L 37/238
L 37/238 is a live miscellaneous licence in the Shire of Leonora, Western Australia, held by Darlot Mining Company Pty Ltd (part of Vault Minerals Limited). Granted on 28 Mar 2024 for 21 years, it expires on 27 Mar 2045. The ground is covered by 121 historical WAMEX reports.
Register summary
- Holder
- Darlot Mining Company Pty Ltd
- Part of
- Vault Minerals Limited (ASX:VAU) as at 2026-06-30
- Local government
- Shire of Leonora, Shire of Wiluna
- Application received
- 17 May 2018
- Commenced
- 28 Mar 2024
- Expiry
- 27 Mar 2045
- Term
- 21 Years
The full record on L 37/238
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 7 conditions and 13 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (5 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A137514 | 2023 | Northern Star Resources Ltd | Yandal East | <1% | Final Surrender Report on E37/1313, Yandal East Project, for the period 2 November 2017 to 16 October 2023 |
| A123126 | 2020 | Bullseye Mining Limited | Dingo Range | <1% | Combined annual report for the Ding Range Project, C98/2013, for the period 1 January 2019 to 31 December 2019 |
| A123375 | 2020 | Toro Energy Ltd | Lake Maitland & Yandal | 20% | Lake Maitland Uranium Project & Yandal Gold Project Annual Technical Report, C74/2006, 1 January 2019 to 31 De |
| A123785 | 2020 | Northern Star Resources Ltd | Yandal East | <1% | Combined annual report for the Yandal East Project, C68/2005 (E36/593, E36/673, E36/900, E37/846–848, E37/1200 |
| A125427 | 2020 | Bullseye Mining Limited | Wonganoo | <1% | E53/1880 Wonganoo Project Annual Report for the period ending 22/09/2020 |
116 more reports
| A122469 | 2020 | Bullseye Mining Limited | Wonganoo | <1% | Wonganoo C204/2011 Annual report for the period 26 October 2018 to 25 October 2019 |
| A119520 | 2019 | Bullseye Mining Limited | Dingo Range | <1% | C98/2013 Dingo Range Annual Report for the period 1 January 2018 to 31 December 2018, E37/01018, E37/01121, E5 |
| A121856 | 2019 | Bullseye Mining Limited | Wongnaoo | <1% | Wongnaoo E53/1880 Annual report for the period 23 September 2018 to 22 September 2019 |
| A119114 | 2019 | Toro Energy Ltd | Yandal | 45% | Yandal Gold Project E37/1146 Annual Technical Report for the period 1 January 2018 to 31 December 2018 |
| A120087 | 2019 | Echo Resources Limited | East Yandal | <1% | Annual Report for the East Yandal Project, C68/2005, for the period ending 28 February 2019 and commencing 23 |
| A118090 | 2018 | Echo Resources Limited | East Yandal | <1% | Annual Report for the East Yandal Project, E36/900, & E37/1313, for the period 2 November 2017 to 21 November |
| A116207 | 2018 | Redport Exploration Pty Ltd | Wiluna | 45% | Wiluna Uranium Project E37/1146 Annual Technical Report for the period 24 December 2016 to 23 March 2017 |
| A116134 | 2018 | Bullseye Mining Limited | Wonganoo | <1% | Wonganoo Project C204/2011 Annual Report for the period 26 October 2016 to 27 October 2017, E53/01352, E53/013 |
| A118218 | 2018 | Bullseye Mining Limited | Wonganoo | <1% | Wonganoo Project E53/1880 Annual Report for the period 23/09/2017 - 22/09/2018 |
| A118452 | 2018 | Bullseye Mining Limited | Wonganoo | <1% | C204/2011 Wonganoo Project Annual Report for the period 26 October 2017 to 25 October 2018, E53/01377, E53/013 |
| A116431 | 2018 | Bullseye Mining Limited | Wonganoo | 5.3% | Wonganoo Project E37/01124 Final Surrender for the period 12 June 2016 to 11 June 2017 |
| A116737 | 2018 | Bullseye Mining Limited | Dingo Range | <1% | Annual Report Dingo Range Project C98/2013 for the period 01/01/2017 - 31/12/2017, E37/01018, E37/01121, E53/0 |
| A111969 | 2017 | Bullseye Mining Limited | Wonganoo | <1% | Partial Surrender E53/1482 Wonganoo Project for the period 18 November 2015 to 17 November 2016 |
| A112636 | 2017 | Bullseye Mining Limited | Dingo Range | <1% | Dingo Range Project C98/2013 Annual Report for the period 01/01/2016 to 31/12/2016, E37/01018, E37/01121, E53/ |
| A115263 | 2017 | Bullseye Mining Limited | Wonganoo | <1% | Wonganoo Project E53/1880 Annual Report for the period 23 September 2016 to 22 September 2017 |
| A112008 | 2017 | Toro Energy Ltd | Lake Maitland | 45% | Lake Maitland Uranium Project E37/1146 Annual Technical Report 1 January 2016 to 31 December 2016 |
| A107743 | 2016 | Inca Minerals Ltd | Dingo Range | 1.4% | Annual Report for C204/2011 Dingo Range for the period 26 October 2014 to 25 October 2015, E37/01124, E53/0135 |
| A108379 | 2016 | Toro Energy Limited | Lake Maitland | 45% | E37/1146 - Lake Maitland Annual Technical Report 24 December 2014 to 23 December 2015 |
| A109594 | 2016 | Toro Energy Ltd | Lake Maitland | 7.2% | Lake Maitland E37/1145 Annual Technical Report for the period 28/06/2015 to 27/06/2016 |
| A110070 | 2016 | Toro Energy Ltd | Lake Maitland | 7.2% | E37/1145 Final Surrender Report Lake Maitland Uranium Project For the Period 28 June 2013 to 31 August 2016 |
| A110498 | 2016 | Bullseye Mining Limited | Wonganoo | 1.4% | Wonganoo Project C204/2011 Annual Report for the period 26 October 2015 to 25 October 2016, E37/01124, E53/013 |
| A108819 | 2016 | Bullseye Mining Limited | Dingo Range | <1% | Combined Annual Report Dingo Range Project Group Number: C98/2013 Tenements: E37/1018, E37/1121, E53/1482 Repo |
| A105528 | 2015 | Inca Minerals Ltd | Dingo Range | <1% | Partial Surrender Report E53/1380 Dingo Range for the period 06/01/2009 to 05/01/2015 |
| A106289 | 2015 | Toro Energy Ltd | Lake Maitland | 1.3% | Annual Mineral Exploration Report Lake Maitland Combined Reporting C74/2006 January 1st to December 31st 2014 |
| A106979 | 2015 | Bullseye Mining Limited | Dingo Range | <1% | Combined Annual Report Dingo Range Project C98/2013, E37/1018, E37/1121, E53/1482 Reporting Period: 1st Januar |
| A104752 | 2015 | Toro Energy Ltd | Lake Maitland | 45% | E37/1146 Lake Maitland Annual Report for period 24th December 2013 to 23rd December 2014 |
| A106186 | 2015 | Toro Energy Ltd | Wiluna - Lake Maitland | 15% | Final Surrender Report E37/970, E37/971 29/12/2008 – 11/03/2015 Combined Reporting No C74/2006 |
| A106674 | 2015 | Toro Energy Limited | Lake Maitland | 7.2% | Annual Report on Lake Maitland E37/1145 for period 28th June 2014 to 27th June 2015 |
| A104462 | 2015 | Inca Minerals Ltd | Dingo Range | 1.2% | DINGO RANGE PROJECT ANNUAL EXPLORATION REPORT Combined Reporting Group C204/2011 E37/975, E37/1124, E53/1352, |
| A100607 | 2014 | Inca Minerals Ltd | Dingo Range | <1% | DINGO RANGE PROJECT ANNUAL MINERAL EXPLORATION REPORT Combined Reporting Group C204/2011 E53/1352, E53/1377, E |
| A101127 | 2014 | Mega Uranium Ltd; Toro Energy Ltd | Lake Maitland | 2.4% | Lake Maitland Project, Annual Report for the period 01/01/2013 to 31/12/2013, E37/970-971; E53/1060, 1099, 121 |
| A101799 | 2014 | Independence Group Nl | Dingo Range | <1% | ANNUAL REPORT ON C98/2013 DINGO RANGE PROJECT, FOR THE PERIOD 01 JANUARY 2013 TO 31 DECEMBER 2013, E53/1482; E |
| A103238 | 2014 | Toro Energy Ltd | Lake Maitland | 7.2% | Annual Report E37/1145 Lake Maitland Project For Period 28th June 2013 to 27th June |
| A101177 | 2014 | Toro Energy Ltd | Wiluna - Lake Maitland | 15% | Wiluna Uranium Project – Lake Maitland Sub-project C74/2006 Partial Surrender Report E37/970 and E37/971 for t |
| A96477 | 2013 | Inca Minerals Ltd | Dingo Range | <1% | Dingo Range Project Annual Mineral Exploration Joint Report Combined Project Number 204/2011 for the period 26 |
| A96966 | 2013 | Independence Group Nl | Wonganoo | <1% | Wonganoo Project, Annual Report for the period 18th November 2011 to 17th November 2012, E53/1482. |
| A98129 | 2013 | Enterprise Metals Ltd | Yandal Homestead | <1% | Yandal Homestead Project, Final Surrender Report for the period 30th April 2012 to 29th April 2013, E37/1117. |
| A98584 | 2013 | Egf Nickel | Mundy | <1% | Annual Technical Report for the Mundy Project, E37/1121 for the period 23rd April 2012 – 22nd April 2013 |
| A97270 | 2013 | Mega Uranium Ltd | Lake Maitland | 2.1% | Lake Maitland Uranium Project East Murchison, Western Australia Combined Annual Report on Exploration for the |
| A93110 | 2012 | Independence Group Nl | Wonganno - Dingo Range | <1% | Annual Mineral Exploration Report Dingo Range JV Wonganoo Project E53/1482 17/01/11 – 16/01/2012 |
| A92880 | 2012 | Mega Uranium Ltd | Lake Maitland | 2.4% | Lake Maitland Project, Annual Report for the period 1st January 2011 to 31st December 2011, E37/895, 970-971; |
| A93727 | 2012 | Hemisphere Resources Ltd | Melba Bore | 71% | E37/1065, MELBA BORE, Final Surrender Report for the year ended 7th March 2012 |
| A89859 | 2011 | Korab Resources Ltd | Melrose | 19% | C 65-1995 Melrose Project E37/794, M37/108, M37/519, M37/1167 Combined Annual Report Year Ending 31 December 2 |
| A91677 | 2011 | Venture Minerals Ltd | Devine | 16% | Exploration Licence 37/772, Final Surrender Report for the period 5/07/2004 to 4/07/2011 (Devine). |
| A90165 | 2011 | Condor Metals Ltd | Dingo Range | <1% | Dingo Range Project, Annual Report for the period 6th January 2010 to 5th January 2011, E53/1380. |
| A90322 | 2011 | Echo Resources Ltd | Maitland | <1% | Maitland Project, Final Surrender Report for the period 5th April 2006 to 4th April 2011, E37/822. |
| A92437 | 2011 | Condor Metals Ltd | Dingo Range | <1% | Annual report for the period 26 October 2010 to 25 October 2011, Dingo Range Project, C204/2011, E37/975, E53/ |
| A86671 | 2010 | Korab Resources Ltd | Melrose | 4.6% | Melrose Project E37/769, E37/794, M37/108, M37/519, M37/1167, C65/1995 Combined Annual Report Year Ending 31 D |
| A86720 | 2010 | Mega Uranium Ltd | Lake Maitland | 2.4% | Combined Annual Report on Exploration for the period ended 31 December 2009, Lake Maitland Project C74/2006, E |
| A87323 | 2010 | Cullen Resources Ltd | Stirling | 70% | Stirling Project, North East Goldfields, W.A. Final Surrender Report For the Period 10th July 2008 to 9th July |
| A86197 | 2010 | Condor Nickel Ltd | Dingo Range | <1% | E53/1380: Dingo Range, Annual Report for period 6 January 2009 to 5 January 2010 |
| A86929 | 2010 | Echo Resources Ltd | Maitland | <1% | Annual Report on Exploration for the period 5 April 2009 to 4 April 2010 E37/822 (Maitland Project) |
| A87270 | 2010 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project Final Surrender Report for the period 2nd July 2003 to 16th February 2010 |
| A88019 | 2010 | Venture Minerals Ltd | Devine | 16% | Exploration Licence 37/772, Annual Report for the period 5/07/2009 to 4/07/2010 |
| A89533 | 2010 | Mega Uranium Ltd | Lake Maitland | 2.4% | Combined Annual Report on Exploration for the period ended 31 December 2010, lake Maitland Project, East Murch |
| A81362 | 2009 | Korab Resources Ltd | Melrose | 9.5% | Melrose Project E37/872 Annual Report Year Ending 20 September 2008 |
| A84216 | 2009 | Cullen Exploration Pty Ltd | STIRLING | 70% | Stirling Project E37/851, Mineral Exploration Report, for the period 10th July 2008 to 9th July 2009 |
| A84542 | 2009 | Venture Minerals Ltd | Stirling Peaks | 16% | Maitland Channel Project, Exploration Licence 37/772, Partial Surrender Report for the period 5/7/2004 to 4/07 |
| A84543 | 2009 | Venture Minerals Ltd | Devine & Stirling Peaks | 16% | Devine & Stirling Peaks Project, Exploration Licence 37/772, Annual Report for the period 5/7/2008 to 4/07/200 |
| A82135 | 2009 | Korab Resources Ltd | Melrose | 4.6% | Melrose Project E37/769, E37/794, M37/108, M37/519, M37/1167 Combined Annual Report Year Ending 31 December 20 |
| A82360 | 2009 | Echo Resources Ltd | MAITLAND | <1% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 5 April 2008 TO 4 April 2009 E37/822 (MAITLAND PROJECT) |
| A84001 | 2009 | Venture Minerals Ltd | MAITLAND CHANNEL | 40% | MAITLAND CHANNEL PROJECT - Exploration Licence 37/863, Final Report for the period 12/04/2007 to 11/04/2009 |
| A84217 | 2009 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project E53/1046 Annual Technical Report For the Period 25th September 2008 to 26th September 2009 |
| A79284 | 2008 | Cullen Exploration Pty Ltd | Stirling | 70% | MINERAL EXPLORATION REPORT For the Period 10th July 2007 to 9th July 2008 |
| A79885 | 2008 | Venture Minerals Ltd | Devine | 16% | Exploration Licence 37/772, Annual Technical Report for the period 05/07/2007 to 04/07/2008 |
| A77816 | 2008 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project, North East Goldfields, W.A Partial Surrender Report For the Period 29th July 2002 to 7th Jan |
| A79117 | 2008 | Korab Resources Ltd | Melrose Project | 15% | Korab Resources Limited Melrose Project E53/1261 Technical Report Year Ending 12 March 2008 |
| A79171 | 2008 | Venture Minerals Ltd | Devine | 16% | :Devine Project, Ecploration Licence 37/772, Partial Surrender Report for the period 05/07/2007 to 04/07/2008 |
| A77634 | 2008 | Venture Minerals Ltd | Devine | 16% | Devine Project-Partial Surrender Report for period 05/07/2006 to 04/07/2007. Exploration Licence 37/772 |
| A77815 | 2008 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project North East Goldfields, WA Mineral Exploration Report For the period 28 July 2007 to 31 Decemb |
| A77980 | 2008 | Korab Resources Ltd | Melrose | 4.6% | Combined Annual Report Year Ending 31 December 2007 |
| A78456 | 2008 | Echo Resources Ltd | Maitland | <1% | SECOND ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 5 April 2007 TO 4 April 2008 E37/822 (MAITLAND PROJECT) |
| A79173 | 2008 | Venture Minerals Ltd | MAITLAND CHANNEL | 40% | Annual Technical Report for the period 12/04/2007 to 11/04/2008 |
| A75048 | 2007 | Korab Resources Ltd | Melrose | 4.6% | Combined Annual Report year ending 31 December 2006 E37/769, E37/794, M37/108, M37/519, M37/1167 Melrose Proje |
| A75159 | 2007 | Echo Resources Ltd | Maitland | <1% | First Annual Report on Exploration for the period 5 April 2006 to 4 April 2007 E37/822 (Maitland Project) |
| A75893 | 2007 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project North East Goldfields, W.A. Annual Technical Report for the Period 29 July 2006 to 28 July 20 |
| A76220 | 2007 | Venture Minerals Ltd | Devine | 16% | Devine Project Exploration Licence 37/772 Annual Technical Report for the period 05/07/2006 to 04/07/2007 |
| A73837 | 2006 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project E53/1046 Partial Surrender Report for the Period 29/07/03 - 28/07/06 Report No.NEG/WO/06/4 (S |
| A73500 | 2006 | Venture Minerals Ltd | Devine | 16% | Devine Project E37/772, Annual Technical Report for the Period 05/07/2005 to 04/07/2006, (Sir Samuel). |
| A72769 | 2006 | Korab Resources Ltd | Melrose | 22% | Annual Report, 31 March 2005 to 30 June 2006, E37/794 Melrose Project, (Sir Samuel). |
| A73449 | 2006 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project (E53/1046), Annual Technical Report, For the Period 29 July 2005 to 28 July 2006, (Cullen Rep |
| A71052 | 2005 | Comet Resources Ltd | Devine | 16% | Devine Project, Exploration licence 37/772, Annual technical report for the period 05/07/2004 to 04/07/2005 (S |
| A71267 | 2005 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project, North East Goldfields, W.A. Annual technical report for the period 29 July 2004 to 28 July 2 |
| A69648 | 2004 | Cullen Exploration Pty Ltd | Wonganoo | 3.1% | Wonganoo Project, Annual Report E53/1046 for the period 29 July 2003 to 28 July 2004. |
| A66327 | 2003 | Julia Corporation Ltd | Dingo Range | 26% | Annual Report for the period ended 18th November 2002 Dingo Range Project E37/489 |
| A67041 | 2003 | Deep Yellow Ltd | Dingo Range | 26% | Final Report for the period ended 9 April 2003 E37/489 Dingo Range Project |
| A64492 | 2002 | Julia Corporation Ltd | Dingo Range | 26% | Exploration Licence E37/489. Dingo Range Project Annual Report For The Period Ended 18th November 2001. |
| A64493 | 2002 | Julia Corporation Ltd | Dingo Range | 26% | Exploration Licence E37/489 Dingo Range Project. Partial Surrender Report. Surrender Date 28/11/01. |
| A62373 | 2001 | Forrestania Gold Nl | Wanganoo Creek | 4.6% | Annual Report for the period 7 April 2000 to 6 April 2001, E53/441, Wanganoo Creek (JV) Project. |
| A62601 | 2001 | Normandy Yandal Operations Ltd | Bronzewing | 4% | Combined Annual Report On Exploration For Period 20/02/2000 To 19/02/2001. Project C176-1997 Bronzewing M36/26 |
| A62411 | 2001 | Normandy Yandal Operations Ltd | Eclipse Well | 37% | Final Report On Exploration For Period 18/04/1994 to 12/04/2001 Project E37/336 Eclipse Well. Reference: e37-3 |
| A62917 | 2001 | Julia Mines Nl | Dingo Range | 26% | Dingo Range Project, Annual Report for the period ending 18th November 2000, E37/489. |
| A60204 | 2000 | Julia Mines Nl | Dingo Range | 26% | Exploration Licence E37/489 Dingo Range Project Annual Report for Period of November 1998 to November 1999 |
| A60326 | 2000 | Great Central Mines Ltd | Bronzewing | 4.1% | Exploration licences E36/161, E37/252,283,336, E53/224,284, 304,305,387,394,573, M36/3263,295,312,318-323,M37/ |
| A60905 | 2000 | Forrestania Gold Nl | Wanganoo Creek | 4.6% | Annual Report for the period 7th April 1999 to 6th April 2000, E53/441, Wanganoo Creek(JV) Project. |
| A58178 | 1999 | Great Central Mines Ltd | Eclipse Well | 37% | Eclipse Well Project, Partial Surrender Report for the period ending 18th April 1994 to 29th December 1998, E3 |
| A58870 | 1999 | Great Central Mines Ltd | Bronzewing | 4% | Exploration Licences E36/161 E37/252,283,336 E53/224,284,304-305,387,394,573 Mining Licences M36/263,295, 312, |
| A58338 | 1999 | Forrestania Gold Nl | Wanganoo Creek | 4.6% | Annual Report for the period 7 April 1998 to 6 April 1999, E53/441, Wanganoo Creek (JV) Project. |
| A58430 | 1999 | Forrestania Gold Nl | Wanganoo Creek | 4.6% | Partial Surrender Report , E53/441, Wanganoo Creek (JV) Project. |
| A53491 | 1998 | Great Central Mines Ltd | Eclipse Well | 37% | Eclipse Well Project,Partial Surrender Report for the period 18/04/1994-05/12/1997, E37/336. |
| A54842 | 1998 | Great Central Mines Ltd | Bronzewing | 3.9% | Bronzewing Project. Great Central Mines Ltd. Joint Annual report for the period 20/02/97 to 19/02/98. E36/161, |
| A55553 | 1998 | Forrestania Gold Nl | Wanganoo Creek | 4.6% | Annual Report for the period 7 April 1997 to 6 April 1998, E53/441, Wanganoo Creek (JV) Project. |
| A52215 | 1997 | Forrestania Gold Nl | Wanganoo Creek | 4.6% | Annual Report for the period 8 April 1996 to 7 April 1997, E53/441, Wanganoo Creek (JV) Project. |
| A51394 | 1997 | Herald Resources Ltd | Melrose | 38% | Melrose Project, Final Surrender Report for the period 2 May 1996 to 30 January 1997, E37/447. |
| A46634 | 1996 | Preston Resources Nl | Freemans Find | 1.7% | Freemans Find Project, Annual Report for the period 19/07/1994 to 18/07/1995, E37/305. |
| A48268 | 1996 | Abador Gold Nl | Wanganoo Creek | 4.6% | E53/441, Wanganoo Creek Project, Annual Report for the period April 1995 to April 1996. |
| A48761 | 1996 | Wear Services Pty Ltd | Eclipse Well | 8.3% | Eclipse Well Project, Annual Report for the period 07/07/1995 to 06/07/1996, E37/339. |
| A44691 | 1995 | Johnsons Well Mining Nl | Stirling Peaks - White Well | 14% | Annual Report for the period 01/02/94-31/01/95, Stirling Peaks - White Well Project[s] E37/332 & E53/481. |
| A46300 | 1995 | Abador Gold Nl | Wanganoo Creek | 4.6% | E53/441, Wanganoo Creek Project, Annual Report for the period April 1994 to April 1995. |
| A41267 | 1994 | Colonial Resources Nl | Freemans Find | 1.7% | Freemans Find Project, Non-statutory Report: Interim Report for the period 19/07/1993 to 18/05/1994, E37/305. |
| A46103 | 1994 | Thornsail Prospecting Pty Ltd | Barwidgee | 78% | Barwidgee Project, Annual Report for the period 01/09/1994 to 01/09/1995, E37/348. |
| A41618 | 1994 | Abador Gold Nl | Wanganoo Creek | 4.6% | E53/441, Wanganoo Creek Project, Annual Report for the period April 1993 to April 1994. |
| A43246 | 1994 | Dominion Mining Ltd | Violet | 37% | Annual Report ,'Violet Project' ,Eclipse Well E37/336 for the period 18 April 1994 to 31 October 1994. |
| A2739 | 1970 | Swiss Aluminium Mining Aust Pty Ltd | North Yandal | 4.2% | North Yandal Project, Non-statutory Report: Brief Exploration Report, December 1970. |
| A1527 | 1968 | Cra Exploration Pty Ltd | Lake Maitland - Barwidgee | 3.4% | Lake Maitland - Barwidgee Project, Annual Report for the period 30/05/1966 to 13th July 1967, TR70/3759H. |
| A51382 | 1753 | Great Central Mines Nl | Eclipse Well | 37% | Exploration Licence E37/336, 'Eclipse Well' ,Annual report for the period 18 April 1996 to 17 April 1997. |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 37/238 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 37/238? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-09. Compiled by NextMaps. Verify against primary sources before reliance.