L 29/204
Register summary
- Holder
- Aurenne Mit Pty Ltd
- Local government
- Shire of Menzies
- Application received
- 10 May 2024
- Commenced
- 17 Oct 2024
- Expiry
- 16 Oct 2045
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A126129 | 2021 | Alt Resources Limited | Perrinvale | <1% | E29/0921 Perrinvale Partial Relinquishment Report period 17 November 2014 to 9 October 2020 |
| A122770 | 2020 | Ora Banda Mining | Mount Ida | <1% | Mt Ida Project C112/2001 Annual Report for the period ending 31/12/2019 |
| A124712 | 2020 | Alt Resources Limited | Quin Hills | <1% | C143/2005 Quinn Hills Project Combined Annual Report for the period ending 30/06/2020 |
| A118654 | 2019 | Alt Resources Limited | Mount Ida South | <1% | E29/1016 Mount Ida South Annual Report Period 08/11/2017 - 07/11/2018 |
| A118711 | 2019 | Alt Resources Limited | Perrinvale | <1% | E29/0921 Perrinvale Annual Report period 17 November 2017 to 16 November 2018 |
114 more reports
| A119089 | 2019 | Eastern Goldfields Limited | Mount Ida | <1% | Mt Ida Project - C112/2001 Annual Report for the period 1 January 2018 to 31 December 2018, E29/00640, E29/006 |
| A121025 | 2019 | Alt Resources Limited | Quinns | <1% | Combined Annual Technical Report Quinns Project C143/2005 for the period 1 July 2018 to 30 June 2019, E 29/649 |
| A115665 | 2018 | Latitude Consolidated Limited | Mount Ida South | <1% | Annual Report for E29/921 Mount Ida South for the period 17/11/2016 - 16/11/2017 |
| A115798 | 2018 | Eastern Goldfields Limited | Mount Ida | <1% | Mt Ida Project - C112/2001 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A112032 | 2017 | Eastern Goldfields Limited | Mount Ida | <1% | Mineral Exploration Report Mount Ida C112/2001 for the period 1 January 2016 to 31 December 2016, E29/00640... |
| A115408 | 2017 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | 45 Mile/Mt Ida M29/181 M29/182 (C12/2006) Final Surrender Report for the period 20 August 1998 to 19 August 20 |
| A108022 | 2016 | Eastern Goldfields Limited | Mount Ida | <1% | MT IDA PROJECT Mineral Exploration Report Combined Report C112/2001 For the Period 1/01/2015 – 31/12/2015, E29 |
| A104676 | 2015 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Annual Report for the period 28-11-2013 to 27-11-2014 Central Yilgarn Iron Project - Mt Ida and Mt Mason C180/ |
| A104852 | 2015 | Swan Gold Mining Ltd | Mount Ida | <1% | Combined C112/2001 Mineral Exploration Report Mt Ida Project for the period 1/01/2014 – 31/12/2014, E29/640.. |
| A107499 | 2015 | Jupiter Mines Ltd | Mount Ida | <1% | Mt Ida Magnetite Project E29/560-I Final Surrender Report for the period 08/09/2006 to 07/09/2015 |
| A103808 | 2014 | Townson Holdings Pty Ltd | 45 Mile [Mt Ida] | <1% | 45 Mile [Mt Ida] Project, Annual Report for the period 20/08/2013 to 19/08/2014, M29/181 & 182. [C12/2006] |
| A101107 | 2014 | Swan Gold Mining Ltd | Mount Ida | <1% | Mineral Exploration Report Mt Ida Project Combined Report C112/2001 For the Period 1/01/2013 – 31/12/2013, E29 |
| A101594 | 2014 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Central Yilgarn Iron Project C180/2010 (Mt Ida and Mt Mason) Annual Report for the period 28/11/2012 to 27/11/ |
| A101881 | 2014 | Fe Limited; Swan Gold Mining Ltd | Mount Ida | <1% | Mount Ida Project, Final Surrender Report for the period 23/09/2008 to 22/01/2014, E29/642. |
| A102076 | 2014 | Swan Gold Mining Ltd | Mount Ida | <1% | Final Surrender Report , Mt Ida Project , E29/644, for the period 23/09/2009 to 12/02/2014. |
| A103119 | 2014 | Swan Gold Mining Ltd | Mount Ida | <1% | Surrender Report Mt Ida Project E29/644 for th period ending 12 February 2014 |
| A96734 | 2013 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Central Yilgarn Iron Ore Project (CYIP) Mt Ida Magnetite Project and Mt Mason DSO Hematite Project C180/2010, |
| A97708 | 2013 | Swan Gold Mining Ltd | Mount Ida | <1% | Mt Ida Project, Annual Report for the period 01/01/2012 to 31/12/2012, E29/561, 660, 640- 644, 647 & E29/659; |
| A98715 | 2013 | Wild Acre Metals Ltd | Mount Ida South | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2012 to 31st July 2013, E29/7 |
| A99562 | 2013 | Townson Holdings Pty Ltd | 45 Mile - Mt Ida | <1% | Reporting Information for the period 20 August 1998 to 19 August 2012 Up to and Including 20 August 2012 to 19 |
| A100144 | 2013 | Wild Acre Metals Limited | Mount Ida | <1% | Final Surrender Report C175/2010 Mt Ida South Project E29/744, E29/749, E29/754 for the period ended 31 July 2 |
| A93077 | 2012 | Jupiter Mines Ltd | Mount Ida - Mount Mason | <1% | Annual Report for the period 28/11/10 to 27/11/2011, Central Yilgarn Iron Project - Mt Ida and Mt Mason, C180/ |
| A95369 | 2012 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2011 to 31st July 2012, E29/7 |
| A95604 | 2012 | Townson Holdings Pty Ltd | Mount Ida | <1% | Reporting Information for the period 20 August 2011 to 19 August 2012, 45 Mile Mt Ida Project M29/181, M29/182 |
| A90617 | 2011 | Swan Gold Mining Ltd | Mount Ida | <1% | Annual Mineral Exploration Report E29/642, 23rd September 2009 – 22nd September 2010 |
| A90620 | 2011 | Swan Gold Mining Ltd | Mount Ida | <1% | E29/644 Annual Report for the period 23rd September 2009 – 22nd September 2010 |
| A91456 | 2011 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | Reporting Information for the period 20 August 2010 to 19 August 2011, 45 Mile - Mt Ida, ML 29/181, ML 29/182, |
| A91684 | 2011 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010- Mt Ida South Project 1st August 2010 to 31st July 2011, E29/744, 749, 750, |
| A85967 | 2010 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 Tenements: E29/526, 539, 559, 56 |
| A89288 | 2010 | Jupiter Mines Ltd | Mount Ida - Mount Mason | <1% | MounT Ida - Mount Mason Annual Report C180/2010, Period 28/11/09 to 27/11/10 |
| A88536 | 2010 | Jupiter Mines Ltd | Mount Ida | <1% | Mount Ida Project Annual Report E29/560 Period 08/09/09 to 07/09/10 |
| A81393 | 2009 | La Mancha Resources Australia Pty Ltd | MT IDA | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008, Tenements: E29/481, 506, 526, 5 |
| A77445 | 2008 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 C112/2001 |
| A74385 | 2007 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | Mount Ida Project, C112/2001, Combined Annual Report for the Period 01/01/2007 to 31/12/2007 (Menzies) |
| A76175 | 2007 | Townson Holdings Pty Ltd | 45 Mile Well | <1% | ANNUAL REPORT for the period 20 August 2006 to 19 August 2007, 45 MILE, Mt Ida, ML29/181, ML29/182 Ref: C12/20 |
| A76309 | 2007 | Jupiter Mines Ltd | Mount Ida | <1% | Annual Exploration Report for Exploration Licence E29/560 Mt. Ida Iron Ore Project The period 8th September 20 |
| A72271 | 2006 | Mines & Resources Australia Pty Ltd | Mount Ida | <1% | Mt Ida Project, Combined Annual Report for the Period 01/01/2005 to 31/12/2005, C112/2001, (Leonora). |
| A73377 | 2006 | Townson Holdings Pty Ltd | 45 Mile Mount Ida | <1% | Annual Report for the Period 20 August 2005 to 19 August 2006, 45 Mile Mt Ida M29/181-182, Combined Reporting |
| A69701 | 2005 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 20 August 2003 to 19 August 2004, 45 Mile Project, , ML29/181,ML29/182. |
| A70249 | 2005 | International Goldfields Ltd | Mount Ida | <1% | Annual report for the period 01/01/04 - 31/12/04 Mount Ida Project, C112/2001, E29/120, 378, 385, 386, 388, E2 |
| A71502 | 2005 | Townson Holdings Pty Ltd | 45 Mile Mount Ida | <1% | Annual Report for the period 20 August 2004 to 19 August 2005, 45 Mile ML29/181, ML29/182 Originally E29/130, |
| A68922 | 2004 | International Goldfields Ltd | Mount Ida | <1% | Mount Ida Project, Partial Surrender Report for the period 27/04/2000 to 26/04/ 2003 (3rd yr) & 27/04/2000 to |
| A68646 | 2004 | International Goldfields Ltd | Mount Ida | <1% | Annual Report for the period 01/01/2003-31/12/2003 Mount Ida Project (C112/2001), E29/120, E29/385, E29/386, E |
| A66098 | 2003 | Mr Clark Pw | 52 Mile | 3.3% | Combined Annual Report for the period 1/1/2002 to 31/12/2002 52 Mile Project M29/130, M29/119 & M29/84 C50/200 |
| A66455 | 2003 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | 45 Mile - Mount Ida Project, Annual Report for the period 30 April 2002 to 29 April 2003, E29/130. |
| A66710 | 2003 | Hamill Resources Ltd | Mount Ida | <1% | Annual Report for the period 01/01/2002 to 31/12/2002 Mount Ida Project C112/2001: E29/120, 385-6, 388, 413, 4 |
| A67249 | 2003 | Gutnick Resources Nl | Four Corners | <1% | Exploration Licences: E29/141,E29/150, C351/1997 - Four Corners, Surrender Report for the period 24 January 19 |
| A64277 | 2002 | Mr Clark Pw | 52 Mile | 3.3% | Combined Annual Report for the period 1/1/2001 to 31/12/2001 52 Mile Project Mt Ida M29/130, M29/119, M29/84 C |
| A64536 | 2002 | Hamill Resources Ltd | Mount Ida | <1% | Annual Report For The Period 01/01/2001 to 31/12/2001 Mt Ida Project E29/00120, E29/00385, E29/00386, E29/0038 |
| A64636 | 2002 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30 April 2001 to 29 April 2002 45 Mile Mt Ida E29/130 Ref: M7646. |
| A65677 | 2002 | Mt Kersey Mining Nl | Four Corners | <1% | Exploration Licences: E29/141 & 150. Four Corners. Annual Report For The Period 9 August 1997 To 8 August 1998 |
| A65678 | 2002 | Gutnick Resources Nl | Four Corners | <1% | Exploration Licences: E29/141, 150. Four Corners. Joint Annual Report For The Period 9 August 1999 To 8 August |
| A61925 | 2001 | Mr Clark Pw | 52 Mile | 3.3% | Combined Annual Report for the period 1/1/2000 to 31/12/2000 52 Mile Project Mt Ida M29/130, M29/119, M29/84, |
| A62338 | 2001 | Townson Holdings Pty Ltd | 45 Mile Well [Mt Ida] | <1% | Annual Report for the period 30 April 2000 to 29 April 2001 45 Mile Mt Ida E29/130 Ref: M7646. |
| A63746 | 2001 | Gutnick Resources Nl | Four Corners | <1% | Exploration licences: E29/133-134, 141, 150 'C351/1997 - Four Corners' Joint Annual Report for the period 9 Au |
| A59581 | 2000 | Mr Clark Pw | 52 Mile-St Ida | 5.2% | Annual Report for the Period 08/12/1998 to 07/12/1999, 52 Mile -, Mt Ida Project, M29/119. |
| A60209 | 2000 | Mr Clark Pw | 52 Mile | 33% | Annual Report for the period 06/03/1999 to 05/03/2000 52 Mile Mt Ida M29/130 |
| A60606 | 2000 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period April 1999 to 29 April 2000 45 Mile Mt Ida E29/130. |
| A61042 | 2000 | Townson Holdings Pty Ltd | 45 Mile | 5.7% | Final Report for the period 1 July 1999 to 30 June 2000. 45 Mile Project, Mt Ida P29/1534, M7646/1 |
| A58057 | 1999 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report For the Period 30/04/1998 to 29/04/1999 45 Mile Mt Ida E 29/130 |
| A59278 | 1999 | Gutnick Resources Nl | Snake Hill | 2.7% | Partial Surrender Report for the Period 9 August 1992 to 5 July 1999, Exploration Licence E29/150, Snake Hill, |
| A58513 | 1999 | Mt Kersey Mining Nl | Snake Hill | 2.7% | Exploration Licence E29/150 'Snake Hill' Partial Surrender Report for the Period 9 August to 23 December 1998. |
| A58561 | 1999 | Townson Holdings Pty Ltd | 45 Mile | 5.7% | Annual Report For the Period 1/07/1998 to 30/06/1999 P29/1534,M7646/1 |
| A53606 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Copperfield Project. Partial Relinquishment Report Covering Exploration Carried out on the Corbetts Joint Ven |
| A54438 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Copperfield Project, Timoni Joint Venture E29/155, M29/2 Annual Report, Period Ending: 31/12/97 |
| A55259 | 1998 | Townson Holdings Pty Ltd | 45 Mile | 5.7% | 45 Mile Project, Annual Report for the period 1st July 1997 to 30th June 1998, P29/1534.[Mt Ida] |
| A53546 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Copperfield Project. Annual Report for the period 28-10-96 to 27-10-97, E29/167. [Corbetts JV] |
| A54080 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Annual Report - Copperfield Project, Spotted Dog Joint Venture Period Ending: 31/12/1997 M29/27, 36, 37, |
| A54692 | 1998 | Townson Holdings Pty Ltd | 45 Mile | <1% | 45 Mile, Mount Ida E29/130 Annual Report 30/04/97 to 29/04/98 |
| A56418 | 1998 | Northling Pty Ltd | Menzies diamond exploration | <1% | Annual Report to the Department of Minerals and Energy Western Australia, Exploration Licence EL 29/345 Report |
| A51526 | 1997 | Townson Holdings Pty Ltd | 45 Mile | 5.7% | Annual report for the period 1 July 1996 to 30 June 1997 45 Mile Mt Ida P29/1534 |
| A50358 | 1997 | Newcrest Mining Ltd | Copperfield | <1% | Report No. G650-2 Annual report for the period ending 31/12/1996 Copperfield Project Timoni Joint Venture E29/ |
| A50766 | 1997 | Cra Exploration Pty Ltd | Lake Ballard | <1% | Annual Report to 31 January 1997 on E29/141 & 150 Lake Ballard Project. |
| A50813 | 1997 | Newcrest Mining Ltd | Copperfield | <1% | Report No. G700/2 Annual Report for the period ending 31/12/1996 Copperfield Project Spotted Dog Joint Venture |
| A51383 | 1997 | Newcrest Mining Ltd | Copperfield | <1% | Annual report on exploration carried out during the period 24/4/96 to 23/4/97 Copperfield Project Pianto's Opt |
| A47063 | 1996 | Newcrest Mining Ltd | Copperfield | <1% | Annual report for the period ending 31/12/1995 Copperfield Project Timoni Joint Venture Reclaimed Resources E2 |
| A47196 | 1996 | Cocks Mining Nl | 52 Mile | 3.3% | 52 Mile Project Western Australia Annual report 1995 Tenement ML29/84 ML29/119 period covered 24 November 1994 |
| A49641 | 1996 | Newcrest Mining Ltd | Copperfield | <1% | Annual Report for the Period Ending 27-10-1996, Copperfield Project, Corbetts Joint Venture, E29/167 |
| A44850 | 1995 | Townson Holdings Pty Ltd | 45 Mile | 5.3% | Final Report PL29/1253 45 Mile Mount Ida for the period 29 May 1994 to 28 May 1995. |
| A46308 | 1995 | Delta Gold Ltd | Lake Ballard | <1% | Lake Ballard Project ,Annual Report for the Period March 1994 to August 1995, E29/141 & 150. |
| A46627 | 1995 | Stockdale Prospecting Ltd | Ida | <1% | Surrender Report for tenements surrendered on 09/11/95 Ida Project E29/229-230,236-239,244,252 E30/128-130,134 |
| A43523 | 1995 | Mr Cock Fj | 52 Mile | 3.3% | 52 Mile Project, Annual Report 1994, M29/84 & M29/119 for the period covered 24th November 1993 to 23rd Nove |
| A43977 | 1995 | Gold & Mineral Exploration Nl | Mt Ida-Oberwyl | <1% | Annual report for period January 1, 1994 to December 31 1994 Mount Ida - Oberwyl Project E29/120 E29/151 E29/1 |
| A47012 | 1995 | Cocks Mining Nl | 52 Mile | 33% | 52 Mile Project Western Australia Annual report 1995 Tenement ML29/130 period covered 5 March 1994 to 6 March |
| A47014 | 1995 | Cocks Mining Nl | Piantos South | 13% | Piantos South Project Western Australia Annual report, 1995 Tenements ML29/50 ML29/90 PL29/1466 period covered |
| A41379 | 1994 | Delta Gold Ltd | Lake Ballard | <1% | Lake Ballard Project Annual Report for the Period February 1993 to March 1994 E29/141, 150. |
| A42836 | 1994 | Great Southern Mines Nl | Piantos Find | 24% | Piantos Find Project, Annual Report for the year ending 4th December 1994, M29/127. |
| A40480 | 1994 | Gold & Mineral Exploration Nl | Mount Ida | <1% | Annual Report for the period 01/01/93-31/12/93 Mt Ida Oberwyl Project E29/120,151,155,159 M29/02,158 P29/1206, |
| A38447 | 1993 | Townson Holdings Pty Ltd | 45 Mile Well | <1% | Annual report for the period 30/04/92-28/05/93 45 Mile Well Project E29/130 E29/1253 |
| A38576 | 1993 | Delta Gold Ltd | Lake Ballard | <1% | Non-statutory Report : Report on Previous Nickel and Gold Exploration in the Lake Ballard Area ,Exploration Li |
| A36712 | 1992 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30/04/91-28/05/92, 45 Mile Project, E29/130 P29/1253. |
| A30916 | 1990 | Geopeko | Kings Park - Bottle Creek | <1% | Kings Park - Bottle Creek Project, Final Surrender Report for the period 08/12/1989 to 02/04/1990, M29/116. |
| A6292 | 1975 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Annual Report for the year ending 31/12/1975, MC29/2546, 2546-2550, 2492-2495, 2537-2545, 2 |
| A4736 | 1974 | Asarco Australia Ltd | 51 Mile Well | 1.2% | 51 Mile Well Project, Final Surrender Report, April 1974, MC29/2521-2527, 2570-2578, 2585-2603, 2604-2620, 262 |
| A5589 | 1974 | Cra Exploration Pty Ltd | Kurrajong | <1% | Annual report for 1974, Kurrajong Mineral Claims, MC29/2492 ... 29/2836 |
| A3847 | 1973 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Non-statutory Report; Progress Report for the period 1st January 1973 to 31st May 1973, TR7 |
| A3571 | 1973 | Cra Exploration Pty Ltd | Kurrajong - Mount Ida | <1% | Kurrajong - Mount Ida Project, Non-statutory Report: Progress Report for the period 01/02/1972 to 31/12/1972, |
| A4482 | 1973 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Non-statutory Report:Exploratiom Report for the period 1st June 1973 to 30th November 1973, |
| A12559 | 1972 | Cra Exploration Pty Ltd | Kurrajong | <1% | Geophysical Survey at Kurrajong (W.A), November, 1962 |
| A44464 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30 April 1994 to 29 April 1995 45 Mile Mount Ida E29/130 |
| A79709 | 1753 | Townson Holdings Pty Ltd | 45 Mile/ Mount Ida | <1% | ANNUAL REPORT for the period 20 August 2007 to 19 August, 45 MILE, Mt Ida, ML 29/181, ML 29/182, Ref: C12/2006 |
| A52190 | 1753 | Mt Kersey Mining Nl | Snake Hill | <1% | Mt Kersey Mining NL Exploration licences E29/133, E29/134, E29/141, E29/150 Snake Hill C180/1994 Joint Annual |
| A84623 | 1753 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | Reporting information for the period 20 August 2008 to 19 August 2009, 45 Mile, Mount ida, ML 29/181, ML29/182 |
| A88118 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | REPORTING INFORMATION for the period 20 August 2009 to 19 August 2010 45 MILE Mt Ida ML 29/181 ML 29/182 |
| A79645 | 1753 | Jupiter Mines Ltd | Mount Ida | <1% | MT IDA PROJECT Annual Report E29/560 Period 08/09/07 to 07/09/08 |
| A84480 | 1753 | Jupiter Mines Ltd | MT IDA | <1% | MT IDA PROJECT Annual Report E29/560, Period 08/09/08 to 07/09/09 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A41436 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual report for the period 29/05/93-28/05/94 45 Mile Well Project E29/130 P29/1253 |
| A42248 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | 45 Mile Project, PARTIAL SURRENDER REPORT FOR THE PERIOD 29 MAY 1993 TO 28 MAY 1994, E29/130. |
| A43197 | 1753 | Archaean Gold Nl | Corbetts Bore | <1% | Corbetts Bore Project, Annual Report, 28/10/1993 to 27/10/1994,Exploration Licence 29/167. |
| A46915 | 1753 | Archaean Gold Nl | Corbetts Bore | <1% | Corbetts Bore Project, Menzies Area, WA, Annual Report 28th October 1994 to October 27th, 1995, Exploration Li |
| A47926 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Final Report for the period 30 April 1995 to 29 April 1996 45 Mile Mt Ida E29/130 |
| A50952 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual report for the period 30 April 1996 to 29 April 1997 45 Mile Mt Ida E29/130 |
| A107173 | Townson Holdings Pty Ltd | 45 Mile | <1% | REPORTING INFORMATION for the period 20 August 1998 to 19 August 2015 Up to and Including 20 August 2014 to |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 19 years · 16 Oct 2045
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 29/204 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 29/204? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.