E 77/3410
E 77/3410 is a pending exploration licence in the Shire of Menzies, Western Australia, applied for by Harbour Exploration Pty Ltd (part of Leeuwin Metals Ltd). The application was received on 18 Aug 2026 and is awaiting a decision. The ground is covered by 106 historical WAMEX reports.
Register summary
- Holder
- Harbour Exploration Pty Ltd
- Part of
- Leeuwin Metals Ltd (ASX:LM1) as at 2025-06-30
- Local government
- Shire of Menzies, Shire of Yilgarn
- Application received
- 18 Aug 2026
The full record on E 77/3410
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Dealings, mortgages, caveats and transfer history
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A134752 | 2023 | Ramelius Resources Limited | Marda–Windarling–Evanston | <1% | Final (E77/2067, E77/2150, E77/2247, E77/2248, E77/2686, E77/2687, E77/2273, E77/2276) and Partial (E77/2165) |
| A135986 | 2023 | Dreadnought Resources Ltd | Evanston | <1% | Partial Surrender Report Evanston E77/2416 for the period 3 July 2017 to 19 May 2023 |
| A131350 | 2022 | Ramelius Resources Limited | Evanston South | <1% | Annual Mineral Exploration Report — E77/2687: Evanston South Project for the period ending 22/03/2022. |
| A122740 | 2020 | Ramelius Resources Limited | Evanston | <1% | Annual Report for Combined Reporting Group 100/2015 (Evanston Project) for the period 1 January 2019 to 31 Dec |
| A123793 | 2020 | Arrow (Strickland) Pty Ltd | Evanston | <1% | Evanston Partial Surrender Report E77/2416 for the period ending 22/1/2020 |
101 more reports
| A124159 | 2020 | Arrow (Strickland) Pty Ltd | Evanston | <1% | C111/2017 Evanston Project Annual Report for the period ending 15/05/2020 |
| A120480 | 2019 | Arrow Minerals Ltd | Evanston | <1% | Combined Annual Report for the Evanston Project, C111/2017 for the period 16 May 2018 to 15 May 2019, E77/0240 |
| A117256 | 2018 | Arrow Minerals Ltd | Evanston | <1% | C111/2017 Combined Annual Report for the Evanston Project for the period 16 May 2017 to 15 May 2018, E77/02403 |
| A112237 | 2017 | Black Oak Minerals Limited | Evanston | <1% | Combined Annual Report for the Evanston Project for the period 1 January 2016 to 31 December 2016, C100/2015 |
| A112379 | 2017 | Black Oak Minerals Limited | Evanston | <1% | Final Surrender Report for Exploration Licence E77/1814, Yilgarn Mineral Field, for the period 23 May 2011 to |
| A108496 | 2016 | Black Oak Minerals Limited | Evanston | <1% | Combined Annual Report for the Evanston Project, C100/2015, Yilgarn Mineral Field, for the period 1 January 20 |
| A108499 | 2016 | Black Oak Minerals Limited | Evanston | <1% | Final Surrender Report for Exploration Licence E77/1117, Evanston Project, Yilgarn Mineral Field, for the peri |
| A105150 | 2015 | Black Oak Minerals Limited | Evanston Mine | <1% | Final Surrender Report for Exploration Licences E77/1653‐4, Evanston Mine Project, Yilgarn Mineral Field, for |
| A105429 | 2015 | Black Oak Minerals Limited | Evanston Mine | <1% | Combined Annual Report for the Evanston Mine Project, C47/2004 (E77/1741–2, E77/1814, E77/1911, E77/2024-25, E |
| A105679 | 2015 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Combined Annual Report C81/2005 (Evanston Shear) E77/1117, E77/1321, E77/1322 and M77/1259 For the period 31 J |
| A106669 | 2015 | Black Oak Minerals Limited | Die Hardy | <1% | Combined Annual Report for the Die Hardy Project, C126/2009 (E77/1164, E77/1803, E77/1893, E77/2141, E77/2171, |
| A101288 | 2014 | Southern Cross Goldfields Ltd | Marda | <1% | Final surrender report for Exploration Licence E77/1293, Yilgarn Mineral Field, for the period 22 November 200 |
| A101405 | 2014 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Annual Report for the period 31 January 2013 to 30 January 2014, Evanston Shear, E77/1117, E77/1295, E77/1321, |
| A101640 | 2014 | Southern Cross Goldfields Ltd | Evanston | <1% | Combined annual report for the Evanston Mine Project, C47/2004 (E77/1505, E77/1653–4, E77/1741–2, E77/1814, E7 |
| A103171 | 2014 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Combined annual report for the Die Hardy Project, C126/2009 (E77/1164, E77/1803, E77/1893, E77/2017, E77/2141, |
| A97026 | 2013 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Partial Surrender Report E77/1322 (Evanston Shear) For the period 18th January 2007 to 25th February 2013 |
| A97132 | 2013 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Evanston Shear Project, Annual Report for the period 31st January 2012 to 30th January 2013, E77/1117, 1295, 1 |
| A97417 | 2013 | Southern Cross Goldfields Ltd | Evanston Mine | <1% | EVANSTON MINE PROJECT C47/2004 E77/1505, E77/1653–4, E77/1741–2, E77/1814, E77/1911, P77/4101 Yilgarn Mineral |
| A98977 | 2013 | Cliffs Asia Pacific Iron Ore Pty Ltd | Die Hardies | <1% | Final Report for the period 08 May 2013 – 05 July 2013, E77/1304-I Die Hardies Project |
| A99027 | 2013 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Combined annual report for the Die Hardy Project, C126/2009 (E77/1293, E77/1803, E77/1164, M77/576, M77/824, P |
| A93280 | 2012 | Southern Cross Goldfields Ltd | Evanston Mine | <1% | Evanston Mine Project, Annual Report for the period 1st January 2011 to 31st December 2011, E77/1505, 1653-165 |
| A93497 | 2012 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Annual Report for the period 31 January 2011 to 30 January 2012, Evanston Shear E77/1034, E77/1117, E77/1295, |
| A94510 | 2012 | Cliffs Asia Pacific Iron Ore Pty Ltd | Diemals | <1% | Combined Annual and Final Surrender Report for the period 18th April 2011 to 14th June 2012, E77/1521 |
| A94727 | 2012 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Combined annual report for the Die Hardy Project, C126/2009 (E77/1293, E77/1803, E77/1164, M77/576, M77/824, P |
| A89530 | 2011 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Die Hardy Project, Partial Surrender Report Exploration Licence E77/1293-I Report Period: 22/11/2006 to 21/11 |
| A89692 | 2011 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Annual Report for the period 31 January 2010 to 30 January 2011, Evanston Shear, E77/1034, E77/1117, E77/1295 |
| A89878 | 2011 | Southern Cross Goldfields Ltd | Evanston | <1% | Evanston Mine Project Combined Annual Report for the Period 1/01/2010 to 31/12/2010, C47/2004 Tenement Number |
| A91355 | 2011 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Die Hardy Project C126/2009 Combined Annual Report for the Period 1/05/2010 to 30/04/2011, E77/1164, E77/1293, |
| A85691 | 2010 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Partial Surrender Report Exploration Licence E77/1293-I, Die Hardy (22/11/2006 to 11/11/2009) |
| A86222 | 2010 | Cliffs Asia Pacific Iron Ore Pty Ltd | Evanston Shear | <1% | Combined Annual Report C81/2005 (Evanston Shear), E77/1034, E77/1117, E77/1295 and E77/1321, E77/1322 and P77/ |
| A86356 | 2010 | Southern Cross Goldfields Ltd | Evanston | <1% | Evanston Mine Project Combined Annual Report for the Period 1/01/2009 to 31/12/2009, C47/2004, E77/1173, E77/1 |
| A86982 | 2010 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Partial Surrender Report for E77/1164 for the Period 28/03/2006 – 18/03/2010 |
| A87364 | 2010 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Die Hardy Project Combined Annual Report for the Period 1 May 2009 to 30 April 2010 |
| A81430 | 2009 | Polaris Metals Nl | EVANSTON | 62% | EVANSTON PROJECT E77/1122-I FINAL REPORT FOR THE PERIOD, 15 JANUARY 2006 – 14 JANUARY 2009 |
| A81593 | 2009 | Southern Goldfields Ltd | Evanston | <1% | 2008 COMBINED ANNUAL REPORT C47/2004 1/1/2008 - 31/12/2008, E77/1140, E77/1173, E77/1196-I, E77/1268-I, P77/34 |
| A81981 | 2009 | Southern Cross Goldfields Ltd | EVANSTON SHEAR | <1% | EVANSTON SHEAR PROJECT E77/1034, E77/1117, E77/1295, E77/1321, E77/1322, P77/3830, COMBINED ANNUAL REPORT FOR |
| A84405 | 2009 | Southern Cross Goldfields Ltd | Die Hardy | <1% | 2008 Annual Report for Prospecting Licence P77/3458, Die Hardy, Report Period: 9/8/2007 to 8/8/2008 |
| A84406 | 2009 | Southern Cross Goldfields Ltd | Die Hardy | <1% | 2008 Annual Report for Prospecting Licence P77/3458, Die Hardy, Report Period: 9/8/2008 to 8/8/2009 |
| A84407 | 2009 | Southern Cross Goldfields Ltd | Die Hardy | <1% | 2009 Annual Report for Prospecting Licence P77/3459, Die Hardy, Report Period: 9/8/2007 to 8/8/2008 |
| A84408 | 2009 | Southern Cross Goldfields Ltd | Die Hardy | <1% | 2009 Annual Report for Prospecting Licence P77/3459, Die Hardy, Report Period: 9/8/2008 to 8/8/2009 |
| A84914 | 2009 | Southern Cross Goldfields Ltd | E77/1173 | <1% | Final Surrender Report for Prospecting Licence E77/1173, Report Period: 13/09/2006 to 04/09/2009 |
| A77809 | 2008 | Polaris Metals Nl | Evanston | 37% | Evanston Joint Venture Project 2007 Annual Report Exploration Licences E77/1107 & E77/1122 |
| A78110 | 2008 | International Goldfields Ltd | Evanston | <1% | Evanston Project, Annual Report for the period 18/01/2007 to 17/01/2008, E77/1322. [C80/2005] |
| A78112 | 2008 | International Goldfields Ltd | Evanston | <1% | 2007 Combined Annual Report Evanston Project Exploration Licences 77/1034, 77/1117 and Mining Lease 77/576 for |
| A78638 | 2008 | Liberty Gold Nl | Die Hardy | <1% | 2008 ANNUAL REPORT DIE HARDY PROSPECT EXPLORATION LICENCE 77/1164 Period 28/03/2007 to 27/03/2008 |
| A80218 | 2008 | Southern Cross Goldfields Ltd | Evanston | <1% | 2008 ANNUAL REPORT EXPLORATION LICENCE E77/1173 13/09/2007-12/09/2008 |
| A83053 | 2008 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Annual report - 28/03/2008-27/03/2009 |
| A74793 | 2007 | Polaris Metals Nl | Evanston | 37% | Evanston Joint Venture Project, 2006 Annual Report, Exploration licences E77/1107 & E77/1122 (Period:15/01/20 |
| A74892 | 2007 | International Goldfields Ltd | Evanston | <1% | Combined Annual Report for the Reporting Period 31/01/2006 to 30/01/2007, Evanston Project, E77/956, E77/1034, |
| A75228 | 2007 | Transit Holdings Ltd | Die Hardy | <1% | Annual Report for the period 28th March 2006 to 27th March 2007, Die Hardy Project, E77/1164 1:250,000 map she |
| A76669 | 2007 | International Goldfields Ltd | Evanston | <1% | 2007 ANNUAL REPORT EVANSTON PROJECT EXPLORATION LICENCE 77/1173 For the Period 13/09/2006 to 12/09/2007 |
| A77482 | 2007 | Polaris Metals Nl | Die Hardy | <1% | DIE HARDY PROJECT, Annual Report for the Period 22nd November 2006 - 21st November 2007 for E77/1293-I Polaris |
| A72631 | 2006 | International Goldfields Ltd | Evanston | <1% | Evanston Project, Annual Report, for the period 31/01/2005 to 30/01/2006, Project, E77/956,1034,1117,1127; M7 |
| A72962 | 2006 | Polaris Metals Nl | Evanston | 37% | Evanston Joint Venture Project, 2005 Annual Report E77/1107, 1122, Period 15/01/2005 to 15/01/2006, (Polaris M |
| A64742 | 2002 | Barranco Resources Nl | Mount Geraldine | 30% | Technical Report E77/566 Period Reported: 29 April 1998 To April 1999 Report Approval: C189/1995 |
| A63052 | 2001 | Barranco Resources Nl | Mount Geraldine | 30% | Mt Geraldine Project Technical Report E77/566 Annual and Final 29 April 2000 to 29 April 2001 C189/1995. |
| A63174 | 2001 | Evanston Resources Nl | Johnston Range | 1.6% | Johnson Range Combined Annual Report for 2000: E77/503, 556, 633, 637, 679, 680, 704, 720, 725, 761, and 762, |
| A63175 | 2001 | Evanston Resources Nl | Mt Jackson | 12% | Annual Report Tenements: E77/447 & E77/466 Period Reported 01 January 2000 to 31 December 2000. |
| A63304 | 2001 | Barranco Resources Nl | Mount Geraldine | 30% | Mt Geraldine Project E77/566 Annual and Final Technical Repo rt for the period 29 April 2000 to 29 April 2001 |
| A57579 | 1999 | Savage Australian Exploration Pty Ltd | Evanston | 12% | Mt Jackson Project Annual Report E77/447,466 Period Reported 01/01/1998 to 31/12/1998 |
| A57584 | 1999 | Savage Australian Exploration Pty Ltd | Johnston Range | 2% | Johnson Range Project, Annual Report, E77/503, 633, 637, 679, 680, 704, 720, 725, 761, 762, P77/3189, and P77/ |
| A57603 | 1999 | Savage Australian Exploration Pty Ltd | Johnson Range | <1% | Johnston Range Project Technical Report E77/680 Third Year Partial Surrender 10 November 1995 to 3 Aapril 1999 |
| A57625 | 1999 | Barclay Holdings Ltd | Die Hardy | 35% | Die Hardy Project Annual Report. 01/01/98-31/12/98. E77/734. P77/3172-3177. |
| A58495 | 1999 | Savage Australian Exploration Pty Ltd | Johnston Range | 46% | E77/633 Fourth Year Partial Surrender Report for the Period 23 February 1995 to 22 July 1999. Johnson Range Pr |
| A53219 | 1998 | Barclay Holdings Ltd | Johnson Range | <1% | Johnson Range Project, E77/680, Annual Report. Reporting Period:10 November 1996 to 9 November 1997. |
| A53646 | 1998 | Savage Australian Exploration Pty Ltd | Marda | 30% | Marda Project, Technical Report, 29 April 1994 to 18 December 1997 |
| A54091 | 1998 | Barclay Holdings Ltd | Johnston Range | 46% | E77/633 Annual Report for the Period 23 February 1997 to 22 February 1998. Johnson Range Project. |
| A54093 | 1998 | Barclay Holdings Ltd | Johnston Range / Yarbu | 46% | E77/633 Partial Surrender Report, Reporting Period : 23 Febraury 1995 to 22 February1998. |
| A54094 | 1998 | Barclay Holdings Ltd | Johnston Range - Yarbu | 1.4% | Johnston Range - Yarbu Project, E77/503 ,Partial Surrender Report, Reporting Period :21st July 1993 to 5th May |
| A54690 | 1998 | Barclay Holdings Ltd | Johnston Range | 7.8% | Annual report for the period 11 June 1997 to 10 June 1998, Johnston Range Project, E77/447 |
| A54721 | 1998 | Savage Australian Exploration Pty Ltd | Marda | 30% | Marda Project, Partial Surrender Report (4th Year) E77/566 for reporting period 29th April 1994 to 31st March |
| A54968 | 1998 | Savage Australian Exploration Pty Ltd | Mount Geraldine | 7.4% | Mt Geraldine Project, Combined Technical Report E77/564-566, 578, 624, 638 30/04/97 - 29/04/98 |
| A55748 | 1998 | Barclay Holdings Ltd | Johnston Range | 58% | E77/734 Annual Report reporting period: 28 June 1997 to 27 June 1998. |
| A55805 | 1998 | Barclay Holdings Ltd | Johnston Range | 1.4% | E77/503 Annual Report for the Period 21 July 1997 to 20 July 1998. Johnson Range Project. |
| A50537 | 1997 | Noble Resources Nl | Evanston | 4.2% | Annual Report for the Evanston Project Combined Report No.281/1995 for the period 1st January 1996 to 31st Dec |
| A51738 | 1997 | Barclay Holdings Ltd | Johnston Range | 7.8% | Annual report for the period 1 January 1997 to 10 June 1997,Johnston Range Project , E77/447. |
| A51772 | 1997 | Savage Australian Exploration Pty Ltd | Mount Geraldine | 7.4% | Mt Geraldine Project Combined Technical Report Tenements E77/564 E77/565 E77/566 E77/578 E77/624 E77/638 Annua |
| A52975 | 1997 | Barclay Holdings Ltd | Johnston Range | 12% | Annual Report for the Period 6 October 1996 to 5 October 1997. Johnson Range Project, E77/466. |
| A47208 | 1996 | Evanston Gold Mines Nl | Pigeon Rocks | <1% | Pigeon Rocks Project, Annual Report November 1995 - February 1996, Exploration on E77/663. |
| A47768 | 1996 | Noble Resources Nl | Evanston | 4.4% | Evanston Project [Part 2], for the period 1st January 1995 to 31st December 1995, E77/576, E77/400, E77/466, E |
| A48948 | 1996 | Savage Australian Exploration Pty Ltd | Mount Geraldine | 6% | Mt Geraldine Project Combined Technical Report Tenements E77/564 E77/565 E77/566 E77/567 E77/578 E77/624 E77/6 |
| A45636 | 1995 | Mim Exploration Pty Ltd | Mount Geraldine | 6.6% | Combined Annual Report for the period ending July 31, 1995 on Mount Geraldine, E77/564, 565, 566, 567, 624 ,63 |
| A41032 | 1994 | Broken Hill Metals Nl | Johnston Range | 12% | Annual Report for the Period 6 October 1992 to 5 October 1993, Johnson Range Project, E77/466 |
| A41505 | 1994 | Broken Hill Metals Nl | Johnston Range | <1% | Annual Report for the Period June 1993 to June 1994, Johnson Range Project, E77/366, E77/405 & E77/503. |
| A42173 | 1994 | Broken Hill Metals Nl | Mount Jackson - Norotel | 12% | Annual Report for the Period 1993 to 1994. Mt Jackson - Noretel JV Project, E77/447 and E77/466. |
| A42515 | 1994 | Samantha Gold Nl | Johnston Range | 12% | Annual Report for the Period 6 October 1992 to 5 October 1993, Johnson Range Project, E77/466 |
| A39530 | 1993 | Broken Hill Metals Nl | Johnston Range | 7.8% | Annual Report Report, Johnson Range Project, E77/447 for the Period 11 June 1992 to 10 June 1993. |
| A42514 | 1993 | Broken Hill Metals Nl | Johnston Range | 7.8% | Annual Report, Johnson Range Project, E77/447 for the Period 11 June 1992 to 10 June 1993. |
| A11960 | 1983 | Nord Resources Pacific Pty Ltd | Evanston | <1% | Annual Report 1982 Mineral Claims 77/7589, 7590, 7601, 7602,7629 and Final Report Temporary Reserve TR 8659H |
| A2689 | 1972 | Laporte Australia Ltd | Barlee - Evanston | 23% | Barlee - Evanston Project, Non-statutory Report: Barlee Region Exploration Programme, February 1972, MC77/2 |
| A2801 | 1972 | Cosmos Exp & Minerals Nl | Pigeon Rocks North | 7.6% | Pigeon Rocks North Project, Non-statutory Report: Progress Report of Detailed Investigations, MC77/3192-3200 & |
| A3010 | 1971 | Day Dawn Minerals Nl | Olby Rocks - Pigeon Rocks | 100% | Olby Rocks - Pigeon Rocks Project, Non-statutory Report: Preliminary Report on Olby Rocks, January 1971, MC77/ |
| A4085 | 1971 | Mr Prindiville B F | Pigeon Rocks | 3.4% | Pigeon Rocks Project, Non-statutory Report: 1970 Geological Report on BF Prindiville's Nickel Claims in the Pi |
| A4087 | 1971 | Mr Prindiville B F | Pigeon Rocks | 3.5% | Pigeon Rocks Project, Non-statutory Report: Report on Geological Examination on behalf of Spargo Exploration N |
| A3009 | 1970 | Analex Pty Ltd | Pidgeon Rocks North & South | 100% | Pidgeon Rocks North & South, Non-statutory Report: Brief Exploration Report, October 1970, MC77/ 2506-2517. (O |
| A4083 | 1970 | Mr Prindiville B F | Pigeon Rocks | 5.1% | Pigeon Rocks Project, Non-statutory Report: Evaluation of Mineral Claims, February 1970, MC77/517-520, 568-575 |
| A51910 | 1753 | Barclay Holdings Ltd | Johnston Range | 58% | E77/734 Annual Report Reporting Period: 28 June 1996 to 27 June 1997. |
| A52285 | 1753 | Barclay Holdings Ltd | Johnston Range | 1.4% | Annual Report for the period 21st July 1996 to 20th July 1997 Johnston Range Project ,E77/503. |
| A81368 | 1753 | Southern Cross Goldfields Ltd | Die Hardy | <1% | Annual Report for the Period 22nd November 2007 – 21st November 2008 for E77/1293 |
| A83051 | 1753 | Southern Cross Goldfields Ltd | E77/1164-I | <1% | 2009 PARTIAL SURRENDER REPORT EXPLORATION LICENCE E77/1164-I FOR THE PERIOD 28/03/2006-27/03/2009 |
| A110164 | Black Oak Minerals Limited | Evanston | <1% | Partial Surrender Report, Exploration Licence E77/1741 (Evanston) for the Period 20/8/2010 - 19/8/2016 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 77/3410 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 77/3410? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.