L 29/179
L 29/179 is a live miscellaneous licence in the Shire of Menzies, Western Australia, held by Aurenne Mit Pty Ltd. Granted on 30 Oct 2023 for 21 years, it expires on 29 Oct 2044. The ground is covered by 208 historical WAMEX reports.
Register summary
- Holder
- Aurenne Mit Pty Ltd
- Local government
- Shire of Menzies
- Application received
- 7 Sept 2022
- Commenced
- 30 Oct 2023
- Expiry
- 29 Oct 2044
- Term
- 21 Years
The full record on L 29/179
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 7 conditions and 13 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (3 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148765 | 2025 | Mount Ida Lithium Pty Ltd | Mount Ida | <1% | Final Surrender Report for P29/2405 – P29/2407 for the period 20 April 2017 to 03 April 2025 |
| A149606 | 2025 | Redscope Enterprises Pty Ltd | Henderson North | <1% | Final Surrender Report for Tenement E29/1112 Henderson North Project for the period ending 1/7/2025 |
| A144354 | 2024 | Redscope Mining Pty Ltd; Venus Metals Corporation Limited | Henderson | <1% | Henderson Lithium Project Annual Report E29/1112 for the period ending 1/7/2024 |
| A136511 | 2023 | Igo Ltd | Henderson | <1% | Henderson Project, E29/1112, Annual Report for the Period 02/07/2022 to 01/07/2023 |
| A132133 | 2022 | Venus Metals Corporation Limited | Henderson North | <1% | Annual Report for Tenement E29/1112 Henderson North Project for the period ending 01/07/2022. |
203 more reports
| A126129 | 2021 | Alt Resources Limited | Perrinvale | 3.6% | E29/0921 Perrinvale Partial Relinquishment Report period 17 November 2014 to 9 October 2020 |
| A122770 | 2020 | Ora Banda Mining | Mount Ida | <1% | Mt Ida Project C112/2001 Annual Report for the period ending 31/12/2019 |
| A124712 | 2020 | Alt Resources Limited | Quin Hills | 25% | C143/2005 Quinn Hills Project Combined Annual Report for the period ending 30/06/2020 |
| A124731 | 2020 | Alt Resources Limited | Bottle Creek West | <1% | E29/0901 Final Report period 1 December 2014 to 24th April 2020, Bottle Creek West project. |
| A118711 | 2019 | Alt Resources Limited | Perrinvale | 3.6% | E29/0921 Perrinvale Annual Report period 17 November 2017 to 16 November 2018 |
| A118739 | 2019 | Alt Resources Limited | Riverina | <1% | E29/0970 Riverina Project Annual Report for the period 17 November 2017 to 16 November 2018 |
| A118845 | 2019 | Alt Resources Limited | Riverina | <1% | Riverina E29/0901 Annual Report for the period 1st December 2017 to 30th November 2018 |
| A120779 | 2019 | Alt Resources Limited | Bottle Creek | <1% | Combined Annual Technical Report Bottle Creek Project C112/2013 for the period 24 June 2018 to 23 June 2019. T |
| A119089 | 2019 | Eastern Goldfields Limited | Mount Ida | <1% | Mt Ida Project - C112/2001 Annual Report for the period 1 January 2018 to 31 December 2018, E29/00640, E29/006 |
| A118654 | 2019 | Alt Resources Limited | Mount Ida South | 83% | E29/1016 Mount Ida South Annual Report Period 08/11/2017 - 07/11/2018 |
| A120280 | 2019 | Ora Banda Gold Mining Pty Ltd | Mount Ida | <1% | Annual Report Mount Ida P29/2405 - 2407 for the period 20/04/2018 to 19/04/2019 |
| A121025 | 2019 | Alt Resources Limited | Quinns | 25% | Combined Annual Technical Report Quinns Project C143/2005 for the period 1 July 2018 to 30 June 2019, E 29/649 |
| A115664 | 2018 | Latitude Consolidated Limited | Mount Ida South | <1% | Annual Report for E 29/970 Mount Ida South For the Period 17 November 2016 to 17 November 2017 |
| A115665 | 2018 | Latitude Consolidated Limited | Mount Ida South | 3.6% | Annual Report for E29/921 Mount Ida South for the period 17/11/2016 - 16/11/2017 |
| A118071 | 2018 | Alt Resources Limited | Mount Ida South | 12% | Combined Annual Technical Report Mount Ida South Project C175/2010 for the period 1st September 2017 to 31st A |
| A115798 | 2018 | Eastern Goldfields Limited | Mount Ida | <1% | Mt Ida Project - C112/2001 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A115983 | 2018 | Mgk Resources Pty Ltd; Maincoast Pty Ltd | Quinns | <1% | Quinns Project E29/901 Annual Report for the period 01/12/2016 - 30/11/2017 |
| A116111 | 2018 | Eastern Goldfields Limited | Mount Ida | 8.7% | Mt Ida Project P29/2310 to P29/2318 Final Surrender For the Period 7 October 2013 to 26 February 2018 |
| A117018 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | <1% | Annual Report for P29/2406 Mount Ida for the period 20 April 2017 to 19 April 2018 |
| A117019 | 2018 | Mt Ida Gold Pty Ltd | Mount Ida | <1% | Annual Report for P29/2407 Mount Ida Project for the period 20 April 2017 to 19 April 2018 |
| A117619 | 2018 | Alt Resources Limited | Bottle Creek | <1% | C112/2013 Bottle Creek Project Combined Report period 24 June 2017 to 23 June 2018 |
| A112032 | 2017 | Eastern Goldfields Limited | Mount Ida | <1% | Mineral Exploration Report Mount Ida C112/2001 for the period 1 January 2016 to 31 December 2016, E29/00640... |
| A115004 | 2017 | Mgk Resources Pty Ltd | Mount Ida South | 12% | Mount Ida South C175/2010, E29/00790, M29/00421 Annual Report for the period 30 August 2016 to 31 August 2017 |
| A115408 | 2017 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | 45 Mile/Mt Ida M29/181 M29/182 (C12/2006) Final Surrender Report for the period 20 August 1998 to 19 August 20 |
| A114483 | 2017 | Lehmann, R | Bottlecreek | <1% | Annual Report for the period 24/06/2015 to 23/06/2016, Bottle Creek Project C112/2013, M 29/150 & M 29/151 |
| A109236 | 2016 | Lehmann, R | Bottle Creek | <1% | C112/2013 Annual Report for the period 24/06/2015 to 23/06/2016, Bottle Creek Project, M 29/150 & M 29/151 |
| A109801 | 2016 | Fe Limited | Mount Ida | <1% | Mount Ida E29/806 Final Surrender Report for the period 18/08/2011 to 26/07/2016 |
| A110177 | 2016 | Eastern Goldfields Limited | Mount Ida | <1% | Surrender Report P29/1938-1940, P30/1012-1016, P29/1941-1950 Mount Ida Project For the Period 11 September 200 |
| A110449 | 2016 | Mgk Resources Pty Ltd | Mount Ida South | 12% | Combined Annual Technical Report (C175/2010) Mount Ida South Project for the period of 1 September 2015 to 31 |
| A108022 | 2016 | Eastern Goldfields Limited | Mount Ida | <1% | MT IDA PROJECT Mineral Exploration Report Combined Report C112/2001 For the Period 1/01/2015 – 31/12/2015, E29 |
| A109709 | 2016 | Eastern Goldfields Limited | Mount Ida | 4.4% | Mt Ida Project Annual Report for the period 27 June 2015 to 31 August 2016, P 29/02291, P29/02292, P29/02293, |
| A104852 | 2015 | Swan Gold Mining Ltd | Mount Ida | <1% | Combined C112/2001 Mineral Exploration Report Mt Ida Project for the period 1/01/2014 – 31/12/2014, E29/640.. |
| A106701 | 2015 | Lehmann, R | Bottle Creek | <1% | Bottle Creek Project Combined Annual Report C112/2013 (M 29\150 & M 29\151) for the period 24/06/2014 – 23/06/ |
| A107146 | 2015 | Wild Acre Metals Limited | Mount Ida South | 3.7% | Annual Technical Report C175/2010 - Mt Ida South Project for the Period 1st September 2014 to 31st August 2015 |
| A104676 | 2015 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Annual Report for the period 28-11-2013 to 27-11-2014 Central Yilgarn Iron Project - Mt Ida and Mt Mason C180/ |
| A107499 | 2015 | Jupiter Mines Ltd | Mount Ida | <1% | Mt Ida Magnetite Project E29/560-I Final Surrender Report for the period 08/09/2006 to 07/09/2015 |
| A101107 | 2014 | Swan Gold Mining Ltd | Mount Ida | 12% | Mineral Exploration Report Mt Ida Project Combined Report C112/2001 For the Period 1/01/2013 – 31/12/2013, E29 |
| A101407 | 2014 | Crest Minerals Ltd | Bell Bird | 18% | BELL BIRD PROJECT E29/771, P29/2115, P29/2159 & 2160 Copperfield - Mt Ida Area, W.A. 2013 Annual Mineral Explo |
| A101594 | 2014 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Central Yilgarn Iron Project C180/2010 (Mt Ida and Mt Mason) Annual Report for the period 28/11/2012 to 27/11/ |
| A101880 | 2014 | Fe Limited; Swan Gold Mining Ltd | Mount Ida | 2.1% | Mt Ida Project, Final Surrender Report for the period 09/09/2008 to 22/01/2014, E29/561. |
| A101881 | 2014 | Fe Limited; Swan Gold Mining Ltd | Mount Ida | 87% | Mount Ida Project, Final Surrender Report for the period 23/09/2008 to 22/01/2014, E29/642. |
| A102076 | 2014 | Swan Gold Mining Ltd | Mount Ida | 4% | Final Surrender Report , Mt Ida Project , E29/644, for the period 23/09/2009 to 12/02/2014. |
| A102934 | 2014 | Lehmann, R | Bottle Creek | <1% | BOTTLE CREEK PROJECT M 29\150 & M 29\151 NORTH COOLGARDIE MINERAL FIELD Menzies (SH51-05) 1:250,000 Sheet Mt M |
| A103119 | 2014 | Swan Gold Mining Ltd | Mount Ida | 4% | Surrender Report Mt Ida Project E29/644 for th period ending 12 February 2014 |
| A103432 | 2014 | Fe Limited | Mount Ida | <1% | Mt Ida Project E29/806 Annual Report for the period 18/08/2013 to 17/08/2014 |
| A105117 | 2014 | Wild Acre Metals Limited | Mount Ida | 3.7% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st September 2013 to 31st August 2014, |
| A103808 | 2014 | Townson Holdings Pty Ltd | 45 Mile [Mt Ida] | <1% | 45 Mile [Mt Ida] Project, Annual Report for the period 20/08/2013 to 19/08/2014, M29/181 & 182. [C12/2006] |
| A99103 | 2013 | Fe Limited | Mount Ida | <1% | Mt Ida Project E29/806 Annual Report for the period 18/08/2012 to 17/08/2013 |
| A99562 | 2013 | Townson Holdings Pty Ltd | 45 Mile - Mt Ida | <1% | Reporting Information for the period 20 August 1998 to 19 August 2012 Up to and Including 20 August 2012 to 19 |
| A100144 | 2013 | Wild Acre Metals Limited | Mount Ida | 37% | Final Surrender Report C175/2010 Mt Ida South Project E29/744, E29/749, E29/754 for the period ended 31 July 2 |
| A96734 | 2013 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Central Yilgarn Iron Ore Project (CYIP) Mt Ida Magnetite Project and Mt Mason DSO Hematite Project C180/2010, |
| A96832 | 2013 | Crest Minerals Ltd | Bell Bird | 18% | BELL BIRD PROJECT E29/771, P29/2115, P29/2159 & 2160 Coppperfield - Mt Ida Area, W.A. 2012 Annual Mineral Expl |
| A97708 | 2013 | Swan Gold Mining Ltd | Mount Ida | 12% | Mt Ida Project, Annual Report for the period 01/01/2012 to 31/12/2012, E29/561, 660, 640- 644, 647 & E29/659; |
| A98715 | 2013 | Wild Acre Metals Ltd | Mount Ida South | 16% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2012 to 31st July 2013, E29/7 |
| A98888 | 2013 | Lehmann, R | Bottle Creek | <1% | Annual report for the period 24/06/2012 to 23/06/2013, Bottle Creek Project, M 29\150 & M 29\151 |
| A93077 | 2012 | Jupiter Mines Ltd | Mount Ida - Mount Mason | <1% | Annual Report for the period 28/11/10 to 27/11/2011, Central Yilgarn Iron Project - Mt Ida and Mt Mason, C180/ |
| A94518 | 2012 | Fe Limited | Mount Ida | <1% | E29/806 Annual Report, Mount Ida Project, Report Period: 18/08/2011 to 17/08/2012 |
| A95369 | 2012 | Wild Acre Metals Limited | Mount Ida South | 16% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2011 to 31st July 2012, E29/7 |
| A95604 | 2012 | Townson Holdings Pty Ltd | Mount Ida | <1% | Reporting Information for the period 20 August 2011 to 19 August 2012, 45 Mile Mt Ida Project M29/181, M29/182 |
| A90620 | 2011 | Swan Gold Mining Ltd | Mount Ida | 4% | E29/644 Annual Report for the period 23rd September 2009 – 22nd September 2010 |
| A91456 | 2011 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | Reporting Information for the period 20 August 2010 to 19 August 2011, 45 Mile - Mt Ida, ML 29/181, ML 29/182, |
| A91684 | 2011 | Wild Acre Metals Limited | Mount Ida South | 16% | Annual Technical Report C175/2010- Mt Ida South Project 1st August 2010 to 31st July 2011, E29/744, 749, 750, |
| A89261 | 2011 | Swan Gold Mining Ltd | Mount Ida - Menzies | <1% | Mt Ida Project, Menzies, E29/526 FINAL SURRENDER REPORT FOR THE PERIOD 23/05/2006 to 23/11/2010 |
| A90617 | 2011 | Swan Gold Mining Ltd | Mount Ida | 87% | Annual Mineral Exploration Report E29/642, 23rd September 2009 – 22nd September 2010 |
| A88233 | 2010 | Swan Gold Mining Ltd | Mount Ida | 27% | E29/559 FINAL SURRENDER REPORT FOR THE PERIOD 06/09/2005 to 05/09/2010 Menzies District North Coolgardie Miner |
| A89288 | 2010 | Jupiter Mines Ltd | Mount Ida - Mount Mason | <1% | MounT Ida - Mount Mason Annual Report C180/2010, Period 28/11/09 to 27/11/10 |
| A85967 | 2010 | La Mancha Resources Australia Pty Ltd | Mount Ida | 12% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 Tenements: E29/526, 539, 559, 56 |
| A86748 | 2010 | La Mancha Resources Australia Pty Ltd | Mount Ida | 27% | Mount Ida Project Partial Surrender Report E29/559 for the period 6/09/2005 to 4/02/2010 |
| A88536 | 2010 | Jupiter Mines Ltd | Mount Ida | <1% | Mount Ida Project Annual Report E29/560 Period 08/09/09 to 07/09/10 |
| A81393 | 2009 | La Mancha Resources Australia Pty Ltd | MT IDA | 17% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008, Tenements: E29/481, 506, 526, 5 |
| A84191 | 2009 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT. IDA PROJECT PARTIAL SURRENDER REPORT E29/526 AUGUST 2009 |
| A84962 | 2009 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT. IDA PROJECT FINAL SURRENDER REPORT P29/1755 FOR THE PERIOD 26.11.04-25.11.08 |
| A77445 | 2008 | La Mancha Resources Australia Pty Ltd | Mount Ida | 13% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 C112/2001 |
| A76802 | 2007 | La Mancha Resources Australia Pty Ltd | Snake Hill | 14% | Mount Ida Project Combined Annual Report for the period 16/06/2006 to 15/06/2007, Tenements: E29/133, E29/134. |
| A74385 | 2007 | La Mancha Resources Australia Pty Ltd | Mount Ida | 17% | Mount Ida Project, C112/2001, Combined Annual Report for the Period 01/01/2007 to 31/12/2007 (Menzies) |
| A76175 | 2007 | Townson Holdings Pty Ltd | 45 Mile Well | <1% | ANNUAL REPORT for the period 20 August 2006 to 19 August 2007, 45 MILE, Mt Ida, ML29/181, ML29/182 Ref: C12/20 |
| A76309 | 2007 | Jupiter Mines Ltd | Mount Ida | <1% | Annual Exploration Report for Exploration Licence E29/560 Mt. Ida Iron Ore Project The period 8th September 20 |
| A76808 | 2007 | La Mancha Resources Australia Pty Ltd | Snake Hill | 14% | MT IDA PROJECT E29/133, E29/134 COMBINED ANNUAL REPORT FOR THE PERIOD 16/06/2006 TO 15/06/2007 |
| A71621 | 2006 | International Goldfields Ltd | Four Corners | 14% | Annual Report period ending 16/06/2005 for the Four Corners Project, Tenements E29/133 and E29/134, Combined R |
| A72271 | 2006 | Mines & Resources Australia Pty Ltd | Mount Ida | 18% | Mt Ida Project, Combined Annual Report for the Period 01/01/2005 to 31/12/2005, C112/2001, (Leonora). |
| A73635 | 2006 | International Goldfields Ltd | Snake Hill | 14% | 2006 Combined Annual Report for the Four Corners Project Exploration Licences E29/133, E29/134. (C351/1997) Fo |
| A73919 | 2006 | Bhp Billiton Minerals Pty Ltd | Ida Valley | 8.2% | Relinquishment Report for the Period 27 August 2002 to 2 November 2006, Ida Valley Project E29/484, (Leonora). |
| A73377 | 2006 | Townson Holdings Pty Ltd | 45 Mile Mount Ida | <1% | Annual Report for the Period 20 August 2005 to 19 August 2006, 45 Mile Mt Ida M29/181-182, Combined Reporting |
| A73395 | 2006 | Bhp Billiton Iron Ore Pty Ltd | Ida Valley | 4% | Combined Annual Report C126/2002, For the Period 1 July 2005 to 30 June 2006, Ida Valley Project E29/483, E29/ |
| A69701 | 2005 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 20 August 2003 to 19 August 2004, 45 Mile Project, , ML29/181,ML29/182. |
| A70249 | 2005 | International Goldfields Ltd | Mount Ida | 18% | Annual report for the period 01/01/04 - 31/12/04 Mount Ida Project, C112/2001, E29/120, 378, 385, 386, 388, E2 |
| A70987 | 2005 | Wmc Resources Ltd | Ida Valley | 4% | Combined annual report: C126/2002, For the period 1 July 2004 to 30 June 2005, Due:31st August 2005. Ida Valle |
| A71502 | 2005 | Townson Holdings Pty Ltd | 45 Mile Mount Ida | <1% | Annual Report for the period 20 August 2004 to 19 August 2005, 45 Mile ML29/181, ML29/182 Originally E29/130, |
| A68318 | 2004 | International Goldfields Ltd | Four Corners | 14% | Annual Report for the period 17/06/2002-16/06/2003 Four Corners Project, E29/133, E29/134, Combined Report No |
| A68646 | 2004 | International Goldfields Ltd | Mount Ida | 19% | Annual Report for the period 01/01/2003-31/12/2003 Mount Ida Project (C112/2001), E29/120, E29/385, E29/386, E |
| A68814 | 2004 | International Goldfields Ltd | Mount Ida | 2.6% | Partial Surrender Report E29/388 for the period 31/03/2000 t o 30/03/2003 (end of 3rd year) and 31/03/2000 to |
| A68922 | 2004 | International Goldfields Ltd | Mount Ida | 48% | Mount Ida Project, Partial Surrender Report for the period 27/04/2000 to 26/04/ 2003 (3rd yr) & 27/04/2000 to |
| A69174 | 2004 | Wmc Resources Ltd | Ida Valley | 4% | Ida Valley Project, Annual Report E29/483 & E29/484 for the period 01/07/2003-30/06/2004 (C126/2002). |
| A69531 | 2004 | International Goldfields Ltd | Four Corners | 14% | Annual report for the period ending 16/06/04 Four Corners Project, C351/1997, E29/133, E29/134 |
| A66098 | 2003 | Mr Clark Pw | 52 Mile | 100% | Combined Annual Report for the period 1/1/2002 to 31/12/2002 52 Mile Project M29/130, M29/119 & M29/84 C50/200 |
| A66455 | 2003 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | 45 Mile - Mount Ida Project, Annual Report for the period 30 April 2002 to 29 April 2003, E29/130. |
| A66710 | 2003 | Hamill Resources Ltd | Mount Ida | 19% | Annual Report for the period 01/01/2002 to 31/12/2002 Mount Ida Project C112/2001: E29/120, 385-6, 388, 413, 4 |
| A67227 | 2003 | Wmc Resources Ltd | Ida Valley | 4% | Annual Report for the period 1 July 2002 - 30 June 2003 Nickel Exploration, E29/483,E29/484, C126/2002: ( Ida |
| A67249 | 2003 | Gutnick Resources Nl | Four Corners | 10% | Exploration Licences: E29/141,E29/150, C351/1997 - Four Corners, Surrender Report for the period 24 January 19 |
| A64277 | 2002 | Mr Clark Pw | 52 Mile | 100% | Combined Annual Report for the period 1/1/2001 to 31/12/2001 52 Mile Project Mt Ida M29/130, M29/119, M29/84 C |
| A64536 | 2002 | Hamill Resources Ltd | Mount Ida | 15% | Annual Report For The Period 01/01/2001 to 31/12/2001 Mt Ida Project E29/00120, E29/00385, E29/00386, E29/0038 |
| A64636 | 2002 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30 April 2001 to 29 April 2002 45 Mile Mt Ida E29/130 Ref: M7646. |
| A65676 | 2002 | Mt Kersey Mining Nl | Lake Ballard | 8.2% | Exploration Licence E29/141 'Lake Ballard JV' Annual Ministerial Submission For Extension Of Term For The Peri |
| A65677 | 2002 | Mt Kersey Mining Nl | Four Corners | 10% | Exploration Licences: E29/141 & 150. Four Corners. Annual Report For The Period 9 August 1997 To 8 August 1998 |
| A65678 | 2002 | Gutnick Resources Nl | Four Corners | 10% | Exploration Licences: E29/141, 150. Four Corners. Joint Annual Report For The Period 9 August 1999 To 8 August |
| A65383 | 2002 | Mr Clark Pw | Mount Ida | 7.7% | Annual Report for the period 4 August 2001 to 3 August 2002 E29/446 Mt Ida |
| A61925 | 2001 | Mr Clark Pw | 52 Mile | 100% | Combined Annual Report for the period 1/1/2000 to 31/12/2000 52 Mile Project Mt Ida M29/130, M29/119, M29/84, |
| A62338 | 2001 | Townson Holdings Pty Ltd | 45 Mile Well [Mt Ida] | <1% | Annual Report for the period 30 April 2000 to 29 April 2001 45 Mile Mt Ida E29/130 Ref: M7646. |
| A63106 | 2001 | Mr Clark Pw | Mount Ida | 7.7% | Annual Report for the period 4 August 2000 to 3 August 2001 E29/446 MT IDA. |
| A63746 | 2001 | Gutnick Resources Nl | Four Corners | 12% | Exploration licences: E29/133-134, 141, 150 'C351/1997 - Four Corners' Joint Annual Report for the period 9 Au |
| A59581 | 2000 | Mr Clark Pw | 52 Mile-St Ida | 100% | Annual Report for the Period 08/12/1998 to 07/12/1999, 52 Mile -, Mt Ida Project, M29/119. |
| A59582 | 2000 | Mr Clark Pw | 52 Mile--St ida | 100% | Annual Report for the Period 25/11/1998 to 24/11/1999, 52 Mile - Mt Ida Project, , M29/84,[ Sulphide King] |
| A59962 | 2000 | Acacia Resources Ltd | Mount Ida | 9% | Mt Ida Project E29/159,P29/1561 01/01/1999 to 31/12/1999 |
| A60209 | 2000 | Mr Clark Pw | 52 Mile | 100% | Annual Report for the period 06/03/1999 to 05/03/2000 52 Mile Mt Ida M29/130 |
| A60606 | 2000 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period April 1999 to 29 April 2000 45 Mile Mt Ida E29/130. |
| A61368 | 2000 | Anglogold Australasia Ltd | Mount Ida | 9.1% | Mt Ida Project, E29/159. Annual Report for the Period 1st January 2000 to 31st December 2000. C403/95. Report |
| A57405 | 1999 | Mt Kersey Mining Nl | Snake Hill | 8.2% | Exploration Licence E29/141 'Snake Hill' Partial Surrender Report for the Period 24th January 1992 to 18 Novem |
| A57522 | 1999 | Acacia Resources Ltd | Mount Ida | 9% | Mt Ida Project E29/159, P29/1561 Annual Repor for the Period 1st January 1998 to 31st December 1998 |
| A58057 | 1999 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report For the Period 30/04/1998 to 29/04/1999 45 Mile Mt Ida E 29/130 |
| A58513 | 1999 | Mt Kersey Mining Nl | Snake Hill | 24% | Exploration Licence E29/150 'Snake Hill' Partial Surrender Report for the Period 9 August to 23 December 1998. |
| A59278 | 1999 | Gutnick Resources Nl | Snake Hill | 24% | Partial Surrender Report for the Period 9 August 1992 to 5 July 1999, Exploration Licence E29/150, Snake Hill, |
| A53483 | 1998 | Delta Gold Ltd | Copperfield | <1% | Annual Technical Report for the Copperfield Project (E29/186) between 9 December 1996 to 8 December 1997 |
| A53617 | 1998 | Stockdale Prospecting Ltd | Ida | 1.4% | Ida Project Combined Annual Report No M9200 E29/233-234, E29/240, E29/242, E29/249 & E29/251 (11/96-11/97) |
| A53546 | 1998 | Newcrest Mining Ltd | Copperfield | 31% | Copperfield Project. Annual Report for the period 28-10-96 to 27-10-97, E29/167. [Corbetts JV] |
| A53606 | 1998 | Newcrest Mining Ltd | Copperfield | 31% | Copperfield Project. Partial Relinquishment Report Covering Exploration Carried out on the Corbetts Joint Ven |
| A54080 | 1998 | Newcrest Mining Ltd | Copperfield | 39% | Annual Report - Copperfield Project, Spotted Dog Joint Venture Period Ending: 31/12/1997 M29/27, 36, 37, |
| A54161 | 1998 | Newcrest Mining Ltd | Copperfield | 8.7% | Annual Report on Exploration carried out during 1st January 1997 to 31st December 1997, Copperfield Project, M |
| A54438 | 1998 | Newcrest Mining Ltd | Copperfield | 5% | Copperfield Project, Timoni Joint Venture E29/155, M29/2 Annual Report, Period Ending: 31/12/97 |
| A54692 | 1998 | Townson Holdings Pty Ltd | 45 Mile | <1% | 45 Mile, Mount Ida E29/130 Annual Report 30/04/97 to 29/04/98 |
| A55108 | 1998 | Delta Gold Ltd | Copperfield | <1% | Surrender Report , Copperfield Projejct, 9th December 1994 to 28th April 1998. |
| A55874 | 1998 | Newcrest Mining Ltd | Copperfield | 9.1% | Partial Surrender Report E29/159 Copperfield Project, Mt Ida joint venture. Report No: G630/7. (Period August |
| A56011 | 1998 | Mt Kersey Mining Nl | Snake Hill | 8.2% | Snake Hill Project, Partial Surrender Report for the period 24th January 1992 to 24th April 1998, E29/141. |
| A56693 | 1998 | Gme Resources Nl | Mt Ida - Oberwyl | 9.1% | Partial Surrender Report E29/159 Mt Ida - Oberwyl Project report period 26/2/98 - 19/6/98. |
| A50358 | 1997 | Newcrest Mining Ltd | Copperfield | 3.2% | Report No. G650-2 Annual report for the period ending 31/12/1996 Copperfield Project Timoni Joint Venture E29/ |
| A50508 | 1997 | Delta Gold Ltd | Copperfield | <1% | Copperfield Project, Annual Report for period 09/12/1995 to 08/12/1996, E29/186. |
| A50766 | 1997 | Cra Exploration Pty Ltd | Lake Ballard | 10% | Annual Report to 31 January 1997 on E29/141 & 150 Lake Ballard Project. |
| A50771 | 1997 | Newcrest Mining Ltd | Copperfield | 8.3% | Annual Report for the period ending 31/12/1996 Copperfield Project Mt Ida Joint Venture E29/159, E29/199 & M29 |
| A50810 | 1997 | Stockdale Prospecting Ltd | Ida | 1.1% | Ida Project Combined Annual Report E29/231 to E29/234 E29/240 E29/242 E29/249 and E29/251 (11/95 to 11/96) |
| A50813 | 1997 | Newcrest Mining Ltd | Copperfield | 51% | Report No. G700/2 Annual Report for the period ending 31/12/1996 Copperfield Project Spotted Dog Joint Venture |
| A52288 | 1997 | Mt Kersey Mining Nl | Snake Hill | 39% | Exploration Licences E29/134 'Snake Hill' Ministerial submission for extension of term for the period 17/06/97 |
| A53624 | 1997 | Stockdale Prospecting Ltd | Ida | 1.4% | Ida Project, Combined Partial Relinquishment Report, E29/233, 234, 240, 242, 249, 251 December 1997. |
| A51383 | 1997 | Newcrest Mining Ltd | Copperfield | 70% | Annual report on exploration carried out during the period 24/4/96 to 23/4/97 Copperfield Project Pianto's Opt |
| A47009 | 1996 | Cocks Mining Nl | Bellbird | 63% | Bellbird Project Western Australia Annual report 1995 Tenement M39/128 Period covered 8 December 1994 to 7 Dec |
| A47063 | 1996 | Newcrest Mining Ltd | Copperfield | 3.3% | Annual report for the period ending 31/12/1995 Copperfield Project Timoni Joint Venture Reclaimed Resources E2 |
| A47196 | 1996 | Cocks Mining Nl | 52 Mile | 100% | 52 Mile Project Western Australia Annual report 1995 Tenement ML29/84 ML29/119 period covered 24 November 1994 |
| A47283 | 1996 | Delta Gold Ltd | Copperfield | <1% | Annual Technical Report for the Copperfield Project between 9 December 1994 to 8 December 1995 |
| A47322 | 1996 | Stockdale Prospecting Ltd | Ida | 1.1% | Combined Annual report E29/231 E29/232 E29/233 E29/234 E29/240 E29/242 E29/249 E29/251 (11/94 to 11/95) |
| A49641 | 1996 | Newcrest Mining Ltd | Copperfield | 31% | Annual Report for the Period Ending 27-10-1996, Copperfield Project, Corbetts Joint Venture, E29/167 |
| A47810 | 1996 | Newcrest Mining Ltd | Copperfield | 8.3% | Annual Report for the period ending 31/12/1995 Copperfield Project Mt Ida Joint Venture E29/159, E29/199 & M29 |
| A49265 | 1996 | Cra Exploration Pty Ltd | Snake Hill | 14% | Annual report to 16 June 1996 on E29/133 and E29/134 Snake Hill Project,. |
| A45472 | 1995 | Cra Exploration Pty Ltd | Snake Hill | 14% | ANNUAL REPORT TO 16 JUNE 1995 ON E29/133, 134 SNAKE HILL MENZIES SH5105 W.A |
| A45994 | 1995 | Cocks Mining Nl | Bellbird | <1% | Bellbird Project Western Australia Annual report, 1995 Tenement ML29/27 period covered 4 July 1994 to 3 July 1 |
| A47014 | 1995 | Cocks Mining Nl | Piantos South | 100% | Piantos South Project Western Australia Annual report, 1995 Tenements ML29/50 ML29/90 PL29/1466 period covered |
| A47007 | 1995 | Cocks Mining Nl | Stevensons | 99% | Stevensons Project Western Australia Annual report 1995 Tenement ML29/74 Period covered 22 October 1994 to 21 |
| A47008 | 1995 | Cocks Mining Nl | Spotted Dog South | 45% | Spotted Dog South Project Western Australia Annual report 1995 Tenement ML29/61 period covered 17 May 1994 to |
| A47012 | 1995 | Cocks Mining Nl | 52 Mile | 100% | 52 Mile Project Western Australia Annual report 1995 Tenement ML29/130 period covered 5 March 1994 to 6 March |
| A43522 | 1995 | Mr Cock Fj | Bellbird | 63% | Bellbird Project ,M29/128, Annual Report for the period 08/15/1993 to 07/12/1994. |
| A43523 | 1995 | Mr Cock Fj | 52 Mile | 100% | 52 Mile Project, Annual Report 1994, M29/84 & M29/119 for the period covered 24th November 1993 to 23rd Nove |
| A43977 | 1995 | Gold & Mineral Exploration Nl | Mt Ida-Oberwyl | 5.5% | Annual report for period January 1, 1994 to December 31 1994 Mount Ida - Oberwyl Project E29/120 E29/151 E29/1 |
| A45920 | 1995 | Cra Exploration Pty Ltd | Snake Hill | 14% | Partial Surrender Report for the period ending 16/06/95 Snake Hill Project E29/133 E29/134 |
| A46308 | 1995 | Delta Gold Ltd | Lake Ballard | 10% | Lake Ballard Project ,Annual Report for the Period March 1994 to August 1995, E29/141 & 150. |
| A46577 | 1995 | Archaean Gold Nl | Piantos Find | 81% | Piantos Find Project, Final Report for period 26/10/1994 to 15/11/1995, E29/257. |
| A40480 | 1994 | Gold & Mineral Exploration Nl | Mount Ida | 5.5% | Annual Report for the period 01/01/93-31/12/93 Mt Ida Oberwyl Project E29/120,151,155,159 M29/02,158 P29/1206, |
| A41805 | 1994 | Cra Exploration Pty Ltd | Snake Hill | 14% | Annual Report for the period 17/06/93-16/06/94 Snake Hill Project E29/133,134 |
| A43320 | 1994 | Mr Cock Fj | Stevensons | 99% | Stevensons project W.A Annual report 1994 Tenement: ML29/74 period covered 22nd October 1993 to 21st October 1 |
| A41379 | 1994 | Delta Gold Ltd | Lake Ballard | 10% | Lake Ballard Project Annual Report for the Period February 1993 to March 1994 E29/141, 150. |
| A41673 | 1994 | Cra Exploration Pty Ltd | Snake Hill base | 14% | Partial Relinquishment Report to 16 June 1994 |
| A42836 | 1994 | Great Southern Mines Nl | Piantos Find | 100% | Piantos Find Project, Annual Report for the year ending 4th December 1994, M29/127. |
| A38447 | 1993 | Townson Holdings Pty Ltd | 45 Mile Well | <1% | Annual report for the period 30/04/92-28/05/93 45 Mile Well Project E29/130 E29/1253 |
| A38576 | 1993 | Delta Gold Ltd | Lake Ballard | 10% | Non-statutory Report : Report on Previous Nickel and Gold Exploration in the Lake Ballard Area ,Exploration Li |
| A36712 | 1992 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30/04/91-28/05/92, 45 Mile Project, E29/130 P29/1253. |
| A38133 | 1992 | Cra Exploration Pty Ltd | Snake Hill | 14% | Annual report for the period 17/06/91-16/06/92 Snake Hill Project E29/133 E29/134 |
| A30916 | 1990 | Geopeko | Kings Park - Bottle Creek | 91% | Kings Park - Bottle Creek Project, Final Surrender Report for the period 08/12/1989 to 02/04/1990, M29/116. |
| A28103 | 1989 | Sabminco Nl | Stevensons | 45% | Spotted Dog South Area. M29/61. Report for period ending 17/05/89. Sabminco NL |
| A20948 | 1986 | Mt Martin Gold Mines Nl | Corida Mine | 23% | Corida Mine, [Annual report], 1985, P29/311, 29/312, MC29/3175, 29/3239, GML29/6000 |
| A10675 | 1982 | Cra Exploration Pty Ltd | Jackson Bore | <1% | Jackson Bore Project, Annual Report for the year ending 31/12/1981, MC29/3350-3352 & MC29/3396-3400. |
| A9783 | 1981 | International Nickel Aust Ltd | Fifty One Mile Well | 20% | Fifty One Mile Well Project, 1980 Annual Report, January 1981, MC29/3095-3102, 3171-3716, 3238 & 3244. |
| A9782 | 1980 | International Nickel Aust Ltd | Fifty One Mile Well | 19% | Fifty One Mile Well Project, 1979 Annual Report , January 1980, MC29/3095-3102,3171-3176,3238,3244. |
| A8362 | 1979 | International Nickel Aust Ltd | Fifty One Mile Well | 38% | Fifty One Mile Well Project, Annual Report for the period 01/01/1978 to 31/12/1978, MC29/3095-3102. |
| A6292 | 1975 | Cra Exploration Pty Ltd | Kurrajong | 22% | Kurrajong Project, Annual Report for the year ending 31/12/1975, MC29/2546, 2546-2550, 2492-2495, 2537-2545, 2 |
| A5589 | 1974 | Cra Exploration Pty Ltd | Kurrajong | 22% | Annual report for 1974, Kurrajong Mineral Claims, MC29/2492 ... 29/2836 |
| A4736 | 1974 | Asarco Australia Ltd | 51 Mile Well | 44% | 51 Mile Well Project, Final Surrender Report, April 1974, MC29/2521-2527, 2570-2578, 2585-2603, 2604-2620, 262 |
| A3571 | 1973 | Cra Exploration Pty Ltd | Kurrajong - Mount Ida | 30% | Kurrajong - Mount Ida Project, Non-statutory Report: Progress Report for the period 01/02/1972 to 31/12/1972, |
| A4482 | 1973 | Cra Exploration Pty Ltd | Kurrajong | 26% | Kurrajong Project, Non-statutory Report:Exploratiom Report for the period 1st June 1973 to 30th November 1973, |
| A3847 | 1973 | Cra Exploration Pty Ltd | Kurrajong | 30% | Kurrajong Project, Non-statutory Report; Progress Report for the period 1st January 1973 to 31st May 1973, TR7 |
| A12559 | 1972 | Cra Exploration Pty Ltd | Kurrajong | 22% | Geophysical Survey at Kurrajong (W.A), November, 1962 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43197 | 1753 | Archaean Gold Nl | Corbetts Bore | 31% | Corbetts Bore Project, Annual Report, 28/10/1993 to 27/10/1994,Exploration Licence 29/167. |
| A46915 | 1753 | Archaean Gold Nl | Corbetts Bore | 31% | Corbetts Bore Project, Menzies Area, WA, Annual Report 28th October 1994 to October 27th, 1995, Exploration Li |
| A50952 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual report for the period 30 April 1996 to 29 April 1997 45 Mile Mt Ida E29/130 |
| A51856 | 1753 | Mt Kersey Mining Nl | Snake Hill | 39% | Exploration Licence E29/134 'Snake Hill' Annual report for the period 17 June 1996 to 16 June 1997 |
| A52190 | 1753 | Mt Kersey Mining Nl | Snake Hill | 12% | Mt Kersey Mining NL Exploration licences E29/133, E29/134, E29/141, E29/150 Snake Hill C180/1994 Joint Annual |
| A79709 | 1753 | Townson Holdings Pty Ltd | 45 Mile/ Mount Ida | <1% | ANNUAL REPORT for the period 20 August 2007 to 19 August, 45 MILE, Mt Ida, ML 29/181, ML 29/182, Ref: C12/2006 |
| A84623 | 1753 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | Reporting information for the period 20 August 2008 to 19 August 2009, 45 Mile, Mount ida, ML 29/181, ML29/182 |
| A41436 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual report for the period 29/05/93-28/05/94 45 Mile Well Project E29/130 P29/1253 |
| A42248 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | 45 Mile Project, PARTIAL SURRENDER REPORT FOR THE PERIOD 29 MAY 1993 TO 28 MAY 1994, E29/130. |
| A44464 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30 April 1994 to 29 April 1995 45 Mile Mount Ida E29/130 |
| A47926 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Final Report for the period 30 April 1995 to 29 April 1996 45 Mile Mt Ida E29/130 |
| A79645 | 1753 | Jupiter Mines Ltd | Mount Ida | <1% | MT IDA PROJECT Annual Report E29/560 Period 08/09/07 to 07/09/08 |
| A84480 | 1753 | Jupiter Mines Ltd | MT IDA | <1% | MT IDA PROJECT Annual Report E29/560, Period 08/09/08 to 07/09/09 |
| A88118 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | REPORTING INFORMATION for the period 20 August 2009 to 19 August 2010 45 MILE Mt Ida ML 29/181 ML 29/182 |
| A93189 | 1753 | Hooper S | Mount Ida - Bell Bird | 65% | Mount Ida Project P29/2159 & 2160 (Bell Bird) Coppperfield - Mt Ida Area, W.A. 2011-2012 Annual Mineral Explor |
| A107173 | Townson Holdings Pty Ltd | 45 Mile | <1% | REPORTING INFORMATION for the period 20 August 1998 to 19 August 2015 Up to and Including 20 August 2014 to |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 29/179 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 29/179? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.