C28/2005 |
| A89872 | 2011 | Troy Resources Nl; Western Areas Nl | Sandstone | 1.7% | Sandstone Project Combined Annual Report: C28/2005_2010A 1 January 2010 to 31 December 2010 |
| A86313 | 2010 | Troy Resources Nl | Sandstone | 1.7% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the period 1 january 2009 to 31 De |
| A77701 | 2008 | Troy Resources Nl | Sandstone Project | 1.8% | SANDSTONE PROJECT WESTERN AUSTRALIA COMBINED ANNUAL REPORT C28/2005 For the Period 1 January 2007 to 31 Decemb |
| A74809 | 2007 | Troy Resources Nl | Sandstone | 2.1% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 Jan 2006 to 31 Decemb |
| A73496 | 2006 | Troy Resources Nl | Sandstone | <1% | Sandstone Project, Surrender Report, For the Period 14 May 1984 to 8 June 2006, (Troy Resources Report No. SS/ |
| A72098 | 2006 | Troy Resources Nl | Sandstone/Clackline/Black Hill | 2.3% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report For Period 1 January 2005 to 31 Decemb |
| A73473 | 2006 | Troy Resources Nl | Sandstone | 28% | Sandstone Project, Sandstone, Western Australia, Surrender Report For the Period 23 August 1994 to 6 October |
| A70072 | 2005 | Troy Resources Nl | Raffertys Patch | <1% | Combined annual report for the period 01/01/04 - 31/12/04 Wirraminna Group Project, C179/1996, E57/202, E57/25 |
| A70144 | 2005 | Troy Resources Nl | Maninga Marley | 42% | Maninga Marley Project,Sandstone, Western Australia Annual Report For the Period 1 January 2004 to 31 December |
| A70610 | 2005 | Troy Resources Nl | Hancock | <1% | Combined annual report for the period 07/02/04 - 06/02/05 Edale Project, C82/1994, E57/196, M57/01, 22, 23, 68 |
| A68178 | 2004 | Troy Resources Nl | Sandstone | <1% | Annual Report for the period 26th July 2002 to 25th July 20 03 Sandstone E57/424 Report No SST/04/1/1.1 |
| A68179 | 2004 | Troy Resources Nl | Sandstone | <1% | Partial Surrender Report for the period 26th July 2000 to 25 th July 2003 Sandstone E57/424 Report No SST/04/4 |
| A68295 | 2004 | Troy Resources Nl | Edale | <1% | EDALE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 7TH FEBRUARY 2003 to 6TH FEBRU |
| A68296 | 2004 | Troy Resources Nl | Maninga Marley | 42% | Maninga Marley Project, Sandstone, Western Australia, Annual Report for Period 1 January 2003 to 31 December 2 |
| A68574 | 2004 | Troy Resources Nl | Wirraminna Group | <1% | Annual report for the period 01/01/2003-31/12/2003 Wirraminna Group (C179/1996), E57/426, M57/2, M57/191, M57/ |
| A69551 | 2004 | Troy Resources Nl | Lightning Well / Magnet Road | 12% | Magnet Road Project, E57/208, E57/429, E57/430, Lightning Well Project E57/220, Annual report for the period 2 |
| A69860 | 2004 | Troy Resources Nl | Black Hill | <1% | Annual report for the period 26th July 2003 to 25th July 20 04 E57/424 Sandstone Report No SSV/05/1/1.1 |
| A66339 | 2003 | Troy Resources Nl | Maninga Marley | 42% | Maninga Marley Project, Annual Report for the period 1st January 2002 to 31st December 2002, M57/301. |
| A66340 | 2003 | Troy Resources Nl | Raffertys Patch | <1% | Wirraminna Group, Sandstone, Combined Annual Report for the period 1st January 2002 to 31st December 2002 C179 |
| A66401 | 2003 | Troy Resources Nl | Edale | <1% | Edale Project, Annual Report for the period 7th February 2002 to 6th February 2003, E57/196, M57/1, 22 -23, 68 |
| A67237 | 2003 | Troy Resources Nl | Magnet Road - Lighning Well | 12% | Annual Report for the period 29 July 2002 to 28 July 2003, Magnet Road Project, E57/208,429,430 & Lighning W |
| A64333 | 2002 | Troy Resources Nl | Wirraminna | 1.2% | Combined Annual Report for the period 1st January 2001 to 31st December 2001 exploration licences 57/309 & 310 |
| A64401 | 2002 | Troy Resources Nl | Maninga Marley | 42% | Maninga Marley Project, Annual Report for the period 1st January 2001 to 31st December 2001, M57/301. |
| A64672 | 2002 | Troy Resources Nl | Edale | <1% | Edale Project , Annual Report for the period 7th February 2001 to 6th February 2002, E57/196; M57/1, 22-23, 68 |
| A65080 | 2002 | Croesus Mining Nl | Black Hill | <1% | Black Hill Project Annual Report For The Period 26 April 2001 to 25 April 2002 On The Tenement E57/424. |
| A65186 | 2002 | Troy Resources Nl | Magnet Road - Lighting Well | 12% | Magnet Road Project E57/208, 57/429 & 57/430 & Lighting Well Project E57/220 ,Annual Report for the period 29t |
| A62664 | 2001 | Troy Resources Nl | Edale | <1% | Annual Report E57/196, M57/1,22,23,68,87-88 Edale Project,for period covering 07/02/2000-06/02/2001 (C82/1994 |
| A62024 | 2001 | Troy Resources Nl | Wirraminna | 1.2% | Wirraminna Project, East Murchison Mineral Field, Western Australia. Combined Annual Report exploration licen |
| A62661 | 2001 | Troy Resources Nl | Maninga Marley | 42% | Maninga Marley Project, Annual Report, P57/690-692 ,for the period 1st January 2000 to 31st December 2000 [C12 |
| A62677 | 2001 | Croesus Mining Nl | Black Hill | <1% | Black Hill Project Annual Report For The Period 26 April 2000 to 25 April 2001 On The Tenement E57/424. |
| A63559 | 2001 | Troy Resources Nl | Magnet Road - Lightning Well | 12% | Combined Annual Report Magnet Road Project E57/208, 57/429 & 57/430 and Lightning Well Project E57/220 Sandsto |
| A60928 | 2000 | Troy Resources Nl | Wirraminna | 1.2% | Wirraminna Project East Murchison Mineral Field Western Australia Combined Annual Report Exploration Licences |
| A61180 | 2000 | Troy Resources Nl | Magnet Road - Lightning Well | 12% | Annual Report, Magnet Road Project, E57/208,429,430 & Lightning Well Project E57/220, for the period 29th Jul |
| A60015 | 2000 | Herald Resources Ltd | Raffertys Patch | 42% | Block Model Mineral Resource Estimates for the Havilah and Maninga Marley Prospects P57/690-692 (Period from 1 |
| A60307 | 2000 | Troy Resources Nl | Sandstone Edale | <1% | Sandstone Edale Project, Annual Report , E57/196; M57/1,22,23,68,87 & 88 , for the period 07/02/1999 to 06/02/ |
| A61492 | 2000 | Herald Resources Ltd | Lightning Well | 16% | Lightning Well Project, Partial Surrender Report for the period 16th September 1993 to 17th June 1998, E57/220 |
| A57797 | 1999 | Herald Resources Ltd | Maninga Marley | 42% | Maninga Marley Project Year End 31/12/1998 Prospecting Licence: 57/690-692 |
| A57913 | 1999 | Herald Resources Ltd | Hancocks | <1% | Annual technical report on mineral exploration activities Edale JV Project for the year ending 06/02/99. E57/1 |
| A58043 | 1999 | Troy Resources Nl | Wirraminna | 1.2% | Combined annual report E57/309 to 310, M57/111, 134, 234, 239, 249, 262 to 264, 266, P57/652, 683, 684, 685, 6 |
| A58816 | 1999 | Herald Resources Ltd | Magnet Road - Lightning Well | 12% | Annual Report, Magnet Road/Lightning Well Project, E57/208 and E57/220, 29 July 1998 to 28 July 1999, [C379/19 |
| A53669 | 1998 | Herald Resources Ltd | Edale | <1% | 1997 Annual Technical Report on Mineral Exploration Activities Edale JV Project M57/1,22,23,68,88 and E57/196. |
| A53670 | 1998 | Herald Resources Ltd | Maninga Marley | 42% | 1997 Annual Technical Report Maninga Marley Project, P57/690-692 for the period 12/1996 - 12/1997. |
| A53678 | 1998 | Herald Resources Ltd | Sandstone | 1.9% | Sandstone Project - Annual Report M57/40, 128-130, 179, 192, 248, P57/686-687,, 698-700, etc. Year Ending: 31/ |
| A54231 | 1998 | Battle Mountain Australia Inc | Wirraminna | 1.2% | Wirraminna JV Project, W.A. 01/01/97 - 31/12/97 Exploration Licence: 57/309-310, Mining Lease: 57/111, 134, |
| A56100 | 1998 | Herald Resources Ltd | Sandstone - Lightning Well | 16% | Sandstone - Lightning Well Project, Annual Report , E57/220, for the period 16/09/97-15/09/98. |
| A50701 | 1997 | Herald Resources Ltd | Sandstone | <1% | 1997 Annual Techncial Report on Mineral Exploration Activities Sandstone Project M57/1 M57/22 M57/23 M57/68 M5 |
| A52752 | 1997 | Herald Resources Ltd | Sandstone- Lightning Well | 16% | 1997 Annual Report for the period 16/09/1966 to 15/09/1997, Sandstone- Lightning Wel lProject, E57/220. |
| A50555 | 1997 | Herald Resources Ltd | Raffertys Patch | 42% | Maninga Marley Project P57/690, P57/691, P57/692 Annual Technical Report for the Year Ending 31 December 1996 |
| A46988 | 1996 | Herald Resources Ltd | Sandstone - Maninga Marley | 42% | Sandstone -Maninga Marley Project, P57/690, P57/691 and P57/692 ,Annual Report for the period 1st January 1 |
| A49128 | 1996 | Herald Resources Ltd | Maninga Marley | 16% | Annual Technical Report E57/220 16 September 1995 to 15 September 1996 (Maninga Marley) |
| A49722 | 1996 | Elmina Nl | Sandstone | <1% | Sandstone Project , Annual Report on Exploration & Development for the period 7th Febuary 1995 to 6th Febuary |
| A45775 | 1995 | Mt Kersey Mining Nl | Sandstone | 12% | Exploration licences E57/208 & 220 Prospecting Licences P57/769 & 803-5. Sandstone Project, Annual Report for |
| A46539 | 1995 | Elmina Nl | Sandstone -Ladybird | 2.3% | Sandstone -Ladybird Project, Annual Report for the period 12th July 1994 to 11th July 1995, M57/88. |
| A46351 | 1995 | Gold Mines Of Australia Ltd | Raffertys | <1% | Youanmi Project - Raffertys E57/201, P57/733 SH50-04 Youanmi WA. Annual report on exploration for the period 1 |
| A40465 | 1994 | Gold & Mineral Exploration Nl | Maninga Marley | 42% | Annual report for the period 11/92-12/93 Maninga Marley Project P57/690 P57/691 P57/692 |
| A42406 | 1994 | Elmina Nl | Sandstone | <1% | Annual Report for the Period 07/09/93 - 06/09/94 The Vanguard Project M57/22 |
| A42887 | 1994 | Mt Kersey Mining Nl | Maninga Marley | 16% | E57/220,Maninga Marley Project, Annual report for the period 16 September 1993 to 15 September 1994. |
| A41073 | 1994 | Gold Mines Of Australia Ltd | Raffertys | <1% | Raffertys Project, E57/201, P57/733 SH50-04 Youanmi WA. Annual report on exploration for the period 1st April |
| A41939 | 1994 | Elmina Nl | Sandstone | 2.3% | Annual Report for the period 12/07/93-11/07/94 Ladybird/Sandstone Project M57/88 |
| A35522 | 1992 | Western Mining Corporation Ltd | Mount Breen | 2.3% | Mount Breen Project, Partial Surrender Report for the period 12th July 1988 to 11th October 1989, M57/88. |
| A35753 | 1992 | Western Mining Corporation Ltd | Sandstone | <1% | Annual Report for the Period 07/09/90 - 06/09/91 Vanguard Project M57/22 |
| A35756 | 1992 | Western Mining Corporation Ltd | Sandstone | 2.3% | Annual Report for the Period 12/07/90 - 11/07/91 Mount Breen/Ladybird Project M57/88 at Sandstone |
| A36537 | 1992 | Western Mining Corporation Ltd | Sandstone | 2.3% | Annual Report for the period 12/07/91-11/07/92 Mt Breen Project M57/88 |
| A36876 | 1992 | Western Mining Corporation Ltd | Sandstone | <1% | Annual Report for the period 07/09/91-06/09/92 Vanguard Project M57/22 |
| A33136 | 1991 | Western Mining Corporation Ltd | Sandstone -Mt Breen | 2.3% | Sandstone -Mt Breen Project, [Bi] Annual Report for the period 12th July 1988 to 11th July 1990, M57/88. |
| A32233 | 1990 | Carpentaria Exp Co Pty Ltd | Maninga Marley | 42% | Technical report No:1419, Maninga Marley Project Exploration completed between March and November 1990 |
| A28089 | 1989 | Western Mining Corporation Ltd | Sandstone | <1% | Vanguard Prospect at Sandstone Mining lease M57/22 07/09/87 to 06/09/88 |
| A29123 | 1989 | Western Mining Corporation Ltd | Sandstone | <1% | Mining lease M57/22 (Vanguard Prospect) at Sandstone 07/09/88 to 06/09/89 |
| A28526 | 1989 | Gold & Mineral Exploration Nl | Maninga Marley | 42% | Maninga Marley Project - Gold and Mineral Exploration NL Progress Report to 07/89 (E57/50, E57/148, M57/25 and |
| A22273 | 1988 | Western Mining Corporation Ltd | Vanguard | <1% | Annual report Mining Lease M57/22 (Vanguard Prospect) at Sandstone 07/09/86 to 06/09/87 |
| A24821 | 1988 | Black Horse Mining Nl | Lightning Patch | <1% | Summary progress report on exploration activities at Lightning Patch up to 1/6/88 |
| A21190 | 1987 | Homestake Australia Ltd | Maninga Marley | 42% | Maninga Marley Joint Venture progress report 1 October, 1986 to 31 July, 1987 (HAL Report No. 1987/25) |
| A22683 | 1987 | Litex Contractors Pty Ltd | Maninga Marley | 42% | Maninga Marley Joint Venture Progress report 01/10/86-31/07/87 (Tenements E57/50 M57/25 M57/43) |
| A19597 | 1986 | Homestake Australia Ltd | Maninga Marley | 42% | Maninga Marley Joint Venture Annual report to 30 September, 1986 (HAL Report No. 1986/35) |
| A19135 | 1986 | Western Mining Corporation Ltd | Sandstone | <1% | Annual report Mining Lease M57/22 (Vanguard Prospect) at Sandstone 7 September 1985 to 6 September 1986 |
| A16446 | 1985 | Western Mining Corporation Ltd | Vanguard | <1% | Annual report Mining Lease M57/22 (Vanguard Prospect) at Sandstone 7 September 1984 to 6 September 1985 WMC |
| A16621 | 1985 | Homestake Australia Ltd | Maninga Marley | 39% | Maninga Marley Joint Venture Annual report to 30 September, 1985 (HAL Report NO. 1985/26) |
| A14547 | 1984 | Clackline Refractories Ltd | Dandaraga | 57% | Dandaraga Project, Final Surrender Report for theperiod ending 23/11/1984, MC57/5045 & 5046; P57/153. |
| A11862 | 1983 | Western Mining Corporation Ltd | Sandstone | 9.1% | Annual Report Temporary Reserve 7380H Sandstone East Murchis on Mineral Field - Black Range District 18 Januar |
| A12104 | 1983 | Western Mining Corporation Ltd | Sandstone - Blackhill | 2.6% | Progress Report Sandstone / Black Hill Minerals JV East Murchison Mineral Field - Black Range District 23 June |
| A10963 | 1982 | Western Mining Corporation Ltd | Sandstone | 9.1% | Annual report Temporary reserve 7380H Sandstone East Murchison mineral field Black Range division 18th January |
| A9683 | 1981 | Western Mining Corporation Ltd | Sandstone | 3% | Annual Report Temporary Reserve 7378H East Murchison Goldfield, Black Range Division 18 January 1980 to 17 Jan |
| A13372 | 1981 | Christopher Stevens Pty Ltd | Murchison/Eastern Mineral Fields | 2.6% | Murchison/Eastern Mineral Fields Project, Non-statutory Report: A Geological Appraisal, December 1981, CML12/8 |
| A5852 | 1975 | Pennzoil Of Australia Ltd | Dandaranga - Black Range | 38% | Dandaraga Prospect - Black Range Project, [Non-statutory report], Summary report, July 1975, MC57/4114-4116 & |
| A3591 | 1972 | Kennecott Exp Aust Pty Ltd | Youanmi One | 8.6% | Youanmi One Project, Non-statutory Report: Stratigraphic Facing at Youanmi One, April 1972, MC57/165-170...... |
| A2455 | 1971 | Kennecott Exp Aust Pty Ltd | Youanmi Four Block | 12% | Youanmi Four Block Project, Annual Report for the period ending 31/12/1971, MC57/1183-1186, 1189-1190 & 1196. |
| A10529 | 1971 | Kennecott Exp Aust Pty Ltd | Boolygoo | 7.1% | Boolygoo Project, Non-statutory Report: 1970 Progress Report on Boolygoo Examination, February 1971, MC57/165- |
| A11458 | 1971 | Kennecott Exp Aust Pty Ltd | Boolygoo Examination | 7.5% | Boolygoo Examination Project, Annual (Progress) Report , 1970, MC57/ 396-399,400-411, 165-170, 173-177, 200-20 |
| A3371 | 1971 | Kennecott Exp Aust Pty Ltd | Youanmi 1 & 2 | 9.3% | Youanmi 1 & 2 Project, Non-statutory Report:Final Report, Boolygoo Examination for period ending June1971, MC |
| A6936 | 1971 | Kennecott Exp Aust Pty Ltd | Wiluna One (Boolygoo) | 7.1% | Wiluna One (Boolygoo) Project, Non-statutory Report: Exploration Data: Survey Datum Log, Geophysical Surveys, |
| A2567 | 1970 | Kennecott Exp Aust Pty Ltd | Youanmi One | 8.6% | Youanmi One Project, Annual Report ( Ground Geopysical Survey) for the period ending 31/12/1970, MC57/165-170 |
| A9685 | 1753 | Western Mining Corporation Ltd | Sandstone | 2.2% | Sandstone Project, Non-statutory Report: Terminal Report for the period 18th January 1980 to 17th January 1981 |
| A82122 | 1753 | Troy Resources Nl | SANDSTONE | 1.8% | SANDSTONE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 1 January 2008 to 31 Decem |
| A50673 | 1753 | Battle Mountain Australia Inc | Wirraminna | 1.2% | Wirraminna JV Project E57/309, E57/310, M57/111, M57/134, M57/234, M57/239, M57/249, M57/262 to M57/264, M57/2 |
| A33646 | 1753 | Western Mining Corporation Ltd | Sandstone | <1% | Sixth annual report Mining Lease M57/22 (Vanguard Prospect) at Sandstone 07/09/89 to 06/09/90 WMC |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 27 days · 19 Sept 2026
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 57/1033 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 57/1033? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.