E 77/2367
Register summary
- Holder
- Geko Explore Pty Ltd
- Local government
- Shire of Yilgarn
- Application received
- 26 Apr 2016
- Commenced
- 5 July 2017
- Expiry
- 4 July 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143323 | 2024 | Riversgold (Australia) Pty Ltd | Bullfinch | <1% | Marvel Loch E77/2418 Partial Surrender Report for the period ending 30/04/2024. |
| A143378 | 2024 | Riversgold Pty Ltd | Bullfinch | <1% | Bullfinch E77/2418 Annual Technical Report for the period ending 30/04/2024 |
| A139374 | 2024 | Riversgold Pty Ltd | Bull Finch | <1% | Annual Report for Bullfinch E77/2418 for the period ending 30/04/2023 |
| A136290 | 2023 | Xantippe Sx Pty Ltd. | E77/2367 | 21% | E77/2367 Partial Surrender Report for the period 5/7/2017 to 04/07/2023 |
| A131660 | 2022 | Mining Equities Pty Ltd | Dalmore | <1% | Annual Report for the Dalmore Project (E77/2418) from 1/5/2021 to 31/4/2022 |
118 more reports
| A128773 | 2021 | Ev Metals Australia Pty Limited | Dalmore | <1% | Dalmore Annual Tenement Report E 77/02418 for the period 1 May 2020 to 30 April 2021. |
| A125078 | 2020 | Barto Gold Mining Pty Ltd | Southern Cross North | <1% | Combined Technical Report C160/2006 Southern Cross North for the period ending 30/06/2020 |
| A124599 | 2020 | Bullfinch Metals | Dalmore | <1% | Annual Report for the Dalmore Project (E77/2418) from 1/5/2019 to 30/4/2020 |
| A125682 | 2020 | Xantippe Resources Limited | "Ghoorlie" | 19% | Annual report Ghoorlie project C177/2017 for the period 1 August 2019 to 31 July 2020 |
| A125491 | 2020 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project Annual Report for the period ending 31/08/2020 |
| A120452 | 2019 | Bullfinch Metals | Dalmore | <1% | Annual Report For the Dalmore Project (E77/2418) from 1/5/2018 to 30/4/2019 |
| A121301 | 2019 | Minjar Gold Pty Ltd; Tianye Sxo Gold Mining Pty Ltd | Southern Cross North | <1% | Combined Mineral Exploration Report C160/2006 Southern Cross North Project for the period 1 July 2018 to 30 Ju |
| A122094 | 2019 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project Annual Report for the period 1 September 2018 to 31 August 2019 |
| A117500 | 2018 | Minjar Gold Pty Ltd | Southern Cross North | <1% | 2018 C160/2006 Annual Report Southern Cross North, 01 July 2017 - 30 June 2018 |
| A117770 | 2018 | Duketon Consolidated Pty Ltd | Marvel Loch North | 21% | Marvel Loch North E77/2367 Annual Report for the period 05/07/2017 to 04/07/2018 |
| A118398 | 2018 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project for the period 01/09/2017 - 31/08/2018 |
| A114588 | 2017 | Tianye Sxo Gold Mining Pty Ltd; Minjar Gold Pty Ltd | Southern Cross Operations | <1% | Combined Annual Report C160/2006 Southern Cross Operations for the period 1 July 2016 to 30 June 2017 |
| A115283 | 2017 | Bullseye Mining Limited | Southern Cross | <1% | Southern Cross Project C44/2017 Annual Report for the period 1 September 2016 to 31 August 2017, P77/04015, E7 |
| A109727 | 2016 | Hanking Gold Mining Pty Ltd | Southern Cross North | 1.6% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2015 to 30 June 2016 |
| A106588 | 2015 | Hanking Gold Mining Pty Ltd | Southern Cross North | 1.2% | Southern Cross North Project C160/2006 Annual Report for the period 01/07/2014 - 30/06/2015 |
| A100809 | 2014 | Southern Cross Goldfields Ltd | Battle - Glendower | 10% | Battle - Glendower Project, Annual Report for the period 01/11/2012 to 31/10/2013, M77/166, 1025 & 1044; P77/3 |
| A102953 | 2014 | Southern Cross Goldfields Ltd | Battle Glendower | 13% | Battle Glendower Project, Final Surrender Report for the period 15/12/2011 to 23/07/2014, P77/4112-4113, 4124- |
| A92663 | 2012 | Southern Cross Goldfields Ltd | Battler - Glendower | 10% | Battler - Glendower Project combined annual report for the period 1 November 2010 to 31 October 2011, M77/166 |
| A94612 | 2012 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2011 to 30 June 2012, E77/1379......P77/385 |
| A95847 | 2012 | Inca Minerals Ltd | Southern Cross | 10% | Southern Cross Project E77/1898 Annual report for the period ending 02 October 2012 |
| A91166 | 2011 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2010 to 30 June 2011 |
| A87644 | 2010 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2009 to 30 June 2010 |
| A88968 | 2010 | Southern Cross Goldfields Ltd | Battler - Glendower | 10% | BATTLER-GLENDOWER PROJECT M77/166, M77/1025, M77/1044, P77/3523-P77/3526, P77/3645-3648 COMBINED ANNUAL REPORT |
| A84537 | 2009 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North Project, Annual Report for the Period 1 July 2008 to 30 June 2009, C160/2006, E77/1090, E |
| A80710 | 2008 | Southern Cross Goldfields Ltd | BATTLER-GLENDOWER | 10% | BATTLER-GLENDOWER PROJECT M77/166, M77/1025, M77/1044, P77/3523-3524, P77/3525, P77/3526, P77/3645-3648, COMBI |
| A77185 | 2008 | Polaris Metals Nl | Battler_Glendower | 20% | Battler_Glendower Project M77/166, M77/1025, M77/1044, P77/2917-2919 AND P77/3048 COMBINED ANNUAL REPORT FOR T |
| A74492 | 2007 | Polaris Metals Nl | Battler - Glendowner | 20% | Battler-Glendowner Project M77/166,1025,1044,P77/2917-2919, 3048, Combined Annual Report for the Period 1 Nove |
| A75920 | 2007 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North Project, Annual Report for the period 1 July 2006 - 30 June 2007, E77/462......M77/17.... |
| A71943 | 2006 | Polaris Metals Nl | Battler - Glendowner | 20% | Battler-Glendowner Project, M77/166,1025,1044,P77/2917-2919, P77/3048, Combined Annual Report for the period 1 |
| A73564 | 2006 | St Barbara Ltd | Jupiter | <1% | Jupiter Project, Annual Report for the Period 16 September 2005 to 15 September 2006, E77/714, M77/86, M77/133 |
| A70224 | 2005 | Polaris Metals Nl | Battler-Glendowner | 20% | Battler-Glendowner Project, (M77/166, M77/1025, M77/1044, P77/2917-P77/2919 and P77/3048, 1st November 2003 to |
| A71370 | 2005 | St Barbara Mines Ltd | Jupiter | <1% | Jupiter Project, Annual Report for the period 16th September 2004 to 15th September 2005, (Combined Reporting |
| A67994 | 2004 | Sons Of Gwalia Ltd | May Queen | 19% | May Queen Project, Annual Report for the period 12 April 2003 to 16 September 2003, C66/1998:M77/106, M77/554, |
| A69473 | 2004 | Sons Of Gwalia Ltd | Jupiter | <1% | Annual report for the period 16/09/03 - 15/09/04 Jupiter Project,C002/2004, M77/86, M77/133, M77/159, M77/175 |
| A67993 | 2004 | Sons Of Gwalia Ltd | Glendower | 19% | Annual Report for the period 22/03/2003- 16/09/2003 Glendower Project (C338/1996), M77/408, M77/564, P77/2912- |
| A68104 | 2004 | Sons Of Gwalia Ltd | Mary Lena | 2.7% | Mary Lena Project, Annual ReportM77/555, M77/668, P77/2922 for the period 22 December 2002 to 21 December 200 |
| A65911 | 2003 | Sons Of Gwalia Ltd | Mary Lena | 2.7% | Mary Lena Project, Annual Report for the period 22/12/01-21/12/02. [C195/1996] M77/555, M77/668, P77/2922 . |
| A66663 | 2003 | Sons Of Gwalia Ltd | May Queen | 19% | May Queen Project, Annual Report for the period 12 April 2001-11 April 2003, C66/1998: M77/106, 554, 571, 732 |
| A66664 | 2003 | Sons Of Gwalia Ltd | Glendower | 19% | Glendower Project, Annual Report for the period 21 March 2002 - 20 March 2003, [C338/1996], M77/408, 564, P77/ |
| A67610 | 2003 | Sons Of Gwalia Ltd | May Queen | 38% | Surrender Report for C66/1998 Tenements Surrendered on 24 July 2003. May Queen Project M77/106,P77/2920-2921,P |
| A66944 | 2003 | Sons Of Gwalia Ltd | May Queen | <1% | Surrender Report for C66/1998 Tenement Surrendered on 14 January 2003 May Queen Project M77/781 Report No. 034 |
| A67165 | 2003 | Sons Of Gwalia Ltd | Mary Lena | 14% | Mary Lena project, Surrender Report for the period 1 October 1992 to 4 July 2003,C195/1996: P77/2922 . |
| A67186 | 2003 | Sons Of Gwalia Ltd | Glendower | 34% | Final Surrender Report for the period 1 October 1992 - 4 July 2003, Glendower Project, C338/1996: P77/2912,291 |
| A67409 | 2003 | Sons Of Gwalia Ltd | Triad | <1% | Triad Project,Annual Report for the period 1 September 2002 to 31 August 2003. [ C107/1996] M77/86,133,159,186 |
| A67771 | 2003 | Polaris Metals Nl | Battler | 20% | Battler prospect (M77/166, M77/1025, M77/1044, P77/2917- 2919 and P77/3048) Annual report for the period 1st N |
| A65236 | 2002 | Sons Of Gwalia Ltd | Triad | <1% | Triad Project, Annual Report For The Period 1 September 2001- 31 August 2002. Tenements: M77/86, M77/133, M77 |
| A62471 | 2001 | Sons Of Gwalia Ltd | Glendower | 19% | Glendowner Project, Annual Report For The Period 22 March 2000 - 21 March 2001. Tenements: M77/408, M77/564, P |
| A62473 | 2001 | Sons Of Gwalia Ltd | Mary Lena | 93% | Mary Lena Surrender Report For The Period 6 January 1997 - 5 January 2001. Tenement: P77/3217. Report No: 0349 |
| A63208 | 2001 | Australian Gold Resources Ltd | Southern Cross | 18% | E77/527, E77/533 ,Southern Cross Project, Annual Report C91/1997 for the period 11 May 2000 To 10 May 2001. |
| A63392 | 2001 | Sons Of Gwalia Ltd | Triad | <1% | Triad Project, Annual Report For The Period 1 September 2000 - 31 August 2001, M77/86, M77/133, M77/159,M77/18 |
| A59913 | 2000 | Sons Of Gwalia Ltd | Triad | <1% | Triad Project. M77/86,133,159,186,380,424. Annual Report for the period 01/09/98-31/08/99. |
| A59995 | 2000 | Sons Of Gwalia Ltd | Mary Lena | 2.9% | Mary Lena Project Annual report for the period 22/12/1998 to 21/12/1999 Tenements M77/555,M77/668,P77/2922,P77 |
| A60611 | 2000 | Sons Of Gwalia Ltd | May Queen | 17% | May Queen, Annual Report for the Period 12 April 1999 to 11 April 2000, M77/106,554,571,732,781, P77/2920,2921 |
| A61410 | 2000 | Sons Of Gwalia Ltd | Glendower | 19% | Glendower Project, Annual Report for the period 22/03/1999 to 21/03/2000, M77/408,564; P77/2912-2919. |
| A61441 | 2000 | Sons Of Gwalia Ltd | Triad | <1% | Triad Project, Annual Report for the Period 01/09/1999 to 31/08/2000, M77/86,133,159,186,380,424. |
| A57074 | 1999 | Sons Of Gwalia Ltd | Triad | <1% | Triad Project (M77/86, 133, 159, 186, 380, 424), Annual Report for the period 01/09/97 - 31/08/98. |
| A58335 | 1999 | Sons Of Gwalia Ltd | Mary Lena | 2.9% | Mary Lena Project, Annual Report For the period 22/12/1997 to 21/12/1998 M77/555,668, P77/2922,3217. |
| A59189 | 1999 | Sons Of Gwalia Ltd | Glendower | 19% | Glendower Project, Annual Report for the period 22/03/98-21/03/99. M77/408,564;P77/2912-2919. |
| A59368 | 1999 | Sons Of Gwalia Ltd | May Queen | 17% | May Queen Project, Annual Report for the Period 12 April 1998 to 11 April, 1999, M77/106, 554, 571, 781, 2763, |
| A55906 | 1998 | Sons Of Gwalia Ltd | May Queen | 17% | May Queen, Annual Report for 12/04/97 - 11/04/98 M77/106, 554, 571, 781, P77/2763, 2920-2921, 2924-2929, P77/3 |
| A56014 | 1998 | Australian Gold Resources Ltd | Southern Cross | 3.4% | Southern Cross, C91/1997, Exploration Licence:E77/527, 533 Joint Annual report, For the period 11/05/97 - 10/0 |
| A54502 | 1998 | Sons Of Gwalia Ltd | Triad | <1% | Triad Project, Annual Report 01/09/96 - 31/08/97 M77/86, 133, 159, 186, 380, 424. |
| A55082 | 1998 | Sons Of Gwalia Ltd | Mary Lena | 2.9% | Mary Lena Project, Annual Report 22/12/96 - 21/12/97 M77/555, 668, P77/2922, 3217 |
| A56337 | 1998 | Sons Of Gwalia Ltd | Glendower | 19% | Glendower Project. Annual Report for the period 22/03/97-21/03/98. M77/408,564. P77/2912-2919. |
| A52079 | 1997 | Sons Of Gwalia Ltd | May Queen | 17% | Yilgarn Mineral Field May Queen Project Annual report for the period 12 April 1996 to 11 April 1997 Tenements |
| A52004 | 1997 | Sons Of Gwalia Ltd | Glendower | 19% | Glendower Project , Annual Report for the period 22 March 1996 to 21 March 1997, M77/408, M77/564; P77/2912 to |
| A50764 | 1997 | Sons Of Gwalia Ltd | Mary Lena | 2.7% | Mary Lena Project, Annual Report for the period 22 December 1995 to 21 December 1996 , ML77/555 ML77/668 and |
| A49220 | 1996 | Sons Of Gwalia Ltd | Glendower | <1% | Glendower Project, Annual report for the period 1st September 1995 to 31st August 1996 , M77/86 M77/133 M77/15 |
| A47387 | 1996 | Sons Of Gwalia Ltd | Glendower | 19% | Glendower Project, Annual Report for the period 22/03/95 to 21/03/96, M77/408, M77/564; P/2912 to PL77/2919. |
| A47953 | 1996 | Sons Of Gwalia Ltd | May Queen | 18% | Yilgarn Mineral Field May Queen Project Annual report for the period 12/04/95 to 11/04/96 Tenements: Mining Le |
| A44105 | 1995 | Reynolds Yilgarn Gold Operations Ltd | Glendower | 19% | Glendower Project, M77/408, M77/564, P77/2912-2919, Annual Report for the period 22nd March 1994 To 21st Marc |
| A44951 | 1995 | Sons Of Gwalia Ltd | May Queen | 18% | Yilgarn Mineral Field May Queen Western Australia Mining Leases M77/106 M77/554 M77/571 Prospecting Licences P |
| A45388 | 1995 | Broken Hill Metals Nl | Southern Cross | 1.3% | Annual Report Broken Hill Metals Southern Cross Operation Prospecting Licence 77/2996,Exploration Licences E77 |
| A44839 | 1995 | Mr Mcdonald Mj | Southern Cross | 64% | Southern Cross project, Exploration Licence E77/533,Annual Report for the period 27 April 1994 to 26 April 199 |
| A47673 | 1995 | Burmine Ltd | Lenneburg | <1% | Lenneburg Project, Mining Leases M77/86 and M77/380 Annual report for period 01/07/93 to 30/06/94 |
| A48129 | 1995 | Sons Of Gwalia Ltd | Mary Lena | 2.7% | Mary Lena Project, Annual Report for the period 28 October 1994 to 27 October 1995 ,ML77/555 ML77/668 and P77 |
| A41033 | 1994 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 18% | Annual report for the period 12/04/93-11/04/94 May Queen Project M77/106 M77/554 M77/571 P77/2763 P77/2871 P7 |
| A41911 | 1994 | Broken Hill Metals Nl | Lenneburg | 12% | Annual Report Lenneburg EL E77/455 May 23rd 1993 - May 24th 1994. |
| A42872 | 1994 | Reynolds Australia Gold Operations Ltd | Mary Lena | 10% | Mary Lena Project, M77/577 to M77/578 and P77/2922 to P77/2923 Annual report for the period 28th October 1993 |
| A40832 | 1994 | Reynolds Australia Metals Ltd | Glendower | 19% | Glendower Project, M77/408,M77/564;P77/2912-2919, Annual Report for the Period 22 March 1993 to 21 March 1994 |
| A39252 | 1993 | Reynolds Yilgarn Gold Operations Ltd | May Queen-Lennenburg West | 18% | Annual Report for the period 12/04/92-11/04/93 May Queen/Lennenburg West Project M77/106,554,571 P77/2763,2871 |
| A39804 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mary Lena | 10% | Mary Lena Project, Annual Report for the period 28/10/1992 to 27/10/1993, M77/577-578, P77/2922 -2923. |
| A39227 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Glendower | 19% | Annual Report for the period 22/03/92-21/03/93 Glendower Project M77/408,564 P77/1984-1987,2912-2919 |
| A39627 | 1993 | Broken Hill Metals Nl | Lenneburg | <1% | Annual report for the period 10/92-10/93 Lenneburg Project M77/86 M77/380 |
| A39720 | 1993 | Broken Hill Metals Nl | Lenneburg | 12% | Lenneburg Project, E77/455 Annual Report for the Period Ending 24th May 1993. Report No. 93-016. |
| A39730 | 1993 | Broken Hill Metals Nl | May Queen | <1% | Annual report for the period 1992-1993 May Queen Project M77/555 |
| A36638 | 1992 | Broken Hill Metals Nl | Lenneburg | <1% | Annual Report for the Period 01/05/91 - 01/05/92 Lenneburg Project, M77/86,380 |
| A36521 | 1992 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 17% | Annual Report for the period 12/04/91-11/04/92 May Queen Project |
| A37618 | 1992 | Reynolds Australia Metals Ltd | Mary Lena | 10% | Annual Report for the Period 28/10/91 - 27/10/92 Mary Lena Project M77/476, M77/577 to M77/578, P77/1529 to P7 |
| A37627 | 1992 | Reynolds Australia Metals Ltd | Glendower | 30% | Annual report for the period 22/03/91-21/03/92,Glendower Project, M77/200 M77/313, M77/408 M77/278; P77/1944 P |
| A32399 | 1991 | Mawson Pacific Ltd | Lenneberg | 98% | Annual Report for the Period 28/01/90 - 27/01/91 Prospecting Licenses 77/1906-1908 & Mining Lease 77/233 Lenne |
| A34956 | 1991 | Broken Hill Metals Nl | Lenneburg | <1% | Annual Report for the period 1990-1991 Lenneburg Project M77/86,380 |
| A34817 | 1991 | Reynolds Yilgarn Gold Operations Ltd | Glendower | 30% | Annual Report for the period 22/03/90-21/03/91, Glendower Project, M77/200,278,313,408; P77/1944,1958-1961,198 |
| A34840 | 1991 | Reynolds Yilgarn Gold Operations Ltd | Mary Lena | 6.8% | Annua Report for the period 28/10/90 to 27/10/91, Mary Lena Project, M77/314 M77/409 M77/476 P77/1529 to P77/1 |
| A34841 | 1991 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 19% | Annual report for the period 12/04/90-11/04/91 May Queen Project M77/106 M77/127 M77/233 M77/248 M77/316 M77/4 |
| A30883 | 1990 | Mawson Pacific Ltd | Glendower | 33% | Annual Report for the period 1989-1990, Glendower Project, M77/200,313,408; P77/1957. |
| A31008 | 1990 | Mawson Pacific Ltd | May Queen | 98% | May Queen Tenements Annual Report Mining lease 77/233 Prospecting lease 77/1906, 77/1907, 77/1908 Yilgarn Mine |
| A31972 | 1990 | Mawson Pacific Ltd | Glendower | 24% | Annual Report for the period 08/08/89-07/08/90, Glendower Project, M77/278 |
| A31973 | 1990 | Mawson Pacific Ltd | May Queen | 37% | Yilgarn Mineral Field, WA. May Queen Annual Report. M77/106,279,298,410. 91989-1990). |
| A32085 | 1990 | Mawson Pacific Ltd | Mary Lena | 6.8% | P77/1151,1368,1529-1531,2322. M77/314,409,476. Mary Lena Project, Annual Report for the period 11/89-11/90. |
| A32436 | 1990 | Broken Hill Metals Nl | Lenneburg | <1% | Lenneburg project, M77/86 & M77/380 ,Annual report for 1989-1990 |
| A27217 | 1989 | Resource Service Group Pty Ltd | Lenneburg | <1% | Lenneberg Project,Exploration Progress Report for the period 03/88-03/89 (M77/86-87 P77/99-100) |
| A27686 | 1989 | Mawson Pacific Ltd | Lenneberg | 98% | Lenneberg Mining licence ML 77/233 Yilgarn mineral Licence 06/04/88 - 05/04/89 |
| A28550 | 1989 | Mawson Pacific Ltd | May Queen | 69% | May Queen. M77/279. Yilgarn Mineral Field. Annual report (8/8/88 to 7/8/89) |
| A28653 | 1989 | Mawson Pacific Ltd | Glendower | 24% | Annual Report for the period 08/08/88-07/08/89 Glendower Project, M77/278. |
| A29387 | 1989 | Mawson Pacific Ltd | Lenneberg | 14% | Lenneberg Project, M77/314, Yilgarn Mineral Field Annual Report 16/11/88 - 15/11/89 |
| A29405 | 1989 | Mawson Pacific Ltd | May Queen | 63% | May Queen, M77/298, Yilgarn Mineral Field. Annual report, 16/11/88 to 15/11/89 |
| A29776 | 1989 | Mawson Pacific Ltd | Glendower | 49% | Annual Report for the period 16/11/88-15/11/89, Glendower Project, M77/313. |
| A23225 | 1988 | Everest Gold Ltd | Lenneburg | <1% | Annual report Lenneberg Project Mining Leases M77/86 M77/87 Prospecting Licences P77/999 P77/1000 for the peri |
| A23403 | 1988 | Aust Consolidated Minerals Ltd | Marvel Queen | 23% | Marvel Queen Joint Venture. Annual Report to 25/01/88 (M77/127,233,248 P77/1367,1786,1836). |
| A5713 | 1975 | Tenneco Australia Inc | Southern Cross | 10% | Southern Cross Project, Non-statutory Report: Appendix B, To accompany Statutory Report [A5493], December 1974 |
| A5493 | 1974 | Tenneco Australia Inc | Southern Cross | 10% | Southern Cross Project, Non-statutory Report, December 1974, MC77/5562 ...77/5743, [See also A5713] |
| A7083 | 1973 | Tenneco Australia Inc | Southern Cross, Greenmount | 10% | Southern Cross Project, Non-statutory Report: Supplementary Report : Assessment of the Southern Cross Area, W. |
| A11666 | 1973 | Tenneco Australia Inc | Southern Cross | 10% | Southern Cross Project, Non-statutory Report: An Assessment of the Southern Cross Area, November 1973, MC77/55 |
| A79533 | 1753 | St Barbara Ltd | Southern Cross North | <1% | SOUTHERN CROSS NORTH PROJECT ANNUAL REPORT FOR THE PERIOD 1 JULY 2007 –30 JUNE 2008 C160/2006 |
| A85615 | 1753 | Southern Cross Goldfields Ltd | Battler - Glendower | 10% | BATTLER-GLENDOWER PROJECT M77/166, M77/1025, M77/1044, P77/3523-3524, P77/3525, P77/3526, P77/3645-3648 COMBIN |
| A48115 | 1753 | Australian Gold Resources Ltd | Southern Cross | 64% | Exploration Licence E77/533 'Southern Cross Project' Annual report for the period 27 April 1995 to 26 April 19 |
| A51644 | 1753 | Australian Gold Resources Ltd | Southern Cross | 18% | Exploration Licences E77/527 and E77/533 'Southern Cross' C191/1997 Joint Annual report for the period 11 May |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 10 months · 4 July 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 77/2367 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 77/2367? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.