NextMapsWA TenementsE 57/1356

E 57/1356

PendingExploration LicenceShire of SandstoneBlack Range District
Area
3,100ha
Applied
Nov 2022
4 years ago
WAMEX reports
126
WA median is 53
Report drilling
93
of 126 reports
Sandstone Explore on the live map

Register summary

Holder
Mcclaren, Kym Anthony
Local government
Shire of Sandstone
Application received
24 Nov 2022

Exploration history on this ground

126 historical WAMEX exploration reports intersect E 57/1356: 85 report geochemistry or sampling, 80 include a digital data package.
When this ground was worked · 121 of 126 reports dated
51970s
171980s
301990s
342000s
272010s
82020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A149596 2025 Brightstar Resources Limited Sandstone <1% 2025 Partial Surrender Report for E57/1101 Sandstone for the period ending 06/06/2025.
A129532 2022 Alto Metals Limited Edale Shear Zone <1% Alto Metals Edale Co-funded Drilling Report, R22
A133046 2022 Alto Metals Limited Sandstone 15% Sandstone Gold Project E57/1030 Partial surrender report for the period ending 07/10/2022.
A133108 2022 Alto Metals Limited Sandstone <1% Sandstone Gold Project E57/1031 Partial Surrender report for the period ending 06/10/2022.
A133180 2022 Alto Metals Limited Sandstone <1% Sandstone Gold Project E57/1033 Partial Surrender report for the period ending 07/10/2022.
121 more reports
A133184 2022 Alto Metals Limited Sandstone <1% Sandstone Gold Project E57/1044 Partial Surrender Report for the period ending 07/10/2022.
A123185 2020 Sandstone Operations Pty Ltd Sandstone 2.6% Combined Annual Report Sandstone Project, C28/2005, 1 January 2019 to 31 December 2019
A124089 2020 Alto Metals Limited Black Hill <1% Sandstone Gold Project Black Hill E57/01101 Annual Report for the period ending 06/06/2020
A121869 2019 Alto Metals Limited Sandstone Group 2 <1% Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2018 to 19 September 2019
A119562 2019 Middle Island Resources Limited Sandstone 15% Sandstone Project C28/2005 Combined Annual Report For the Period 1 January 2018 to 31 December 2018, M57/00129
A121731 2019 Alto Metals Limited Sandstone 7.3% Sandstone Project C139/2016 Combined Annual Report For the Period 20 September 2018 to 19 September 2019, E 57
A116324 2018 Sandstone Operations Pty Ltd Sandstone 15% Sandstone Operations Project Combined Annual Report C28/2005_2017 For the Period 1 January 2017 to 31 December
A118569 2018 Alto Metals Limited Sandstone <1% Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/0
A118570 2018 Alto Metals Limited Sandstone 7.4% Sandstone Project C139/2016 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/
A115490 2017 Alto Metals Limited Sandstone 7.4% Sandstone Project C139/2016 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/
A115491 2017 Alto Metals Limited Sandstone 2 <1% Sandstone Project C24/2017 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/0
A112443 2017 Sandstone Operations Pty Ltd Sandstone 15% Combined Annual Report C28/2005 Sandstone Gold Project 1 January 2016 to 31 December 2016, M 57/00128, M 57/00
A112532 2017 Sixmez Pty Ltd Six Mile 100% Summary Geology and exploration Review for P57/1187, P57/1188 and P57/1189
A108818 2016 Black Oak Minerals Limited Sandstone <1% SANDSTONE PROJECT C28/2005 Combined Annual Report for the period 1 January 2015 to 31 December 2015, E57/580,
A105480 2015 Black Oak Minerals Limited Sandstone <1% Combined Annual Report for the Sandstone Project C281/2005 for the period 1 January 2014 to 31 December 2014,
A102287 2014 Southern Goldfields Ltd Sandstone 29% Partial Surrender Report, Sandstone Project, E57/704, for the period 20 February 2008 to 19 February 2014.
A103802 2014 Southern Cross Goldfields Ltd Sandstone <1% Sandstone Project, E57/808, East Murchison Mineral Field, Final Surrender Report for the period 21/06/2010 to
A101991 2014 Southern Cross Goldfields Ltd Sandstone 4.2% Combined annual report for the Sandstone Project, East Murchison Mineral Field, for the period 1 January 2013
A103801 2014 Southern Cross Goldfields Ltd Sandstone 29% SANDSTONE PROJECT E57/704-I East Murchison Mineral Field Final Surrender Report for the period 20/02/2008 to 2
A100213 2013 Southern Cross Goldfields Ltd Sandstone <1% Final Surrender Report for the Sandstone Project, E57/640-I, for the period 30 October 2008 to 29 October 2013
A97309 2013 Troy Resources Ltd.; Western Areas Limited Sandstone 1.6% Sandstone Project, Annual Report for the period 1st January 2012 to 31st December 2012, E57/485......E57/877;
A100211 2013 Southern Cross Goldfields Ltd Sandstone <1% Final Surrender Report for the Sandstone Project, E57/642-I, for the period 5 September 2007 to 25 September 2
A96222 2012 Troy Resources Ltd. Sandstone 29% Sandstone Project, Nickel Exploration Drillhole WADD0002, for the period 1st January 2010 to 31st December 201
A96259 2012 Western Areas Nl Sandstone 29% Report for 2012 Drill Campaign Sandstone stratigraphic hole WADD0013 E57/0704, Report Period: 1st June 2012 to
A93563 2012 Troy Resources Nl Sandstone 1.5% Sandstone Project Combined Annual Report for the period 1 January 2011 to 31 December 2011, C28/2005
A89872 2011 Troy Resources Nl; Western Areas Nl Sandstone 1.5% Sandstone Project Combined Annual Report: C28/2005_2010A 1 January 2010 to 31 December 2010
A91964 2011 Troy Resources Nl SANDSTONE <1% E57/595, SANDSTONE WESTERN AUSTRALIA, FINAL SURRENDER REPORT , For the Period 13 July 2006 to 12 July 2011
A88049 2010 Troy Resources Nl Sandstone <1% E57/595 Sandstone Partial Surrender Report For the Period 13 July 2006 to 12 July 2010
A86313 2010 Troy Resources Nl Sandstone 1.5% Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the period 1 january 2009 to 31 De
A88247 2010 Mr Donald-Hill Rf Six Mile Well 100% Annual Report Six Mile Well Project P57/01187, P57/01188, P57/01189 Period 12/09/2009 to 11/09/2010
A84883 2009 Troy Resources Nl Sandstone <1% E57/595 Sandstone PARTIAL SURRENDER REPORT For the Period 13 July 2006 to 12 July 2009
A84953 2009 Richard Forbes Donald-Hill Six Mile Well 100% Six Mile Well Project, Annual Report for the period 12/09/2008 to 11/09/2009, P57/1187-1189.
A77701 2008 Troy Resources Nl Sandstone Project 1.3% SANDSTONE PROJECT WESTERN AUSTRALIA COMBINED ANNUAL REPORT C28/2005 For the Period 1 January 2007 to 31 Decemb
A74809 2007 Troy Resources Nl Sandstone 1.5% Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 Jan 2006 to 31 Decemb
A73496 2006 Troy Resources Nl Sandstone 1% Sandstone Project, Surrender Report, For the Period 14 May 1984 to 8 June 2006, (Troy Resources Report No. SS/
A72098 2006 Troy Resources Nl Sandstone/Clackline/Black Hill 2.2% Sandstone Project, Sandstone, Western Australia, Combined Annual Report For Period 1 January 2005 to 31 Decemb
A73549 2006 Troy Resources Nl Sandstone 36% Sandstone Project M57/418,419, Combined Surrender Report C28/2005, For the Period 23 June 1999 to 7 February 2
A73554 2006 Troy Resources Nl Sandstone 95% Sandstone Project E57/338, Surrender Report for the Period 11 July 1996 to 19 June 2006, Combined Reporting No
A70072 2005 Troy Resources Nl Raffertys Patch 4.3% Combined annual report for the period 01/01/04 - 31/12/04 Wirraminna Group Project, C179/1996, E57/202, E57/25
A70220 2005 Troy Resources Nl Sandstone 9.4% Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 January 2004 to 31 De
A70610 2005 Troy Resources Nl Hancock 2.3% Combined annual report for the period 07/02/04 - 06/02/05 Edale Project, C82/1994, E57/196, M57/01, 22, 23, 68
A68295 2004 Troy Resources Nl Edale 2.3% EDALE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 7TH FEBRUARY 2003 to 6TH FEBRU
A68294 2004 Troy Resources Nl Sandstone 9.4% Annual Report for the period 01/01/2003-31/12/2003 Sandstone Project(C1/1999), E57/189, E57/267, M57/254, M57/
A68574 2004 Troy Resources Nl Wirraminna Group 4.3% Annual report for the period 01/01/2003-31/12/2003 Wirraminna Group (C179/1996), E57/426, M57/2, M57/191, M57/
A69551 2004 Troy Resources Nl Lightning Well / Magnet Road <1% Magnet Road Project, E57/208, E57/429, E57/430, Lightning Well Project E57/220, Annual report for the period 2
A66349 2003 Troy Resources Nl Sandstone 9.4% Combined Annual Report for the period 1st January 2002 to 31st December 2002 Sandstone Project C1/1999: Dairy
A66340 2003 Troy Resources Nl Raffertys Patch 4.3% Wirraminna Group, Sandstone, Combined Annual Report for the period 1st January 2002 to 31st December 2002 C179
A66401 2003 Troy Resources Nl Edale 2.3% Edale Project, Annual Report for the period 7th February 2002 to 6th February 2003, E57/196, M57/1, 22 -23, 68
A67237 2003 Troy Resources Nl Magnet Road - Lighning Well <1% Annual Report for the period 29 July 2002 to 28 July 2003, Magnet Road Project, E57/208,429,430 & Lighning W
A64333 2002 Troy Resources Nl Wirraminna 6.5% Combined Annual Report for the period 1st January 2001 to 31st December 2001 exploration licences 57/309 & 310
A64598 2002 Troy Resources Nl Sandstone 9.4% Sandstone Project Combined Annual For The Period 1st January 2001 to 31st December 2001. Tenements: Newtown: M
A64672 2002 Troy Resources Nl Edale 2.3% Edale Project , Annual Report for the period 7th February 2001 to 6th February 2002, E57/196; M57/1, 22-23, 68
A65186 2002 Troy Resources Nl Magnet Road - Lighting Well <1% Magnet Road Project E57/208, 57/429 & 57/430 & Lighting Well Project E57/220 ,Annual Report for the period 29t
A62172 2001 Troy Resources Nl Sandstone 9.4% Sandstone Project Combined Annual Report for the period 1st January 2000 to 31st December 2000. Tenements Newt
A62664 2001 Troy Resources Nl Edale 2.3% Annual Report E57/196, M57/1,22,23,68,87-88 Edale Project,for period covering 07/02/2000-06/02/2001 (C82/1994
A63535 2001 Troy Resources Nl Mount Klemptz 13% Annual Report ,Exploration Licence 57/257, Mining Licences 57/415, 416, 417, 418 and 419, Mt Klemptz Project,
A62024 2001 Troy Resources Nl Wirraminna 6.5% Wirraminna Project, East Murchison Mineral Field, Western Australia. Combined Annual Report exploration licen
A63559 2001 Troy Resources Nl Magnet Road - Lightning Well <1% Combined Annual Report Magnet Road Project E57/208, 57/429 & 57/430 and Lightning Well Project E57/220 Sandsto
A60928 2000 Troy Resources Nl Wirraminna 6.5% Wirraminna Project East Murchison Mineral Field Western Australia Combined Annual Report Exploration Licences
A61180 2000 Troy Resources Nl Magnet Road - Lightning Well <1% Annual Report, Magnet Road Project, E57/208,429,430 & Lightning Well Project E57/220, for the period 29th Jul
A60116 2000 Troy Resources Nl Sandstone 9.4% Annual Report, Sandstone Project, East Murchison Mineral Field, Western Australia 01/01/1999 to 31/12/1999. Te
A60307 2000 Troy Resources Nl Sandstone Edale 2.3% Sandstone Edale Project, Annual Report , E57/196; M57/1,22,23,68,87 & 88 , for the period 07/02/1999 to 06/02/
A61041 2000 Troy Resources Nl Mount Klemptz 13% Annual Report E57/257 and M57/415,416,417,418 and 419 Mt Klemptz Project, for the period 6 February 1999 - 2
A61492 2000 Herald Resources Ltd Lightning Well <1% Lightning Well Project, Partial Surrender Report for the period 16th September 1993 to 17th June 1998, E57/220
A57655 1999 Herald Resources Ltd Sandstone 9.6% Exploration Activites Sandstone Project 01/1999 East Murchison Mineral Field M57/40, 128-130, 179, 192,
A57913 1999 Herald Resources Ltd Hancocks 2.3% Annual technical report on mineral exploration activities Edale JV Project for the year ending 06/02/99. E57/1
A58043 1999 Troy Resources Nl Wirraminna 6.5% Combined annual report E57/309 to 310, M57/111, 134, 234, 239, 249, 262 to 264, 266, P57/652, 683, 684, 685, 6
A58309 1999 Troy Resources Nl Mount Klemptz 13% Annual Report Exploration Licence 57/257, Mt Klemptz Project, for the period 06/02/1998 to 05/02/1999.
A58581 1999 Herald Resources Ltd Sandstone 95% Herald Resources Limited - Partial Surrender Report E57/338 11/07/96 - 10/07/1999
A58816 1999 Herald Resources Ltd Magnet Road - Lightning Well <1% Annual Report, Magnet Road/Lightning Well Project, E57/208 and E57/220, 29 July 1998 to 28 July 1999, [C379/19
A53669 1998 Herald Resources Ltd Edale 2.3% 1997 Annual Technical Report on Mineral Exploration Activities Edale JV Project M57/1,22,23,68,88 and E57/196.
A53678 1998 Herald Resources Ltd Sandstone 9.9% Sandstone Project - Annual Report M57/40, 128-130, 179, 192, 248, P57/686-687,, 698-700, etc. Year Ending: 31/
A54226 1998 Battle Mountain Australia Inc Mount Klemptz 13% Mt. Klemptz JV Project, W.A. Exploration Licence: 57/257 06/02/97 - 05/02/98
A54231 1998 Battle Mountain Australia Inc Wirraminna 6.5% Wirraminna JV Project, W.A. 01/01/97 - 31/12/97 Exploration Licence: 57/309-310, Mining Lease: 57/111, 134,
A56100 1998 Herald Resources Ltd Sandstone - Lightning Well <1% Sandstone - Lightning Well Project, Annual Report , E57/220, for the period 16/09/97-15/09/98.
A50037 1997 Herald Resources Ltd Sandstone 10% 1996 Annual Technical Report on Mineral Exploration Activities Sandstone Project M57/40 M57/128 to M57/130 M57
A50701 1997 Herald Resources Ltd Sandstone 2.3% 1997 Annual Techncial Report on Mineral Exploration Activities Sandstone Project M57/1 M57/22 M57/23 M57/68 M5
A51420 1997 Battle Mountain Australia Inc Mount Klemptz 13% Mt Klemptz Joint Venture Project Western Australia Exploration Licence E57/257 Annual Mineral Exploration Repo
A52752 1997 Herald Resources Ltd Sandstone- Lightning Well <1% 1997 Annual Report for the period 16/09/1966 to 15/09/1997, Sandstone- Lightning Wel lProject, E57/220.
A46840 1996 Herald Resources Ltd Sandstone 5.3% 1995 Annual report on Mineral Exploration Activities Sandstone Project M57/40 M57/128 to M57/130 M57/179 M57/1
A49128 1996 Herald Resources Ltd Maninga Marley <1% Annual Technical Report E57/220 16 September 1995 to 15 September 1996 (Maninga Marley)
A49722 1996 Elmina Nl Sandstone 5.4% Sandstone Project , Annual Report on Exploration & Development for the period 7th Febuary 1995 to 6th Febuary
A44660 1995 Elmina Nl Sandstone - Six Mile 100% Sandstone - Six Mile Project , M57/32, Annual Report for the period 15th January 1994 to 14 January 1995.
A45775 1995 Mt Kersey Mining Nl Sandstone <1% Exploration licences E57/208 & 220 Prospecting Licences P57/769 & 803-5. Sandstone Project, Annual Report for
A46400 1995 Elmina Nl Sandstone- Hancocks East 2.6% Sandstone- Hancocks East Project, E57/196, Annual report on Exploration for the period 10 September 1994 to 9
A40496 1994 Elmina Nl Sandstone - Six Mile 100% Annual Report for the period 15/01/1993-14/01/1994, Sandstone - Six Mile Project, M57/32
A42887 1994 Mt Kersey Mining Nl Maninga Marley <1% E57/220,Maninga Marley Project, Annual report for the period 16 September 1993 to 15 September 1994.
A43127 1994 Elmina Nl Sandstone 2.6% Sandstone Project Hancocks East Prospect Exploration Licence E57/196 East Murchison Mineral Field, Western Aus
A41901 1994 Herald Resources Ltd Sandstone - Nunngarra - Twin Shafts 17% 1993 to 1994 Annual Report on exploration Sandstone Project (Nunngarra /Twin Shafts) M57/128 to M57/130, M57/1
A36817 1992 Herald Resources Ltd Sandstone - Billys Charm - Goat Farm - P 11% Annual Report for the Period 01/01/91 - 01/06/92 Sandstone/Billys Charm/Goat Farm/Plum Pudding/Two Mile Hill/
A32447 1991 Elmina Nl Sandstone 100% Sandstone Project, Non-statutory Report: Exploration Report, February 1991, M57/32;P57/467.
A32812 1991 Herald Resources Ltd Sandstone 19% 1990 Annual report on mineral exploration activities Sandstone JV East Murchison Mineral Field
A30125 1990 Elmina Nl Six Mile Well 100% Six Mile Well Project, Annual Report for the period 01/01/1989 to 01/01/1990, M57/32.
A30584 1990 Herald Resources Ltd Sandstone 20% Sandstone J.V. East Murchison Mineral Field 1989 annual report E57/31, M57/13, 34, 38
A27732 1989 Herald Resources Ltd Sandstone 19% 1988 Annual report on Mineral Exploration Activities Sandstone JV East Murchison Mineral Field Herald Resource
A30513 1988 Elmina Nl Six Mile Well 100% Six Mile Well Project, Non-statutory Report: Quarterly Report for the period ending 31/13/1988, M57/32.
A23925 1988 Clackline Ltd Sandstone - Black Hill 20% 1987 Annual Report on mineral exploration activities. Sandstone Joint Venture, East Murchison Mineral Field. (
A19638 1987 Western Mining Corporation Ltd Sandstone 31% Annual report retained portion of Exploration Licence E57/5 'Rafferty's' at Sandstone 18 December 1985 to 17 D
A17798 1986 Western Mining Corporation Ltd Raffertys - Sandstone 36% Final surrender Report, E57/05, Raffertys and MC57/4818 and 4820 at Sandstone, 18 December 1984 to 17 December
A19017 1986 Clackline Refractories Ltd Shannons - Sandstone 20% E57/31 Black Hills Minerals Ltd - Clackline Refractories Ltd Sandstone Joint Venture (1985) Shannons, Twin
A17799 1986 Western Mining Corporation Ltd Sandstone 31% Annual report retained portion of Exploration Licence E57/5 'Rafferty's' and Mineral Claim MC57/4816 at Sandst
A14813 1985 Black Hill Minerals Ltd Sandstone 23% Sandstone Project Report for the period ending 31st January 1985 MC57/4517, MC57/4573 to MC57/4576, MC57/4657
A14906 1985 Western Mining Corporation Ltd Sandstone - Black Hill 17% Annual report Sandstone/Black Hill Minerals Joint Venture 7 December 1983 to 2 November 1984 Gold Mining Lease
A15036 1985 Western Mining Corporation Ltd Sandstone 36% Annual report Exploration Licence E57/5 'Rafferty's' and Mineral Claims MC57/4816, MC57/4818 and MC57/4820 at
A15425 1985 Western Mining Corporation Ltd Sandstone - Black Hill 20% Terminal Report Sandstone/Black Hill Minerals Joint Venture 3 November 1984 to 17 April 1985 Exploration Licen
A13356 1984 Western Mining Corporation Ltd Sandstone/Black Hill 17% Annual Report, Sandstone/Black Hills Minerals Joint Venture, GMLS: 57/1348-1350, 1352, 1353, 1374, 1387, 1388,
A11861 1983 Western Mining Corporation Ltd Sandstone 5% Sandstone Project, Annual Report for the period 18th January 1982 to 17th December 1982, TR70/7379H.
A12104 1983 Western Mining Corporation Ltd Sandstone - Blackhill 3.3% Progress Report Sandstone / Black Hill Minerals JV East Murchison Mineral Field - Black Range District 23 June
A10961 1982 Western Mining Corporation Ltd Black Range 5% Black Range Project, Annual Report for the period for the period 18/01/1981 to 17/01/1982, TR7379H.
A11926 1982 Black Hill Minerals Ltd Plum Pudding 22% Plum pudding gold mine and prospect - Report of Completion of Stage 1 Exploration Programme April 1982
A9683 1981 Western Mining Corporation Ltd Sandstone 1.2% Annual Report Temporary Reserve 7378H East Murchison Goldfield, Black Range Division 18 January 1980 to 17 Jan
A2454 1971 Kennecott Exp Aust Pty Ltd Youanmi Three Block 40% Youanmi Three Block Project, Annual Report for the period ending 31/12/1971, MC57/397-404, 580-583 & 1191-1195
A6948 1971 Kennecott Exp Aust Pty Ltd Youanmi Three Block 40% Youanmi Three Block Project, Non-statutory Report: Geophysics Data, March 1971, MC57/397-404, 580-583, 1191-1
A10529 1971 Kennecott Exp Aust Pty Ltd Boolygoo 10% Boolygoo Project, Non-statutory Report: 1970 Progress Report on Boolygoo Examination, February 1971, MC57/165-
A11458 1971 Kennecott Exp Aust Pty Ltd Boolygoo Examination 11% Boolygoo Examination Project, Annual (Progress) Report , 1970, MC57/ 396-399,400-411, 165-170, 173-177, 200-20
A6936 1971 Kennecott Exp Aust Pty Ltd Wiluna One (Boolygoo) 10% Wiluna One (Boolygoo) Project, Non-statutory Report: Exploration Data: Survey Datum Log, Geophysical Surveys,
A47813 1753 Battle Mountain Australia Inc Mount Klemptz 13% Mt Klemptz Project ,E57/257, Annual Mineral Exploration Report 6 February 1995 to 5 February 1996 .
A82122 1753 Troy Resources Nl SANDSTONE 1.5% SANDSTONE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 1 January 2008 to 31 Decem
A50673 1753 Battle Mountain Australia Inc Wirraminna 6.5% Wirraminna JV Project E57/309, E57/310, M57/111, M57/134, M57/234, M57/239, M57/249, M57/262 to M57/264, M57/2
A24137 1753 Clackline Ltd Sandstone - Black Hill 20% 1987 partial surrender report. E51/31. East Murchison Mineral Field
A39505 1753 Herald Resources Ltd Sandstone - Twin Shafts 17% Annual report for the period 01/07/92-31/06/93 Sandstone/Twin Shafts Project M57/128-130 M57/192 P57/698-700
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 57/1356 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 57/1356 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 57/1356? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.