E 77/2616
Register summary
- Holder
- Black Dragon Energy (Aus) Pty Ltd
- Local government
- Shire of Yilgarn
- Application received
- 26 July 2019
- Commenced
- 11 Mar 2020
- Expiry
- 10 Mar 2030
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A154364 | 2026 | Zenith Minerals Limited | Split Rocks Project | 57% | Split Rocks Project E77/2616 Partial Surrender Report for Period ending 10 March 2026 |
| A134354 | 2023 | Abarta Laverton Pty Ltd | Edwards | <1% | C216/2022 (Edwards) Combined Annual Report for the period ending 19/12/2022 |
| A134357 | 2023 | Zenith Minerals Limited | Split Rocks | <1% | Partial Surrender Report E77/2375 Split Rocks Project for the period ending 17/01/2023. |
| A137592 | 2023 | Zenith Minerals Limited | Split Rocks | <1% | E77/2388 Split Rocks Project for the period ending 15/10/2023. |
| A127199 | 2021 | Zenith Minerals Limited | Split Rocks | 57% | Split Rocks Project E77/2616 Partial Surrender Report for the period 11/3/2020 to 23/12/2020 |
134 more reports
| A125237 | 2020 | Barto Gold Mining Pty Ltd | Southern Cross | <1% | E77/2217 Final Surrender Report for the period ending 12/6/2020 |
| A124022 | 2020 | Minjar Gold Pty Ltd | Edwards Find | <1% | Edwards Find C216/2017 Annual Report for the period ending 29/02/2020 |
| A123300 | 2020 | Zenith Minerals Limited | Split Rocks South | <1% | Split Rocks South Project, C21/2019, 18 January 2019 to 17 January 2020 |
| A123301 | 2020 | Zenith Minerals Limited | Split Rocks | <1% | Split Rocks Project, C30/2018, 18 January 2019 to 17 January 2020 |
| A124535 | 2020 | Cazaly Iron Pty Ltd; Yilgarn Iron Pty Ltd | Parker Range | <1% | Combined Annual Report C106/2009 for the period 1/7/2019 to 30/6/2020.M 77/00741,M 77/00742,M 77/00764,P 77/04 |
| A122525 | 2020 | Imd Gold Mines Ltd | Parker Dome | <1% | Group Parker Dome C261/2008 Annual Report for the period 1 October 2018 to 30 September 2019, M77/01256, E77/0 |
| A121475 | 2019 | Cazaly Iron Pty Ltd | Parker Range | <1% | Combined Annual Report - Parker Range Project [C106/2009] for the period 1/7/2018 to 30/6/2019, M77/00741, M77 |
| A119553 | 2019 | Zenith Minerals Limited | Split Rocks South | <1% | Split Rocks South Project C21/2019 Annual Report for the period 18 January 2018 to 17 January 2019, E77/02386, |
| A119557 | 2019 | Zenith Minerals Limited | Split Rocks | <1% | Split Rocks Project C30/2018 Annual Report for the period 18 January 2018 to 17 January 2019 |
| A120420 | 2019 | Minjar Gold Pty Ltd | Edwards Find | <1% | Edwards Find C216/2017 Annual Report for the period 1 March 2018 to 28 February 2019, M77/00160, M77/00265, M7 |
| A121840 | 2019 | Cazaly Iron Pty Ltd | Parker Range | <1% | Parker Range E77/1403 Final Surrender Report For the Period 7 November 2008 to 18 July 2019 |
| A117182 | 2018 | Cazaly Iron Pty Ltd | Parker Range | <1% | Combined Annual Report - Parker Range Project C106/2009 for the period 01/07/2017 - 30/06/2018, E77/01403, P77 |
| A116484 | 2018 | Zenith Minerals Limited | Split Rocks | <1% | C30/2018 Split Rocks - Combined Annual Report for the period 18/01/2017 - 17/01/2018, E77/02375, E77/02386, E7 |
| A116867 | 2018 | Tianye Sxo Gold Mining Pty Ltd; Minjar Gold Pty Ltd | Edwards Find | <1% | Edwards Find C216/2017 Annual Report for the period 1 March 2017 to 28 February 2018, M77/00160, E77/01793, E7 |
| A115920 | 2018 | Cazaly Resources Limited | Parker Range | 30% | Parker Range E77/1235 Final Surrender Report For the Period 11 May 2007 to 15 September 2017 |
| A115178 | 2017 | Zenith Minerals Limited | Split Rocks | <1% | Split Rocks Project E77/2375 Partial Surrender Report for the period to 02/10/2017 |
| A115344 | 2017 | Hanking Gold Mining Pty Ltd | Southern Cross | <1% | Exploration Licence 77/2217 Annual Mineral Exploration Report for the period 23 January 2015 to 22 January 201 |
| A112512 | 2017 | Hanking Gold Mining Pty Ltd | Southern Cross | <1% | Exploration Licence 77/2217 Annual Report for the period 23/01/2016 to 22/01/2017 |
| A112645 | 2017 | Cazaly Iron Pty Ltd | Parker Range | <1% | Parker Range Project Final Surrender Report E77/01101 [C106/2009] For the Period 2 February 2006 to 30 April 2 |
| A114584 | 2017 | Cazaly Resources Limited | Parker Range | 14% | Parker Range Project C106/2009 Annual Report For the Period 1 July 2016 to 30 June 2017, E77/01235, E77/01403, |
| A110600 | 2016 | Black Oak Minerals Limited | Parker Dome | <1% | Combined annual report for the Parker Dome Project, C261/2008 E77/1965, E77/2091, M77/1256, Yilgarn Mineral Fi |
| A109864 | 2016 | Cazaly Resources Limited | Parker Range | 9.8% | Combined Annual Report - Parker Range Project C106/2009, 1 July 2015 to 30 June 2016, E77/01101, E77/01235, E7 |
| A110695 | 2016 | Black Oak Minerals Limited | Parker Dome | <1% | Combined annual report for the Parker Dome Project, C261/2008 E77/1965, E77/2091, M77/1256, P77/4151, Yilgarn |
| A104911 | 2015 | Black Oak Minerals Limited | Parker Dome | <1% | Combined annual report for the Parker Dome Project, C261/2008 (E77/1778, E77/1790, E77/1938–39, E77/1965, E77/ |
| A104965 | 2015 | Hannans Reward Ltd | Skeleton Rocks | 6.5% | Final Surrender Report- Skeleton Rocks Project E77/1719, E77/1784, E77/1785 for the Period 20th September 2010 |
| A106843 | 2015 | Cazaly Resources Ltd | Parker Range | 9.8% | Combined Annual Report Parker Range Project For the Period 1st July 2014 to 30th June 2015, E77/2135, E77/1101 |
| A107598 | 2015 | Black Oak Minerals Limited | Parker Dome | <1% | Parker Dome Project Combined Annual Report for the period 1 October 2014 to 30 September 2015, C261/2008 E77/1 |
| A100520 | 2014 | Southern Cross Goldfields Ltd | Parker Dome | <1% | Combined Annual Report for the Parker Dome Project for the period 1 October 2012 to 30 September 2013 C261/200 |
| A100956 | 2014 | Hannans Reward Ltd | Skeleton Rocks | 3.8% | Skeleton Rocks Project, Final Surrender Report for the period 20/09/2010 to 15/01/2014, E77/1705, 1718-1719, 1 |
| A102865 | 2014 | Hannans Reward Ltd | Skeleton Rocks | 6.5% | Skeleton Rocks Project, Annual Report for the period 24/06/2013 to 23/06/2014, E77/1719, 1784 & 1785. |
| A103247 | 2014 | Cazaly Resources Ltd | Parker Range | 12% | Combined Annual Report Parker Range Project For the Period 1st July 2013 to 30th June 2014, E77/1788, E77/2135 |
| A103250 | 2014 | Southern Cross Goldfields Ltd | Parker Range | 3.7% | Final surrender report for the Parker Range Project, P77/4016, P77/4036- 4038, P77/4079-4080, P77/4103, P77/41 |
| A103251 | 2014 | Southern Cross Goldfields Ltd | Parker Range | <1% | Final surrender report for the Parker Range Project, E77/1778, E77/1790, E77/1938, E77/1939, E77/1996 and E77/ |
| A100654 | 2014 | Cazaly Resources Ltd | Parker Range | 68% | Final Surrender Report Parker Range Project E77/1743 for the period ended 12 September 2013 |
| A99259 | 2013 | Hannans Reward Ltd | Skeleton Rocks | 2.8% | Annual Mineral Exploration Report C148/2011- Skeleton Rocks Project for the Period 24th June 2012 to 23rd June |
| A99406 | 2013 | Cazaly Resources Ltd | Parker Range | 37% | Combined Annual Report Parker Range Project C106/2009 For the Period 1st July 2012 to 30th June 2013, E77/1011 |
| A96719 | 2013 | Southern Cross Goldfields Ltd | Parker Dome | <1% | Parker Dome Project C261/2008 Combined Annual Report for the period 1 October 2011 to 30 September 2012, E77/1 |
| A97682 | 2013 | Dulcie Operations | Dulcie | 4.7% | Dulcie Project , Annual Report for the period 1st January 2011 to 31st December 2012, M77/581, M77/1246, M77/ |
| A96412 | 2013 | Southern Cross Goldfields Ltd | Dulcie | <1% | E77/1937 Dulcie Project Annual Report for the period 19/10/2011 to 18/10/2012 |
| A92668 | 2012 | Southern Cross Goldfields Ltd | Parker Dome | 2.5% | Surrender report for the Parker Dome Project — E77/1063, E77/1171, P77/3601–3604 & P77/3818 (C261/2008), Yilga |
| A95000 | 2012 | Cazaly Resources Ltd | Parker Range | 37% | Combined Annual Report Parker Range Report For the Period 1st July 2011 to 30th June 2012, E77/1101, 1235, 140 |
| A94391 | 2012 | Hannans Reward Ltd | Skeleton Rocks | 3.2% | Annual Mineral Exploration Report C148/2011- Skeleton Rocks Project for the Period 24th June 2011 to 23rd June |
| A94612 | 2012 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2011 to 30 June 2012, E77/1379......P77/385 |
| A92662 | 2012 | Southern Cross Goldfields Ltd | Parker Dome | 1.4% | Parker Dome Project, Annual Report for the period 1st October 2010 to 30th September 2011, E77/1063, 1314, 177 |
| A91719 | 2011 | Cazaly Resources Ltd | Parker Range | 68% | Annual Report Parker Range Project E77/1743 For the Period 27 August 2010 to 26 August 2011 |
| A90894 | 2011 | Hannans Reward Ltd | Skeleton Rocks | 3.3% | Annual Mineral Exploration Report C148/2011 - Skeleton Rocks Project for the period 24th June 2010 to 23rd Jun |
| A91166 | 2011 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2010 to 30 June 2011 |
| A91447 | 2011 | Cazaly Resources Ltd | Parker Range | 13% | Combined Annual Report Parker Range Project C106/2009 For the Period 1st July 2010 to 30th June 2011 |
| A89035 | 2011 | Southern Cross Goldfields Ltd | Parker Dome | <1% | Partial Surrender Report Exploration Licence E77/1171 Report Period: 16/10/206 to 24/9/2010 |
| A89007 | 2011 | Southern Cross Goldfields Ltd | Parker Dome | <1% | Parker Dome Project, Partial Surrender Report for the period 16/10/2006 to 24/09/2010, E77/1063. |
| A88038 | 2010 | Cazaly Resources Ltd | Parker Range | 13% | Combined Annual Report Parker Range Project For the Period 1st July 2009 to 30th June 2010, C106/2009 |
| A85699 | 2010 | Southern Cross Goldfields Ltd | Parker Dome | <1% | Partial Surrender Report Exploration Licence E77/1063 FOR THE PERIOD 16/10/2006-15/10/2009 |
| A85795 | 2010 | Southern Cross Goldfields Ltd | Parker Dome | <1% | Partial Surrender Report Exploration Licence E77/1063 Report Period: 16/10/2006 to 15/10/2009 |
| A88742 | 2010 | Southern Cross Goldfields Ltd | Parker Dome | 1.3% | Parker Dome Project C261/2008 Combined Annual Report for the Period 1/10/2009 to 30/9/2010 |
| A87638 | 2010 | Cazaly Resources Ltd | Parker Range | 30% | Partial Surrender Report Parker Range Project E77/1235 For the Period 11th May 2007 to 10th May 2010 |
| A87644 | 2010 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2009 to 30 June 2010 |
| A79724 | 2009 | Gondwana Resources Ltd | South Parker Range | <1% | COMBINED ANNUAL REPORT South Parker Range Gold Project Tenements E77/351, E77/1101, M77/52, M77/423, M77/561, |
| A84764 | 2009 | St Barbara Ltd | Southern Cross South | 1.7% | Southern Cross South Project C161/2006 Annual Report for the Period 1 October 2008 to 30 September 2009, E74/2 |
| A81290 | 2009 | Southern Cross Goldfields Ltd | PARKER DOME | 4% | PARKER DOME PROJECT ANNUAL REPORT FOR THE PERIOD 21 December 2007 – 20 December 2008 P77/3601 |
| A81365 | 2009 | Southern Cross Goldfields Ltd | PARKER DOME | 25% | PARKER DOME PROJECT ANNUAL REPORT FOR THE PERIOD 21 December 2007 – 20 December 2008, P77/3602 |
| A81366 | 2009 | Southern Cross Goldfields Ltd | PARKER DOME | 27% | PARKER DOME PROJECT ANNUAL REPORT FOR THE PERIOD 21 December 2007 – 20 December 2008, P77/3603 |
| A84462 | 2009 | Gondwana Resources Ltd | South Parker Range | <1% | COMBINED ANNUAL REPORT, South Parker Range Gold Project, Period covered to 30th June 2009, C129/2005 Tenements |
| A84967 | 2009 | International Goldfields Ltd | British Hill North | 73% | Surrender Report, British Hill North E77/1074, for the period 20/09/2006 to 19/09/2009 |
| A84134 | 2009 | Cazaly Resources Ltd | PARKER RANGE | 19% | Combined Annual Report, Parker Range E77/1235, E77/1403, P77/3481, P77/3764, P77/3765, For the Period 1st July |
| A84537 | 2009 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North Project, Annual Report for the Period 1 July 2008 to 30 June 2009, C160/2006, E77/1090, E |
| A85232 | 2009 | Southern Cross Goldfields Ltd | Parker Dome | 1.4% | Parker Dome Project Combined Annual Report for the Period 1/10/2008 to 30/9/2009, C261/2008, E77/1163, E77/117 |
| A77384 | 2008 | International Goldfields Ltd | British Hill North | 13% | Full Surrender and 2007, Annual Report British Hill North Project, Dulcie West Prospect, Prospecting Licences |
| A80627 | 2008 | Southern Cross Goldfields Ltd | PARKER | <1% | PARKER DOME PROJECT, ANNUAL REPORT FOR THE PERIOD 16 OCTOBER 2007 – 15 OCTOBER 2008 E77/1063 |
| A77792 | 2008 | Polaris Metals Nl | British Hill | <1% | British Hill Project, 2007 Combined Annual Report, P77/3308 - P77/3312 for the period 01/01/2007 to 31/12/2007 |
| A79218 | 2008 | Cazaly Resources Ltd | Parker Range | 30% | Annual Report Parker Range - E77/1235 for the period 11 May 2007 to 10 May 2008 Yilgarn Mineral Field |
| A80090 | 2008 | Quantum Resources Ltd | Dulcie North | 62% | ANNUAL AND SURRENDER REPORT FOR THE PERIOD 7 November 2006 27 October 2008 |
| A80061 | 2008 | St Barbara Ltd | Southern Cross South | 1.5% | SOUTHERN CROSS SOUTH PROJECT, ANNUAL REPORT FOR THE PERIOD 1 OCTOBER 2007 30 SEPTEMBER 2008 |
| A76940 | 2008 | Polaris Metals Nl | British Hill North | <1% | BRITISH HILL NORTH PROJECT, ANNUAL REPORT FOR THE PERIOD 4 OCTOBER 2006 - 3 OCTOBER 2007 E77/1171 |
| A76941 | 2008 | Polaris Metals Nl | British Hill North | <1% | BRITISH HILL NORTH PROJECT, ANNUAL REPORT FOR THE PERIOD 16 OCTOBER 2006 - 15 OCTOBER 2007 E77/1063 |
| A80289 | 2008 | Southern Cross Goldfields Ltd | Parker Dome | <1% | PARKER DOME PROJECT, ANNUAL REPORT FOR THE PERIOD 4 OCTOBER 2007 – 3 OCTOBER 2008 E77/1171 |
| A76559 | 2007 | Gondwana Resources Ltd | Parker Range | <1% | COMBINED ANNUAL REPORT South Parker Range Gold Project Yilgarn Mineral Field, Parker Range Period covered to 3 |
| A74626 | 2007 | Polaris Metals Nl | British Hill | 7.1% | British Hill Project, Annual Report for the period 01/01/2006 to 31/12/2006, P77/3308 -3312, 3341-3346. (C25/2 |
| A74442 | 2007 | International Goldfields Ltd | British Hill | 13% | 2006 Annual Report, British Hill - Dulcie West Prospect P77/3341-3346, For the Period 01/01/2006 to 31/12/2006 |
| A76724 | 2007 | International Goldfields Ltd | BRITISH HILL NORTH | 73% | 2007 ANNUAL REPORT BRITISH HILL NORTH EXPLORATION LICENCE 77/1074 For the Period 20/09/2006 to 19/09/2007 |
| A73093 | 2006 | International Goldfields Ltd | British Hill - Dulcie West | 13% | 2005 Annual Report, British Hill, Dulcie West Prospect P77/3341-3346, For the Period 01/01/2005 to 31/12/2005, |
| A73133 | 2006 | Gondwana Resources Ltd | South Parker Range | <1% | Combined Annual Report, South Parker Range Gold Project, Period Covered to 30 June 2006, Combined Reporting No |
| A73011 | 2006 | Polaris Metals Nl | British Hill | 7.1% | British Hill Project P77/3308-3312,3341-3346, Annual Report for the Period 01/01/2005 to 31/12/2005, Combined |
| A70255 | 2005 | Polaris Metals Nl | British Hill | 7.1% | Annual report for the period 01/01/04 - 31/12/04 British Hill Project, C25/2001, P77/3308-3312, P77/3341-3346 |
| A67999 | 2004 | Polaris Metals Nl | British Hill | <1% | 'British Hill' Tenement Group Annual Report for the Period 1 January 2003 to 31 December 2003 Tenements P77/33 |
| A69331 | 2004 | Western Areas Nl | Bullfinch North | 3.9% | Annual report 2001 and 2002, Bullfinch North Project E77/922, E77/932, and E77/933, C159/2001 (22/5/01 - 31/12 |
| A68726 | 2004 | Gondwana Resources Ltd | Parker Range | 59% | Annual Report for the period 26/06/2002-25/06/2003 Parker Range Project (C141/2001), E77/825, P77/2762, P77/29 |
| A68961 | 2004 | Polaris Metals Nl | British Hill (Dulcie West) | 14% | Annual report for the period 06/06/2003-05/06/2004 British Hill North (Dulcie West) Prospect P77/3343, P77/334 |
| A69147 | 2004 | International Goldfields Ltd | British Hill | 14% | Annual report for the period 07/06/2002-06/06/2003 British Hill-Dulcie West Project (C25/2001), P77/3343 P77/3 |
| A66336 | 2003 | Sons Of Gwalia Ltd | Parker Range | 34% | Parker Range Project, Annual Report for the period 1st January 2001 to 25th June 2002, E77/825; P77/2762, 2810 |
| A66946 | 2003 | Sons Of Gwalia Ltd | Parker Range | 34% | Parker Range Project, Annual Report for the period 26 June 2002 to 25 June 2003, E77/825;P77/2762,2810-2813 28 |
| A66727 | 2003 | Hamill Resources Ltd | British Hill | <1% | Annual Report for the period 01/01/2002 to 31/12/2002 British Hill Project C25/2001: P77/3308-12 |
| A64579 | 2002 | Hamill Resources Ltd | British Hill | <1% | Annual Report For The Period 01/01/2001 to 31/12/2001 British Hill Project P77/03308, P77/03309, P77/03310 P77 |
| A63159 | 2001 | Platinum Australia Ltd | Northonopine Rock | 11% | Northonopine Rock E77/964, Parker Range area, Yilgarn Mineral Field, Western Australia. Surrender Report. Tech |
| A62076 | 2001 | Platinum Australia Ltd | Mt Caudan | 11% | Annual Exploration Report for the period 5th September 1999 to 4th September 2000 Mt Caudan Project exploratio |
| A62953 | 2001 | Sons Of Gwalia Ltd | Marvel Loch | 2.3% | Marvel Lock Joint Venture Annual Report For The Period 1 January 1997 To 31 December 2000. Tenements: E77/435, |
| A63569 | 2001 | Platinum Australia Ltd | Mount Caudan | 18% | Mt Caudan Project E77/550, MLA 77/897 Parker Range area, Yilgarn Mineral Field, Western Australia Surrender Re |
| A57813 | 1999 | Abador Gold Nl | Parker Range | 45% | Annual and Surrender Report for the period 18 August 1998 to 17 August 1999 Parker Range Project (E77/48, E77/ |
| A58616 | 1999 | Abador Gold Nl | Parker Range | 7.8% | Parker Range Project, Final Surrender Report for the period 28th May 1998 to 10th May 1999, P77/2856-2859. |
| A58656 | 1999 | Croesus Mining Nl | Cheritons | 28% | Surrender Report for E77/715 Cheritons for the period 14/06/96-08/06/99 |
| A59525 | 1999 | Roebuck Resources Nl | Mt Caudan | 11% | Mt Caudan Project, Exploration Licences E77/55,584, Parker Range Area, Yilgarn Mineral Field, Western Australi |
| A56356 | 1998 | Dragon Mining Nl | Parker Range | 43% | Parker Range Project, Annual Report for the period 18/08/1997 to 17/08/1998, E77/48, E77/501; P77/2846, P77/ |
| A57237 | 1998 | Roebuck Resources Nl | Mt Caudan | 11% | Mt Caudan Project Exploration Licences E77/550 and E77/584 Parker Range Area Yilgarn Mineral Field Western Aus |
| A53982 | 1998 | Roebuck Resources Nl | Roe | 18% | Final Report Roe Project E28/579, 614, 624, 625, 664, P28/891-894, 915-922 and P31/1528-1529, December 1997. |
| A55953 | 1998 | Croesus Mining Nl | Cheritons | 28% | 14/06/97 - 13/06/98 Annual Technical Report for work completed in E77/715 Cheritons for the period 14/06/97 - |
| A52695 | 1997 | Croesus Mining Nl | Cheritons | 28% | Partial surrender report for work completed on E77/715-Cheritons for the period 14/06/96-05/06/97. |
| A52825 | 1997 | Roebuck Resources Nl | Parker Range | 11% | Mt Caudan Project, Exploration Licences E77/550, E77/584, E77/588, Parker Range Area Yilgarn Mineral Field, We |
| A52926 | 1997 | Roebuck Resources Nl | Skeleton Rocks | 9.9% | Skeleton Rocks Project, Final Surrender Report,November 1997, E77/588. (Parker Range Area) |
| A51959 | 1997 | Abador Gold Nl | Parker Range | 43% | Parker Range Project, Annual Report for the period 18th August 1996 to 17th August 1997,E77/48 & 501; P77/28 |
| A52065 | 1997 | Roebuck Resources Nl | Mount Caudan | 18% | Mount Caudan Project, Partial Surrender Report, August 1997, E77/550. |
| A54947 | 1997 | Abador Gold Nl | Parker Range | 65% | Parker Range Project, Partial Surrender Report, E77/501 , reporting period from 18 August 1996 to 17 August 19 |
| A52694 | 1997 | Croesus Mining Nl | Cheritons | 28% | Annual technical report for work completed on E77/715-Cheritons for the period 14/06/96-13/06/97. |
| A52884 | 1997 | Abador Gold Nl | Parker Range | 65% | Parker Range Project, Partial Surrender Report for the period 18th August 1996 to 17th August 1997, E77/501. |
| A49450 | 1996 | Abador Gold Nl | Parker Range-British Hill | 29% | Parker Range-British Hill Project, Annual [and Interpretation] Report for the period 01/05/1995 to 17/08/1996 |
| A49266 | 1996 | Roebuck Resources Nl | Mount Caudan | 11% | Mount Caudan Project Yilgarn Mineral Field, WA. Mt Caudan E77/550, E77/584, E77/588 Annual Report for the Peri |
| A49500 | 1996 | Sons Of Gwalia Ltd | Skeleton Rocks | <1% | Yilgarn Mineral Field Skeleton Rocks Project Annual report for the period 20 September 1995 to 19 September 19 |
| A48238 | 1996 | Abador Gold Nl | British Hill | <1% | British Hill Project, Annual Report for the period 17 April 1995 to 17 April 1996 . M77/343. |
| A48491 | 1996 | Abador Gold Nl | Dulcie West | 65% | Dulcie West Project, Annual Report for the period 1st May 1995 to 1st May 1996, E77/501. |
| A44398 | 1995 | Roebuck Resources Nl | Mt Caudan North | 11% | Mt Caudan Project, Yilgarn Mineral Field, WA. Mt Caudan E77/550 Annual Report for the Period 21 February 1994 |
| A44956 | 1995 | Reynolds Yilgarn Gold Operations Ltd | Skeleton Rocks | <1% | Yilgarn Mineral Field Skelton Rocks Joint Venture Exploration Licence E77/430 Report for the period 20th Septe |
| A45456 | 1995 | Eclipse Ridge Pty Ltd | Parker Range South/Pointer 7 | 3.7% | Annual Report on P77/2747 to 2750, P77/2856 to 2857 for the year ending 27 November 1994 Parker Range South/Po |
| A45458 | 1995 | Eclipse Ridge Pty Ltd | Dulcie West | 54% | Annual Report on P77/2846 to 2848, P77/2858 to 2860 and E77/501 for the year ending 27 May 1995, Dulcie West p |
| A45460 | 1995 | Eclipse Ridge Pty Ltd | British Hill Mine | <1% | Annual Report on M77/343 two years ending 17 April 1995, British Hill Mine. ECLRPT.008. |
| A42585 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Skeleton Rocks | <1% | Partial Surrender Report for the period 20/09/93-31/08/94 Skeleton Rocks Project E77/430 |
| A42807 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Skeleton Rocks | <1% | Yilgarn Mineral Field Skeleton Rocks Exploration Licence E77/430 Annual report for the period 20th September 1 |
| A41510 | 1994 | Southern Goldfields Ltd | British Hill | 21% | 1993 Annual Report M77/342, M77/343, M77365, M77/553, E77/48, E77/501, P77/2742 to 2750 INC, P77/2846 to 2848 |
| A42286 | 1994 | Eclipse Ridge Pty Ltd | Dulcie West | 54% | Annual Report on P77/2846 to 2848, P77/2858 to 2860 and E77/501 for the year ending 27 May 1994 Dulcie West Pr |
| A40514 | 1994 | Eclipse Ridge Pty Ltd | Parker Range South - Pointer 7 British H | 3.7% | Annual Report on P77/2747 to 2750 and P77/2856 to 2857 Parker Range South - Pointer 7 British Hill Joint Ventu |
| A40026 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Skeleton Rocks | <1% | Skeleton Rocks E77/430. Annual report for period 20/09/92-19/09/93. |
| A37756 | 1993 | Reynolds Australia Metals Ltd | Skeleton Rocks | <1% | Annual report for the period 20/09/91 to 19/09/92 Skeleton Rocks Project E 77/430 |
| A36476 | 1992 | Southern Goldfields Ltd | Parker Range | <1% | Parker Range project development plan mining lease 77/343 |
| A35426 | 1991 | Cra Exploration Pty Ltd | Parker Range | 11% | Annual Report to 25 April 1991 on M77/289, M77/342-344, M77/365, M77/384-388, E77/48 Parker Range Joint Ventur |
| A31967 | 1990 | Cra Exploration Pty Ltd | Parker Range | 4% | Annual Report to 25 April 1990 on M77/289, M77/342-344, M77/365, M77/384-388, E77/48 Parker Range SH50-16 Sout |
| A29425 | 1989 | Cra Exploration Pty Ltd | Parker Range | 3.7% | Annual Report to 25 April 1989 on P77/706-729, P77/791-792 (M77/289), P77/976-977, 988 (M77/365), E77/48 (M77/ |
| A5958 | 1975 | Amax Exploration Aust Inc | Parker Range Dome | <1% | Parker Range Dome Project, Annual Report, June 1975, MC77/5145-5204, 5300-5355, 5364-5401, 5404-5411, 5414-548 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 4 years · 10 Mar 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 77/2616 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 77/2616? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.