Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150718 | 2025 | Golden Horse Minerals Limited | E77/2149 | <1% | Partial Surrender Report for E77/2149 for the period ending 23/09/2025. |
| A125078 | 2020 | Barto Gold Mining Pty Ltd | Southern Cross North | <1% | Combined Technical Report C160/2006 Southern Cross North for the period ending 30/06/2020 |
| A125682 | 2020 | Xantippe Resources Limited | "Ghoorlie" | <1% | Annual report Ghoorlie project C177/2017 for the period 1 August 2019 to 31 July 2020 |
| A125491 | 2020 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project Annual Report for the period ending 31/08/2020 |
| A121301 | 2019 | Minjar Gold Pty Ltd; Tianye Sxo Gold Mining Pty Ltd | Southern Cross North | <1% | Combined Mineral Exploration Report C160/2006 Southern Cross North Project for the period 1 July 2018 to 30 Ju |
112 more reports
| A122094 | 2019 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project Annual Report for the period 1 September 2018 to 31 August 2019 |
| A117500 | 2018 | Minjar Gold Pty Ltd | Southern Cross North | <1% | 2018 C160/2006 Annual Report Southern Cross North, 01 July 2017 - 30 June 2018 |
| A118398 | 2018 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project for the period 01/09/2017 - 31/08/2018 |
| A112600 | 2017 | Bullseye Mining Limited | Marvel Loch North | <1% | Marvel Loch North E77/2149 Annual Report for the period 11 March 2016 to 10 March 2017 |
| A114588 | 2017 | Tianye Sxo Gold Mining Pty Ltd; Minjar Gold Pty Ltd | Southern Cross Operations | <1% | Combined Annual Report C160/2006 Southern Cross Operations for the period 1 July 2016 to 30 June 2017 |
| A115283 | 2017 | Bullseye Mining Limited | Southern Cross | <1% | Southern Cross Project C44/2017 Annual Report for the period 1 September 2016 to 31 August 2017, P77/04015, E7 |
| A108767 | 2016 | Bullseye Mining Limited | Marvel Loch North | <1% | Annual Report Marvel Loch North E77/2149 Reporting Period 11th March 2015 – 10th March 2016 |
| A109727 | 2016 | Hanking Gold Mining Pty Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2015 to 30 June 2016 |
| A106441 | 2015 | Bullseye Mining Limited | Marvel Loch North | <1% | Annual Report Marvel Loch North E77/2149 Reporting Period: 11th March 2014 – 10th March 2015 |
| A106588 | 2015 | Hanking Gold Mining Pty Ltd | Southern Cross North | <1% | Southern Cross North Project C160/2006 Annual Report for the period 01/07/2014 - 30/06/2015 |
| A94612 | 2012 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2011 to 30 June 2012, E77/1379......P77/385 |
| A91166 | 2011 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2010 to 30 June 2011 |
| A87644 | 2010 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2009 to 30 June 2010 |
| A84537 | 2009 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North Project, Annual Report for the Period 1 July 2008 to 30 June 2009, C160/2006, E77/1090, E |
| A76602 | 2007 | Dominion Mining Ltd | Wockallary | <1% | SURRENDER REPORT E77/1152 'WOCKALLARY' From 23 February 2004 to 20 September 2007 |
| A75239 | 2007 | Dominion Mining Ltd | Wockallary | <1% | Partial Surrender Report E77/1152 'Wockallary' From 23 February 2004 to 22 February 2007 Yilgarn Mineral Field |
| A75920 | 2007 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North Project, Annual Report for the period 1 July 2006 - 30 June 2007, E77/462......M77/17.... |
| A72816 | 2006 | St Barbara Mines Ltd | Marvel Loch | 17% | Marvel Loch Project, Annual Report for the Period 1 May 2005 to 30 April 2006, Combined Reporting No. C99/2003 |
| A70717 | 2005 | Dominion Mining Ltd | Wockallary | <1% | Annual report E77/1152, Wockallary, From 23 February 2004 to 22 February 2005 (Southern Cross). |
| A70789 | 2005 | St Barbara Mines Ltd | Marvel Loch | 17% | Marvel Loch Project, Annual Report for the period 1st May 2004 to 30th April 2005, M77/7-8, 10, 26, 112-114, 2 |
| A68024 | 2004 | Sons Of Gwalia Ltd | Marvel Loch | 96% | Marvel Loch Operations Project, Annual Report for the period 17 December 2002 - 16 December 2003, M77/113 |
| A68101 | 2004 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project, Annual Report M77/112, M77/358, M77/598 for the period 17 December 2002 to 16 December 200 |
| A68102 | 2004 | Sons Of Gwalia Ltd | Marvel Loch Operations | 67% | Marvel Loch Operations Project, Annual Report M77/114 for the period 17/12/2002- 16/12/2003. |
| A68194 | 2004 | Sons Of Gwalia Ltd | Marvel Loch Operations | 100% | Marvel Loch Operations Project, M77/26, Annual Report for the period 4 January 2003-3 January 2004. |
| A68769 | 2004 | Sons Of Gwalia Ltd | Marvel Loch | 17% | Annual report for the period 01/05/2003-30/04/2004 Marvel loch Operations Project(099/2003), M77/7-8, M77/10, |
| A65908 | 2003 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Annual Report for the period 17 December 2001-16 December 2002 Jaccoletti Project, M77/112, M77/358, M77/598. |
| A66333 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 8.4% | Annual Report for the period 15 September 2001 - 14 September 2002 East Marvel Loch Project M77/239 Report No |
| A67069 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 67% | Marvel Loch Project, Annual Report for the two year period 17 December 2000 to 16 December 2002 M77/114. |
| A67070 | 2003 | Sons Of Gwalia Ltd | Marvel Loch Operations | 96% | Annual Report for the two year period 17 December 2000 to 16 December 2002 M77/113 Report No. 0328-2003-11 |
| A67071 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 100% | Marvel Loch Project, Annual Report for the period 22 June 2002 to 21 June 2003, M7/008. |
| A67072 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 100% | Marvel Loch Operations Project Annual report for the period 22 June 2002 to 21 June 2003, M7/007 SOG Report No |
| A67106 | 2003 | Sons Of Gwalia Ltd | Marvel Loch Operations | 23% | Annual Report for the period 24 August 2001 - 23 August 2002 Marvel Loch Operations Project M77/10 Report No.0 |
| A67193 | 2003 | Sons Of Gwalia Ltd | Starfinch | 7.2% | Surrender Report for the period 28 May 1992 to 30 July 2003 Starfinch Project [C243/1995] P77/2854, M77/644 . |
| A67362 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 23% | Annual Report for the period 24 August 2002 - 23 August 2003 Marvel Loch Operations Project M77/10 Report No. |
| A67375 | 2003 | Sons Of Gwalia Ltd | Starfinch | 23% | Starfinch Project, Annual Report for the period 1 August 2002 to 31 July 2003, M77/525,644,2854, [C243/1995] |
| A67421 | 2003 | Sons Of Gwalia Ltd | East Marvel Loch | 8.4% | Annual Report for the period 15 September 2002 to September 2003 ,East Marvel Loch Project, M77/239. |
| A67566 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 100% | Marvel Loch M77/26, Annual Report for the period 4 January 1999 - 3 January 2002port No. 0328 2002 20 SOG Repo |
| A67567 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 96% | Annual Report for the period 17 December 1999 to 16 December 2000 Marvel Loch M77/113 Report No 0328 2000 02 |
| A67568 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 67% | Marvel Loch Project, M77/114, Annual Report for the period17 December 1999 - 16 December 2000. |
| A67708 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 100% | Annual Report for the period 22 June 1999-21 June 2002 Marvel Loch Project M77/7 Report No:0328 2002 18 |
| A67709 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 100% | Annual Report for the period 22 June 1999-21 June 2002 Marvel Loch Project M77/08. |
| A67710 | 2003 | Sons Of Gwalia Ltd | Marvel Loch | 23% | Annual Report for the period 24 August 1999-23 August 2001 Marvel Loch Project M77/10 Report No:0328 2001 08 |
| A67077 | 2003 | Sons Of Gwalia Ltd | Marvel Loch Operations | 100% | Marvel Loch Operations Project Annual report for the period 4 January 2002 to 3 January 2003, M77/26 SOG Repor |
| A63927 | 2002 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project , Annual Report for the period 17 December 2000 - 16 December 2001, M77/112, M77/358, M77/5 |
| A65110 | 2002 | Sons Of Gwalia Ltd | Starfinch | 23% | Starfinch Project, Annual Report For The Period 1 August 2001 - 31 July 2002, M77/525, M77/644, P77/2854 [C243 |
| A63001 | 2001 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project , Annual Report For The Period 17/12/98 - 16/12/2000, M77/112, M77/598, M77/358 |
| A63496 | 2001 | Sons Of Gwalia Ltd | Starfinch | 23% | Starfinch Project ,Annual Report for the period 1 August 2000 - 31 July 2001, M77/525 & 644; P77/2854. |
| A61021 | 2000 | Sons Of Gwalia Ltd | Starfinch | 23% | Starfinch Project, Annual Report for the Period 01/08/1999 to 31/07/2000, M77/525,644, P77/2854. |
| A59576 | 2000 | Sons Of Gwalia Ltd | Starfinch | 23% | Starfinch Project ,Annual Report for the period 01/08/98 - 31/07/99 M77/525, 644; P77/ 2854 |
| A61226 | 2000 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Partial Surrender Report for the period 07/06/1999 to 06/06/2000. E77/708. |
| A58336 | 1999 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project Annual Report For the Period 17/12/1997 to 16/12/1998, M77/112,358,598 |
| A57640 | 1999 | Sons Of Gwalia Ltd | StarFinch | 23% | StarFinch Project M77/525,644,2854 Reporting Period 1/8/97 to 31/7/98 |
| A59421 | 1999 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Annual Report for the Period 7-6-98 to 6-6-99, E77/708, 913. |
| A60128 | 1999 | Sons Of Gwalia Ltd | East Marvel Loch | 8.4% | East Marvel Loch Project Annual Report for the period 15/09/1998-14/09/1999 |
| A54679 | 1998 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Partial Surrender Report for the period 7-6-96 to 6-6-97, E77/708. |
| A56803 | 1998 | Sons Of Gwalia Ltd | East Marvel Loch | 8.4% | East Marvel Loch Project - Annual Report 15/09/96 - 14/09/98, M77/239. |
| A56122 | 1998 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Annual Report for the Period 7-6-97 to 6-6-98, E77/708. |
| A56616 | 1998 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project, Annual Report for the period 01/12/1996 to 01/12/1997, M77/112, 358 & 598. |
| A52213 | 1997 | Sons Of Gwalia Ltd | Frog Rock | <1% | Frog Rock Project, Annual Report for the period 7-6-96 to 6-6-97, E77/708. |
| A52350 | 1997 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project, Annual Report for the period 17/12/95 to 16/12/96 M77/112, 358, & 598. |
| A53910 | 1997 | Sons Of Gwalia Ltd | Starfinch | 23% | Starfinch Project, Annual report for the period 01/08/96-31/07/97 , ML77/525 ML77/644 PL77/2854. |
| A50480 | 1996 | Sons Of Gwalia Ltd | East Marvel Loch East | 8.4% | East Marvel Loch Project ,Annual Report for the period 15 September 1995 to 14 September 1996, M77/239. |
| A50368 | 1996 | Sons Of Gwalia Ltd | Starfinch | 23% | Starfinch Project ,Annual report for the period 1 August 1995 to 31 July 1996 Tenements ML77/525 and ML77/644 |
| A45909 | 1995 | Sons Of Gwalia Ltd | East Marvel Loch | 8.4% | East Marvel Loch Project, Annual Report 16 September 1994 to 15 September 1995, M77/239. |
| A45000 | 1995 | Sons Of Gwalia Ltd | Starfinch | 23% | Starfinch Project Annual Report for the period 1 August 1994 to 31 July 1995 M77/525.664,PL77/2854 |
| A47981 | 1995 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project , Annual Report for the period 16th December 1994 to 17th December 1995, M77/112 M77/358 & |
| A42139 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Marvel Loch East | 8.4% | Annual Report for the period 16/09/93-15/09/94 East Marvel Loch Project M77/239 |
| A42493 | 1994 | Cambrian Resources Nl | Marvel Loch | 26% | 1994 Annual Report (period 01/08/93 to 31/07/94) Marvel Loch Project M77/525 P77/285 |
| A39067 | 1993 | Cambrian Resources Nl | Marvel Loch | 22% | Annual report for the period 01/08/92-31/07/93 Marvel Loch Project M77/525 P77/2854 |
| A39230 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Marvel Loch | 8.4% | Annual Report for the period 16/09/92-15/09/93 East Marvel Loch Project M77/239 |
| A39732 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | 17% | Annual report for the period 12/92-12/93 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A39736 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | 17% | Report for the period 1993 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A39737 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | 17% | Report for the period 1993 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A40616 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Jaccoletti Hill JV/Beta/Four Threes/Geel | 17% | Report for the period 1993 Jaccoletti Hill JV/Beta/Four Threes/Geelong Project M77/112 |
| A37094 | 1992 | Reynolds Australia Metals Ltd | East Marvel Loch - May Queen | 8.4% | Annual Report for the period 16/09/91-15/09/92, May Queen-East Marvel Loch Project, M77/239. |
| A35292 | 1991 | Reynolds Yilgarn Gold Operations Ltd | East Marvel Loch - May Queen | 8.4% | Annual Report for the period 16/09/90-15/09/91, May Queen- Marvel Loch East Project, M77/239. |
| A31186 | 1990 | Cambridge Mining Services | Mountain Queen | 17% | Report on exploration on M77/112 for the period ending 15 December 1989. Cambridge Mining Services Pty Ltd Nev |
| A31939 | 1990 | Mawson Pacific Ltd | East Marvel Loch | 8.4% | Annual Report for the period 15/09/89-14/09/90, East Marvel Loch Project,M77/239. |
| A29320 | 1989 | Mawson Pacific Ltd | Compensation | 100% | GML77/4609, Annual Report for the period 01/01/89 - 31/12/89, Compensation Project. |
| A29361 | 1989 | Mawson Pacific Ltd | Marvel Loch East | 8.4% | Marvel Loch East Project, Annual Report for the period 15/09/1988 to 14/09/1989 , M77/239. [C160/2006] |
| A29381 | 1989 | Mawson Pacific Ltd | Marvel Loch | 96% | Marvel Loch Mining Lease ML77/113 Yilgarn Mineral Feild Annual Report 17/12/88 - 16/12/89 |
| A29383 | 1989 | Mawson Pacific Ltd | Marvel Loch | 67% | Marvel Loch Project, Mining Lease M77/114 ,Annual Report 17/12/88 - 16/12/89. |
| A23827 | 1988 | Mawson Pacific Ltd | Marvel Loch | 100% | Non-statutory Report: Yearly Surface Mining Report 01 July 1987 to 28 June 1988. Marvel Loch Project. (M77/08) |
| A25139 | 1988 | Australian Mine Management Pty Ltd | Marvel Loch | 100% | Surface Mining Report (Annual report for the period 01/07/87 to 28/06/88, M77/07, Sandstone, Marvel Loch). |
| A25157 | 1988 | Jingellic Minerals Nl | Mountain Queen | 17% | Annual Report on M77/112 for the period 14/12/87 to 14/12/88 (Mountain Queen Project, Marvel Loch, Southern cr |
| A26108 | 1988 | Mawson Pacific Ltd | Marvel Loch | 2.4% | M77/10, 160 Marvel Loch. (1988) |
| A26113 | 1988 | Mawson Pacific Ltd | Bishop Lode | 100% | Bishop Lode Project, Annual Report for the period 4th January 1987 to 3rd January 1988, M77/26. [C160/2006] |
| A21181 | 1987 | Mincoa Nl | Undaunted | 100% | Annual Report for Undaunted Project, for the period 01/01/1987 to 31/12/1987, M77/08. |
| A21182 | 1987 | Mr Muskett R | Mountain Queen | 17% | Geolgocial Report on Diamond Drilling of former GML's77/4434 and GML77/4646 Mountain Queen Gold Mine, Marvel L |
| A25158 | 1987 | Jingellic Minerals Nl | Mountain Queen | 9.1% | 1987 RAB Drilling Programme. M77/31,112. (Mountain Queen & Omega, Southern Cross). |
| A26114 | 1987 | Mawson Pacific Ltd | Exhibition | 96% | Exhibition Project, Annual Report for the period 17th December 1986 to 16th December 1987, M77/113. [C160/200 |
| A17921 | 1986 | Marvel Loch Gold Mine | Marvel Loch | 23% | Marvel Loch Project, Non-statutory Report: Report on Ore Reserves, June 1986, M77/10. [C160/2006] |
| A18168 | 1986 | Nevoria Gold Mines Ltd | Marvel Loch | 44% | Report on Geological Investigations ML77/30 Nevoria Gold Mines July 1986 (Marvel Loch Project) |
| A14771 | 1985 | Nevoria Gold Mines Ltd | Mountain Queen/Marvel Loch | 46% | Aquisition, Processing and Interpretation Report on Necoria Joint Venture, Marvel Loch Grid, Ground Magnetic S |
| A14887 | 1985 | Nevoria Gold Mines Ltd | Marvel Loch | 96% | Geological Report G.M.L 77/4694: Scorpio, Marvel Loch W.A |
| A17705 | 1985 | Pancontinental Mining Ltd | Scorpio | 96% | Non-statutory Report : Geological Report M77/4694, Scorpio Project, 1985. |
| A15714 | 1985 | Southern Goldfields Ltd | Marvel Loch North & South | 44% | Non-statutory Report : Marvel Loch North M77/30, Marvel Loch South P77/494 1984 Geological Report on RAB Dril |
| A15716 | 1985 | Southern Goldfields Ltd | Mountain Queen | 43% | Mountain Queen Project, Non-statutory Report: Geological Report on Drilling 01/11/1984 to 31/12/1984 , GML77/ |
| A15222 | 1984 | Kia Ora Gold Corp Nl | Marvel Loch East | 100% | Marvel Loch East Project, Annual Report for the year ending 31/12/1984, M77/26. [C160/2006] |
| A15715 | 1984 | Southern Goldfields Ltd | Mountain Queen | 44% | Mountain Queen Project, Non-statutory Report: Laterite Drilling,October 1984, M77/30. |
| A15822 | 1984 | Marvel Loch Gold Mine | Marvel Loch | 23% | Marvel Loch Project, Non-statutory Report : Underground Development Drilling Report for the period 1st Septem |
| A11830 | 1982 | Bhp Minerals Pty Ltd | Mountain Queen/Marvel Loch | 19% | Report on Exploration and Reserve Circulation Drilling M48-M90. May 1981 - February 1982 |
| A11832 | 1982 | Bhp Minerals Pty Ltd | Mountain Queen | <1% | Report on rotary airblast drilling, March-May, 1982 |
| A39811 | 1982 | Kia Ora Gold Corp Nl | Marvel Loch | 40% | R Report for the period ending 31/03/82 Marvel Loch Project GML77/4628-4631,4731-4733,5093-5094 |
| A10612 | 1981 | Bhp Minerals Pty Ltd | Mountain Queen/Marvel Loch | <1% | Dampier Joint Venture Mountain Queen Area - Report on Exploration and Drilling July 1980 to April 1981 |
| A5713 | 1975 | Tenneco Australia Inc | Southern Cross | <1% | Southern Cross Project, Non-statutory Report: Appendix B, To accompany Statutory Report [A5493], December 1974 |
| A5493 | 1974 | Tenneco Australia Inc | Southern Cross | <1% | Southern Cross Project, Non-statutory Report, December 1974, MC77/5562 ...77/5743, [See also A5713] |
| A7083 | 1973 | Tenneco Australia Inc | Southern Cross, Greenmount | <1% | Southern Cross Project, Non-statutory Report: Supplementary Report : Assessment of the Southern Cross Area, W. |
| A11666 | 1973 | Tenneco Australia Inc | Southern Cross | <1% | Southern Cross Project, Non-statutory Report: An Assessment of the Southern Cross Area, November 1973, MC77/55 |
| A60769 | 1972 | Thiess Bros Pty Ltd | Tailing Dump | 7.3% | Tailing Dump Prospect Yilgarn Goldfield Western Australia Preliminary Report. (1972. GML77/4250 GML77/4524 MC7 |
| A79533 | 1753 | St Barbara Ltd | Southern Cross North | <1% | SOUTHERN CROSS NORTH PROJECT ANNUAL REPORT FOR THE PERIOD 1 JULY 2007 –30 JUNE 2008 C160/2006 |
| A23485 | 1753 | Kia Ora Gold Corp Nl | Bishop Lode | 98% | Bishop Lode Project - Yilgarn Mineral Field, Southern Cross, W.A. 01/07/1986 - 30/11/1986 M77/26, M77/113 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 77/3337 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 77/3337 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 77/3337? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.