L 37/234
Register summary
- Holder
- Emerald Resources (Wa) Pty Ltd
- Local government
- Shire of Leonora, Shire of Wiluna
- Application received
- 9 Apr 2018
- Commenced
- 7 Aug 2018
- Expiry
- 6 Aug 2039
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A122469 | 2020 | Bullseye Mining Limited | Wonganoo | 3.8% | Wonganoo C204/2011 Annual report for the period 26 October 2018 to 25 October 2019 |
| A123375 | 2020 | Toro Energy Ltd | Lake Maitland & Yandal | 3.2% | Lake Maitland Uranium Project & Yandal Gold Project Annual Technical Report, C74/2006, 1 January 2019 to 31 De |
| A123830 | 2020 | Bullseye Mining Limited | Foley's | 5.8% | E37/1243 Foley's Project Annual Report for the period ending 22/3/2020 |
| A124622 | 2020 | Bullseye Mining Limited | Wonganoo | <1% | Wonganoo E53/1611 Annual Report for the period ending 21/06/2020 |
| A125427 | 2020 | Bullseye Mining Limited | Wonganoo | 35% | E53/1880 Wonganoo Project Annual Report for the period ending 22/09/2020 |
135 more reports
| A123126 | 2020 | Bullseye Mining Limited | Dingo Range | <1% | Combined annual report for the Ding Range Project, C98/2013, for the period 1 January 2019 to 31 December 2019 |
| A123219 | 2020 | Bullseye Mining Limited | North Laverton | <1% | C65/1995 North Laverton Gold Project for the period ending 31/12/2019 |
| A123390 | 2020 | Bullseye Mining Limited | North Laverton | 8.7% | M37/1309 North Laverton Gold Project for the period ending 30/01/2020 |
| A119525 | 2019 | Bullseye Mining Limited | North Laverton | <1% | North Laverton Gold Project C65/1995 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119856 | 2019 | Bullseye Mining Limited | North Laverton | 8.7% | North Laverton Gold Project M37/1309 Annual Report for the period 31 January 2018 to 30 January 2019 |
| A120242 | 2019 | Bullseye Mining Limited | Foley's | 5.8% | E37/1243 Foley's Project Annual Report for the period 23 March 2018 to 22 March 2019 |
| A119114 | 2019 | Toro Energy Ltd | Yandal | 7.2% | Yandal Gold Project E37/1146 Annual Technical Report for the period 1 January 2018 to 31 December 2018 |
| A119520 | 2019 | Bullseye Mining Limited | Dingo Range | <1% | C98/2013 Dingo Range Annual Report for the period 1 January 2018 to 31 December 2018, E37/01018, E37/01121, E5 |
| A120676 | 2019 | Bullseye Mining Limited | Wonganoo | <1% | Annual report E53/1611 Wonganoo project for the period 22 June 2018 to 21 June 2019 |
| A121856 | 2019 | Bullseye Mining Limited | Wongnaoo | 35% | Wongnaoo E53/1880 Annual report for the period 23 September 2018 to 22 September 2019 |
| A116134 | 2018 | Bullseye Mining Limited | Wonganoo | 2.6% | Wonganoo Project C204/2011 Annual Report for the period 26 October 2016 to 27 October 2017, E53/01352, E53/013 |
| A117892 | 2018 | Bullseye Mining Limited | Wonganoo | <1% | Partial Surrender E53/1611 Wonganoo Project for the period 22/06/2017 - 21/06/2018 |
| A118218 | 2018 | Bullseye Mining Limited | Wonganoo | 35% | Wonganoo Project E53/1880 Annual Report for the period 23/09/2017 - 22/09/2018 |
| A118452 | 2018 | Bullseye Mining Limited | Wonganoo | 3.8% | C204/2011 Wonganoo Project Annual Report for the period 26 October 2017 to 25 October 2018, E53/01377, E53/013 |
| A116736 | 2018 | Bullseye Mining Limited | North Laverton | 8.7% | North Laverton Gold Project M37/01309 Annual report for the period 31 January 2017 to 30 January 2018 |
| A116207 | 2018 | Redport Exploration Pty Ltd | Wiluna | 7.2% | Wiluna Uranium Project E37/1146 Annual Technical Report for the period 24 December 2016 to 23 March 2017 |
| A116431 | 2018 | Bullseye Mining Limited | Wonganoo | 32% | Wonganoo Project E37/01124 Final Surrender for the period 12 June 2016 to 11 June 2017 |
| A116737 | 2018 | Bullseye Mining Limited | Dingo Range | <1% | Annual Report Dingo Range Project C98/2013 for the period 01/01/2017 - 31/12/2017, E37/01018, E37/01121, E53/0 |
| A117141 | 2018 | Bullseye Mining Limited | Foley's | 5.8% | Foley's Project E37/01243 Annual Report for the period 23/03/2017 to 22/03/2018 |
| A117389 | 2018 | Bullseye Mining Limited | North Laverton | <1% | North Laverton Project C65/1995 Annual Report for the period 1 January 2017 to 31 December 2017 |
| A117706 | 2018 | Bullseye Mining Limited | Wonganoo | <1% | E53/1611 Annual Report on E53/1611, Wonganoo Project, 22 June 2017 - 21 June 2018 |
| A112008 | 2017 | Toro Energy Ltd | Lake Maitland | 7.2% | Lake Maitland Uranium Project E37/1146 Annual Technical Report 1 January 2016 to 31 December 2016 |
| A112639 | 2017 | Bullseye Mining Limited | North Laverton | <1% | North Laverton Gold Project C65/1995 Annual Report for the period 01/01/2016 to 31/12/2016 |
| A112636 | 2017 | Bullseye Mining Limited | Dingo Range | <1% | Dingo Range Project C98/2013 Annual Report for the period 01/01/2016 to 31/12/2016, E37/01018, E37/01121, E53/ |
| A113853 | 2017 | Bullseye Mining Limited | Foley's | 5.8% | Foley's Project E37/01243 Annual Report for the period 23 March 2016 to 22 March 2017 |
| A115017 | 2017 | Bullseye Mining Limited | Wonganoo | <1% | E53/1611 Wonganoo Project Annual Report for the period 22 June 2016 to 21 June 2017 |
| A115263 | 2017 | Bullseye Mining Limited | Wonganoo | 35% | Wonganoo Project E53/1880 Annual Report for the period 23 September 2016 to 22 September 2017 |
| A108379 | 2016 | Toro Energy Limited | Lake Maitland | 7.2% | E37/1146 - Lake Maitland Annual Technical Report 24 December 2014 to 23 December 2015 |
| A108822 | 2016 | Bullseye Mining Limited | North Laverton | 2.4% | Combined Annual Report North Laverton Group Number: C65/1995 Tenements: E37/901, E37/1208, E37/1015, E37/1017, |
| A109051 | 2016 | Bullseye Mining Limited | North Laverton | 1.5% | North Laverton Project Partial Surrender Report Tenement E37/1017 (Part of Reporting Group C65/1995) Reporting |
| A107743 | 2016 | Inca Minerals Ltd | Dingo Range | 11% | Annual Report for C204/2011 Dingo Range for the period 26 October 2014 to 25 October 2015, E37/01124, E53/0135 |
| A110369 | 2016 | Bullseye Mining Limited | North Laverton | <1% | North Laverton Gold Project Partial Surrender E37/1018 For the Period 30 July 2014 to 26 October 2016 |
| A108819 | 2016 | Bullseye Mining Limited | Dingo Range | <1% | Combined Annual Report Dingo Range Project Group Number: C98/2013 Tenements: E37/1018, E37/1121, E53/1482 Repo |
| A109512 | 2016 | Bullseye Mining Limited | Wonggannoo | <1% | E53/01611 Wonggannoo Project Annual Report for the period 22 June 2015 to 21 June 2016 |
| A110272 | 2016 | Bullseye Mining Limited | Boundary North | 8% | Partial Surrender Report E37/1050 Boundary North, For the Period 27 August 2015 to 26 August 2016 |
| A110498 | 2016 | Bullseye Mining Limited | Wonganoo | 11% | Wonganoo Project C204/2011 Annual Report for the period 26 October 2015 to 25 October 2016, E37/01124, E53/013 |
| A106417 | 2015 | Bullseye Mining Limited | North Laverton | 2.5% | Combined Annual Report North Laverton Group Number: C65/1995 Tenements: E37/901, E37/1015, E37/1017, E37/1050, |
| A105528 | 2015 | Inca Minerals Ltd | Dingo Range | 6.7% | Partial Surrender Report E53/1380 Dingo Range for the period 06/01/2009 to 05/01/2015 |
| A104462 | 2015 | Inca Minerals Ltd | Dingo Range | 9.5% | DINGO RANGE PROJECT ANNUAL EXPLORATION REPORT Combined Reporting Group C204/2011 E37/975, E37/1124, E53/1352, |
| A104752 | 2015 | Toro Energy Ltd | Lake Maitland | 7.2% | E37/1146 Lake Maitland Annual Report for period 24th December 2013 to 23rd December 2014 |
| A105873 | 2015 | Inca Minerals Ltd | Dingo Range | 4.4% | Dingo Range E37/975 Surrender Report for the period 8th September 2009 to 7th April 2015 |
| A106634 | 2015 | Cullen Exploration Pty Ltd | Wonganoo | <1% | Wonganoo Project E53/01611 Annual Report for the period 22/06/2014 to 21/06/2015 |
| A106979 | 2015 | Bullseye Mining Limited | Dingo Range | <1% | Combined Annual Report Dingo Range Project C98/2013, E37/1018, E37/1121, E53/1482 Reporting Period: 1st Januar |
| A102033 | 2014 | Melrose Gold Mines Ltd | Melrose - Wonganoo | 2.5% | Melrose - Wonganoo Project C 65/1995 Annual Report Year Ending 31 December 2013, E37/901, E 37/1015, E 37/1017 |
| A100607 | 2014 | Inca Minerals Ltd | Dingo Range | 1.6% | DINGO RANGE PROJECT ANNUAL MINERAL EXPLORATION REPORT Combined Reporting Group C204/2011 E53/1352, E53/1377, E |
| A101799 | 2014 | Independence Group Nl | Dingo Range | <1% | ANNUAL REPORT ON C98/2013 DINGO RANGE PROJECT, FOR THE PERIOD 01 JANUARY 2013 TO 31 DECEMBER 2013, E53/1482; E |
| A102875 | 2014 | Cullen Resources Ltd | Wonganoo | <1% | WONGANOO PROJECT NORTH EAST GOLDFIELDS, W.A. E 53/1611 ANNUAL REPORT For the Period 22nd June 2013 to 21st Jun |
| A99516 | 2013 | Melrose Gold Mines Ltd | Melrose | 3% | Annual Report Year Ending 31 December 2012 Group Number: C 65/1995 Group Name: Melrose Tenements: E 37/1015, E |
| A96477 | 2013 | Inca Minerals Ltd | Dingo Range | 1.6% | Dingo Range Project Annual Mineral Exploration Joint Report Combined Project Number 204/2011 for the period 26 |
| A98882 | 2013 | Cullen Exploration Pty Ltd | Wonganoo - Dingo Range Central | <1% | Wonganoo Project E 53/1611 Annual Report for the period 22nd June 2012 to 21st June 2013 |
| A93727 | 2012 | Hemisphere Resources Ltd | Melba Bore | 15% | E37/1065, MELBA BORE, Final Surrender Report for the year ended 7th March 2012 |
| A89859 | 2011 | Korab Resources Ltd | Melrose | 37% | C 65-1995 Melrose Project E37/794, M37/108, M37/519, M37/1167 Combined Annual Report Year Ending 31 December 2 |
| A90890 | 2011 | Uranium Australia Ltd | Wonganoo | 1.5% | Wonganoo Project E37/1017 Annual Report Year Ending 11 April 2011 |
| A92711 | 2011 | Egf Nickel | Mount Mundy | <1% | First Annual Technical Report Mt Mundy Project E37/1018 Period 1st October 2010 – 30th of September 2011 |
| A93591 | 2011 | Melrose Gold Mines Ltd | Melrose | 3% | Annual Report Year Ending 31 December 2011 Group Number: C 65/1995 Group Name: Melrose Tenements: E 37/1015, E |
| A90165 | 2011 | Condor Metals Ltd | Dingo Range | 6.7% | Dingo Range Project, Annual Report for the period 6th January 2010 to 5th January 2011, E53/1380. |
| A92437 | 2011 | Condor Metals Ltd | Dingo Range | 1.6% | Annual report for the period 26 October 2010 to 25 October 2011, Dingo Range Project, C204/2011, E37/975, E53/ |
| A87323 | 2010 | Cullen Resources Ltd | Stirling | 15% | Stirling Project, North East Goldfields, W.A. Final Surrender Report For the Period 10th July 2008 to 9th July |
| A86197 | 2010 | Condor Nickel Ltd | Dingo Range | 6.7% | E53/1380: Dingo Range, Annual Report for period 6 January 2009 to 5 January 2010 |
| A86671 | 2010 | Korab Resources Ltd | Melrose | 11% | Melrose Project E37/769, E37/794, M37/108, M37/519, M37/1167, C65/1995 Combined Annual Report Year Ending 31 D |
| A87270 | 2010 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project Final Surrender Report for the period 2nd July 2003 to 16th February 2010 |
| A88214 | 2010 | Condor Nickel Ltd | Dingo Range | 4.4% | E37/975 Annual Report for the period 8 September 2009 to 7 September 2010 |
| A82135 | 2009 | Korab Resources Ltd | Melrose | 11% | Melrose Project E37/769, E37/794, M37/108, M37/519, M37/1167 Combined Annual Report Year Ending 31 December 20 |
| A84216 | 2009 | Cullen Exploration Pty Ltd | STIRLING | 15% | Stirling Project E37/851, Mineral Exploration Report, for the period 10th July 2008 to 9th July 2009 |
| A84258 | 2009 | Korab Resources Ltd | MELROSE | 2.5% | Melrose Project E37/769 Partial Surrender Report for the Period Ended 19 May 2009 |
| A84217 | 2009 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project E53/1046 Annual Technical Report For the Period 25th September 2008 to 26th September 2009 |
| A77978 | 2008 | Korab Resources Ltd | Melrose | 2.5% | PARTIAL SURRENDER REPORT, E37/769 Period ended 30 May 2007 |
| A79284 | 2008 | Cullen Exploration Pty Ltd | Stirling | 15% | MINERAL EXPLORATION REPORT For the Period 10th July 2007 to 9th July 2008 |
| A79117 | 2008 | Korab Resources Ltd | Melrose Project | <1% | Korab Resources Limited Melrose Project E53/1261 Technical Report Year Ending 12 March 2008 |
| A77815 | 2008 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project North East Goldfields, WA Mineral Exploration Report For the period 28 July 2007 to 31 Decemb |
| A77816 | 2008 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project, North East Goldfields, W.A Partial Surrender Report For the Period 29th July 2002 to 7th Jan |
| A77980 | 2008 | Korab Resources Ltd | Melrose | 11% | Combined Annual Report Year Ending 31 December 2007 |
| A75048 | 2007 | Korab Resources Ltd | Melrose | 11% | Combined Annual Report year ending 31 December 2006 E37/769, E37/794, M37/108, M37/519, M37/1167 Melrose Proje |
| A75893 | 2007 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project North East Goldfields, W.A. Annual Technical Report for the Period 29 July 2006 to 28 July 20 |
| A73837 | 2006 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project E53/1046 Partial Surrender Report for the Period 29/07/03 - 28/07/06 Report No.NEG/WO/06/4 (S |
| A71650 | 2006 | Korab Resources Ltd | Melrose | 2.5% | Melrose Project, Annual Report E37/769, Year ended 23 September 2005, (Sir Samuel). |
| A72769 | 2006 | Korab Resources Ltd | Melrose | 45% | Annual Report, 31 March 2005 to 30 June 2006, E37/794 Melrose Project, (Sir Samuel). |
| A73449 | 2006 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project (E53/1046), Annual Technical Report, For the Period 29 July 2005 to 28 July 2006, (Cullen Rep |
| A71267 | 2005 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project, North East Goldfields, W.A. Annual technical report for the period 29 July 2004 to 28 July 2 |
| A69648 | 2004 | Cullen Exploration Pty Ltd | Wonganoo | 2.8% | Wonganoo Project, Annual Report E53/1046 for the period 29 July 2003 to 28 July 2004. |
| A66325 | 2003 | Julia Corporation Ltd | Dingo Range | 4.6% | Dingo Range (JV) Project, Annual Report for year ended 31 December 2002 [C65/1995] : E37/204, 273, 328, 329, M |
| A66920 | 2003 | Deep Yellow Ltd | Dingo Range | 8.4% | Combined Final Report C65/1995: M37/517-518,520, E37/273,329 Dingo Range Project |
| A66327 | 2003 | Julia Corporation Ltd | Dingo Range | 1.1% | Annual Report for the period ended 18th November 2002 Dingo Range Project E37/489 |
| A67041 | 2003 | Deep Yellow Ltd | Dingo Range | 1.1% | Final Report for the period ended 9 April 2003 E37/489 Dingo Range Project |
| A64494 | 2002 | Julia Corporation Ltd | Dingo Range | <1% | Exploration Licence: E53/483. Dingo Range Project. Report For The Year Ended 4th December 2001. |
| A64492 | 2002 | Julia Corporation Ltd | Dingo Range | 1.1% | Exploration Licence E37/489. Dingo Range Project Annual Report For The Period Ended 18th November 2001. |
| A64493 | 2002 | Julia Corporation Ltd | Dingo Range | 1.1% | Exploration Licence E37/489 Dingo Range Project. Partial Surrender Report. Surrender Date 28/11/01. |
| A64490 | 2002 | Julia Corporation Ltd | Dingo Range | 6.7% | Dingo Range E37/204 Surrender Report. Surrender Date 31 October 2001. WADME REF: M7165/1 |
| A64499 | 2002 | Julia Mines Nl | Dingo Range | 4.6% | Dingo Range Project, Annual Report For Year Ended 31 December, 2001. [[ C65/1995], E37/273, E37/204, E37/328, |
| A62373 | 2001 | Forrestania Gold Nl | Wanganoo Creek | 11% | Annual Report for the period 7 April 2000 to 6 April 2001, E53/441, Wanganoo Creek (JV) Project. |
| A62601 | 2001 | Normandy Yandal Operations Ltd | Bronzewing | 1.1% | Combined Annual Report On Exploration For Period 20/02/2000 To 19/02/2001. Project C176-1997 Bronzewing M36/26 |
| A62918 | 2001 | Julia Mines Nl | Dingo Range | <1% | Exploration Licence E53/483, Dingo Range Project, Annual Report for the Period ended 4th December 2000. |
| A62177 | 2001 | Julia Mines Nl | Dingo Range | 4.6% | Dingo Range 2000 Combined Annual Report for the year ended 31 December 2000 E37/204, E37/273, E37/328, E37/329 |
| A62411 | 2001 | Normandy Yandal Operations Ltd | Eclipse Well | 9.8% | Final Report On Exploration For Period 18/04/1994 to 12/04/2001 Project E37/336 Eclipse Well. Reference: e37-3 |
| A62917 | 2001 | Julia Mines Nl | Dingo Range | 1.1% | Dingo Range Project, Annual Report for the period ending 18th November 2000, E37/489. |
| A60204 | 2000 | Julia Mines Nl | Dingo Range | 1.1% | Exploration Licence E37/489 Dingo Range Project Annual Report for Period of November 1998 to November 1999 |
| A60202 | 2000 | Julia Mines Nl | Dingo Range | <1% | Mining Licence E53/483 Dingo Range Project Two Year Report for December 1997 to December 1998. |
| A60905 | 2000 | Forrestania Gold Nl | Wanganoo Creek | 11% | Annual Report for the period 7th April 1999 to 6th April 2000, E53/441, Wanganoo Creek(JV) Project. |
| A60326 | 2000 | Great Central Mines Ltd | Bronzewing | 1.1% | Exploration licences E36/161, E37/252,283,336, E53/224,284, 304,305,387,394,573, M36/3263,295,312,318-323,M37/ |
| A60496 | 2000 | Julia Mines Nl | Dingo Range | 4.6% | Dingo Range 1999 Combined Annual Report for the Year ending 31/12/1999.(E37/204,273,321,328,329, M37/108,517-5 |
| A58562 | 1999 | Julia Mines Nl | Dingo Range | 4.6% | Dingo Range 1998 Combined Annual Report E37/204,273,328-329,517-520, P37/5046,5145,5285 Year End 13/12/1998 |
| A58430 | 1999 | Forrestania Gold Nl | Wanganoo Creek | 11% | Partial Surrender Report , E53/441, Wanganoo Creek (JV) Project. |
| A58178 | 1999 | Great Central Mines Ltd | Eclipse Well | 9.8% | Eclipse Well Project, Partial Surrender Report for the period ending 18th April 1994 to 29th December 1998, E3 |
| A58338 | 1999 | Forrestania Gold Nl | Wanganoo Creek | 11% | Annual Report for the period 7 April 1998 to 6 April 1999, E53/441, Wanganoo Creek (JV) Project. |
| A58870 | 1999 | Great Central Mines Ltd | Bronzewing | 1% | Exploration Licences E36/161 E37/252,283,336 E53/224,284,304-305,387,394,573 Mining Licences M36/263,295, 312, |
| A54842 | 1998 | Great Central Mines Ltd | Bronzewing | 1% | Bronzewing Project. Great Central Mines Ltd. Joint Annual report for the period 20/02/97 to 19/02/98. E36/161, |
| A55553 | 1998 | Forrestania Gold Nl | Wanganoo Creek | 11% | Annual Report for the period 7 April 1997 to 6 April 1998, E53/441, Wanganoo Creek (JV) Project. |
| A53491 | 1998 | Great Central Mines Ltd | Eclipse Well | 9.8% | Eclipse Well Project,Partial Surrender Report for the period 18/04/1994-05/12/1997, E37/336. |
| A55103 | 1998 | Julia Mines Nl | Dingo Range | 4.6% | Dingo Range Project, Annual Report Year Ended: 31/12/1997 E37/204, 273, 328-329, M37/517-520, P37/5046, 5245, |
| A54308 | 1998 | Julia Mines Nl | Dingo North | <1% | Annual Report year ended 4th December 1997 exploration licence 53/483, Dingo North Project. |
| A51254 | 1997 | Eagle Mining Corp Nl | Dingo Range North | <1% | 1996 Annual Report for the year ending 4th December 1996 Dingo Range North - E53/483. |
| A50985 | 1997 | Eagle Mining Corp Nl | Dingo Range | 4.6% | 1996 Combined Annual report E37/204 E37/273 E37/328 E37/329 M37/517 M37/518 M37/519 M37/520 P37/5046 P37/5145 |
| A52215 | 1997 | Forrestania Gold Nl | Wanganoo Creek | 11% | Annual Report for the period 8 April 1996 to 7 April 1997, E53/441, Wanganoo Creek (JV) Project. |
| A48268 | 1996 | Abador Gold Nl | Wanganoo Creek | 11% | E53/441, Wanganoo Creek Project, Annual Report for the period April 1995 to April 1996. |
| A47361 | 1996 | Julia Mines Nl | Dingo Range | 4.6% | Dingo Range (JV)Project, Annual Rreport 1st January to 31st December 1995 All tenements E37/204 E37/273 E37/3 |
| A46300 | 1995 | Abador Gold Nl | Wanganoo Creek | 11% | E53/441, Wanganoo Creek Project, Annual Report for the period April 1994 to April 1995. |
| A42138 | 1994 | Julia Mines Nl | Dingo Range | 6.7% | Annual Report for the period 27/06/93-26/06/94 Dingo Range Project E37/204 |
| A43246 | 1994 | Dominion Mining Ltd | Violet | 9.8% | Annual Report ,'Violet Project' ,Eclipse Well E37/336 for the period 18 April 1994 to 31 October 1994. |
| A46103 | 1994 | Thornsail Prospecting Pty Ltd | Barwidgee | 23% | Barwidgee Project, Annual Report for the period 01/09/1994 to 01/09/1995, E37/348. |
| A41618 | 1994 | Abador Gold Nl | Wanganoo Creek | 11% | E53/441, Wanganoo Creek Project, Annual Report for the period April 1993 to April 1994. |
| A39180 | 1993 | Julia Mines Nl | Dingo Range | 6.7% | Annual report for the period 27/06/92-26/06/93 Dingo Range Project E37/204 |
| A34646 | 1991 | Hunter Resources Ltd | Dingo Range | 6.7% | Annual exploration report for period ended 26/06/91 Dingo Range - E37/204 |
| A7671 | 1978 | Western Mining Corporation Limited | Dingo Range | 3.4% | Dingo Range (JV) Project, Non-statutory Report: Terminal Report for the period 01/12/1973 to 30/06/1975, MC37/ |
| A4221 | 1973 | Amalgamated Petroleum Nl | Wonganoo | <1% | Wonganoo Project, Annual Report for the period 27th November 1972 to 26th November 1973, TR70/4545H. |
| A2116 | 1972 | Amalgamated Petroleum Nl | Wonganoo | <1% | Wonganoo Project, Annual Report for the period 27th November 1970 to 26th November 1971, TR70/4545H. |
| A2117 | 1972 | Amalgamated Petroleum Nl | Wonganoo | <1% | Wonganoo Project, Annual Report for the period 27th November 1970 to 26th November 1971, TR70/4545H. |
| A3279 | 1972 | Amalgamated Petroleum Nl | Wonganoo | <1% | Wonganoo Project, Annual Report for the year ending 26th November 1972, TR70/4545H. |
| A1 | 1970 | Minops Pty Ltd | Wonganoo | <1% | Wonganoo Project, Annual Report for the period ending 26th November 1970, TR70/4545H. (Areas :- Dingo Range; K |
| A161 | 1970 | Amalgamated Petroleum Nl | Wonganoo - Johnny Walker | <1% | Wonganoo - Johnny Walker Project, Annual Report for year ending 31/12/1969, TR70/4545H. |
| A162 | 1970 | Amalgamated Petroleum Nl | Wonganoo - Johnny Walker | <1% | Wonganoo - Johnny Walker Project, Non-statutory Report: Report on Regional Mapping, January 1970, TR70/4545H. |
| A2739 | 1970 | Swiss Aluminium Mining Aust Pty Ltd | North Yandal | 1% | North Yandal Project, Non-statutory Report: Brief Exploration Report, December 1970. |
| A160 | 1969 | Amalgamated Petroleum Nl | Wonganoo - Johnny Walker | <1% | Wonganoo - Johnny Walker Project, Annual Report for period 06/11/1968 to 05/11/1969, TR70/4545H. |
| A1527 | 1968 | Cra Exploration Pty Ltd | Lake Maitland - Barwidgee | <1% | Lake Maitland - Barwidgee Project, Annual Report for the period 30/05/1966 to 13th July 1967, TR70/3759H. |
| A51382 | 1753 | Great Central Mines Nl | Eclipse Well | 9.8% | Exploration Licence E37/336, 'Eclipse Well' ,Annual report for the period 18 April 1996 to 17 April 1997. |
| A96693 | 1753 | Independence Group Nl | Mount Mundy | <1% | Annual Technical Report Mt Mundy Project E37/1018 Period 1st October 2011 – 30th of September 2012 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 13 years · 6 Aug 2039
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 37/234 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 37/234? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.