L 16/140 is a live miscellaneous licence in the Shire of Coolgardie, Western Australia, held by Origin Companies Pty Ltd. Granted on 12 Mar 2024 for 21 years, it expires on 11 Mar 2045. The ground is covered by 148 historical WAMEX reports.
Register summary
- Holder
- Origin Companies Pty Ltd
- Local government
- Shire of Coolgardie, City of Kalgoorlie-Boulder
- Application received
- 24 Nov 2020
- Commenced
- 12 Mar 2024
- Expiry
- 11 Mar 2045
- Term
- 21 Years
The full record on L 16/140
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 13 conditions and 15 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (10 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A152928 | 2025 | Gold Tiger Resources (Australia) Limited | Credo | 22% | Final Surrender Report for E16/449 Credo Project for the period ending 10/10/2025 |
| A135686 | 2023 | Evolution Mining (Mungari) Pty Ltd | Venom | 50% | Final Surrender Report - E16/445 Venom Project for the period ending 08/04/2023. |
| A135944 | 2023 | Gold Tiger Resources (Australia) Limited | Credo | 23% | Credo E16/492 Partial Surrender Report for the period ending 30/03/2023 |
| A130141 | 2022 | Gold Tiger Resources (Australia) Limited | Credo | 38% | Surrender Report For E16/415 & E16/457 Credo Project for the period ending 10/12/2021. |
| A130111 | 2022 | Gold Tiger Holdings (Australia) Pty Ltd | Credo | 12% | Final Surrender Report for E16/365 & M16/524 Credo Project for the period ending 10/12/2021. |
143 more reports
| A133190 | 2022 | Ora Banda Mining | Lady Ida | 9.7% | E16/483 and E16/487 Partial Surrender Lady Ida for the period ending 7/11/2022 |
| A128930 | 2021 | Ora Banda Mining Limited | Lady Ida | <1% | Lady Ida E16/475 Partial Surrender for the period 5 October 2015 to 4 October 2021 |
| A124813 | 2020 | Northern Star (Kanowna) Pty Limited | Lake Carnage | 9.2% | Lake Carnage C72/2013 Annual Technical Report for the period ending 11/07/2020, E 16/00445, E 24/00167 |
| A123040 | 2020 | Ora Banda Mining Limited | Davyhurst D | 7.8% | Lady Ida Annual Report C212/2017 (Davyhurst D) for the period 1 January 2019 to 31 December 2019 |
| A125506 | 2020 | Gold Tiger Resources (Australia) Pty Ltd | Credo | 64% | Partial Surrender E16/457 Credo Project for the period ending 03/09/2020 |
| A125399 | 2020 | Gold Tiger Resources (Australia) Pty Ltd | Credo | 29% | Credo Project C03/2013 Combined Annual Technical Report 01/07/19 to 30/06/2020 |
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | 7.2% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A124149 | 2020 | Horizon Minerals Limited | Yarmany | 9.6% | Combined Annual Report Ending 29 April 2020 for Yarmany Group C65/2018,E 16/00492,E 16/00470,E 16/00471,E 16/0 |
| A124493 | 2020 | Evolution Mining (Mungari) Pty Ltd | Lake Carnage | 52% | Final Surrender Report - E16/488 Lake Carnage Project for the period ending 08/04/2020 |
| A119473 | 2019 | Eastern Goldfields Limited | Lady Ida | 7.8% | Lady Ida Annual Report - C212/2017 for the period 1 January 2018 to 31 December 2018, E16/00337, E16/00344, E1 |
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | 6.9% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
| A120462 | 2019 | Eastern Goldfields Limited | Lady Ida | 13% | Lady Ida Partial Surrender Report for the period 2 May 2016 to 5 April 2019, E16/00480, E16/00482, E16/00483, |
| A120886 | 2019 | Horizon Minerals Limited | Yarmany | 9.6% | Yarmany Project C65/2018 Annual Report for the period 30 June 2018 to 29 June 2019, E16/00492, E16/00493, E16/ |
| A121254 | 2019 | Tanvanth Sandhu Singh | Credo | 29% | Credo Project C03/2013 Combined Annual Tenement Report 01/07/18 to 30/06/2019.E 16/00365,E 16/00393,E 16/00396 |
| A120904 | 2019 | Evolution Mining (Mungari) Pty Ltd | Lake Carnage | 9.2% | Group Annual Report - C72/2013 - Lake Carnage E16/00445, E24/00167 for the period 12 July 2018 to 11 July 2019 |
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | 5.2% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A116992 | 2018 | Black Mountain Gold Ltd | Area 54 | 23% | Annual Technical Report for E16/492 Area 54 Project for the period 31/03/2017 - 30/03/2018 |
| A115745 | 2018 | Eastern Goldfields Limited | Lady Ida | 26% | C212/2017 Lady Ida E16/482 and E16/483 Annual Report For the Period 7 November 2016 to 6 November 2017 |
| A116104 | 2018 | Eastern Goldfields Limited | Lady Ida | 7.7% | Lady Ida Combined Reporting Group C212/2017 Annual Report for the period 1 January 2017 to 31 December 2017, E |
| A117606 | 2018 | Evolution Mining (Mungari) Pty Ltd | Lake Carnage | 9.2% | ANNUAL REPORT LAKE CARNAGE C72/2013, 12 JULY 2017 - 11 JULY 2018 |
| A117259 | 2018 | Black Mountain Gold Limited | Yarmony | 9.6% | Combined Annual Technical Report for C65/2018 Yarmony Project For the Period 30 April 2017 to 29 April 2018, E |
| A117754 | 2018 | Sandhu, Ts | Credo | 29% | Combined Annual Tenement Report 1/07/2017 to 30/06/2018, Credo, C3/2013 |
| A110644 | 2017 | Matsa Resources Limited | Dunnsville | 23% | Dunnsville Project, E16/405, Final Surrender Report for the period 05/04/2011 - 07/07/2016 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | 5% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A114688 | 2017 | Evolution Mining (Mungari) Pty Ltd | Lake Carnage | 9.2% | Annual Report for the Lake Carnage Project, C72/2013, For the Period 12 July 2016 to 11 July 2017 |
| A112370 | 2017 | Eastern Goldfields Limited | Lady Ida | <1% | Mount Ida Annual Report C110/2015 For the Period 1 January 2016 to 31 December 2016, E16/00332.....E16/00475 |
| A110013 | 2016 | Sandhu, Ts | Credo | 29% | Combined Annual Tenement Report Credo Project C3/2012 For the Period 1 July 2015 to 30 June 2016, E16/00393, E |
| A108366 | 2016 | Matsa Resources Limited | Dunnsville | 4.5% | Dunnsville Project Combined Mineral Exploration Report |
| A110024 | 2016 | Evolution Mining Limited | Lake Carnage | 9.2% | Lake Carnage Project C72/2013, E16/00445, E24/00167 Annual Report for the period 12 July 2015 to 11 July 2016 |
| A105522 | 2015 | Matsa Resources Limited | Dunnsville | 12% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2014 – 31st January 2015, E16/ |
| A106992 | 2015 | Matsa Resources Limited | Dunnsville | 30% | Final Surrender Report E16/407 Dunnsville Project for the period 05/04/2011 to 23/06/2015 |
| A106945 | 2015 | Singh B | Credo | 29% | Credo Project C03/2002, E16/393, E16/365, E16/396, E16/415, E16/449, E16/457, E16/458, M16/524, P16/2667 Annua |
| A106907 | 2015 | Evolution Mining Pty Ltd | Lake Carnage | 9.2% | Annual Report for the period 12th July 2014 to 11th July 2015, Lake Carnage Project, E24/167 and E16/445, C72/ |
| A106508 | 2015 | Matsa Resources Limited | Dunnsville | 23% | Dunnsville Project E16/405 Partial Surrender Report For the Period 5 April 2011 to 24 June 2015 |
| A107004 | 2015 | Matsa Resources Limited | Dunnsville | 83% | Final Surrender Report E16/406 Dunnsville Project for the period 2 March 2011 to 23 June 2015 |
| A107008 | 2015 | Matsa Resources Limited | Dunnsville | 22% | Final Surrender Report E16/297 Dunnsville Project for the period 21 August 2006 to 23 June 2015 |
| A100564 | 2014 | Metaliko Resources Ltd | Frances Lesley | 40% | Surrender report for the period 27 March 2008 to 13 November 2013, Frances Lesley Project, E16/335 |
| A101142 | 2014 | Swan Gold Mining Ltd | Lady Ida | <1% | Lady Ida Project, Annual Report for the period 01/01/2013 to 31/12/2013, E16/252, 327, 332, 337, 344, 347, 355 |
| A102052 | 2014 | Matsa Resources Ltd | Dunsville | 12% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2013 – 31st January 2014, E16/ |
| A103136 | 2014 | Sandhu, Ts | Credo | 18% | C3/2013 Annual Exploration Report Credo Project for the period 09/12/2013 to 08/12/2014, E16/393, 365, 396, 41 |
| A103217 | 2014 | St Barbara Ltd | Lake Carnage | 9.2% | Annual Mineral Exploration Report - DMP Combined Reporting Group: C72/2013 Lake Carnage Reporting Period: 12 J |
| A102594 | 2014 | Swan Gold Mining Ltd | Lady Ida | <1% | Surrender Report Lady ida Project E16/400, E16/412, P16/2502, P16/2503, P16/2504, P16/2505, P16/2506, P16/2507 |
| A97085 | 2013 | Swan Gold Mining Ltd | Lady Ida | 5.1% | LADY IDA PROJECT Mineral Exploration Report for the period 1/01/2012 – 31/12/2012 C59/2008, E16/252.....P16/25 |
| A97740 | 2013 | Metaliko Resources Ltd | Frances Lesley | 40% | Annual report for the period 1 January 2012 to 8 January 2013, Frances Lesley Project, E16/335 |
| A97843 | 2013 | Matsa Resources Ltd | Dunnsville | 12% | Dunnsville Project, Annual Report for the period 1st February 2012 to 31st January 2013, E16/294, 296, 297, 36 |
| A99166 | 2013 | Sandhu, Ts | Credo | 18% | C3/2013 Annual Exploration Report Credo Project E16/365, E16/393, E16/396, E16/415, M16/524 and P16/2667 Repor |
| A99161 | 2013 | St Barbara Ltd | Lake Carnage | 9.2% | Lake Carnage Project, Annual Report for the period 12/07/2012 to 11/07/2013, E24/167, E16/445. [C72/2013] |
| A94840 | 2012 | St Barbara Ltd | Lake Carnage | <1% | Annual Mineral Exploration Report - DMP Lake Carnage Tenement- E24/167 Reporting Period: 12th of July 2011 to |
| A93570 | 2012 | Matsa Resources Ltd | Dunnsville | 14% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2011 – 31st January 2012, E16/ |
| A93551 | 2012 | Metaliko Resources Ltd | Frances Lesley | 31% | Annual report for the period 9 January 2011 to 8 January 2012, Frances Lesley Project, C271/2011, E16/292 & E1 |
| A90072 | 2011 | Matsa Resources Ltd | Dunnsville | 4.1% | Dunnsville Project, Annual Report for the period 1st February 2010 to 31st January 2011, E16/294, E16/296-297, |
| A86072 | 2010 | Heron Resources Ltd | Dunnsville | 31% | Annual Report for the period 1 January 2009 to 31 December 2009, Dunnsville Project, C125/2008, E16/292, E16/3 |
| A86565 | 2010 | Matsa Resources Ltd | Dunnsville | 2.9% | Combined Annual Report Dunnsville Project C196/2007 E16/259 E16/296 M16/487 E16/294 E16/297, 1st February 2009 |
| A88458 | 2010 | Matsa Resources Ltd | DUNNSVILLE | 22% | PARTIAL SURRENDER REPORT DUNNSVILLE PROJECT E16/297 21st August 2006 – 17th August 2010 |
| A85733 | 2010 | Matsa Resources Ltd | Dunnsville | 22% | Partial Surrender Report Dunnsville Project E16/297 21 August 2006 - 12 November 2009 |
| A85758 | 2010 | Gbs Gold Australia Pty Ltd | Credo | <1% | Partial Surrender Report Credo Project E16/257 |
| A85803 | 2010 | Blackham Resources Ltd | Rundle Dam | <1% | E24/144 Final Surrender Report, 31 May 2009 - 11 September 2009 (C127/2007) |
| A84355 | 2009 | Blackham Resources Ltd | Rundle Dam | <1% | Rundle Dam Project C127/2007, M16/187, E24/144, for the period 1 June 2008 to 31 May 2009 |
| A81592 | 2009 | Matsa Resources Ltd | DUNNSVILLE | 1.9% | COMBINED ANNUAL REPORT DUNNSVILLE PROJECT, C196/2007, 1st February 2008 – 31st January 2009 |
| A78167 | 2008 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | 2% | COMBINED ANNUAL REPORT DUNNSVILLE PROJECT C196/2007 1ST FEBRUARY 2007 - 31ST JANUARY 2008 |
| A78187 | 2008 | Mr Sage Awp | Reptile Dam | 38% | 2007 ANNUAL REPORT EXPLORATION LICENCE 16/236 REPTILE DAM ANDALUCITE DEPOSIT (Period 02/01/2007 to 01/01/2008) |
| A78255 | 2008 | Gbs Gold Australia Pty Ltd | Credo | 47% | ANNUAL EXPLORATION REPORT CREDO PROJECT C66/2005 For Period Ending 28 February 2008 Tenements: E16/218, E16/23 |
| A78531 | 2008 | Dioro Exploration Nl | Credo | 13% | Credo Project, Annual Report for the year ending 12th May 2008, E16/251. |
| A80495 | 2008 | Vale Inco Australia Limited Partnership | Dunnsville | 31% | COMBINED ANNUAL REPORT FOR THE PERIOD 9 JANUARY 2008 - 31 DECEMBER 2008, C125/2008 |
| A80179 | 2008 | Dioro Exploration Nl | Credo | 13% | SURRENDER REPORT FOR THE PERIOD 13 MAY 2005 12 MAY 2008 |
| A75292 | 2007 | Gbs Gold Australia Pty Ltd | Credo | 35% | ANNUAL EXPLORATION REPORT CREDO PROJECT C66/2005 Tenements: E16/218, E16/230, E16/237, E16/257, E16/274, E16/2 |
| A75549 | 2007 | Gbs Gold Australia Pty Ltd | Credo | 47% | Annual Exploration Report Credo Project C66/2005 Tenements: E16/218, E16/230, E16/237, E16/253, E16/289, P16/2 |
| A74030 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | Annual Exploration Report, Credo Project E16/257, For Period 14 September 2005 to 13 September 2006, (Kalgoorl |
| A75087 | 2007 | Gbs Gold Australia Pty Ltd | Credo | 94% | Partial Surrender Report Credo Project E16/237 |
| A77301 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | 22% | ANNUAL REPORT DUNNSVILLE PROJECT E16/297 21 AUGUST 2006 - 20 AUGUST 2007 |
| A72582 | 2006 | Gbs Gold Australia Pty Ltd | Credo | 47% | C66/2005 Annual Exploration Report Credo Project, E16/218, 230, 237, 253, 289, & P16/2185, and P24/3794, For P |
| A73075 | 2006 | Avoca Resources Ltd | Blister Dam | <1% | Blister Dam(Chadwin) Project E24/120,P16/2149-2151,3773-3774 , Combined Technical Report C162/2002 for the Per |
| A73338 | 2006 | South Kal Mines Pty Ltd | Credo | 13% | Credo Project E16/251, Annual Report for the Period 13 May 2005 to 12 May 2006, (SKM Report No. SKM_TL_X2445, |
| A70332 | 2005 | Terra Gold Mining Ltd | Credo | 47% | Annual report, Credo Project, E16/218, E16/230, E16/237, E16/253, E16/289, and P16/2185, P24/3794, From 7 Jan |
| A68083 | 2004 | Placer Dome Asia Pacific Ltd | Chadwin (Blister Dam) | <1% | Chadwin (Blister Dam) Project, Annual Report 03/10/2002-02/10/2003 C162/2002 |
| A68084 | 2004 | Placer Dome Asia Pacific Ltd | Blister Dam | 50% | Blister Dam JV project, Annual Report 03/10/2002-02/10/2003, C187/2001 |
| A69534 | 2004 | Avoca Resources Ltd | Blister Dam (Chadwin) | <1% | Blister Dam (Chadwin) Project, Exploration Licence E24/120, Prospecting licences P16/2149 - 2151, P24/3772 - 3 |
| A64980 | 2002 | Auriongold Exploration Pty Ltd | Credo | 3.3% | Credo Project Annual Report 28/04/2001 - 27/04/2002 C100/2001. Tenement/s P16/2042, E16/176, 183, 185-187, 200 |
| A65157 | 2002 | Auriongold Exploration Pty Ltd | Credo | 4.1% | Credo Project Surrender Report 03/04/2000 - 09/08/2002 E16/176, 200, 208, 210, E30/223-224, 229 Mineral Field |
| A65488 | 2002 | Placer Dome Asia Pacific Ltd | Blister Dam | 65% | BLISTER DAM PROJECT ANNUAL REPORT FOR THE PERIOD 02/10/2001 to 01/10/2002 ON TENEMENTS E16/181, E16/195 DEPART |
| A62710 | 2001 | Delta Gold Ltd | Lady Ida | 9.8% | Lady Ida Project E16/84 and 85 Annual Report 24 January 1992 to 23 January 2001 E16/89 Surrender Report 14 Dec |
| A63824 | 2001 | Heron Resources Ltd | Blister Dam | 65% | BLISTER DAM PROJECT DUNNSVILLE AND CARBINE PROSPECT E16/181 & E16/195 COOLGARDIE MINERAL FIELD COMBINED ANNUAL |
| A63951 | 2001 | Centaur Mining & Exploration Ltd | Doyles Dam | <1% | Joint Annual Report for the period 18 February 2000 to 17 February 2001 C276/1997 - Doyles Dam prospecting lic |
| A59886 | 2000 | Coolgardie Gold Nl | Kangaroo Plains | 44% | Surrender Report Exploration Licence 16/130 Kangaroo Plains |
| A60211 | 2000 | Delta Gold Ltd | Lady Ida | 8.7% | Lady Ida Project, Annual Report, 02/1999 to 01/2000, E16/84, 85,89,109-112,115, E15/503, M16/261-264. |
| A60559 | 2000 | Delta Gold Ltd | Dunnsville | 20% | Annual technical Report Dunnsville Joint Venture 24/05/1999 to 23/05/2000 Tenements E16/90,P16/1534,P16/1535. |
| A61482 | 2000 | Delta Gold Ltd | Dunnsville North | 47% | Dunnsville North Project, (E16/95) Annual/Final Report 1999 - 2000 |
| A61496 | 2000 | Mr Laurie J | Top Dam | 18% | Top Dam Project, (E16/124) Annual Report 1999 - 2000 and Final Surrender Report |
| A57061 | 1999 | Delta Gold Ltd | Ida Fault | 47% | Ida Fault Project (E16/95- Paladin) Annual Report 1997 - 1998. |
| A57344 | 1999 | Roper River Resources Nl | The Granites | <1% | The Granites Project E16/145 Annual Report for the Period 6th November 1997 to 5th November 1998 |
| A58076 | 1999 | Resource Mapping Pty Ltd | Reptile Dam | 40% | Annual Exploration Report for period 01/01/1998 to 31/12/1998 Reptile Dam Prospect, Prospecting Licences P16/1 |
| A58084 | 1999 | Delta Gold Ltd | Lady Ida | 8.7% | Delta Gold NL - Lady Ida Project 01/1998 - 01/1999 E16/89, 115, 84, 85, 109-112, E15/503 |
| A58289 | 1999 | Coolgardie Gold Nl | Top Dam | 18% | Annual Report E16/124 for period 26/03/1998 to 25/03/1999 (Top Dam Project). |
| A58807 | 1999 | Coolgardie Gold Nl | Top Dam | 18% | Top Dam Project, (E16/124) Surrender Report for the period 26/03/1996 to 25/03/2000. |
| A59017 | 1999 | Delta Gold Ltd | Dunnesville gold exploration | 20% | Annual Technical Report for Dunnsville Joint Venture 24/05/1998 to 23/05/1999 Tenements E16/90,P16/1534,P16/15 |
| A59095 | 1999 | Roper River Resources Nl | The Granites | <1% | The Granites Project, E16/145 Surrender Report, October 1999. |
| A59440 | 1999 | Delta Gold Ltd | Lady Ida | 47% | Lady Ida Project, Annual Report for E16/95, Dunnsville North 24 November 1998 to 23 November 1999 . |
| A53302 | 1998 | Eden Creek Pty Ltd | Dunnsville | 47% | Dunnsville Project, (E16/95) Annual Report 1996 - 1997 |
| A53590 | 1998 | Eden Creek Pty Ltd | Dunnsville | 1.1% | Partial Surrender Report on Exploration Licence E16/96 Dunnsville Western Australia covering the period 30 Dec |
| A53591 | 1998 | Eden Creek Pty Ltd | Dunnsville | 1.1% | Dunnsville Project, (E16/96) Annual Report 1996 - 1997 |
| A54539 | 1998 | Delta Gold Ltd | Ida Fault | 4.8% | Ida Fault Project. Combined annual report for the period 01/02/97-31/01/98. E15/279-280,316,325,387. E16/84-85 |
| A54775 | 1998 | Coolgardie Gold Nl | Top Dam | 18% | Annual Report E16/124,Top Dam Project, for the period 26/03/1997 to 25/03/1998. |
| A55207 | 1998 | Delta Gold Ltd | Ida Fault | 20% | Ida Fault (JV) Project, Partial Surrender Report for the period 24/05/1993 to 30/06/1998, E16/90. |
| A55208 | 1998 | Delta Gold Ltd | Ida Fault | 47% | Ida Fault Project (E16/95) Partial Surrender Report for the period 24/11/1993 to 30/06/1998. |
| A55371 | 1998 | Bloodhound Gold Nl | Reptile Dam | 40% | Annual Exploration Report, Combined Report for the periods 18 June 1996 to 17th June 1997 and 18th June 1997 t |
| A55544 | 1998 | Delta Gold Ltd | Ida Fault | 20% | Ida Fault Project Annual Report for E16/90,P16/1534-1535 Dunnsville Joint Venture 24/05/1997 to 23/05/1998 |
| A56723 | 1998 | Coolgardie Gold Nl | Dunnsville | 44% | Kangaroo Plains (E16/130) Annual Report for the Period 27/09/1997 - 26/09/1998 |
| A51915 | 1997 | Resolute Ltd | Carbine North | 3.5% | Carbine North Project Mining Leases M16/83 M16/84 M16/187 M16/311 M16/317 M24/672 M24/673 M24/599 M24/212 Pros |
| A51925 | 1997 | Yardarino Mining Nl | Credo | 46% | Credo Project, Final Surrender Report,June 1997, E16/135. |
| A52523 | 1997 | Coolgardie Gold Nl | Kangaroo Plains | 44% | Kangaroo Plains Project, (E16/130) Annual Report 1996 - 1997 |
| A50054 | 1997 | Eden Creek Pty Ltd | Dunnsville | 47% | Dunnsville Project, (E16/95) Annual Report 1995 - 1996 |
| A50302 | 1997 | Eden Creek Pty Ltd | Dunnsville | 1.1% | Dunnsville Project, (E16/96) Annual Report for 1995 - 1996 |
| A50850 | 1997 | Delta Gold Ltd | Ida Fault | 4.9% | Ida Fault Project Combined Annual Report for the period 1st February 1996 to 31st January 1997 Tenements E16/8 |
| A51308 | 1997 | Coolgardie Gold Nl | Top Dam | 18% | Top Dam Project, (E16/124) Annual Report 1996 - 1997 |
| A47876 | 1996 | Delta Gold Ltd | Ida Fault | 4.9% | Ida Fault Project Combined Annual report for the period 1st February 1995 to 31st January 1996 Tenements E16/8 |
| A49482 | 1996 | Resolute Ltd | Carbine North | <1% | Annual report Carbine North Project Mining Leases M16/83 M16/84 M16/187 M24/212 Prospecting Licences P16/1513 |
| A46942 | 1996 | Eden Creek Pty Ltd | Dunnsville | 47% | Dunnsville Project, (E16/95) Annual Report 1994 - 1995. |
| A47205 | 1996 | Eden Creek Pty Ltd | Dunnsville | 1.1% | Dunnsville Project, (E16/96) Annual Report 1994 - 1995. |
| A48366 | 1996 | Herald Resources Ltd | Dunnsville | 20% | Dunnsville Project E16/90 P16/1534 & P16/1535 Annual Report for Year Ending 23/05/1996 |
| A43499 | 1995 | Eden Creek Pty Ltd | Dunnsville | 47% | Dunnsville Project, (E16/95) Annual Report for theperiod 24/11/1993 to 23/11/1994. |
| A43724 | 1995 | Eden Creek Pty Ltd | Dunnsville | 1.1% | Dunnsville (E16/96) Annual Report 1993 - 1994 |
| A44967 | 1995 | Zephyr Minerals Nl | Dunnsville | 20% | EL16/90 P16/1534-1535 Annual Report Dunnsville Project Period Ending 23/07/1995 |
| A45548 | 1995 | Delta Gold Ltd | Ida Fault | 4.9% | Ida Fault Project Combined Annual Report For the period 1st February 1994- 31 st January 1995 Tenements:E16/84 |
| A46686 | 1995 | Delta Gold Ltd | Kangaroo Plains | 3% | Partial Surrender Report for the period 24/01/94-23/01/95 Kangaroo Plains Project E16/85 |
| A46816 | 1995 | Delta Gold Ltd | Nugget Dam | 24% | Partial Surrender Report for the period 24/01/94-23/01/95 Nugget Dam Project E16/84 |
| A40174 | 1994 | Samantha Gold Nl | Carbine North | 3.5% | Annual report for the period 30/05/92-29/05/93 Carbine North Project M16/83-84 M16/187 M24/212 P16/1513-1514 P |
| A40923 | 1994 | Delta Gold Ltd | Ida Fault | 5.7% | (Annual Report for the Period 01/01/93 - 01/03/94) Report on exploration completed during 1993 on Ida Fault Pr |
| A42950 | 1994 | Gwalia Consolidated Ltd | Davyhurst | 40% | Annual [Final] Report on the Davyhurst Project, M16/174, for the period 01/06/1993 to 01/08/1994. |
| A40178 | 1994 | Samantha Gold Nl | Carbine | 5.4% | Annual report for the period 30/05/91-29/05/92 Carbine North Project M16/62 M16/63 M16/64 M16/81 M16/82 M24/21 |
| A41905 | 1994 | Zephyr Minerals Nl | Dunnesville | 20% | EL16/90 P16/1534-1535 Annual Report Dunnsville Project, Period Ending 23/07/1994 |
| A38366 | 1993 | Delta Gold Ltd | Nugget Dam | 24% | Annual Report for the period 24/01/93-23/01/93 Nugget Dam Project E16/84 |
| A38887 | 1993 | Wilga Mines Nl | Nugget Dam | 24% | Annual report for the period 24/01/92-23/01/93 Nugget Dam Project E16/84 P16/1434 |
| A38625 | 1993 | Delta Gold Ltd | Kangaroo Plains | 3% | Annual Report for the period 24/01/92-23/01/93 Kangaroo Plains Project E16/85 |
| A39008 | 1993 | Bhp Refractories Ltd | Reptile Dam | 40% | Reptile Dam Project, Annual Report for the period November 1988 to May 1993, E16/26 ( Now M16/174). |
| A39757 | 1993 | Yardarino Mining Nl | Dunnesville | 20% | Non-statutory Report: June 1993 Progress Report: Dunnsville Gold Project, E16/90 [Internal Report] |
| A33278 | 1989 | Carbine Gold Nl | Carbine North | 5.4% | Final Report 03/09/86 - 14/08/90 Carbine North Project M16/62-64,81-82; M24/213 & E16/02 Report No:339 |
| A5379 | 1974 | Kennecott Exp Aust Pty Ltd | Kalgoorlie Nine | 1.8% | Progress report [non-statutory] on Kalgoorlie Nine, 1971, and Annual report 1972, MC16/490-505, 16/615-618 |
| A4035 | 1973 | Barrier Exploration Nl | Dunnsville | 32% | Dunnsville Project, Non-statutory Report: New Project Report, January 1973, MC16/976-1035. |
| A2442 | 1970 | Kennecott Exp Aust Pty Ltd | Kalgoorlie Nine Block | 1.8% | Kalgoorlie Nine Block Project, Non-statutory Report: Ground Geopysical Survey, October 1970, MC16/490-505, 615 |
| A33733 | 1753 | Samantha Gold Nl | Carbine North | 5.4% | Annual Report 15/08/90 - 29/05/91 Carbine North Project M16/62-64,81-82; M24/213 and E16/2 Report No:338 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A81847 | 1753 | Monarch Gold Mining Company Ltd | Davyhurst Group D | 1.2% | Davyhurst Group D Project Area, 2008 ANNUAL REPORT FOR PERIOD 01/01/08 to 31/12/08 Group Reporting No.C59/2008 |
| A51725 | 1753 | Herald Resources Ltd | Dunnsville | 20% | Dunnsville Project E16/90,P16/1534 & P16/1535 Annual Report for the Period 24/05/1996 to 23/05/1997 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 16/140 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 16/140? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.