L 29/204
L 29/204 is a live miscellaneous licence in the Shire of Menzies, Western Australia, held by Aurenne Mit Pty Ltd. Granted on 17 Oct 2024 for 21 years, it expires on 16 Oct 2045. The ground is covered by 119 historical WAMEX reports.
Register summary
- Holder
- Aurenne Mit Pty Ltd
- Local government
- Shire of Menzies
- Application received
- 10 May 2024
- Commenced
- 17 Oct 2024
- Expiry
- 16 Oct 2045
- Term
- 21 Years
The full record on L 29/204
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 16 conditions and 14 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (2 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A126129 | 2021 | Alt Resources Limited | Perrinvale | <1% | E29/0921 Perrinvale Partial Relinquishment Report period 17 November 2014 to 9 October 2020 |
| A122770 | 2020 | Ora Banda Mining | Mount Ida | <1% | Mt Ida Project C112/2001 Annual Report for the period ending 31/12/2019 |
| A124712 | 2020 | Alt Resources Limited | Quin Hills | <1% | C143/2005 Quinn Hills Project Combined Annual Report for the period ending 30/06/2020 |
| A118711 | 2019 | Alt Resources Limited | Perrinvale | <1% | E29/0921 Perrinvale Annual Report period 17 November 2017 to 16 November 2018 |
| A119089 | 2019 | Eastern Goldfields Limited | Mount Ida | <1% | Mt Ida Project - C112/2001 Annual Report for the period 1 January 2018 to 31 December 2018, E29/00640, E29/006 |
114 more reports
| A118654 | 2019 | Alt Resources Limited | Mount Ida South | <1% | E29/1016 Mount Ida South Annual Report Period 08/11/2017 - 07/11/2018 |
| A121025 | 2019 | Alt Resources Limited | Quinns | <1% | Combined Annual Technical Report Quinns Project C143/2005 for the period 1 July 2018 to 30 June 2019, E 29/649 |
| A115665 | 2018 | Latitude Consolidated Limited | Mount Ida South | <1% | Annual Report for E29/921 Mount Ida South for the period 17/11/2016 - 16/11/2017 |
| A115798 | 2018 | Eastern Goldfields Limited | Mount Ida | <1% | Mt Ida Project - C112/2001 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A112032 | 2017 | Eastern Goldfields Limited | Mount Ida | <1% | Mineral Exploration Report Mount Ida C112/2001 for the period 1 January 2016 to 31 December 2016, E29/00640... |
| A115408 | 2017 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | 45 Mile/Mt Ida M29/181 M29/182 (C12/2006) Final Surrender Report for the period 20 August 1998 to 19 August 20 |
| A108022 | 2016 | Eastern Goldfields Limited | Mount Ida | <1% | MT IDA PROJECT Mineral Exploration Report Combined Report C112/2001 For the Period 1/01/2015 – 31/12/2015, E29 |
| A104852 | 2015 | Swan Gold Mining Ltd | Mount Ida | <1% | Combined C112/2001 Mineral Exploration Report Mt Ida Project for the period 1/01/2014 – 31/12/2014, E29/640.. |
| A104676 | 2015 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Annual Report for the period 28-11-2013 to 27-11-2014 Central Yilgarn Iron Project - Mt Ida and Mt Mason C180/ |
| A107499 | 2015 | Jupiter Mines Ltd | Mount Ida | <1% | Mt Ida Magnetite Project E29/560-I Final Surrender Report for the period 08/09/2006 to 07/09/2015 |
| A101107 | 2014 | Swan Gold Mining Ltd | Mount Ida | <1% | Mineral Exploration Report Mt Ida Project Combined Report C112/2001 For the Period 1/01/2013 – 31/12/2013, E29 |
| A101594 | 2014 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Central Yilgarn Iron Project C180/2010 (Mt Ida and Mt Mason) Annual Report for the period 28/11/2012 to 27/11/ |
| A101881 | 2014 | Fe Limited; Swan Gold Mining Ltd | Mount Ida | <1% | Mount Ida Project, Final Surrender Report for the period 23/09/2008 to 22/01/2014, E29/642. |
| A102076 | 2014 | Swan Gold Mining Ltd | Mount Ida | <1% | Final Surrender Report , Mt Ida Project , E29/644, for the period 23/09/2009 to 12/02/2014. |
| A103119 | 2014 | Swan Gold Mining Ltd | Mount Ida | <1% | Surrender Report Mt Ida Project E29/644 for th period ending 12 February 2014 |
| A103808 | 2014 | Townson Holdings Pty Ltd | 45 Mile [Mt Ida] | <1% | 45 Mile [Mt Ida] Project, Annual Report for the period 20/08/2013 to 19/08/2014, M29/181 & 182. [C12/2006] |
| A99562 | 2013 | Townson Holdings Pty Ltd | 45 Mile - Mt Ida | <1% | Reporting Information for the period 20 August 1998 to 19 August 2012 Up to and Including 20 August 2012 to 19 |
| A100144 | 2013 | Wild Acre Metals Limited | Mount Ida | <1% | Final Surrender Report C175/2010 Mt Ida South Project E29/744, E29/749, E29/754 for the period ended 31 July 2 |
| A96734 | 2013 | Jupiter Mines Ltd | Central Yilgarn - Mount Ida - Mount Maso | <1% | Central Yilgarn Iron Ore Project (CYIP) Mt Ida Magnetite Project and Mt Mason DSO Hematite Project C180/2010, |
| A97708 | 2013 | Swan Gold Mining Ltd | Mount Ida | <1% | Mt Ida Project, Annual Report for the period 01/01/2012 to 31/12/2012, E29/561, 660, 640- 644, 647 & E29/659; |
| A98715 | 2013 | Wild Acre Metals Ltd | Mount Ida South | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2012 to 31st July 2013, E29/7 |
| A93077 | 2012 | Jupiter Mines Ltd | Mount Ida - Mount Mason | <1% | Annual Report for the period 28/11/10 to 27/11/2011, Central Yilgarn Iron Project - Mt Ida and Mt Mason, C180/ |
| A95369 | 2012 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2011 to 31st July 2012, E29/7 |
| A95604 | 2012 | Townson Holdings Pty Ltd | Mount Ida | <1% | Reporting Information for the period 20 August 2011 to 19 August 2012, 45 Mile Mt Ida Project M29/181, M29/182 |
| A90620 | 2011 | Swan Gold Mining Ltd | Mount Ida | <1% | E29/644 Annual Report for the period 23rd September 2009 – 22nd September 2010 |
| A91456 | 2011 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | Reporting Information for the period 20 August 2010 to 19 August 2011, 45 Mile - Mt Ida, ML 29/181, ML 29/182, |
| A91684 | 2011 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010- Mt Ida South Project 1st August 2010 to 31st July 2011, E29/744, 749, 750, |
| A90617 | 2011 | Swan Gold Mining Ltd | Mount Ida | <1% | Annual Mineral Exploration Report E29/642, 23rd September 2009 – 22nd September 2010 |
| A89288 | 2010 | Jupiter Mines Ltd | Mount Ida - Mount Mason | <1% | MounT Ida - Mount Mason Annual Report C180/2010, Period 28/11/09 to 27/11/10 |
| A85967 | 2010 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 Tenements: E29/526, 539, 559, 56 |
| A88536 | 2010 | Jupiter Mines Ltd | Mount Ida | <1% | Mount Ida Project Annual Report E29/560 Period 08/09/09 to 07/09/10 |
| A81393 | 2009 | La Mancha Resources Australia Pty Ltd | MT IDA | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008, Tenements: E29/481, 506, 526, 5 |
| A77445 | 2008 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 C112/2001 |
| A74385 | 2007 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | Mount Ida Project, C112/2001, Combined Annual Report for the Period 01/01/2007 to 31/12/2007 (Menzies) |
| A76175 | 2007 | Townson Holdings Pty Ltd | 45 Mile Well | <1% | ANNUAL REPORT for the period 20 August 2006 to 19 August 2007, 45 MILE, Mt Ida, ML29/181, ML29/182 Ref: C12/20 |
| A76309 | 2007 | Jupiter Mines Ltd | Mount Ida | <1% | Annual Exploration Report for Exploration Licence E29/560 Mt. Ida Iron Ore Project The period 8th September 20 |
| A72271 | 2006 | Mines & Resources Australia Pty Ltd | Mount Ida | <1% | Mt Ida Project, Combined Annual Report for the Period 01/01/2005 to 31/12/2005, C112/2001, (Leonora). |
| A73377 | 2006 | Townson Holdings Pty Ltd | 45 Mile Mount Ida | <1% | Annual Report for the Period 20 August 2005 to 19 August 2006, 45 Mile Mt Ida M29/181-182, Combined Reporting |
| A69701 | 2005 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 20 August 2003 to 19 August 2004, 45 Mile Project, , ML29/181,ML29/182. |
| A70249 | 2005 | International Goldfields Ltd | Mount Ida | <1% | Annual report for the period 01/01/04 - 31/12/04 Mount Ida Project, C112/2001, E29/120, 378, 385, 386, 388, E2 |
| A71502 | 2005 | Townson Holdings Pty Ltd | 45 Mile Mount Ida | <1% | Annual Report for the period 20 August 2004 to 19 August 2005, 45 Mile ML29/181, ML29/182 Originally E29/130, |
| A68646 | 2004 | International Goldfields Ltd | Mount Ida | <1% | Annual Report for the period 01/01/2003-31/12/2003 Mount Ida Project (C112/2001), E29/120, E29/385, E29/386, E |
| A68922 | 2004 | International Goldfields Ltd | Mount Ida | <1% | Mount Ida Project, Partial Surrender Report for the period 27/04/2000 to 26/04/ 2003 (3rd yr) & 27/04/2000 to |
| A66098 | 2003 | Mr Clark Pw | 52 Mile | 3.3% | Combined Annual Report for the period 1/1/2002 to 31/12/2002 52 Mile Project M29/130, M29/119 & M29/84 C50/200 |
| A66455 | 2003 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | 45 Mile - Mount Ida Project, Annual Report for the period 30 April 2002 to 29 April 2003, E29/130. |
| A66710 | 2003 | Hamill Resources Ltd | Mount Ida | <1% | Annual Report for the period 01/01/2002 to 31/12/2002 Mount Ida Project C112/2001: E29/120, 385-6, 388, 413, 4 |
| A67249 | 2003 | Gutnick Resources Nl | Four Corners | <1% | Exploration Licences: E29/141,E29/150, C351/1997 - Four Corners, Surrender Report for the period 24 January 19 |
| A64277 | 2002 | Mr Clark Pw | 52 Mile | 3.3% | Combined Annual Report for the period 1/1/2001 to 31/12/2001 52 Mile Project Mt Ida M29/130, M29/119, M29/84 C |
| A64536 | 2002 | Hamill Resources Ltd | Mount Ida | <1% | Annual Report For The Period 01/01/2001 to 31/12/2001 Mt Ida Project E29/00120, E29/00385, E29/00386, E29/0038 |
| A64636 | 2002 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30 April 2001 to 29 April 2002 45 Mile Mt Ida E29/130 Ref: M7646. |
| A65677 | 2002 | Mt Kersey Mining Nl | Four Corners | <1% | Exploration Licences: E29/141 & 150. Four Corners. Annual Report For The Period 9 August 1997 To 8 August 1998 |
| A65678 | 2002 | Gutnick Resources Nl | Four Corners | <1% | Exploration Licences: E29/141, 150. Four Corners. Joint Annual Report For The Period 9 August 1999 To 8 August |
| A61925 | 2001 | Mr Clark Pw | 52 Mile | 3.3% | Combined Annual Report for the period 1/1/2000 to 31/12/2000 52 Mile Project Mt Ida M29/130, M29/119, M29/84, |
| A62338 | 2001 | Townson Holdings Pty Ltd | 45 Mile Well [Mt Ida] | <1% | Annual Report for the period 30 April 2000 to 29 April 2001 45 Mile Mt Ida E29/130 Ref: M7646. |
| A63746 | 2001 | Gutnick Resources Nl | Four Corners | <1% | Exploration licences: E29/133-134, 141, 150 'C351/1997 - Four Corners' Joint Annual Report for the period 9 Au |
| A59581 | 2000 | Mr Clark Pw | 52 Mile-St Ida | 5.2% | Annual Report for the Period 08/12/1998 to 07/12/1999, 52 Mile -, Mt Ida Project, M29/119. |
| A60209 | 2000 | Mr Clark Pw | 52 Mile | 33% | Annual Report for the period 06/03/1999 to 05/03/2000 52 Mile Mt Ida M29/130 |
| A60606 | 2000 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period April 1999 to 29 April 2000 45 Mile Mt Ida E29/130. |
| A61042 | 2000 | Townson Holdings Pty Ltd | 45 Mile | 5.7% | Final Report for the period 1 July 1999 to 30 June 2000. 45 Mile Project, Mt Ida P29/1534, M7646/1 |
| A58057 | 1999 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report For the Period 30/04/1998 to 29/04/1999 45 Mile Mt Ida E 29/130 |
| A58513 | 1999 | Mt Kersey Mining Nl | Snake Hill | 2.7% | Exploration Licence E29/150 'Snake Hill' Partial Surrender Report for the Period 9 August to 23 December 1998. |
| A58561 | 1999 | Townson Holdings Pty Ltd | 45 Mile | 5.7% | Annual Report For the Period 1/07/1998 to 30/06/1999 P29/1534,M7646/1 |
| A59278 | 1999 | Gutnick Resources Nl | Snake Hill | 2.7% | Partial Surrender Report for the Period 9 August 1992 to 5 July 1999, Exploration Licence E29/150, Snake Hill, |
| A53546 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Copperfield Project. Annual Report for the period 28-10-96 to 27-10-97, E29/167. [Corbetts JV] |
| A53606 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Copperfield Project. Partial Relinquishment Report Covering Exploration Carried out on the Corbetts Joint Ven |
| A54080 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Annual Report - Copperfield Project, Spotted Dog Joint Venture Period Ending: 31/12/1997 M29/27, 36, 37, |
| A54438 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Copperfield Project, Timoni Joint Venture E29/155, M29/2 Annual Report, Period Ending: 31/12/97 |
| A54692 | 1998 | Townson Holdings Pty Ltd | 45 Mile | <1% | 45 Mile, Mount Ida E29/130 Annual Report 30/04/97 to 29/04/98 |
| A55259 | 1998 | Townson Holdings Pty Ltd | 45 Mile | 5.7% | 45 Mile Project, Annual Report for the period 1st July 1997 to 30th June 1998, P29/1534.[Mt Ida] |
| A56418 | 1998 | Northling Pty Ltd | Menzies diamond exploration | <1% | Annual Report to the Department of Minerals and Energy Western Australia, Exploration Licence EL 29/345 Report |
| A50358 | 1997 | Newcrest Mining Ltd | Copperfield | <1% | Report No. G650-2 Annual report for the period ending 31/12/1996 Copperfield Project Timoni Joint Venture E29/ |
| A50766 | 1997 | Cra Exploration Pty Ltd | Lake Ballard | <1% | Annual Report to 31 January 1997 on E29/141 & 150 Lake Ballard Project. |
| A50813 | 1997 | Newcrest Mining Ltd | Copperfield | <1% | Report No. G700/2 Annual Report for the period ending 31/12/1996 Copperfield Project Spotted Dog Joint Venture |
| A51383 | 1997 | Newcrest Mining Ltd | Copperfield | <1% | Annual report on exploration carried out during the period 24/4/96 to 23/4/97 Copperfield Project Pianto's Opt |
| A51526 | 1997 | Townson Holdings Pty Ltd | 45 Mile | 5.7% | Annual report for the period 1 July 1996 to 30 June 1997 45 Mile Mt Ida P29/1534 |
| A47063 | 1996 | Newcrest Mining Ltd | Copperfield | <1% | Annual report for the period ending 31/12/1995 Copperfield Project Timoni Joint Venture Reclaimed Resources E2 |
| A47196 | 1996 | Cocks Mining Nl | 52 Mile | 3.3% | 52 Mile Project Western Australia Annual report 1995 Tenement ML29/84 ML29/119 period covered 24 November 1994 |
| A49641 | 1996 | Newcrest Mining Ltd | Copperfield | <1% | Annual Report for the Period Ending 27-10-1996, Copperfield Project, Corbetts Joint Venture, E29/167 |
| A46627 | 1995 | Stockdale Prospecting Ltd | Ida | <1% | Surrender Report for tenements surrendered on 09/11/95 Ida Project E29/229-230,236-239,244,252 E30/128-130,134 |
| A47014 | 1995 | Cocks Mining Nl | Piantos South | 13% | Piantos South Project Western Australia Annual report, 1995 Tenements ML29/50 ML29/90 PL29/1466 period covered |
| A47012 | 1995 | Cocks Mining Nl | 52 Mile | 33% | 52 Mile Project Western Australia Annual report 1995 Tenement ML29/130 period covered 5 March 1994 to 6 March |
| A43523 | 1995 | Mr Cock Fj | 52 Mile | 3.3% | 52 Mile Project, Annual Report 1994, M29/84 & M29/119 for the period covered 24th November 1993 to 23rd Nove |
| A43977 | 1995 | Gold & Mineral Exploration Nl | Mt Ida-Oberwyl | <1% | Annual report for period January 1, 1994 to December 31 1994 Mount Ida - Oberwyl Project E29/120 E29/151 E29/1 |
| A44850 | 1995 | Townson Holdings Pty Ltd | 45 Mile | 5.3% | Final Report PL29/1253 45 Mile Mount Ida for the period 29 May 1994 to 28 May 1995. |
| A46308 | 1995 | Delta Gold Ltd | Lake Ballard | <1% | Lake Ballard Project ,Annual Report for the Period March 1994 to August 1995, E29/141 & 150. |
| A40480 | 1994 | Gold & Mineral Exploration Nl | Mount Ida | <1% | Annual Report for the period 01/01/93-31/12/93 Mt Ida Oberwyl Project E29/120,151,155,159 M29/02,158 P29/1206, |
| A41379 | 1994 | Delta Gold Ltd | Lake Ballard | <1% | Lake Ballard Project Annual Report for the Period February 1993 to March 1994 E29/141, 150. |
| A42836 | 1994 | Great Southern Mines Nl | Piantos Find | 24% | Piantos Find Project, Annual Report for the year ending 4th December 1994, M29/127. |
| A38447 | 1993 | Townson Holdings Pty Ltd | 45 Mile Well | <1% | Annual report for the period 30/04/92-28/05/93 45 Mile Well Project E29/130 E29/1253 |
| A38576 | 1993 | Delta Gold Ltd | Lake Ballard | <1% | Non-statutory Report : Report on Previous Nickel and Gold Exploration in the Lake Ballard Area ,Exploration Li |
| A36712 | 1992 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30/04/91-28/05/92, 45 Mile Project, E29/130 P29/1253. |
| A30916 | 1990 | Geopeko | Kings Park - Bottle Creek | <1% | Kings Park - Bottle Creek Project, Final Surrender Report for the period 08/12/1989 to 02/04/1990, M29/116. |
| A6292 | 1975 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Annual Report for the year ending 31/12/1975, MC29/2546, 2546-2550, 2492-2495, 2537-2545, 2 |
| A5589 | 1974 | Cra Exploration Pty Ltd | Kurrajong | <1% | Annual report for 1974, Kurrajong Mineral Claims, MC29/2492 ... 29/2836 |
| A4736 | 1974 | Asarco Australia Ltd | 51 Mile Well | 1.2% | 51 Mile Well Project, Final Surrender Report, April 1974, MC29/2521-2527, 2570-2578, 2585-2603, 2604-2620, 262 |
| A3571 | 1973 | Cra Exploration Pty Ltd | Kurrajong - Mount Ida | <1% | Kurrajong - Mount Ida Project, Non-statutory Report: Progress Report for the period 01/02/1972 to 31/12/1972, |
| A4482 | 1973 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Non-statutory Report:Exploratiom Report for the period 1st June 1973 to 30th November 1973, |
| A3847 | 1973 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Non-statutory Report; Progress Report for the period 1st January 1973 to 31st May 1973, TR7 |
| A12559 | 1972 | Cra Exploration Pty Ltd | Kurrajong | <1% | Geophysical Survey at Kurrajong (W.A), November, 1962 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43197 | 1753 | Archaean Gold Nl | Corbetts Bore | <1% | Corbetts Bore Project, Annual Report, 28/10/1993 to 27/10/1994,Exploration Licence 29/167. |
| A46915 | 1753 | Archaean Gold Nl | Corbetts Bore | <1% | Corbetts Bore Project, Menzies Area, WA, Annual Report 28th October 1994 to October 27th, 1995, Exploration Li |
| A50952 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual report for the period 30 April 1996 to 29 April 1997 45 Mile Mt Ida E29/130 |
| A52190 | 1753 | Mt Kersey Mining Nl | Snake Hill | <1% | Mt Kersey Mining NL Exploration licences E29/133, E29/134, E29/141, E29/150 Snake Hill C180/1994 Joint Annual |
| A79709 | 1753 | Townson Holdings Pty Ltd | 45 Mile/ Mount Ida | <1% | ANNUAL REPORT for the period 20 August 2007 to 19 August, 45 MILE, Mt Ida, ML 29/181, ML 29/182, Ref: C12/2006 |
| A84623 | 1753 | Townson Holdings Pty Ltd | 45 Mile - Mount Ida | <1% | Reporting information for the period 20 August 2008 to 19 August 2009, 45 Mile, Mount ida, ML 29/181, ML29/182 |
| A41436 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual report for the period 29/05/93-28/05/94 45 Mile Well Project E29/130 P29/1253 |
| A42248 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | 45 Mile Project, PARTIAL SURRENDER REPORT FOR THE PERIOD 29 MAY 1993 TO 28 MAY 1994, E29/130. |
| A44464 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Annual Report for the period 30 April 1994 to 29 April 1995 45 Mile Mount Ida E29/130 |
| A47926 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | Final Report for the period 30 April 1995 to 29 April 1996 45 Mile Mt Ida E29/130 |
| A79645 | 1753 | Jupiter Mines Ltd | Mount Ida | <1% | MT IDA PROJECT Annual Report E29/560 Period 08/09/07 to 07/09/08 |
| A84480 | 1753 | Jupiter Mines Ltd | MT IDA | <1% | MT IDA PROJECT Annual Report E29/560, Period 08/09/08 to 07/09/09 |
| A88118 | 1753 | Townson Holdings Pty Ltd | 45 Mile | <1% | REPORTING INFORMATION for the period 20 August 2009 to 19 August 2010 45 MILE Mt Ida ML 29/181 ML 29/182 |
| A107173 | Townson Holdings Pty Ltd | 45 Mile | <1% | REPORTING INFORMATION for the period 20 August 1998 to 19 August 2015 Up to and Including 20 August 2014 to |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 29/204 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 29/204? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.