E 80/6106
E 80/6106 is a pending exploration licence in the Shire of Halls Creek, Western Australia, applied for by Sammy Resources Pty Ltd (part of Cazaly Resources Limited). The application was received on 18 Dec 2024 and is awaiting a decision. The ground is covered by 308 historical WAMEX reports.
Register summary
- Holder
- Sammy Resources Pty Ltd
- Part of
- Cazaly Resources Limited (ASX:CAZ) as at 2026-06-30
- Local government
- Shire of Halls Creek
- Application received
- 18 Dec 2024
The full record on E 80/6106
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (2 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153545 | 2026 | Halls Creek Mining Pty Ltd | Mary River | <1% | Partial Surender Report - Mary River E80/5185 for the period ending 24/11/2025 |
| A146034 | 2025 | Auking Mining Limited | Koongie Park | 18% | E80/5076 – 2024 Partial Surrender Report for the period ending 26/11/2024 |
| A146260 | 2025 | Auking Mining Limited | Koongie Park | 15% | Final Report for E80/ Koongie Park Project for the period 4/12/2019 to 2/12/2024 |
| A151819 | 2025 | Cazaly Resources Limited | Halls Creek | <1% | Partial Surrender Report E80/05307 Halls Creek Project for the period ending 30/10/2025 |
| A138231 | 2024 | Olympio Metals Limited | Woodward Range | <1% | Woodward Range Project Partial Surrender Report E80/5034 for the period ending 17/10/2023. |
245 more reports with detail
| A143529 | 2024 | Auking Mining Limited | Koongie Park | 100% | Final Surrender Report for E80/4766 Koongie Park Project for the period ending 16/05/2024. |
| A145483 | 2024 | Auking Mining Limited | Koongie Park | 58% | Final Surrender Report for E80/4389 Koongie Park Project for the period ending 16/09/2024 |
| A122544 | 2020 | Legacy Iron Ore Ltd | Koongie Park | <1% | Annual Mineral Exploration Report for the Koongi Park Project E80/4221 for the period 14 December 2018 to 13 D |
| A122800 | 2020 | Halls Creek Mining Pty Ltd | Lamboo | 3.3% | Annual Report, C132/2004, Lamboo Project, for the period ending 31 December 2019 |
| A123181 | 2020 | Anglo Australian Resources Nl | KOONGIE PARK | 10% | KOONGIE PARK - 2019 COMBINED ANNUAL REPORT - C166/2006 - 1 JANUARY 2019 to 31 DECEMBER 2019 |
| A125664 | 2020 | Anglo Australian Resources Nl | Koongie Park | 6.4% | Koongie Park C166/2006 Surrender Report For the Period 12 February 2013 to 17 November 2020, P80/1804-1810, 18 |
| A123131 | 2020 | Halls Creek Mining Pty Ltd | Mary River | <1% | Annual Report, Mary River Combined Reporting Project, C158/2019, 1 January 2019 to 31 December 2019 |
| A118821 | 2019 | Legacy Iron Ore Ltd | Koongie Park | <1% | Annual Mineral Exploration Report for the Koongie Park Project E80/04221 for the period 14 December 2017 to 13 |
| A119151 | 2019 | Halls Creek Mining Pty Ltd | Nicolson's Find | 3.3% | Combined Annual Report C132/2004 Nicolson's Find Project for the period 1 January 2018 to 31 December 2018 |
| A115828 | 2018 | Legacy Iron Ore Ltd | Koongie Park | <1% | Annual Mineral Exploration Report for the Koongie Park Project E80/04221 for the period 14/12/2016 - 13/12/201 |
| A116156 | 2018 | Anglo Australian Resources Nl | Koongie Park | 16% | Annual Report for C166/2006 Koongie Park Project For the Period 1 January 2017 to 31 December 2017, E80/04389, |
| A115996 | 2018 | Halls Creek Mining Pty Ltd | Nicolson's Find | 3.3% | Annual Report for C132/2004 "Nicolson's Find" for the period 01/01/2017 - 31/12/2017, E80/02601, E80/03861, E8 |
| A110704 | 2017 | Anglo Australian Resources Nl | KOONGIE PARK | 58% | Koongie Park Project - Partial Surrender Report - E 80/04389 - 17 October 2010 to 14 September 2016 |
| A114854 | 2017 | 3d Resources Ltd | Halls Creek | 1.3% | Final Surrender Report for E80/3370, E80/3496, & E80/3517 Halls Creek Project for the period 15 August 2007 to |
| A111928 | 2017 | Legacy Iron Ore Ltd | Koongie Park | <1% | Annual Mineral Exploration Report for the Koongie Park Project E80/04221 for the period 14 December 2015 to 13 |
| A112174 | 2017 | Halls Creek Mining Pty Ltd | Nicolson’s Find | 3.8% | Annual Technical Report for the period 1 January 2016 to 31 December 2016, Nicolson’s Project, East Kimberley; |
| A107954 | 2016 | Legacy Iron Ore Ltd | Koongie Park | <1% | Annual Mineral Exploration Report East Kimberley Region Koongie Park Project E80/4221 For the Period 14th Dece |
| A108097 | 2016 | Halls Creek Mining Pty Ltd | Nicholsons Find | 3.8% | NICOLSONS FIND PROJECT E80/2601, E80/3861, E80/4458, E80/4459, M80/343, M80/355, M80/359, M80/362, M80/471, M8 |
| A108609 | 2016 | Anglo Australian Resources Nl | Koongie Park | 9.5% | Koongie Park Copper Zinc Gold Project Final Surrender Report P80/1599, P80/1601- 02, P80/1605, P80/1607 & P80/ |
| A108734 | 2016 | Anglo Australian Resources Nl | Koongie Park | 23% | Combined Annual Report C166/2006 Koongie Park Project for the period 1 January 2015 to 31 December 2015, ML80/ |
| A108773 | 2016 | Legacy Iron Ore Ltd | Koongie Park | <1% | Partial Surrender Report for the Koongie Park Project E80/04221 for the period 14 December 2009 to 20 January |
| A110031 | 2016 | 3d Resources Ltd | Halls Creek | 1.3% | Partial Surrender Report for E80/3370, E80/3496 and E80/3517 HALLS CREEK PROJECT for the period 15 August 2007 |
| A110278 | 2016 | 3d Resources Ltd | HALLS CREEK | 1.3% | Annual Report C10/2008 "Halls Creek" for the period 15 August 2015 to 14 August 2016, E80/03370, E80/03496, E8 |
| A104709 | 2015 | Legacy Iron Ore Ltd | Koongie Park | <1% | Annual Mineral Exploration Report East Kimberley Region Koongie Park Project E80/4221 For the Period 14th Dece |
| A105283 | 2015 | Anglo Australian Resources Nl | Koongie Park | 18% | Combined Annual Report Koongie Project C166/2006 for the period 1 January 2014 to 31 December 2014, ML80/276 – |
| A106952 | 2015 | Matsa Resources Limited | Halls Creek | <1% | Final Surrender Report E80/4807 Halls Creek Project for the period 24 April 2014 to 18 June 2015 |
| A107249 | 2015 | Cazaly Resources Ltd | HALLS CREEK | 1% | Combined Annual Technical Report C10/2008 HALLS CREEK COPPER PROJECT E80/3496, E80/3370, E80/3517, E80/3938, E |
| A104477 | 2015 | Halls Creek Mining Pty Ltd | Nicolson’s Find | 3.8% | ANNUAL TECHNICAL REPORT NICOLSON’S FIND PROJECT E80/2601, E80/3861, E80/4458, E80/4459, M80/343, M80/355, M80/ |
| A105750 | 2015 | Anglo Australian Resources Nl | Koongie Park | 15% | Koongie Copper Zinc Gold Project Partial Surrender Report for the period 25th March 2010 to 19th March 2015 |
| A107338 | 2015 | Anglo Australian Resources Nl | Koongie Park | 15% | Koongie Copper Zinc Gold Project Final Surrender Report – E80/4257 For the period 25/03/2010 to 13/08/2015 |
| A100846 | 2014 | Bulletin Resources Ltd | Nicholson's Find | 3.8% | Nicholson's Find Project, Annual Report for the period 01/01/2013 to 31/12/2013, E80/2601, 3861, 4458, 4459; M |
| A101785 | 2014 | Firestrike Resources Limited | Angelo | 8.7% | Annual Report for the period to 2nd February 2014, Angelo Project E80/2707 |
| A103248 | 2014 | Cazaly Resources Ltd | Halls Creek | 1.3% | Combined Annual Technical Report C10/2008 Halls Copper Project E80/3496, E80/3370, E80/3517, E80/3938 and M80/ |
| A104048 | 2014 | Firestrike Resources Limited | Angelo | 8.7% | Final Technical Report for E80/2707 Angelo Project for the period 03/02/2006 to 17/10/2014 |
| A96453 | 2013 | Richmond W R | Garden | <1% | Garden Creek Project Annual Exploration Report Tenement E80/4323 For the period 4 July 2011 – 3 July 2012 |
| A96630 | 2013 | Iron Ore Australia Pty Ltd | Koongie | <1% | Annual Mineral Exploration Report East Kimberley Region Koongie Park Project E80/4221 For the Period 14th Dec |
| A96789 | 2013 | Bulletin Resources Pty Ltd | Nicholson's Find | 3.8% | ANNUAL TECHNICAL REPORT NICOLSON’S FIND PROJECT E80/2601, E80/3861, E80/4458, E80/4459, M80/343, M80/355, M80/ |
| A97725 | 2013 | Firestrike Resources Limited | Angelo | 8.7% | Annual Report for the year ending 2nd February 2013 for E80/2707 Angelo Project Kimberley region, Western Aust |
| A99928 | 2013 | Cazaly Resources Ltd | Halls Creek | 1.3% | Halls Creek Project, Annual Report for the period ending 14th August 2013, E80/3496, 3370, 3517, & 3938; M80/2 |
| A96658 | 2013 | Cazaly Resources Ltd | Halls Creek | 1.3% | Halls Creek Project, Annual Report for the period ending 14th August 2012, E80/3496, 3370 & 3517. [C10/2008] |
| A100242 | 2013 | Cazaly Resources Ltd | Halls Creek - Mount Angelo | <1% | Department of Mines and Petroleum Co Funded Government - Industry Drilling Program 2013-2014 Final Report Hall |
| A92669 | 2012 | Legacy Iron Ore Ltd | Koongie Park | <1% | Koongie Park Project, Annual Report for the period 14th December 2010 to 13th December 2011, E80/4221. |
| A93341 | 2012 | Firestrike Resources Limited | Angelo | 8.7% | Angelo Project, Annual Report for the period 3rd February 2011 to 2nd February 2012, E80/2707. |
| A93447 | 2012 | 3d Resources Ltd | Halls Creek - Koongie Park | 1.3% | Halls Creek - Koongie Park Project E80/3370,3517,3496 Annual Report for the Period Ending 14 August 2011 (C10/ |
| A95965 | 2012 | Anglo Australian Resources Nl | Koongie Park | 100% | Koongie Park Project, Final Surrender Report for the period ending 30/08/2012, E80/3494. [C166/2006] |
| A101051 | 2012 | Legacy Iron Ore Ltd | Koongie Park | <1% | Koongie Park Project, Annual Report for the period 14/12/2012 to 13/12/2013, E80/4221. |
| A92770 | 2012 | Bulletin Resources Pty Ltd | Nicolson’s Find | 4.1% | Annual Technical report for the period 1 January 2011 to 31 December 2011, Nicolson’s Project, East Kimberley; |
| A95792 | 2012 | Magma Metals Ltd | Laura River | 4.4% | Laura River Project (C 82/2002) Combined Annual Report for the period 22 August 2011 to 21 August 2012, E80/25 |
| A89581 | 2011 | Legacy Iron Ore Ltd | Koongie Park | <1% | Annual Mineral Exploration Report Koongie Park Project, E 80/4221 For the Period 14th December 2009 to 13th |
| A89705 | 2011 | 3d Resources Ltd | Halls Creek | <1% | Halls Creek project Annual report for the period ending 14th August 2010 E80/2826, 3370, 3371, 3517, 3641, 36 |
| A89760 | 2011 | Pacrim Energy Ltd | Angelo | 8.7% | Angelo Project E80/2707 Annual Technical Report for the period 3rd February 2010 to 2nd February 2011 |
| A91662 | 2011 | Magma Metals Ltd | Laura River | 4.4% | Laura River Project E80/2523, E80/2552 C82/2002, Combined Annual Report 2011, 22 August 2010 to 21 August 2011 |
| A92507 | 2011 | Anglo Australian Resources Nl | Koongie Park | 18% | KOONGIE COPPER ZINC PROJECT for the period 01/01/2011 to 31/12/2011 Comprising Mining Leases 80/276 and 80/277 |
| A89739 | 2011 | Thundelarra Exploration | Lamboo | 3.8% | Annual Combined Technical Report, C64/2005, M123385, Lamboo Project, E80/2559, E80/2601 and E80/3861, for the |
| A85483 | 2010 | Metminco Ltd | Angelo | 8.7% | Annual Report 3rd February 2009 to 2nd February 2010 - ANGELO E80/2707 |
| A85857 | 2010 | Anglo Australian Resources Nl | Koongie Park | 8.5% | Combined Annual Report for the Period 1 January 2009 to 31 December 2009 Koongie Park Project – C166/2006 M80/ |
| A86140 | 2010 | Gbs Gold Australia Pty Ltd | Nicolsons Find | 58% | Final Surrender Report Nicolsons Find Project E80/3281 |
| A86102 | 2010 | Thundelarra Exploration | Lamboo | 5.7% | ANNUAL TECHNICAL REPORT LAMBOO PROJECT E80/2559, E80/2567, E80/2601, E80/3364, P80/1549, E80/3864, Combined An |
| A80770 | 2009 | Thundelarra Exploration Ltd | LAMBOO | 5.7% | Annual Combined Technical Report, C64/2005, M123385, Lamboo Project, E80/2559, E80/2567, E80/2601, E80/3364, E |
| A81386 | 2009 | Gbs Gold Australia Pty Ltd | NICOLSONS FIND | 44% | ANNUAL REPORT NICOLSONS FIND PROJECT M80/343, 355, 359, 362, 471, 503 and E80/3281, From 1 January 2007 to 31 |
| A81697 | 2009 | Metminco Ltd | ANGELO | 8.7% | Annual Report 3rd February 2008 to 2nd February 2009, ANGELO, E80/2707 |
| A82026 | 2009 | Anglo Australian Resources Nl | KOONGIE PARK | 8.5% | KOONGIE COPPER ZINC PROJECT for the period 01/01/2008 to 31/12/2008, Comprising of Mining Leases 80/276 and 80 |
| A82181 | 2009 | Northern Star Resources Ltd | BAILY RANGE | <1% | FINAL SURRENDER REPORT BAILY RANGE PROJECT E80/2721, For the period 25/05/05 to 14/01/09 |
| A84868 | 2009 | Magma Metals Ltd | Laura River | 5.5% | Laura River Project, Partial Surrender Report for the period 22nd August 2001 to 12th August 2009, E80/2552, [ |
| A84686 | 2009 | Magma Metals Ltd | Laura River | 4.4% | Laura River Project Combined Annual Report 2009, C82/2002, E80/2523, E80/2552, Report Period: 22 August 2008 t |
| A77859 | 2008 | Metminco Ltd | Angelo | 8.7% | Annual Report 3rd February 2007 to 2nd February 2008 Angelo E80/2707 |
| A78946 | 2008 | Northern Star Resources Ltd | Baily Range | <1% | ANNUAL REPORT BAILY RANGE PROJECT E80/2721 For the period 25/05/07 to 24/05/08 |
| A80494 | 2008 | 3d Resources Ltd | Mt Angelo | 5% | Mt Angelo Project, E80/3496 Western Australia, Annual Report for Period Ending 14 August 2008 |
| A77556 | 2008 | Thundelarra Exploration Ltd | Lamboo | 5.8% | ANNUAL TECHNICAL REPORT LAMBOO PROJECT E80/2559, E80/2567, E80/2601, E80/3364, P80/1549 Combined Annual Report |
| A78026 | 2008 | Gbs Gold Australia Pty Ltd | Nicolsons Find | 44% | ANNUAL REPORT NICOLSONS FIND PROJECT M80/343, 355, 359, 362, 471, 503 and E80/3281 From 1 January 2006 to 31 D |
| A78358 | 2008 | Anglo Australian Resources Nl | Koongie Park | 8.5% | Koongie Park Project for the period 01/01/2007 to 31/12/2007 Comprising of Mining Leases 80/276 and 80/277 Exp |
| A79873 | 2008 | Magma Metals Ltd | Laura River | 4.4% | Laura River (JV) Project, Annual (Supplementary) Report for period 22nd August 2007 to 21st August 2008, E80/2 |
| A74383 | 2007 | Gbs Gold International Inc | Nicolsons Find | 44% | Annual Report, Nicolsons Find Project, C326/1994, E80/3281, M80/343,M80/355.... M80/503, from 1 January 2006 t |
| A74473 | 2007 | Pacrim Energy Ltd | Angelo | 8.7% | Annual Report, 3 February 2006 to 2 February 2007, Angelo Project E80/2707, (Mt Ramsay). |
| A74720 | 2007 | Thundelarra Exploration Ltd | Lamboo | 5.8% | Annual Technical Report, Lamboo Project, E80/2559, E80/2567, E80/2601, E80/3364, P80/1549, Combined Annual R |
| A75900 | 2007 | Northern Star Resources Ltd | Baily Range | <1% | First Annual Report Baily Range Project E80/2721 For the period 25/05/06 to 24/05/07 East Kimberley WA. |
| A76466 | 2007 | Magma Metals Ltd | Laura River | 4.4% | LAURA RIVER PROJECT COMBINED ANNUAL REPORT EXPLORATION LICENCES E80/2523, E80/2552, E80/2610 TENEMENT GROUP C8 |
| A76719 | 2007 | Gbs Gold Australia Pty Ltd | Nicolsons Find | 58% | PARTIAL SURRENDER REPORT NICOLSONS FIND PROJECT E80/3281 |
| A73628 | 2006 | Magma Metals Ltd | Laura River | 4.4% | Laura River Project E80/2523,2552,2610, Combined Annual Report C82/2002, For Period 22 August 2005 to 21 Augus |
| A72217 | 2006 | Terra Metals Ltd | Nicholsons Find | 44% | Annual Report, Nicolsons Find Project C132/1994, E80/3281, M80/343,355,359,362,471,503, From 1 January 2005 to |
| A72371 | 2006 | Thundelarra Exploration Ltd | Lamboo | 6.7% | Annual Technical Report, Lamboo Project, Great Gold Mines Joint Venture, E80/2559,2567, For the Period 1 Janua |
| A73574 | 2006 | Northern Star Resources Ltd | Baily Range | <1% | First Annual Report, Baily Range Project E80/2721, For the Period 25/05/05 to 24/05/06, (Mt Ramsay). |
| A70100 | 2005 | Terra Gold Mining Ltd | Nicolsons Find | 44% | Annual report for the period 01/08/03 - 31/12/04 Nicolsons Find Project, C326/1994, M80/343, M80/355, M80/359 |
| A70106 | 2005 | Anglo Australian Resources Nl | Koongie Park | 4.7% | Annual report for the period 01/01/04 - 31/12/04 Koongie Park Project, C114/1993, M80/276, M80/277, M80/278, M |
| A71331 | 2005 | Navigator Resources Ltd | Laura River | 4.4% | Laura River Project, Combined annual report, Exploration licences E80/2523 E80/2552 E80/2610 Tenement group C8 |
| A71521 | 2005 | Thundelarra Exploration Ltd | Lamboo | 4.2% | Annual technical report. Lamboo Project E80/2601 for the period 29 July 2004 to 28 July 2005. East Kimberley m |
| A68156 | 2004 | Thundelarra Exploration Ltd | Lamboo | 4.2% | Lamboo Project,Annual Report E80/2601for the period 29/07/2002-28/07/2003. |
| A68439 | 2004 | Anglo Australian Resources Nl | Koongie Park | 4.7% | Annual report for the period 01/01/2003-31/12/2003 Koongie Park Project M80/276-8, M80/371-3 |
| A69415 | 2004 | Navigator Resources Ltd | Laura River | 4.4% | Annual report for the period 22/08/03 - 21/08/04 Laura River Project C82/2002, E80/2523, E80/2552, E80/2610 |
| A69633 | 2004 | Anglo Australian Resources Nl | Koongie Park | 6.3% | Partial Relinquishment report for the period ending 31/12/04 Koongie Park Project, C114/1993, M80/276, M80/278 |
| A69710 | 2004 | Thundelarra Exploration Ltd | Lamboo | 4.2% | Annual report, Lamboo Project, E80/2601, for the period 29/07/03 - 28/07/04 East Kimberley mineral field, WA |
| A66193 | 2003 | Anglo Australian Resources Nl | Koongie Park | 4.7% | KOONGIE PARK PROJECT M80/276-8, M80/371-3 ANGLO AUSTRALIAN RESOURCES NL Annual Report for the period ending 31 |
| A67542 | 2003 | Navigator Resources Ltd | Laura River | 4.4% | Combined Annual Report for the period 22 August 2002 to 21 August 2003 Laura River Project C82/2002: E80/2523, |
| A65600 | 2002 | Navigator Resources Ltd | Laura River | 4.4% | Laura River Project Combined Annual Report Exploration Licences E80/2523, E80/2552, E80/2610. Tenement Group C |
| A60312 | 2000 | Panorama Resources Nl | Mount Angelo | 13% | Mt Angelo Project E80/1326,E80/1239,E80/2033 and M80/364 Kimberley Mineral Field Western Australia Annual Repo |
| A60363 | 2000 | Kimberley Gold Pty Ltd | Angelo | 2.9% | Surrender Report for EL E80/1971 From 04/01/1995 to 03/01/2000,Angelo Project. |
| A57379 | 1999 | Panorama Resources Nl | Mount Angelo | 13% | Mt Angelo Project E80/1326,E80/1239,E80/2033,M80/364, P80/1296-1298 Kimberley Mineral Field Western Australia |
| A58068 | 1999 | Panorama Resources Nl | Mount Angelo | <1% | Mt Angelo Project, Final Report Prospecting Licences P80/1297 & 1298, April 1999. |
| A58069 | 1999 | Panorama Resources Nl | Mount Angelo | 15% | Mt Angelo Project, Exploration Licence E80/2033 Relinquishment Report for the period ending 29/12/1998. |
| A58915 | 1999 | Pma Gold Pty Ltd | Angelo | 31% | Surrender Report for EL E80/1628 from 11/08/1997 to 07/12/1998 [C326/1994], Angelo Project. |
| A58916 | 1999 | Precious Metals Aust Ltd | Angelo | 2.9% | Partial Surrender Report for EL E80/1971 for the period 29/10/1998 to 13/04/1999 , Annual Reporting Number C3 |
| A53995 | 1998 | Lachlan Resources Nl | Koongie Park | 4.7% | Koongie Joint Venture. M80/276-278,371-373. Annual report for period ending 31/12/97. |
| A54780 | 1998 | Pma Gold Pty Ltd | Angelo - Nicholson | 7.8% | Angelo- Nicholson Prosject, Annual Report for the period 01/07/1996 to 01/07/1997, E80/1628, E80/1822, E80/182 |
| A55769 | 1998 | Pma Gold Pty Ltd | Angelo | 31% | Angelo Project, Partial Surrender Report for the period 01/01/1993 to 01/08/1998, E80/1628. |
| A50930 | 1997 | Panorama Resources Nl | Mount Angelo | 13% | Mt Angelo Project, Annual Report E80/1326,E80/1239,E80/2033,M80/364, P80/1296-1298, for the period ending 28/ |
| A50493 | 1997 | Lachlan Resources Nl | Koongie Park | 4.7% | Project 585 Koongie Joint Venture Tenements M80/276 to M80/278 M80/371 to M80/373 Annual report for period end |
| A52496 | 1997 | Anglo Australian Resources Nl | Pussycat Well | 1.6% | Pussycat Well Project, Annual Report for the period 4th August 1996 to 3rd August 1997, E80/1559. |
| A53307 | 1997 | Panorama Resources Nl | Mount Angelo | 6.4% | Mt Angelo Project, Partial Surrender Report for the period ending 13th November 1997, E80/1239. |
| A53351 | 1997 | Panorama Resources Nl | Mount Angelo | 13% | Mt Angelo Project E80/1326,E80/1239,E80/2033,M80/364, P80/1296-1298 Kimberley Mineral Field Western Australia |
| A46736 | 1996 | Pma Gold Pty Ltd | Angelo | 8.2% | Angelo Project, Annual Report 11/10/1994 to 10/10/1995 E80/1628, 1822, 1823 & 1971 |
| A47621 | 1996 | Panorama Resources Nl | Mount Angelo | 13% | Mt Angelo Project, Annual Report for work carried out during 1995, E80/1326, E80/1239, E80/2033, M80/364, P80/ |
| A48719 | 1996 | Anglo Australian Resources Nl | Pussycat Well | 1.6% | Pussycat Well Project, Annual Report 5th August 1995 to 4th August 1996,E80/1559. |
| A48925 | 1996 | Pma Gold Pty Ltd | Angelo | 7.8% | Annual report to 31 July 1996 on Angelo prospect East Kimberley C326/1994 covering tenements E80/1628 E80/1822 |
| A49239 | 1996 | Anglo Australian Resources Nl | Pussycat Well | 1.6% | Pussycat Well. Exploration Licence E80/1559, Annual Report 4 August 1995 to 3 August 1996. |
| A47122 | 1996 | Lachlan Resources Nl | Koongie Park | 4.7% | Project 585 Koongie Park Tenements M80/276 to M80/278 M80/371 to M80/373 Annual report for period ending 31/12 |
| A43612 | 1995 | Panorama Resources Nl | Mount Angelo | 5.8% | Mt Angelo Project, Report E80/1326, E80/1239, M80/364, P80/1296-1298 for work carried out during 1994. |
| A44900 | 1995 | Anglo Australian Resources Nl | Koongie Park | 4.7% | Koongie Park Joint Venture M80/371 to M80/373 (replacing E80/364) ML's80/276 to ML80/278 Annual report for per |
| A40302 | 1994 | Billiton Australia Pty Ltd | Koongie Park | 7.3% | Annual Report for the period 01/01/93-31/12/93 Koongie Park JV E80/364 M80/276-278 |
| A41393 | 1994 | Panorama Resources Nl | Mount Angelo | 6.4% | Mt Angelo Project, Annual Report for the period ending 06/04/1994, E80/1239. |
| A41657 | 1994 | Panorama Resources Nl | Mount Angelo | 6.4% | Mt. Angelo Project. E80/1239,Partial Surrender Report for the period ending 29 June 1994. |
| A42465 | 1994 | Dominion Mining Ltd | Lamboo East | 31% | Annual Report - Lamboo East Project, E80/1628, for the period 11/08/1993 to 10/08/1994. |
| A37867 | 1993 | Perilya Mines Nl | Mount Angelo | 5.8% | Annual Report to the Department of Minerals and Energy for Period September 1990 to December 1992 Mt Angelo Pr |
| A38325 | 1993 | Billiton Australia Pty Ltd | Koongie Park | 7.3% | Annual Report for the Period 01/01/91 - 31/12/92 Konngie Park JV E80/364, ML's 80/276-278 |
| A35300 | 1992 | Billiton Australia Pty Ltd | Koongie Park | 7.3% | Annual report for the period 01/01/91-31/12/91 Koongie Park JV E80/364 M80/276-278 |
| A33763 | 1991 | Billiton Australia Pty Ltd | Koongie Park | 7.3% | Koongie Park JV, E80/364 ML80/276-278 Annual reporst for period ending 31/12/90 Company report No; 08.5497 |
| A35582 | 1989 | Glenbuff Pty Ltd | Mount Angelo | 6.4% | Mount Angelo Project, Annual Report , December 1989 :-Preliminary Investigation of the Mt Angelo Tenement Appl |
| A508 | 1986 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. Profiles, 1968, ( Folder 1), TR70/ 2687H. |
| A16106 | 1985 | Mesaglow Pty Ltd | Mary River | 1.6% | Mary River Project, Non-statutory Report: Alluvial Gold Potential, Mary River Area, August 1984, E80/293,322; |
| A20921 | 1985 | Zanex Ltd | Halls Creek - Gentle Annie, Palm Springs | <1% | Alluvial prospects [non-statutory report], Halls Creek, Preliminary testing and evaluation, E80/333, 80/335-33 |
| A13182 | 1984 | Gencor Australia Pty Ltd | Lamboo Sill | 8.3% | Lamboo Sill Project, Final Surrender Report for the period ending 23/01/1984, E80/46 ( formerly TR70/8107 & 82 |
| A12066 | 1983 | Union Corp Australia Pty Ltd | Lamboo Sill | 7.1% | Lamboo Sill Project, Final Surrender Report, February 1983, TR70/8107 & 8280H. |
| A10691 | 1982 | Union Corp Australia Pty Ltd | Lamboo Sill | 7.1% | Lamboo Sill Project, Annual Report , January 1982 ( Bulletin No 65, Addendum 14), TR70/8107 & 8280. |
| A9140 | 1980 | Broken Hill Pty Co Ltd | Halls Creek | 7.5% | Halls Creek Project, Final Surrender Report for the year ending 31/12/1979, MC80/5425-5734..............MC80/6 |
| A8989 | 1980 | Uranerz Australia Pty Ltd | Lamboo | 15% | Lamboo Project, 1979 Annual Report, March 1980, MC80/6308-6314, 6318-6320, 6322, 6324, 6326, 6328, 6330, 6335, |
| A20754 | 1979 | Bhp Minerals Pty Ltd | Halls Creek | 7.5% | Halls Creek Project, Non-statutory Report: Exploration for Base Metals, to November 1979, MC80/5391-5422.....M |
| A7115 | 1977 | Kennecott Exp Aust Pty Ltd | Mount Ramsay Four | 1.6% | Mt Ramsay Four Project, Annual Report for the year ending 31/12/1976, MC80/5077-5103, 5181-5191, 5230-5244. |
| A6901 | 1977 | Pickands Mather & Co Int | East Kimberley - Ilmars | <1% | East Kimberley - Ilmars Project, Non-statutory Report: Core Analyses, Air Drill Analyses, 1968-1970, TR70/2687 |
| A6902 | 1977 | Pickands Mather & Co Int | East Kimberley - Angelo- Angelo North | <1% | East Kimberley - Angelo- Angelo North Project, Non-statutory Report: Geochemistry Plans & Drill Sections 1968- |
| A6894 | 1977 | Pickands Mather & Co Int | Kimberley | <1% | Non-statutory Report : Pickands Mather reconnaissance Drainage Survey of the Kimberleys, February 1977, TR70/2 |
| A6195 | 1976 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Key Maps & Sub Number Indexes: Kimberley TRs 70/2686 & 2687H. |
| A712 | 1971 | Pickands Mather & Co Int | Kimberley - Cummins Range | <1% | Kimberley - Cummins Range Project, Non-statutory Report: Reconnaissance Work in the Cummins Range, March 1971, |
| A760 | 1971 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Re-Evaluation of Bow River 1970, February 1971, TR70/2686 |
| A2229 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Laboratory Report on the Beneficiation of Titano Magnetite-Bearing Ga |
| A2441 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual (Summary) Report 1 November 1971, (1971 Field Season April to October ), TR70/2686-2 |
| A4907 | 1971 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Weekly Drill Hole Reports & Drill Records, DDH B.R. 111-1 |
| A6983 | 1971 | Pickands Mather & Co Int | East Kimberley - Panton Sill | <1% | East Kimberley - Panton Sill Project, Non-statutory Report: Analytical Report Assay Sheets for Rock & Soil Sam |
| A708 | 1971 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Exploration at the Ilmars Prospect 1970, February 1971, TR70 |
| A711 | 1971 | Pickands Mather & Co Int | Ord Crossing - Tickalara Bore | <1% | Ord Crossing - Tickalara Bore Project, Non-statutory Report: Geological Report, Ord Crossing Area, Tickalara A |
| A713 | 1971 | Pickands Mather & Co Int | Kimberley - Koongie Park | <1% | Kimberley - Koongie Park Project, Non-statutory Report: Report on Koongie Park Radioactive Showing , March 197 |
| A761 | 1971 | Pickands Mather & Co Int | Kimberley - Hall's Creek | <1% | Kimberley - Hall's Creek Project: Non-statutory Report; Geological Reconnaissance South of Hall's Creek, March |
| A2224 | 1971 | Pickands Mather & Co Int | Bow River | <1% | Bow River Project, Non-statutory Report: Drilling Programme 1971, August 1971,TR70/2686 & 2687H. |
| A2226 | 1971 | Pickands Mather & Co Int | Kimberley - McIntosh " A " | <1% | Kimberley- McIntosh " A " Project, Non-statutory Report: Report on McIntosh " A " Prospect, July 1971, TR70/26 |
| A2227 | 1971 | Pickands Mather & Co Int | Cummins Range | <1% | Cummins Range Project, Non-statutory Report: Report on Cummins Range Prospect, September 1971, TR70/2686-2687, |
| A2228 | 1971 | Pickands Mather & Co Int | Kimberley - Cummmins Range | <1% | Kimberley - Cummmins Range Project, Non-statutory Report:Cummins Range Costeans, November 1971, TR70/2686-2687 |
| A2230 | 1971 | Pickands Mather & Co Int | Emull | <1% | Emull Project, Non-statutory Report:Report on Preliminary Investigation & Percussion Drilling Programme, Octob |
| A6209 | 1971 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Drill Records & Analysis Sheets for the period to February 1971, TR70 |
| A4764 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Ilmars Prospect, Electromagnetics Inline Configuration A, for the yea |
| A4762 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Wild Dog Creek I.P.Profiles, May 1970 , TR70/2686 & 2687H. |
| A4763 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Golf course I P Profiles, May 1970, TR70/2686 & 2687H. |
| A4773 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Little Mount Isa Drill Records,DDH 401 & 402 , July- August 1970, TR7 |
| A4759 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Bow River I.P. Profiles, July 1970, TR70/2687H. |
| A4765 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Koongie Park Lead I. P. Profiles, 1'-200', May 1970, TR70/2687H. |
| A4908 | 1970 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Hole Reports & Analysis Report Sheets for the p |
| A6903 | 1970 | Pickands Mather & Co Int | Kimberley- Mount Angelo | <1% | Kimberley- Mount Angelo Project, Non-statutory Report; Miscellaneous Plans & Sections, 1966 & 1970, TR70/2687H |
| A6904 | 1970 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Plans & Sections , 1970, TR70/2687H. |
| A517 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Annual Report for the year ending 31/12/1969, TR70/2686, 2687,4658, 5284, 5285, 5286 & 528 |
| A519 | 1970 | Pickands Mather & Co Int | Kimberley -llmars | <1% | Kimberley -llmars Project, Non-statutory Report: Ilmars Report 1969, including Sophie Downs Copper Showing - A |
| A6208 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Report Sheets ( Bullman Copper, Moola Bulla & |
| A6211 | 1970 | Pickands Mather & Co Int | Kimberley - | <1% | Kimberley Project, Non-statutory Report: Golf Course Prospect, D. D. H. 1 (Venture 3 Drillilng), Logs & Assay |
| A6213 | 1970 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets for the period 1965 to August 1970.[Lam |
| A526 | 1969 | Pickands Mather & Co Int | Kimberley - Angelo Valley | <1% | Kimberley - Angelo Valley Project, Non-statutory Report: Angelo Valley I.P.Profiles, 1969, TR70/2686 & 2687H. |
| A496 | 1969 | Pickands Mather & Co Int | McIntosh Hills - Panton Sill | <1% | McIntosh Hills - Panton Sill Project, Annual Report for the year ending 31/12/1968, TR70/2687H. |
| A512 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report, February 1968, TR70/ 2687H. |
| A522 | 1969 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report: Report on 1969 Field Season, [Eastern Basics Exploration], |
| A4775 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo Core Analyses 1967-1969; Drill Logs 1967-1969 & Drill Logs |
| A525 | 1969 | Pickands Mather & Co Int | Kimberleys- Bullman | <1% | Kimberleys- Bullman Project, Non-statutory Report: Kimberleys Bullman I.P.Profiles, 1969, TR70/2686 & 2687H. |
| A527 | 1969 | Pickands Mather & Co Int | Kimberley - Napier | <1% | Kimberley - Napier Project, Non-statutory Report: Napier I. P. Profiles 1969, TR70/2686 & 2687H. |
| A528 | 1969 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Kimberley -Bow River I.P.Profiles 1969, TR70/2686 & 2687H |
| A513 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars 1968 I. P. Profiles ( 100' & 200' Dipole), May - June |
| A515 | 1969 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Ilmars Report 1968, Folder No 2, Pocket C & D, February 1969 |
| A516 | 1969 | Pickands Mather & Co Int | Kimberley Area | <1% | Kimberley Area Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/2686 |
| A520 | 1969 | Pickands Mather & Co Int | East Kimberley Project | <1% | East Kimberley Project, Non-statutory Report: Miscellaneous Exploration , 1969 Field Season, TR70/2686 & 2687H |
| A521 | 1969 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: Radioactive Exploration, East Kimberley 1969 Field Season, TR70/ |
| A523 | 1969 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Exploration, 1969 Field Season, TR70/2686 & 2687H. |
| A524 | 1969 | Pickands Mather & Co Int | Kimberley - Sophie Downs | <1% | Kimberley - Sophie Downs Project, Non-statutory Report: Sophie Downs, I.P. Profiles, 1969, TR70/2686 & 2687H. |
| A529 | 1969 | Pickands Mather & Co Int | Kimberley - Golf Course | <1% | Kimberleys- Golf Course, Non-statutory Report: IP Profiles, 1969, TR70/2686 & 2687H. |
| A6212 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report SheetsOctober 1968 to May 1969 , TR70/2686 & 2687H. |
| A6214 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Miscellaneous Analysis Sheets with Sample Shipment Records, to Octobe |
| A6216 | 1969 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets, ( Soil Rock Analysis, 1966-1969, Kimberley Re |
| A505 | 1968 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Mt.Angelo I.P Profiles 1968, TR70/2686 & 2687H. |
| A506 | 1968 | Pickands Mather & Co Int | Kimberley- Sophie Downs | <1% | Kimberley-Sophie Downs Project, Non-statutory Report: Sophie Downs I. P. Profiles, 1968, TR70/2686 & 2687H. |
| A6916 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Regional Stream Sediment Survey Maps, Cambridge Gulf, 1964-1968, TR70 |
| A510 | 1968 | Pickands Mather & Co Int | East Kimberley | <1% | East Kimberley Project, Non-statutory Report: East Kimberley Areas I.P. Profiles, 1968, TR70/ 2687H. |
| A509 | 1968 | Pickands Mather & Co Int | Kimberley- Bow River | <1% | Kimberley- Bow River Project, Non-statutory Report: Bow River I.P.Profiles (Folder 2), 1968, TR70/2687H. |
| A4766 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Black - Bow River I.P. Lines 1966 - 1968, TR70/2687H. |
| A4909 | 1968 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: Weekly Drill Records & Analyis Report Sheets, to September 1 |
| A487 | 1968 | Pickands Mather & Co Int | Kimberley - Ilmar's Showing | <1% | Kimberley - Ilmar's Showing Project, Non-statutory Report: Ilmar's Showing I.P. 200 Foot Dipole 1967 & 300 Fo |
| A489 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars - Little Mount Isa | <1% | Kimberley- Ilmars - Little Mount Isa Project, Final Surrender Report, February 1968, TR70/2686 & 2687H. |
| A490 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars- Little Mount Isa | <1% | Kimberley- Ilmars- Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mount Isa Lead-Zi |
| A491 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars - Little Mount Isa | <1% | Kimberley- Ilmars - Little Mount Isa Project, Non-statutory Report: Report on Ilmars & Little Mt Isa "Zinc- Le |
| A492 | 1968 | Pickands Mather & Co Int | Kimberley-Ilmars | <1% | Kimberley-Ilmars Project, Non-statutory Report: Report on Ilmars Showing I.P., 300 Foot Dipole 1966 & 200 Foot |
| A493 | 1968 | Pickands Mather & Co Int | Kimberley Reserves | <1% | Kimberley Reserves Project, Annual Report for the period ending 31/12/1968,TR70/2686 & 2687H. |
| A494 | 1968 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Report on Field work in the West Kimberley for the year ending 3 |
| A495 | 1968 | Pickands Mather & Co Int | Kimberley - Bow River - Salt Lick Creek | <1% | Kimberley - Bow River-Salt Lick Creek- Black Mountain Project, Annual Report for the year ending 31/12/1968, T |
| A497 | 1968 | Pickands Mather & Co Int | Moola Bulla - Little Panton | <1% | Moola Bulla - Little Panton Project, Annual Report for the period ending 31/12/1968, TR70/2686 & 2687H. |
| A498 | 1968 | Pickands Mather & Co Int | Kimberley - Springvale | <1% | Kimberley - Springvale Project, Annual Report for the year ending 31/12/1968, TR70/2686 & 2687H. |
| A500 | 1968 | Pickands Mather & Co Int | Kimberley - Louisa Downs | <1% | Kimberley - Louisa Downs Project, Non-statutory Report: Report on the Louisa Downs Serpentinite, & Nearby Mine |
| A502 | 1968 | Pickands Mather & Co Int | Kimberley - Fletcher Creek-Armanda Sill | <1% | Kimberley - Fletcher Creek-Armanda Sill Project, Non-statutory Report: Follow-up Work in the Fletcher Creek & |
| A504 | 1968 | Pickands Mather & Co Int | Kimberley - Mount Angelo North | <1% | Kimberley - Mt Angelo North Project, Non-statutory Report: Mt Angelo North I.P.Profiles, 1968, TR70/2686 & 268 |
| A507 | 1968 | Pickands Mather & Co Int | Kimberley- Ilmars Range | <1% | Kimberley- Ilmars Range Project, Non-statutory Report: Ilmars Range I.P Profiles 1968, TR70/2686 & 2687H. |
| A946 | 1968 | Pickands Mather & Co Int | Kimberley - Lansdowne | <1% | Kimberley - Lansdowne Project, Non-statutory Report: Plans for Lansdowne Area, TR70/2686 & 2687H. |
| A6199 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets, Regional Stream Geochemistry , Series : 42000, February |
| A6200 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets-Regional Stream Geochemistry, Series 43 0000, February 1 |
| A6215 | 1968 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Analysis Report Sheets, Soil Rock Analysis to November 1966-1969, TR7 |
| A471 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Mt Angelo I.P. 100 & 300 Foot Dipole to June 1967, TR7 |
| A476 | 1967 | Pickands Mather & Co Int | Kimberley - Sophie Downs | <1% | Kimberley - Sophie Downs Project, Non-statutory Report: Report on Sophie Downs Regional Copper Anomaly, Novemb |
| A4774 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Mt Angelo Weekly Drill Hole Reports:- D.H. 202-209,1966 & 1967, TR70/ |
| A474 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Angelo North Project, Non-statutory Report: Brief Exploration Report, November 1967, TR70/2687H. |
| A478 | 1967 | Pickands Mather & Co Int | Kimberley - Grants Creek | <1% | Kimberley - Grants Creek Project, Non-statutory Report:Final Report for the period ending 31/12/1967, TR70/268 |
| A4758 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Angelo-Peko, I.P.Lines, June 1966 & August 1967, TR70/2687H. |
| A4905 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimnberley - Bow River Project, Non-statutory Report: Analysis Report Sheets & Daily Drilling Records, B R 10 |
| A4906 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report:Final Logs, DDH B.R.106-110, to August 1967, TR70/2687H. |
| A6205 | 1967 | Pickands Mather & Co Int | Kimberley -Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report: Series 61, Analysis Report Sheet, for the period to Janua |
| A468 | 1967 | Pickands Mather & Co Int | Kimberley - Ilmars | <1% | Kimberley - Ilmars Project, Non-statutory Report: I.P.:& E.M. Results , Ilmars Project, March 1967, TR70/2686 |
| A455 | 1967 | Pickands Mather & Co Int | Kimberley- Bow River- Mt Angelo | <1% | Kimberley- Bow River - Mt Angelo Project, Annual Report for the period ending 31/12/1966 (Field Season), TR70/ |
| A457 | 1967 | Pickands Mather & Co Int | Kimberley - Gentle Annie | <1% | Kimberley - Gentle Annie Project, Non-statutory Report: Progress Report, March 1967, TR70/2686 & 2687H. |
| A459 | 1967 | Pickands Mather & Co Int | Kimberley -Grants Creek | <1% | Kimberley - Grants Creek Project, Non-statutory Report: Progress Report for September / October 1966, March 19 |
| A465 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mt Angelo Project, Non-statutory Report:Mt Angelo Geophysical Report, December 1966, TR70/2686 & 2 |
| A469 | 1967 | Pickands Mather & Co Int | Kimberley- Ilmars | <1% | Kimberley- Ilmars Project, Non-statutory Report:Progess Report, Ilmars Zinc- Lead - Copper Showing, March 1967 |
| A472 | 1967 | Pickands Mather & Co Int | East Kimberley -West Kimberley | <1% | East Kimberley -West KimberleyProject, Annual Report for the period ending 318/12/1967, TR70/2686 & 2687H. |
| A473 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: 1967 Report on Bow River Air Drill Programme, October 196 |
| A475 | 1967 | Pickands Mather & Co Int | Kimberley - Gentle Annie Creek | <1% | Kimberley - Gentle Annie Creek Project, Non-statutory Report: Final Report 1966, Gentle Annie Creek Area, Apri |
| A477 | 1967 | Pickands Mather & Co Int | Kimberley - Mount Angelo | <1% | Kimberley - Mount Angelo Project, Non-statutory Report: Diamond Drilling Results at Mt Angelo, December 1967, |
| A479 | 1967 | Pickands Mather & Co Int | Kimberley - Yampi Sound | <1% | Kimberley - Yampi Sound Project, Non-statutory Report: Preliminary Report, Coppermine Inlet Area, October 1967 |
| A480 | 1967 | Pickands Mather & Co Int | Kimberley - Panton River | <1% | Kimberley - Panton River Project, Non-statutory Report: Final Report, Panton River Copper- Zinc-Lead Anomaly, |
| A481 | 1967 | Pickands Mather & Co Int | West Kimberley | <1% | West Kimberley Project, Non-statutory Report: Report on Field Work for the year ending 31/12/1967, TR70/2686 & |
| A482 | 1967 | Pickands Mather & Co Int | Kimberley - Angelo North | <1% | Kimberley - Angelo North Project, Non-statutory Report: Maps, Sections & Diagrams, circa August 1967, TR70/268 |
| A483 | 1967 | Pickands Mather & Co Int | Kimberley - Margaret River | <1% | Kimberley - Margaret River Project, Non-statutory Report: Margaret River I.P. Survey, 200' Dipole, September 1 |
| A484 | 1967 | Pickands Mather & Co Int | Kimberley - Peko Angelo | <1% | Kimberley - Peko Angelo Project, Non-statutory Report: Peko Angelo I.P. 100' Dipole, September 1967, TR70/2686 |
| A486 | 1967 | Pickands Mather & Co Int | Kimberley - Discovery Yard | <1% | Kimberley - Discovery Yard Project, Non-statutory Report: Discovery Yard I.P. 100 Foot Dipole, August 1967. Tr |
| A488 | 1967 | Pickands Mather & Co Int | Kimberley - Emull | <1% | Kimberley - Emull Project, Non-statutory Report: Emull I.P. Survey, 200 Foot Dipole, September 1967,TR70/2686 |
| A501 | 1967 | Pickands Mather & Co Int | Kimberley - Bow River | <1% | Kimberley - Bow River Project, Non-statutory Report: Bow River I.P. 200 Foot Dipole, 1965 & 1967, TR70/2686 & |
| A6197 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry , 40 Series, to December |
| A6198 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Assay Sheets - Regional Stream Geochemistry, Series 41 0000, Reruns a |
| A6206 | 1967 | Pickands Mather & Co Int | Kimberley | <1% | Kimberley Project, Non-statutory Report: Exploration Report, Analysis Results on Copper, Nickel, Sulphur & Pho |
All 308 report numbers over this ground
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 80/6106 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 80/6106? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.