E 80/6059
Register summary
- Holder
- Techgen Metals Ltd
- Local government
- Shire of Halls Creek
- Application received
- 25 June 2024
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143903 | 2024 | Future Metals Nl | Sally Downs | 100% | Final Surrender of the Sally Downs Project E80/04951 for the period 19 May 2016 to 5 June 2024 |
| A144859 | 2024 | Kaili Iron Pty Ltd | Halls Creek | <1% | Carrington Sandy Creek and Wild Dog Final report C92/2019 for the period ending 03/10/2024. E 80/5113,E 80/511 |
| A144768 | 2024 | Igo Limited | Mabel Downs | <1% | E80/5587 Partial Surrender Report Mabel Downs for the period ending 30/07/23024. |
| A135246 | 2023 | Panamulet Resources Pty Ltd | Sally Downs | 100% | Sally Downs - Annual Report E80/4951 for the period ending 18/5/2023 |
| A137497 | 2023 | Kaili Iron Pty Ltd | Halls Creek | <1% | 2023 Combined Annual Report C120/2019 Halls Creek Project for the period ending 30/08/2023. E 80/5113,E 80/511 |
245 more reports with detail
| A131401 | 2022 | Panamulet Resources Pty Ltd | Sally Downs | 100% | Partial Surrender Report for E80/4951 Sally Downs for the period ending 18/05/2022. |
| A132305 | 2022 | Kaili Iron Pty Ltd | Halls Creek | <1% | 4th Annual Technical Report Period Ending 30th August 2022 Halls Creek Project C120/2019. E 80/5113,E 80/5114, |
| A131400 | 2022 | Panamulet Resources Pty Ltd | Sally Downs | 100% | Annual report for E80/4951 Sally Downs for the period ending 18/05/2022. |
| A128628 | 2021 | Kaili Iron Pty Ltd | CARRINGTON, WILD DOG AND SANDY CREEK | <1% | 2021 Combined Annual Report Carrington Wild Dog and Sandy Creek C120/2019.E80/05113,E80/05114,E80/05115 |
| A127608 | 2021 | Pathfinder Exploration Pty Ltd; Norvale Pty Ltd | Sally Downs | 100% | Sally Downs Project - Annual Report for E80/4951 for the period ending 18/05/2021 |
| A124255 | 2020 | Pathfinder Exploration Pty Ltd | Sally Downs | 100% | Sally Downs E80/04951 Annual Report for the Period Ending 18th May 2020 |
| A125226 | 2020 | Mcintosh Resources Pty Ltd | McIntosh | 2.8% | Combined Annual report C191/2010 "McIntosh" for the period 1/9/2019 to 31/8/2020 |
| A125291 | 2020 | Fin Resources Limited | McKenzie Springs | <1% | McKenzie Springs E80/04808 Annual Report for the period ending 10/09/2020 |
| A125204 | 2020 | Kaili Iron Pty Ltd | Halls Creek - Black - Glidden | <1% | Halls Creek E80/5113-5115, 2nd Annual Technical Report Black and Glidden Project for the period ending 30/08/2 |
| A125296 | 2020 | Fin Resources Limited | McKenzie Springs | <1% | McKenzie Springs Partial Surrender Report E80/4808 for the period ending 10/9/2020 |
| A120700 | 2019 | Norvale Pty Ltd; Pathfinder Exploration Pty Ltd | Sally Downs | 100% | E80/4951 Sally Downs Annual Report for the period 19 May 2018 to 18 May 2019 |
| A120938 | 2019 | Pathfinder Exploration Pty Ltd | Sally Downs | 100% | Sally Downs E80/4951 Annual Report for the period 19 May 2018 to 18 May 2019 |
| A121480 | 2019 | Mcintosh Resources Pty Ltd | McIntosh | 2.8% | Combined Annual report C191/2010 "McIntosh" for the period 1/9/2018 to 31/8/2019 for the McIntosh project. |
| A121522 | 2019 | Kaili Iron Pty Ltd | Halls Creek | <1% | C120/2019 First Annual Combined Report for the Halls Creek Project C120/2019 for the period 31 August 2018 to |
| A121584 | 2019 | Fin Resources Limited | McKenzie Springs | <1% | McKenzie Springs E80/4808 - Annual Report 11/9/18 to 10/9/19 |
| A117226 | 2018 | Norvale Pty Ltd; Pathfinder Exploration Pty Ltd | Sally Downs | 100% | Sally Downs E80/4951 Annual Report for the year ending 18/05/2018 |
| A118326 | 2018 | Mineral Resources Limited | McIntosh | 3% | McIntosh Project C191/2010 Combined Annual Report for the period 1 September 2017 to 31 August 2018 |
| A118521 | 2018 | Fin Resources Limited | McKenzie Spring | <1% | Annual Report for E80/4808 McKenzie Spring for the period 11 September 2017 to 10 September 2018 |
| A115060 | 2017 | Sammy Resources Pty Ltd | McKenzie Springs | <1% | McKenzie Springs E80/04808 Annual Report For the Period 11 September 2016 to 10 September 2017 |
| A114649 | 2017 | Pathfinder Exploration Pty Ltd | Sally Downs | 100% | Sally Downs - E80/4951 Annual Report Period Ending 18th May 2017 |
| A115042 | 2017 | Hexagon Resources Limited | McIntosh | 3% | Combined Annual Report for the period 1 September 2016 to 31 August 2017, McIntosh Project, C191/2010, E80/038 |
| A110213 | 2016 | Cazaly Resources Limited | McKenzie Springs | <1% | Annual Mineral Exploration Report - McKenzie Springs Project E80/4808 for the period 11th September 2015 to 10 |
| A109313 | 2016 | Rebecca Resources Pty Ltd | Sandy Creek | <1% | Sandy Creek Project E80/4381 Surrender Report for the period 28/10/2010 to 17/06/2016 |
| A110224 | 2016 | Hexagon Resources Limited | McIntosh | 3% | Combined Annual Report for the period 1 September 2015 to 31 August 2016, McIntosh Project, C191/2010, E80/038 |
| A104537 | 2015 | Lamboo Resources Ltd | McIntosh | 37% | Partial Surrender Report for the period 3rd December 2008 to 2nd December 2014, McIntosh Project, E80/3906 |
| A107116 | 2015 | Cazaly Resources Ltd | McKenzie Springs | <1% | McKenzie Springs Project E80/4808 For the Period 11th September 2014 to 10th September 2015 |
| A107106 | 2015 | Lamboo Resources Ltd | McIntosh | 3.1% | Combined Annual report for the period 1 September 2014 to 31 August 2015, McIntosh Project, C191/2010, E80/386 |
| A107492 | 2015 | Rebecca Resources Pty Ltd | Sandy Creek | <1% | Sandy Creek E80/4381 Annual Technical Report for the period 28/10/2014 - 27/10/2015 |
| A113989 | 2015 | Lamboo Resources Ltd | McIntosh | 24% | Drilling report for the co-funded diamond drilling program at the McIntosh Project East Kimberley, June 2015 ( |
| A104388 | 2014 | Lamboo Resources Ltd | McIntosh | <1% | Annual report - 14th November 2013 to 13th November 2014, McIntosh Project, E80/4732 |
| A104390 | 2014 | Lamboo Resources Ltd | McIntosh | <1% | Annual report - 14th November 2013 to 13th November 2014, McIntosh Project, E80/4739 |
| A103702 | 2014 | Lamboo Resources Ltd | McIntosh | 8.6% | Combined Annual Report, McIntosh Project C191/2010, E80/3864, E80/3906-7, E80/3928, E80/4396 and E80/4688, for |
| A104307 | 2014 | Rebecca Resources Pty Ltd | Sandy Creek | <1% | SANDY CREEK PROJECT ANNUAL TECHNICAL REPORT E80/4381 FOR THE PERIOD 28/10/2013 TO 27/10/2014 |
| A97779 | 2013 | Pindan Exploration Company Pty Ltd | East Kimberley | <1% | East Kimberley Project, Annual Report for the period 16th February 2012 to 15th February 2013, E80/2748, 2749, |
| A100704 | 2013 | Lamboo Resources Ltd | Mcintosh | 12% | Interim Report, McIntosh Graphite Project, E80/3864, E80/3906-7, E80/3928 and E80/4396, for Co-Funded Drilling |
| A98557 | 2013 | Panoramic Resources Ltd | East Kimberley | <1% | Surrender Report E80/2749, E80/2817, E80/2836, E80/2836 and Partial Surrender Report E80/4398 East Kimberley J |
| A99726 | 2013 | Lamboo Resources Ltd | McIntosh | 8.6% | Combined Annual Report, McIntosh Project C191/2010, E80/3864, E80/3906-7, E80/3928, E80/4396 and E80/4688, fo |
| A100444 | 2013 | Rebecca Resources Pty Ltd | Sandy Creek | <1% | Sandy Creek Project Annual Technical Report E80/4381 for the period 28/10/2012 - 27/10/2013 |
| A92775 | 2012 | Pathfinder Exploration Pty | McIntosh | 10% | McIntosh Project Reporting E80/3864, 3906, 3907, 3928 & 4396 Western Australia Annual Report for the Period En |
| A93593 | 2012 | Panoramic Resources Ltd | East Kimberley | <1% | Annual Report, East Kimberley Joint Venture Project C89/2009; for the period 16 February 2011 to 15 February 2 |
| A95472 | 2012 | Lamboo Resources Ltd | McIntosh | 10% | Combined Annual Report, McIntosh Project C191/2010, E80/3864, E80/3906-7, E80/3928 and E80/4396, for the perio |
| A96148 | 2012 | Rebecca Resources Pty Ltd | Sandy Creek | <1% | Sandy Creek Project, Annual Report for the period 28/10/2011 to 27/10/2012, E80/4381. |
| A90194 | 2011 | Pindan Exploration Company Pty Ltd | East Kimberley | <1% | East Kimberley (JV) Project, Annual Report for the period 16th February 2010 to 15th February 2011, E80/2290, |
| A90207 | 2011 | Pathfinder Exploration Pty Ltd | McIntosh | 37% | McIntosh Project, E80/3906, Western Australia, Annual Report for the period ending 2nd December 2010. (C191/2 |
| A92142 | 2011 | Rising Mining Holdings Pty Ltd | Sandy Creek | <1% | 2011 ANNUAL REPORT SANDY CREEK PROJECT EXPLORATION LICENCE 80/4381 EAST KIMBERLEY WESTERN AUSTRALIA 28/10/2010 |
| A86570 | 2010 | Pathfinder Exploration Pty Ltd | McIntosh | 37% | McIntosh Project E80/3906, Western Australia, Annual Report for the period Ending 2nd December 2009 |
| A86767 | 2010 | Pindan Exploration Company Pty Ltd | East Kimberley | <1% | Annual Report, East Kimberley Joint Venture Project; (Combined Report Number C89/2009) for the period 16 Febru |
| A84430 | 2009 | Talisman Mining Ltd | East Kimberley | 13% | East Kimberley E80/3971 Surrender Report, 20th November 2008 - 30th September 2009 |
| A82016 | 2009 | Breakaway Resources Ltd | EAST KIMBERLEY | <1% | ANNUAL REPORT ON THE EAST KIMBERLEY PROJECT, FOR THE PERIOD 16 FEBRUARY 2008 TO 15 FEBRUARY 2009 KIMBERLEY MIN |
| A82280 | 2009 | Thundelarra Exploration Ltd | ORD | <1% | Combined Annual Report, Ord Project, E80/3858, E80/3355, for the period 16 May 2008 to 15 May 2009, East Kimb |
| A82297 | 2009 | Navigator Resources Ltd | Wills Creek | <1% | Surrender Report for the Wills Creek Project, E80/2351 & E80/2754, C52/2005 |
| A79136 | 2008 | Navigator Resources Ltd | Wills Creek | <1% | Wills Creek Combined Annual Report 2007/2008, C52/2005 (Dixon Range) |
| A79137 | 2008 | Thundelarra Exploration Ltd | Ord | 18% | COMBINED ANNUAL REPORT, ORD PROJECT EXPLORATION LICENCES E80/2109 and E80/3858, 2255, 3354, & 3503 FOR THE PER |
| A79479 | 2008 | Thundelarra Exploration Ltd | Dougal Bore | 58% | ANNUAL TECHNICAL REPORT DOUGAL BORE PROJECT EXPLORATION LICENCE E80/3503 FOR THE PERIOD 24 JULY 2007 TO 23 JUL |
| A78394 | 2008 | Breakaway Resources Ltd | East Kimberley | <1% | Annual Report on the East Kimberley Project For the period 16 February 2007 to 15 February 2008 Combined Repor |
| A79419 | 2008 | Thundelarra Exploration Ltd | Togo North | 13% | ANNUAL REPORT TOGO NORTH PROJECT, E80/3498,FOR THE PERIOD 24 JULY 2007 TO 23 JULY2008 EAST KIMBERLEY MINERAL F |
| A75645 | 2007 | Thundelarra Exploration Ltd | Halls Creek | 8.2% | Combined Annual Report Ord Project Exploration Licences E80/2109, 3354, 3355 & 3356 for the Period 26 March 20 |
| A76700 | 2007 | Thundelarra Exploration Ltd | Dougal Bore | 58% | ANNUAL TECHNICAL REPORT DOUGAL BORE PROJECT EXPLORATION LICENCE E80/3503 FOR THE PERIOD 26 MARCH 2006 TO 15 MA |
| A76814 | 2007 | Breakaway Resources Ltd | East Kimberley | <1% | SURRENDER REPORT ON EXPLORATION LICENCES E80/2634, 3276, 3293 AND 3294 FOR THE PERIOD TO 12 OCTOBER 2007 KIMBE |
| A74850 | 2007 | Breakaway Resources Ltd | East Kimberley | <1% | Annual Report on the East Kimberley Project for the Period 15 February 2006 TO 14 February 2007 Kimberley Mine |
| A75413 | 2007 | Sally Malay Mining Ltd | Wills Creek | <1% | Wills Creek Project Combined Annual report C52/2005 Exploration Licences E80/2351 and E80/2754 For the period |
| A75422 | 2007 | Sally Malay Mining Ltd | Melon Patch | 1% | E80/1685 Annual Report for the year ended 7th March 2007 |
| A77459 | 2007 | Sally Malay Mining Ltd | Melon Patch | 1% | E80/1685, Annual Exploration Report For The Year Ended 7th March 2008, (Melon Patch Project) |
| A72138 | 2006 | Thundelarra Exploration Ltd | Halls Creek | 8.2% | Annual Report, Ord Project E80/2109, For the Period 26 March 2004 to 25 March 2005, East Kimberley Mineral Fie |
| A72891 | 2006 | Thundelarra Exploration Ltd | West McIntosh and Togo | 12% | Annual Report, West McIntosh & Togo Projects E80/2565 and E80/2579, Combined Reporting No. C45/2002, For the P |
| A72969 | 2006 | Thundelarra Exploration Ltd | Ord | 8.2% | Combined Annual Report, Ord Project E80/2109,3354-3356, For the Period 26 March 2005 to 15 May 2006, (Thundela |
| A74459 | 2006 | Thundelarra Exploration Ltd | West McIntosh & Togo | 12% | Annual Report, West McIntosh & Togo Projects E80/2565,2579, Combined Reporting No. C45/2002, For the Period 15 |
| A76522 | 2006 | Thundelarra Exploration Ltd | Togo North | 13% | ANNUAL REPORT TOGO NORTH PROJECT E80/3498 FOR THE PERIOD 24 JULY 2006 TO 23 JULY 2007 EAST KIMBERLEY MINERAL F |
| A72016 | 2006 | Lionore Australia (East Kimberley) Pty Ltd | East Kimberley | <1% | Annual Report on the East Kimberley Project, For the period 16 February 2005 to 15 February 2006, Kimberley Mi |
| A72551 | 2006 | Sally Malay Mining Ltd | Wills Creek | <1% | Combined Annual Exploration Report (C52/2005), Wills Creek Project E80/2351,E80/2754, For the Year Ending 6 Ma |
| A73148 | 2006 | Pathfinder Exploration Pty Ltd | McIntosh | 1% | McIntosh Project E80/1685, Annual Report for the Period Ending 8 March 2006, (Dixon Range). |
| A69684 | 2005 | Lionore Australia Pty Ltd | Sally Downs | <1% | Annual report on the Sally Downs Project, for the period 15 August 2003 to 14 August 2004, East Kimberley mine |
| A70864 | 2005 | Pathfinder Exploration Pty Ltd | McIntosh | 1% | McIntosh Project - E80/1685, Western Australia, Annual report for the period ending 8th March 2005 (Dixon Rang |
| A71312 | 2005 | Navigator Resources Ltd | Wills Creek | <1% | Wills Creek Project Partial Surrender Report, Exploration Licences E80/2351, For period 7-5-01 to 6-5-05, (Dix |
| A69977 | 2005 | Thundelarra Exploration Ltd | West McIntosh and Togo | 12% | Annual report for the period 15/03/04 - 14/03/05 West McIntosh and Togo Projects, C45/2002, E80/2565, E80/2579 |
| A70670 | 2005 | Navigator Resources Ltd | Wills Creek | <1% | Wills Creek Project, Combined annual report C52/2005, Exploration licences E80/2351 and E80/2754, For period 7 |
| A70863 | 2005 | Pathfinder Exploration Pty Ltd | McIntosh | 1% | McIntosh Project - E80/1685, Western Australia, Annual report for the period ending 8th March 2004 (Dixon Rang |
| A67985 | 2004 | Thundelarra Exploration Ltd | West McIntosh/Togo | 12% | Annual Report for the period 15/03/2003- 14/03/2004 West McIntosh & Togo Projects (C45/2002), E80/2565, E80/25 |
| A68780 | 2004 | Navigator Resources Ltd | Wills Creek | <1% | Annual Report, Wills Creek Project, Exploration Licence E80/2351 for the period 07/05/2003-06/05/2004. |
| A69780 | 2004 | Aldershot Resources Ltd | McKenzie Bore PGE exploration | 60% | Annual report, McKenzie Bore Project, E80/2925, for the period 2 July 2003 to 1 July 2004, Halls Creek, East K |
| A66580 | 2003 | Navigator Resources Ltd | Wills Creek | <1% | 2nd Annual Report for period 7 May 2002 - 6 May 2003 Wills Creek Project E80/2351 |
| A66347 | 2003 | Platinum Australia Ltd | McIntosh | 1% | McIntosh PGE Project E80/1685, Annual Report for the period 8th March 2002 - 7th March 2003 |
| A64922 | 2002 | Navigator Resources Ltd | Wills Creek | <1% | Annual Report For Period 7 May 2001 - 6 May 2002 Exploration Licence E80/2351 Wills Creek Project |
| A64948 | 2002 | Platinum Australia Ltd | McIntosh | 1% | Annual Report For The Period 8th March 2001 - 7th March 2002. Technical Report No. 793 |
| A66625 | 2002 | Platinum Australia Ltd | West McIntosh and Togo PGE | 12% | Annual Report for the period 15 March 2002 to 14 March 2003 West McIntosh & Togo PGE Project E80/2565 and 2579 |
| A64720 | 2002 | Anglo American Exploration (Australia) Pty Ltd | Halls Creek Moblie Zone | 8.2% | E80/2109 (Halls Creek Moblie Zone Project) Annual Report for the Period 25th March 2001 to 24th March 2002. |
| A61845 | 2001 | Fodina Minerals Pty Ltd | McKenzie Spring | 4.5% | Surrender Report E80/2414 McKenzie Spring Western Australia For the period 04/01/2000 to 21/12/2000 |
| A62704 | 2001 | Orlando Resources Nl | Springvale | 8.2% | Springvale Project Annual Report For EL80/2109 For The Period 24/3/2000 To 23/3/2001. |
| A63056 | 2001 | Platinum Australia Ltd | McIntosh | 1% | McIntosh PGE Project Exploration Licence 80/1685 Annual Report For The Period 2000-2001. Technical Report No. |
| A60039 | 2000 | Bhp Minerals Pty Ltd | Mabel Downs Joint Venture | 3.5% | CR9275 Mable Downs Joint Venture E80/2102,E80/2107,E80/2109 Annual Reprot for the Year Ending 22/03/2000 Dixon |
| A60291 | 2000 | Earth Australia Minerals Pty Ltd | McIntosh | 1% | Annual Report for the Period 08/03/1999 to 07/03/2000 McIntosh PGE Project East Kimberley E80/1685 |
| A57845 | 1999 | Pathfinder Exploration Pty Ltd | McIntosh | 1% | McIntosh Pge Project - EL80/1685 East Kimberley W.A. Annual Report Period End: 08/03/99 |
| A58505 | 1999 | Bhp Minerals Pty Ltd | Mabel Downs | 1.5% | Partial Surrender Report E80/2102, 2107-2110, 2147 for period ending March 1998 ( Mabel Downs Project). |
| A58504 | 1999 | Bhp Minerals Pty Ltd | Mabel Downs | 1.1% | Mabel Downs Joint Venture 03/1998 E80/2102, 2107-2110, 2146-2148 |
| A58506 | 1999 | Bhp Minerals Pty Ltd | Mabel Downs | 1.3% | Mabel Downs Joint Venture - Dixon Range 03/1999 E80/2102, 2107-2109, 2146-2148 |
| A58507 | 1999 | Bhp Minerals Pty Ltd | Mabel Downs | 3.5% | Partial Surrender Report E80/2102, 2107, 2109 for the period ending March 1999 ( Mabel Downs Project). |
| A55197 | 1998 | Pathfinder Exploration Pty Ltd | McIntosh PGE | 1% | McIntosh PGE Project- E80/1685 Annual Report for the period ending 8th March 1998. |
| A51507 | 1997 | Nickel Ventures Nl | East Kimberley | 1.4% | East Kimberley Project, Annual Report for the period 20/01/96 to 22/03/97, E80/2107-2110 & E80/2146-2147. [C |
| A52309 | 1997 | Pathfinder Exploration Pty Ltd | McIntosh | 1% | McIntosh Project, Annual Report for the period ending 8th March 1997, E80/1685. |
| A47833 | 1996 | Helix Resources Nl | Mabel Hill | 36% | Mabel Hill Project, Partial Relinquishment Report, April 1996, E80/1827. |
| A48799 | 1996 | Pathfinder Exploration Pty Ltd | McIntosh | 1% | McIntosh Project, Annual Report for the period ending 8th March 1996, E80/1685. |
| A48839 | 1996 | Helix Resources Nl | Mabel Hill | 36% | Mabel Hill Project, Annual Report for the year ending 18th July 1996, E80/1827. |
| A45517 | 1995 | Helix Resources Nl | Mabel Hill / East Kimberley | 36% | Mabel Hill / East Kimberley Project, First Annual Report E80/1827 for year ending 18th July 1995. |
| A44375 | 1995 | Pathfinder Exploration Pty Ltd | McIntosh | 1% | McIntosh Project, Annual Report Exploration Licence E80/1685 for the period ending 8th March 1995. |
| A508 | 1986 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. Profiles, 1968, ( Folder 1), TR70/ 2687H. |
| A9674 | 1981 | Gem Exp & Minerals Ltd | Mount Remarkable | 1.7% | Mount Remarkable Project, Non-statutory Report: Detrital Casserite & Scheelite Results, Gemex 1980 Programme, |
| A6894 | 1977 | Pickands Mather & Co Int | Kimberley | <1% | Non-statutory Report : Pickands Mather reconnaissance Drainage Survey of the Kimberleys, February 1977, TR70/2 |
| A6901 | 1977 | Pickands Mather & Co Int | East Kimberley - Ilmars | <1% | East Kimberley - Ilmars Project, Non-statutory Report: Core Analyses, Air Drill Analyses, 1968-1970, TR70/2687 |
| A6902 | 1977 | Pickands Mather & Co Int | East Kimberley - Angelo- Angelo North | <1% | East Kimberley - Angelo- Angelo North Project, Non-statutory Report: Geochemistry Plans & Drill Sections 1968- |
| A6195 | 1976 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Key Maps & Sub Number Indexes: Kimberley TRs 70/2686 & 2687H. |
| A18606 | 1974 | Australian Anglo American Ltd | Corkwood- Lamboo | <1% | Corkwood Project, Non-statutory Report : The Geology and Mineralization of the Corkwood Prospect Area, Lamboo |
| A712 | 1971 | Pickands Mather & Co Int | Kimberley - Cummins Range | <1% | Kimberley - Cummins Range Project, Non-statutory Report: Reconnaissance Work in the Cummins Range, March 1971, |
| A760 | 1971 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Re-Evaluation of Bow River 1970, February 1971, TR70/2686 |
| A2441 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual (Summary) Report 1 November 1971, (1971 Field Season April to October ), TR70/2686-2 |
| A4907 | 1971 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Weekly Drill Hole Reports & Drill Records, DDH B.R. 111-1 |
| A6983 | 1971 | Pickands Mather & Co Int | East Kimberley - Panton Sill | <1% | East Kimberley - Panton Sill Project, Non-statutory Report: Analytical Report Assay Sheets for Rock & Soil Sam |
| A708 | 1971 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Exploration at the Ilmars Prospect 1970, February 1971, TR70 |
| A711 | 1971 | Pickands Mather & Co Int | Ord Crossing - Tickalara Bore | <1% | Ord Crossing - Tickalara Bore Project, Non-statutory Report: Geological Report, Ord Crossing Area, Tickalara A |
| A713 | 1971 | Pickands Mather & Co Int | Kimberley - Koongie Park | <1% | Kimberley - Koongie Park Project, Non-statutory Report: Report on Koongie Park Radioactive Showing , March 197 |
| A761 | 1971 | Pickands Mather & Co Int | Kimberley - Hall's Creek | <1% | Kimberley - Hall's Creek Project: Non-statutory Report; Geological Reconnaissance South of Hall's Creek, March |
| A2224 | 1971 | Pickands Mather & Co Int | Bow River | <1% | Bow River Project, Non-statutory Report: Drilling Programme 1971, August 1971,TR70/2686 & 2687H. |
| A2226 | 1971 | Pickands Mather & Co Int | Kimberley - McIntosh " A " | <1% | Kimberley- McIntosh " A " Project, Non-statutory Report: Report on McIntosh " A " Prospect, July 1971, TR70/26 |
| A2227 | 1971 | Pickands Mather & Co Int | Cummins Range | <1% | Cummins Range Project, Non-statutory Report: Report on Cummins Range Prospect, September 1971, TR70/2686-2687, |
| A2228 | 1971 | Pickands Mather & Co Int | Kimberley - Cummmins Range | <1% | Kimberley - Cummmins Range Project, Non-statutory Report:Cummins Range Costeans, November 1971, TR70/2686-2687 |
| A2229 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Laboratory Report on the Beneficiation of Titano Magnetite-Bearing Ga |
| A2230 | 1971 | Pickands Mather & Co Int | Emull | <1% | Emull Project, Non-statutory Report:Report on Preliminary Investigation & Percussion Drilling Programme, Octob |
| A6209 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Drill Records & Analysis Sheets for the period to February 1971, TR70 |
| A4764 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Ilmars Prospect, Electromagnetics Inline Configuration A, for the yea |
| A4759 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Bow River I.P. Profiles, July 1970, TR70/2687H. |
| A4765 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Koongie Park Lead I. P. Profiles, 1'-200', May 1970, TR70/2687H. |
| A4773 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Little Mount Isa Drill Records,DDH 401 & 402 , July- August 1970, TR7 |
| A4908 | 1970 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Hole Reports & Analysis Report Sheets for the p |
| A6903 | 1970 | Pickands Mather & Co Int | Kimberley- Mount Angelo | <1% | Kimberley- Mount Angelo Project, Non-statutory Report; Miscellaneous Plans & Sections, 1966 & 1970, TR70/2687H |
| A6904 | 1970 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Plans & Sections , 1970, TR70/2687H. |
| A517 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual Report for the year ending 31/12/1969, TR70/2686, 2687,4658, 5284, 5285, 5286 & 528 |
| A519 | 1970 | Pickands Mather & Co Int | Kimberley -llmars | <1% | Kimberley -llmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing - A |
| A4762 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Wild Dog Creek I.P.Profiles, May 1970 , TR70/2686 & 2687H. |
| A4763 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Golf course I P Profiles, May 1970, TR70/2686 & 2687H. |
| A6208 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Report Sheets ( Bullman Copper, Moola Bulla & |
| A6211 | 1970 | Pickands Mather & Co Int | Kimberley - | <1% | Kimberley Project, Non-statutory Report: Golf Course Prospect, D. D. H. 1 (Venture 3 Drillilng), Logs & Assay |
| A6213 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets for the period 1965 to August 1970.[Lam |
| A523 | 1969 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Exploration, 1969 Field Season, TR70/2686 & 2687H. |
| A4775 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo Core Analyses 1967-1969; Drill Logs 1967-1969 & Drill Logs |
| A496 | 1969 | Pickands Mather & Co Int | McIntosh Hills - Panton Sill | <1% | McIntosh Hills - Panton Sill Project, Annual Report for the year ending 31/12/1968, TR70/2687H. |
| A512 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report, February 1968, TR70/ 2687H. |
| A522 | 1969 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report: Report on 1969 Field Season, [Eastern Basics Exploration], |
| A513 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars 1968 I. P. Profiles ( 100' & 200' Dipole), May - June |
| A515 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 2, Pocket C & D, February 1969 |
| A516 | 1969 | Pickands Mather & Co Int | Kimberley Area | <1% | Kimberley Area Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/2686 |
| A520 | 1969 | Pickands Mather & Co Int | East Kimberley Project | <1% | East Kimberley Project, Non-statutory Report: Miscellaneous Exploration , 1969 Field Season, TR70/2686 & 2687H |
| A521 | 1969 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Radioactive Exploration, East Kimberley 1969 Field Season, TR70/ |
| A524 | 1969 | Pickands Mather & Co Int | Kimberley - Sophie Downs | <1% | Kimberley - Sophie Downs Project, Non-statutory Report: Sophie Downs, I.P. Profiles, 1969, TR70/2686 & 2687H. |
| A525 | 1969 | Pickands Mather & Co Int | Kimberleys- Bullman | <1% | Kimberleys- Bullman Project, Non-statutory Report: Kimberleys Bullman I.P.Profiles, 1969, TR70/2686 & 2687H. |
| A526 | 1969 | Pickands Mather & Co Int | Kimberley - Angelo Valley | <1% | Kimberley - Angelo Valley Project, Non-statutory Report: Angelo Valley I.P.Profiles, 1969, TR70/2686 & 2687H. |
| A527 | 1969 | Pickands Mather & Co Int | Kimberley - Napier | <1% | Kimberley - Napier Project, Non-statutory Report: Napier I. P. Profiles 1969, TR70/2686 & 2687H. |
| A528 | 1969 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Kimberley -Bow River I.P.Profiles 1969, TR70/2686 & 2687H |
| A529 | 1969 | Pickands Mather & Co Int | Kimberley - Golf Course | <1% | Kimberleys- Golf Course, Non-statutory Report: IP Profiles, 1969, TR70/2686 & 2687H. |
| A6212 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report SheetsOctober 1968 to May 1969 , TR70/2686 & 2687H. |
| A6214 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets with Sample Shipment Records, to Octobe |
| A6216 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets, ( Soil Rock Analysis, 1966-1969, Kimberley Re |
| A505 | 1968 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Mt.Angelo I.P Profiles 1968, TR70/2686 & 2687H. |
| A506 | 1968 | Pickands Mather & Co Int | Kimberley- Sophie Downs | <1% | Kimberley-Sophie Downs Project, Non-statutory Report: Sophie Downs I. P. Profiles, 1968, TR70/2686 & 2687H. |
| A6916 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Regional Stream Sediment Survey Maps, Cambridge Gulf, 1964-1968, TR70 |
| A509 | 1968 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report: Bow River I.P.Profiles (Folder 2), 1968, TR70/2687H. |
| A510 | 1968 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: East Kimberley Areas I.P. Profiles, 1968, TR70/ 2687H. |
| A4766 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Black - Bow River I.P. Lines 1966 - 1968, TR70/2687H. |
| A4909 | 1968 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Records & Analyis Report Sheets, to September 1 |
| A487 | 1968 | Pickands Mather & Co Int | Kimberley - Ilmar's Showing | <1% | Kimberley - Ilmar's Showing Project, Non-statutory Report: Ilmar's Showing I.P. 200 Foot Dipole 1967 & 300 Fo |
| A489 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars - Little Mount Isa | <1% | Kimberley- Ilmars - Little Mount Isa Project, Final Surrender Report, February 1968, TR70/2686 & 2687H. |
| A490 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars- Little Mount Isa | <1% | Kimberley- Ilmars- Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mount Isa Lead-Zi |
| A491 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars - Little Mount Isa | <1% | Kimberley- Ilmars - Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mt Isa "Zinc- Le |
| A492 | 1968 | Pickands Mather & Co Int | Kimberley-Ilmars | <1% | Kimberley-Ilmars Project, Non-statutory Report: Report on Ilmars Showing I.P., 300 Foot Dipole 1966 & 200 Foot |
| A493 | 1968 | Pickands Mather & Co Int | Kimberley Reserves | <1% | Kimberley Reserves Project, Annual Report for the period ending 31/12/1968,TR70/2686 & 2687H. |
| A494 | 1968 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Report on Field work in the West Kimberley for the year ending 3 |
| A495 | 1968 | Pickands Mather & Co Int | Kimberley - Bow River - Salt Lick Creek | <1% | Kimberley - Bow River-Salt Lick Creek- Black Mountain Project, Annual Report for the year ending 31/12/1968, T |
| A497 | 1968 | Pickands Mather & Co Int | Moola Bulla - Little Panton | <1% | Moola Bulla - Little Panton Project, Annual Report for the period ending 31/12/1968, TR70/2686 & 2687H. |
| A498 | 1968 | Pickands Mather & Co Int | Kimberley - Springvale | <1% | Kimberley - Springvale Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687H. |
| A500 | 1968 | Pickands Mather & Co Int | Kimberley - Louisa Downs | <1% | Kimberley - Louisa Downs Project, Non-statutory Report: Report on the Louisa Downs Serpentinite, & Nearby Mine |
| A502 | 1968 | Pickands Mather & Co Int | Kimberley - Fletcher Creek-Armanda Sill | <1% | Kimberley - Fletcher Creek-Armanda Sill Project, Non-statutory Report: Follow-up Work in the Fletcher Creek & |
| A504 | 1968 | Pickands Mather & Co Int | Kimberley - Mount Angelo North | <1% | Kimberley - Mt Angelo North Project, Non-statutory Report: Mt Angelo North I.P.Profiles, 1968, TR70/2686 & 268 |
| A507 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars Range | <1% | Kimberley- Ilmars Range Project, Non-statutory Report: Ilmars Range I.P Profiles 1968, TR70/2686 & 2687H. |
| A946 | 1968 | Pickands Mather & Co Int | Kimberley - Lansdowne | <1% | Kimberley - Lansdowne Project, Non-statutory Report: Plans for Lansdowne Area, TR70/2686 & 2687H. |
| A6199 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets, Regional Stream Geochemistry , Series : 42000, February |
| A6200 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets-Regional Stream Geochemistry, Series 43 0000, February 1 |
| A6215 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets, Soil Rock Analysis to November 1966-1969, TR7 |
| A471 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 & 300 Foot Dipole to June 1967, TR7 |
| A476 | 1967 | Pickands Mather & Co Int | Kimberley - Sophie Downs | <1% | Kimberley - Sophie Downs Project, Non-statutory Report: Report on Sophie Downs Regional Copper Anomaly, Novemb |
| A4905 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimnberley - Bow River Project, Non-statutory Report: Analysis Report Sheets & Daily Drilling Records, B R 10 |
| A474 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Angelo North Project, Non-statutory Report: Brief Exploration Report, November 1967, TR70/2687H. |
| A478 | 1967 | Pickands Mather & Co Int | Kimberley - Grants Creek | <1% | Kimberley - Grants Creek Project, Non-statutory Report:Final Report for the period ending 31/12/1967, TR70/268 |
| A4758 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Angelo-Peko, I.P.Lines, June 1966 & August 1967, TR70/2687H. |
| A4774 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo Weekly Drill Hole Reports:- D.H. 202-209,1966 & 1967, TR70/ |
| A4906 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report:Final Logs, DDH B.R.106-110, to August 1967, TR70/2687H. |
| A6205 | 1967 | Pickands Mather & Co Int | Kimberley -Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Series 61, Analysis Report Sheet, for the period to Janua |
| A457 | 1967 | Pickands Mather & Co Int | Kimberley - Gentle Annie | <1% | Kimberley - Gentle Annie Project, Non-statutory Report: Progress Report, March 1967, TR70/2686 & 2687H. |
| A455 | 1967 | Pickands Mather & Co Int | Kimberley- Bow River- Mt Angelo | <1% | Kimberley- Bow River - Mt Angelo Project, Annual Report for the period ending 31/12/1966 (Field Season), TR70/ |
| A459 | 1967 | Pickands Mather & Co Int | Kimberley -Grants Creek | <1% | Kimberley - Grants Creek Project, Non-statutory Report: Progress Report for September / October 1966, March 19 |
| A483 | 1967 | Pickands Mather & Co Int | Kimberley - Margaret River | <1% | Kimberley - Margaret River Project, Non-statutory Report: Margaret River I.P. Survey, 200' Dipole, September 1 |
| A465 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report:Mt Angelo Geophysical Report, December 1966, TR70/2686 & 2 |
| A468 | 1967 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: I.P.:& E.M. Results , Ilmars Project, March 1967, TR70/2686 |
| A469 | 1967 | Pickands Mather & Co Int | Kimberley- Ilmars | <1% | Kimberley- Ilmars Project, Non-statutory Report:Progess Report, Ilmars Zinc- Lead - Copper Showing, March 1967 |
| A472 | 1967 | Pickands Mather & Co Int | East Kimberley -West Kimberley | <1% | East Kimberley -West KimberleyProject, Annual Report for the period ending 318/12/1967, TR70/2686 & 2687H. |
| A473 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: 1967 Report on Bow River Air Drill Programme, October 196 |
| A475 | 1967 | Pickands Mather & Co Int | Kimberley - Gentle Annie Creek | <1% | Kimberley - Gentle Annie Creek Project, Non-statutory Report: Final Report 1966, Gentle Annie Creek Area, Apri |
| A477 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Diamond Drilling Results at Mt Angelo, December 1967, |
| A484 | 1967 | Pickands Mather & Co Int | Kimberley - Peko Angelo | <1% | Kimberley - Peko Angelo Project, Non-statutory Report: Peko Angelo I.P. 100' Dipole, September 1967, TR70/2686 |
| A479 | 1967 | Pickands Mather & Co Int | Kimberley - Yampi Sound | <1% | Kimberley - Yampi Sound Project, Non-statutory Report: Preliminary Report, Coppermine Inlet Area, October 1967 |
| A480 | 1967 | Pickands Mather & Co Int | Kimberley - Panton River | <1% | Kimberley - Panton River Project, Non-statutory Report: Final Report, Panton River Copper- Zinc-Lead Anomaly, |
| A481 | 1967 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Report on Field Work for the year ending 31/12/1967, TR70/2686 & |
| A482 | 1967 | Pickands Mather & Co Int | Kimberley - Angelo North | <1% | Kimberley - Angelo North Project, Non-statutory Report: Maps, Sections & Diagrams, circa August 1967, TR70/268 |
| A486 | 1967 | Pickands Mather & Co Int | Kimberley - Discovery Yard | <1% | Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard I.P. 100 Foot Dipole, August 1967. Tr |
| A488 | 1967 | Pickands Mather & Co Int | Kimberley - Emull | <1% | Kimberley - Emull Project, Non-statutory Report: Emull I.P. Survey, 200 Foot Dipole, September 1967,TR70/2686 |
| A501 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. 200 Foot Dipole, 1965 & 1967, TR70/2686 & |
| A6197 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , 40 Series, to December |
| A6198 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry, Series 41 0000, Reruns a |
| A6206 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Exploration Report, Analysis Results on Copper, Nickel, Sulphur & Pho |
| A6210 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets to October 1967, TR70/2686 & 2687H. |
| A4680 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Report on Saunders Creek Anticline Copper Anomaly, December 1966, TR7 |
| A4674 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: An Extract from Progress Report, September 1966, TR70/2687H. |
| A4675 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Supplementary Report on the Margaret River Gossan, April 1966, TR70/2 |
| A4682 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Report on the Salt Lick Creek Nickel Anomaly & Lissadell - Mt Pitt Go |
| A4756 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo I.P. 300' Di Pole Lines, June 1966, TR70/2687H. |
| A4676 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report:Progress Report on Mount Angelo Copper Showing ( Mt Ramsay 3), April 1 |
| A4684 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report; Final Report, Bow River Copper -Nickel Prospect, November 1966, TR70 |
| A4686 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Brief Geological Report , Bow River I P Lines , July 1966, TR70/2687 |
| A444 | 1966 | Pickands Mather & Co Int | Kimberley - Ding Dong Downs | <1% | Ding Dong Downs Project, Non-statutory Report: Summary Report on Ding Dong Downs Copper, Lead & Zinc Anomaly, |
| A460 | 1966 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Geological Report, Mount Angelo Copper Showing, May 1966, |
| A462 | 1966 | Pickands Mather & Co Int | Kimberley - Panton River | <1% | Kimberley - Panton River Project, Non-statutory Report: Preliminary Report of Panton River Copper Anomaly , De |
| A463 | 1966 | Pickands Mather & Co Int | Kimberley- Carr Boyd Range | <1% | Kimberley- Carr Boyd Range Project, Non-statutory Report: Final Report, November 1966, TR70/2686 &2687H. |
| A464 | 1966 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report:Final Report on the Bow River Region, December 1966, TR70/2 |
| A466 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard Copper Anomaly, December 1966, TR70/2 |
| A6203 | 1966 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - regional Stream Geochemistry , Series 53 0000, to Janu |
| A1492 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Metal Concentrations in Stream Sediment Locations, 1965, TR70/26 |
| A6906 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Regional Geology & Geochemical Anomalies Maps, (circa 1965), TR70/268 |
| A4757 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo. 200' IP Lines, November 1965, TR70/2687H. |
| A6917 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Regional Stream Sediment Geochemistry Maps, Lissadell & Derby, |
| A6919 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Stream Sediment Survey Maps, Dixon Range, 1964, TR70/2687H. |
| A6920 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Stream Sediment Survey Maps, Mt Ramsay, 1964, TR70/2687H. |
| A6921 | 1965 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Stream Sediment Survey Geochemistry Maps, Gordon Downs & Mt Bann |
| A439 | 1965 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual Report for the year ending 31/12/1964, TR70/2686 & 2687H. |
| A440 | 1965 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley -Bow River Project, Non-statutory Report: Preliminary Report, November 1965. TR70/2686 & 2687H. |
| A441 | 1965 | Pickands Mather & Co Int | Kimberley- Taylor River | <1% | Kimberley - Taylor River Project, Non-statutory Report; Brief Summary Exploration Report on the Taylor River C |
| A442 | 1965 | Pickands Mather & Co Int | Mount Elliza No 1 | <1% | Kimberley - Mount Elliza No 1 Project, Non-statutory Report: Mt Eliza No 1 Tin - Arsenic Anomaly Summary Repor |
| A443 | 1965 | Pickands Mather & Co Int | Kimberley - Carr Boyd Range | <1% | Kimberley - Carr Boyd Range Project, Non-statutory Report: Preliminary Report, Carr Boyd Range Lead Anomaly, N |
| A445 | 1965 | Pickands Mather & Co Int | Kimberley - Five Mile Gossan | <1% | Kimberley - Five Mile Gossan Project,Non-statutory Report: Summary Report, August 1965, TR70/2686 & 2687H. |
All 279 report numbers over this ground
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 80/6059 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 80/6059 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 80/6059? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.