L 38/77
L 38/77 is a live miscellaneous licence in the Shire of Laverton, Western Australia, held by Gsm Mining Company Pty Ltd. Granted on 23 June 2000 for 21 years (renewed), it expires on 22 June 2042. The ground is covered by 81 historical WAMEX reports.
Register summary
- Holder
- Gsm Mining Company Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 25 Aug 1998
- Commenced
- 23 June 2000
- Expiry
- 22 June 2042
- Term
- 21 Years (Renewed)
The full record on L 38/77
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 4 changes of holder
- The full record: 11 conditions and 1 endorsement
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (8 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
76 more reports
| A117575 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | <1% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT, C168/2001, 01 JULY 2017 - 30 JUNE 2018 |
| A114580 | 2017 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Technical Report for the period 1 July 2016 to 30 June 2017, E38/012 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A108971 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016 |
| A109143 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | E38/2301 PARTIAL SURRENDER REPORT FOR THE PERIOD 03 MAY 2010 – 29 APRIL 2016 |
| A109737 | 2016 | Gsm Mining Company Pty Ltd | Wallaby | <1% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT (C168/2001) FOR THE PERIOD 01 JULY 2015 – 30 JUNE 2015 |
| A105693 | 2015 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38 |
| A106502 | 2015 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Annual Report for the period 1 July 2014 to 30 June 2015, E38/01211, E38/01935, E39/ |
| A103165 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project Combined Annual Technical Report (C168/2001) for the period 1 July 2013 to 30 June 2014, P38/3 |
| A102187 | 2014 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 01 April 2013 – 31 March 201 |
| A98006 | 2013 | Barrick (Granny Smith) Pty Ltd | Central Laverton | <1% | PROJECT 8124 Central Laverton Project, Annual Report for the period 1st April 2012 to 31st March 2013, M38//18 |
| A99045 | 2013 | Barrick (Australia Pacific) Ltd | Wallaby | <1% | Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137 |
| A93358 | 2012 | White Cliff Minerals Limited | Granny Smith South | <1% | Granny Smith South Project, Annual Report for the period 24/02/2010 to 23/02/2012, E38/2301; P38/3840-3844. [C |
| A93837 | 2012 | Barrick (Australia Pacific) Ltd | Central Laverton | <1% | Central Laverton Project Annual Report for the period 1 April 2011 – 31 March 2012, M38/18, M38/161, M38/162, |
| A94717 | 2012 | Barrick (Granny Smith) Pty Ltd | Wallaby | <1% | PROJECT 8855 WALLABY PROJECT P38/3666, P39/4976 E38/1211, E38/1935, E39/1260 M38/560, M38/593, M38/690, M38/69 |
| A90102 | 2011 | White Cliff Nickel Ltd | Granny Smith | <1% | Granny Smith Project, Annual Report for the year ending 24th February 2011, E38/2301; P38/3840-3844. |
| A90288 | 2011 | Barrick (Granny Smith) Pty Ltd | Central Laverton | <1% | Central Laverton Project, Annual Report for the period 1st April 2010 to 31st March 2011, M38/18, 161-162, 167 |
| A91080 | 2011 | Barrick (Granny Smith) Pty Ltd | Wallaby | <1% | PROJECT 8855 WALLABY PROJECT ANNUAL REPORT Period 1 July 2010 – 30 June 2011 TECHNICAL REPORT No. 1437 GSWA Re |
| A87115 | 2010 | Barrick (Australia Pacific) Ltd | Central Laverton | <1% | Project 8124 Central Laverton Project Annual Report Period 1 April 2009 – 31 March 2010 Technical Report No. 1 |
| A87653 | 2010 | Barrick (Australia Pacific) Ltd | Wallaby | <1% | Project 8855 Wallaby Project P38/3666, M38/593, M38/690, M38/691, M38/692, M38/725, M38/726, M38/744, M38/849 |
| A84117 | 2009 | Barrick (Granny Smith) Pty Ltd | WALLABY | <1% | WALLABY PROJECT M38/593, M38/690, M38/691, M38/692, M38/725, M38/726, M38/744, ANNUAL REPORT Period 1 July 200 |
| A82532 | 2009 | Barrick Gold Of Australia Ltd | Central Laverton | <1% | Central Laverton Project Annual Report, Period 1 Apr 2008 - 31 Mar 2009 |
| A82633 | 2009 | Crescent Gold Ltd | South Laverton | <1% | Final Surrender Report, South Laverton Project E38/2180 5th June 2009 to 10th June 2009 |
| A79308 | 2008 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260, M38/675, M38/677 Annual Report Period 1 July 200 |
| A78560 | 2008 | Barrick Gold Of Australia Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT ANNUAL REPORT (PROJECT 8124) Period 1 April 2007 - 31 March 2008. TECH REPORT No. 126 |
| A79330 | 2008 | Barrick Gold Of Australia Ltd | Wallaby | <1% | ANNUAL REPORT Period 1 July 2007 to 30 June 2008, PROJECT 8855, WALLABY PROJECT, M38/690, M38/691, M38/692, |
| A75487 | 2007 | Barrick (Granny Smith) Pty Ltd | Central Laverton | <1% | Project 8124 Central Laverton Project E38/1434, E38/1640...M 38/525 and P38/3096 Annual Report Period 1 April |
| A76087 | 2007 | Barrick Gold Of Australia Ltd | Lake Carey | <1% | Lake Carey Project E38/448, M38/675 & M38/677 Annual Report Period 1 July 2006 - 30 June 2007 TECHNICAL REPORT |
| A76120 | 2007 | Barrick Gold Of Australia Ltd | Wallaby (Lake Carey) | <1% | Project 8855 Wallaby Project M38/690, M38/691, M38/692, M38/725 Annual Report Period 1 July 2006 - 30 June 200 |
| A72812 | 2006 | Barrick (Granny Smith) Pty Ltd | Granny Smith | <1% | Central Laverton Project, Annual Exploration Report for the Period 1 April 2005 to 31 March 2006, Combined Rep |
| A73489 | 2006 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447-448,E39/387,389,M38/675,677, Annual Exploration Report for the Period 1 July 2005 t |
| A73490 | 2006 | Barrick (Granny Smith) Pty Ltd | Wallaby (Lake Carey) | <1% | Wallaby Project M38/690-692,725, Annual Exploration Report for the Period 1 July 2005 to 30 June 2006, Combine |
| A71035 | 2005 | Placer (Granny Smith) Pty Ltd | Central Laverton | <1% | Central Laverton Project, E38/394, 1442...P38/3061 and P38/3 101 Mount Margaret Mineral Field Annual Explorati |
| A71272 | 2005 | Placer (Granny Smith) Pty Ltd | Wallaby (Lake Carey) | <1% | Wallaby Project, M38/690, M38/691 & M38/692, Mount Margaret mineral field, Western Australia, Annual explorati |
| A71318 | 2005 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,E38/448,E39/387,E39/389,M38/675, M38/677, Mount Margaret Mineral Field Western Aus |
| A68897 | 2004 | Placer Dome Asia Pacific Ltd | Central Laverton | <1% | Annual Exploration Report for the Period 1st April 2003 to 3 1st March 2004 Ref.No.: C86/2002 E38/394, E 38/14 |
| A69088 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | <1% | Wallaby Project, M38/690,691,692, Mount Margaret Mineral Field, Western Australia, Annual Exploration Report f |
| A69089 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | <1% | Lake Carey Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 |
| A66814 | 2003 | Placer (Granny Smith) Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002: E38/0394, M38/18,161-2,167 ,191-2, 205,253,287-8,380,389,397,440,525, P38/3 |
| A67248 | 2003 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Annual Exploration Report for the period 1 July 2002 to 30 June 2003 Lake Carey Project C401/1996: E38/447,448 |
| A67527 | 2003 | Placer (Granny Smith) Pty Ltd | Wallaby | <1% | Wallaby Project, M38/690,691,692, Mount Margaret Mineral Field, Western Australia, Annual Exploration Report f |
| A65163 | 2002 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/483 M38/675, & M38/677 Verification report for the |
| A65288 | 2002 | Placer (Granny Smith) Pty Ltd | Wallaby | <1% | Wallaby Project, M38/690, M38/691 & M38/692 Verification Report For The First Annual Report On Exploration Per |
| A65289 | 2002 | Placer (Granny Smith) Pty Ltd | Hillside Well | <1% | Hillside Well Project E38/394, M38/389, M38/397, M38/440 M38/525 For The Sixth Annual Report On Exploration Pe |
| A63479 | 2001 | Placer (Granny Smith) Pty Ltd | Hillside Well | <1% | Hillside Well Project E38/394, M38/389, M38/440, M38/525 Mou nt Margaret Mineral Field, Western Australia. Fi |
| A63512 | 2001 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/ 483, M38/677, M38/690, M38/691 & M38/692 Mount Ma |
| A61209 | 2000 | Placer (Granny Smith) Pty Ltd | Hillside Well | <1% | Hillside Well Project, E38/394,389,397,440,525, Mount Margaret Mineral Field, Western Australia, Fourth Annual |
| A61259 | 2000 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,448,457,E39/389,483,M38/675,677, 690-692, Annual Report for the period ending 30t |
| A59018 | 1999 | Placer (Granny Smith) Pty Ltd | Hillside Well | <1% | Hillside Well Project E38/394 M38/389 M38/397 M38/440 M38/525 Mount Margaret Mineral Field Western Australia T |
| A59288 | 1999 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447,448,457,387,389,483, Annual Report for the period ending 30/06/1999. |
| A55945 | 1998 | Placer (Granny Smith) Pty Ltd | Hillside West | <1% | Hillside West Project, E38/393, 394, M38/389 Mount Margaret Mineral Field, W.A. Second Annual Report, Period E |
| A56250 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Fifth Annual report on Exploration period e |
| A56808 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, Partial Surrender Report for theperiod 09/08/1992 to 11/11/1998, E38/448. |
| A52163 | 1997 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Mount Margaret Mineral Field Western Austra |
| A52351 | 1997 | Placer (Granny Smith) Pty Ltd | Hillside Well | <1% | Hillside Well Project. E38/393, 394, M38/389 Mount Margaret Mineral Field W.A. First Annual Report on explorat |
| A49079 | 1996 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 and E39/483 Mount Margaret Mineral Field Western A |
| A48991 | 1996 | Wmc Resources Ltd | Hillside Well | <1% | Combined Annual report for the period 30 April 1995 to 30 June 1996 Hillside Combined Project Exploration Lice |
| A44632 | 1995 | Western Mining Corporation Ltd | Hillside Well | <1% | Surrender Report for the period 30 April 1991 to 29 April 1995 The Hillside Well Project Exploration Licence 3 |
| A45119 | 1995 | Western Mining Corporation Ltd | Hillside Well | <1% | Annual report for the period 30 April 1994 to 29 April 1995 The Hillside Well Project Exploration Licences E38 |
| A45235 | 1995 | Placer Exploration Ltd | Lake Carey | <1% | The Lake Carey project E38/447, E38/448, E38/457, E39/387, E39/389, E39/400, P39/2797, P39/2798, P38/2799, P39 |
| A42133 | 1994 | Placer Exploration Ltd | Lake Carey | <1% | Annual Report for the period 01/07/93-30/06/94 Lake Carey Peroject E38/447-448,457 E39/387,389,400,2797-2801 |
| A41629 | 1994 | Western Mining Corporation Ltd | Hillside Well | <1% | Annual Report for the period 01/02/93-29/04/94 Hillside Well Project E38/393-394 |
| A39256 | 1993 | Placer Exploration Ltd | Island | <1% | Annual Report for the period 09/08/92-08/08/93 The Island Project E38/447-448 E39/387 P38/2433-2439 |
| A37269 | 1992 | Western Mining Corporation Ltd | Hillside Well | <1% | Hillside Well Project, Annual Report for the period 30/04/1991 to 29/04/1992, E38/393. |
| A33678 | 1991 | Ashton Gold Mines Pty Ltd | Euro Dominion | <1% | Euro Dominion Project, Final Surrender Report for the period 1st January 1990 to 22 October 1990, M38/144,214, |
| A17955 | 1990 | Ashton Gold Mines Pty Ltd | Euro Dominion | <1% | Euro Dominion Project,Annual Report for the period 1st January 1989 to 31st December 1989, M38/143,144,214 & 2 |
| A27630 | 1988 | Hillmin Gold Mines Pty Ltd | Euro | <1% | Annual Technical Report, Euro Project, EL38/15, PL38/355 and 356, AM38/143, 144, 214 and 215, Period 1/1/1988 |
| A4724 | 1974 | Asarco Australia Ltd | Euro | <1% | Euro Project, Non-statutory Report: Final Report, April 1974, MC38/6602, 6604, 6607, 6610-6613, 6615, 6617, 66 |
| A4363 | 1973 | Utah Development Co Ltd | Childe Harold | <1% | Childe Harold Project, Final Surrender Report for the period ending 31/12/1972, MC38/117-125. |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A3642 | 1972 | Utah Development Co Ltd | Childe Harold | <1% | Childe Harold Project, Non-statutory Report: Progress Report for the period ending 31st December 1971, MC38/11 |
| A3644 | 1972 | Utah Development Co Ltd | Childe Harold | <1% | Childe Harold Project, Non-statutory Report: Miscellaneous Geological Maps & Ground Magnetic Data & Plans 1-17 |
| A3645 | 1972 | Utah Development Co Ltd | Childe Harold | <1% | Childe Harold Project, Non-statutory Report: Miscellaneous Plans & Geochemical Data, Plans 18-35, April 1972, |
| A3643 | 1971 | Utah Development Co Ltd | Childe Harold | <1% | Childe Harold Project, Non-statutory Report:Photogeoleogical Data, March 1971, MC38/117-125, 1436-1437 & 2051. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A38872 | 1753 | Western Mining Corporation Ltd | Windarra | <1% | Annual report for the period 04/92-06/93 Windarra/Hillside Well Project E38/393 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 38/77 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 38/77? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.