L 39/340
L 39/340 is a live miscellaneous licence in the Shire of Menzies, Western Australia, held by Murrin Murrin Operations Pty Ltd. Granted on 23 Mar 2023 for 21 years, it expires on 22 Mar 2044. The ground is covered by 94 historical WAMEX reports.
Register summary
- Holder
- Murrin Murrin Operations Pty Ltd
- Local government
- Shire of Menzies
- Application received
- 7 Dec 2022
- Commenced
- 23 Mar 2023
- Expiry
- 22 Mar 2044
- Term
- 21 Years
The full record on L 39/340
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 14 conditions and 12 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Dealings, mortgages, caveats and transfer history
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A125567 | 2020 | Murrin Murrin Operations Pty Ltd | Irwin Hills | <1% | Mineral Exploration Report for the Irwin Hills Nickel Laterite Project M39/1088 for the period 8 September 201 |
| A124476 | 2020 | Lord Byron Mining Pty Ltd | Jasper Hills | <1% | Jasper Hills Combined - C318/2011 for the period 1 May 2019 to 30 April 2020. M 39/00138,M 39/00139,M 39/00185 |
| A120711 | 2019 | Charge Cobalt Pty Ltd; White Cliff Minerals Limited | Coglia | 8.1% | Surrender report Coglia Cobalt-Nickel Project E39/1833 for the period 7 April 2017 to 30 April 2019 |
| A121631 | 2019 | Murrin Murrin Operations Pty Ltd | Irwin Hills | <1% | Annual Mineral Exploration Report for the Irwin Hills Project M39/01088 for the period 8 September 2018 to 7 S |
| A121150 | 2019 | Lord Byron Mining Pty Ltd; Blue Cap Mining Pty Ltd | Jasper Hills | <1% | C318/2011 Jasper Hills Annual Report for the period 1 May 2018 to 30 April 2019, M39/00138, M39/00139, M39/001 |
89 more reports
| A117211 | 2018 | Strategic Resource Management Pty Ltd | Jasper Hills | <1% | Final Surrender Report Jasper Hills Project E39/01772 for the period 10 August 2015 to 20 March 2018 |
| A117350 | 2018 | White Cliff Minerals Limited | Coglia | 8.1% | Coglia Cobalt-Nickel Project E39/01833 Exploration during the first year of grant 7 April 2017 to 6 April 2018 |
| A117300 | 2018 | Focus Minerals (Laverton) Pty Limited | Jasper Hills | <1% | Jasper Hills Project C318/2011 Annual Report for the period 1 May 2017 to 30 April 2018, M39/00138, M39/00139, |
| A117931 | 2018 | Murrin Murrin Operations Pty Ltd | Irwin Hills | <1% | Annual Report for the Irwin Hills Project M39/1088 for the period 8 September 2017 to 7 September 2018 |
| A112048 | 2017 | Strategic Resource Management Pty Ltd | Jasper Hills | <1% | Annual Report Jasper Hills E39/1772 for the period 10 August 2015 to 9 August 2016 |
| A112619 | 2017 | Strategic Resource Management Pty Ltd | Jasper Hills | 1.5% | Final Surrender Report - E39/1532 Jasper Hills Project for the period 20 December 2015 to 19 December 2016 |
| A114207 | 2017 | Focus Minerals (Laverton) Pty Limited | Jasper Hills | <1% | C318/2011 Jasper Hills Project Combined Group Report for the period 1 May 2016 to 30 April 2017, M39/00138, M3 |
| A115184 | 2017 | Murrin Murrin Operations Pty Ltd | Irwin Hills | <1% | Annual Report for the Irwin Hills Project M39/01088 for the period 8 September 2016 to 7 September 2017 |
| A115207 | 2017 | Strategic Resource Management Pty Ltd | Jasper Hills | <1% | Annual Technical Report - E39/1772 Jasper Hills For the Period 10 August 2016 to 9 August 2017 |
| A108826 | 2016 | Strategic Resource Management Pty Ltd | Jasper Hill | 1.5% | Annual Mineral Exploration Report E39/1532 For the period 20/12/2014 to 19/12/2015 |
| A109424 | 2016 | Focus Minerals (Laverton) Pty Limited | Jasper Hills | <1% | Jasper Hills Project M39/262, M39/185, M39/139, M39/138 Combined Annual Report for the period 1 May 2015 to 30 |
| A110194 | 2016 | Murrin Murrin Operations Pty Ltd | Irwin Hills | <1% | Annual Report for the Irwin Hills Project M39/01088 for the period 8 September 2015 to 7 September 2016 |
| A104722 | 2015 | Yilgarn Mining (Wa) Pty Ltd; Murrin Murrin Operations Pty Lt | Irwin Hills | 9.5% | Surrender Report for P39/4594, P39/4595 and P39/4682 (C112/1997 Irwin Hills) for the period 17 October 2008 to |
| A105249 | 2015 | Minara Resources Ltd | Irwin Hills | 9.5% | Surrender Report – P39/4594, P39/4595 and P39/4682 Irwin Hills Project – C112/1997 for the period 17 October 2 |
| A106003 | 2015 | Focus Minerals (Laverton) Pty Ltd | Jasper Hills | <1% | Jasper Hills Project – C318/2011, Western Australia, for the period 1 May 2014 to 30 April 2015, Combined Annu |
| A107220 | 2015 | Murrin Murrin Operations Pty Ltd | Irwin Hills | <1% | Annual Report, Irwin Hills Project, M39/1088 |
| A101415 | 2014 | Strategic Resource Management Pty Ltd | Jasper Hill | 1.5% | Annual Mineral Exploration Report (Jasper Hill) E39/1532 For the Period 20/12/2012 to 19/12/2013 |
| A101913 | 2014 | Murrin Murrin Operations Pty Ltd; Yilgarn Mining (Wa) Pty Lt | Irwin Hills | 4.2% | Combined Annual Report, Irwin Hills Project, C112/1997, E39/1284, E39/1307, E39/1471, P39/4594, P39/4595, P39/ |
| A103371 | 2014 | Focus Minerals (Laverton) Pty Ltd | Jasper Hills | <1% | Jasper Hills Project, C318/2011, Combined Annual Report, 01/05/2013 to 30/04/2014, M39/0138, M39/0139, M39/018 |
| A100227 | 2013 | Murrin Murrin Operations Pty Ltd; Yilgarn Mining (Wa) Pty Lt | Irwin Hills - Rocky Well | 6.5% | Partial Surrender Report – E39/1284 – Rocky Well 13 October 2008 to 12 October 2013 (Irwin Hills Project – C11 |
| A97885 | 2013 | Strategic Resource Management Pty Ltd | Jasper Hill | 1.5% | Jasper Hill Project, Annual Report for the period 20/12/2011 to 19/12/2012, E39/1532. |
| A98827 | 2013 | Focus Minerals (Laverton) Pty Ltd | Jasper Hills | <1% | Jasper Hills Project, C318/2011, Combined Annual Report, 01/05/2012 to 30/04/2013, Licences: M39/0138 M39/0139 |
| A92692 | 2012 | Crescent Gold Ltd | Jasper Hills | <1% | Interim Combined Annual Report on Exploration for the period 01/05/2010 to 30/04/2011; Jasper Hills Project; C |
| A93566 | 2012 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | 4.2% | IRWIN HILLS PROJECT (E39/1284, E39/1307, E39/1471, P39/4594–4595 and P39/4682) Annual Technical Report For the |
| A94619 | 2012 | Crescent Gold Ltd | Jasper Hills | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 01/05/2011 TO 30/04/2012 JASPER HILLS PROJECT C318/2011 T |
| A90003 | 2011 | Crescent Gold Ltd | Jasper Hills | <1% | Jasper Hills Project, Annual Report for the period 01/0102010 to 31/12/2010, E39/970; M39/138-139, 185 & 262. |
| A90048 | 2011 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | 4.2% | Irwin Hills Project, Annual Report for the period ending 17th January 2011, E39/1284, 1307, 1471; P39/4594-459 |
| A86467 | 2010 | Crescent Gold Ltd | Jasper Hills | <1% | Partial Surrender Report - Jasper Hills for Lease E39/970, Period 29th November 2008 to 28th November 2009 |
| A86516 | 2010 | Crescent Gold Ltd | Jasper Hills | <1% | Jasper Hills Combined Annual Report C242/1995 for Leases E39/0970, M39/0138, M39/0139, M39/0185 and M39/0262, |
| A86866 | 2010 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | 4.2% | IRWIN HILLS PROJECT (E39/1284, E39/1307, E39/1471, P39/4594–4595 and P39/4682) Annual Technical Report, For th |
| A81512 | 2009 | Crescent Gold Ltd | JASPER HILLS | <1% | Partial Surrender Report for Lease E39/0970, Period 29th November 2005 to 28th November 2008. |
| A81649 | 2009 | Crescent Gold Ltd | JASPER HILLS | <1% | JASPER HILLS Combined Annual Report C242/1995 For Leases E39/0970, M39/0138, M39/0139, M39/0185 & M39/0262, Pe |
| A81934 | 2009 | Yilgarn Mining (Wa) Pty Ltd | IRWIN HILLS | 1.2% | IRWIN HILLS PROJECT (E 39/352, 407, 1074, 1105; P 39/2588; E 38/1714, 1718, & 1719), Annual Technical Report, |
| A78087 | 2008 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | 1.2% | IRWIN HILLS PROJECT (E 39/352, 407, 1074, 1105; P 39/2588; E 38/1714, 1718, & 1719) Annual Technical Report fo |
| A78190 | 2008 | Crescent Gold Ltd | Jasper Hills | <1% | VERIFICATION REPORT JASPER HILLS Combined Annual Report C242/1995 For leases E39/970, M39/138, M39/139, M39/18 |
| A74542 | 2007 | Crescent Gold Ltd | Jasper Hills | <1% | Jasper Hills Project E39/970 Annual Report for the Period 29th Nov 2005 to 28th Nov 2006 (Minigwal) |
| A75029 | 2007 | Crescent Gold Ltd | Jasper Hills | <1% | Verification Report, Jasper Hills, Combined Annual Report C242/1995, Reference: M3664/3, For leases M39/138, M |
| A75099 | 2007 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills(Bungani) | 1.2% | Irwin Hills Project, (E39/352, 407, 1074, 1105; P39/2588; E38/1714, 1718, & 1719), Annual Technical Report for |
| A72387 | 2006 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills (Bungani) | 2% | Irwin Hills Project E39/352,407,1074,P39/2588, Annual Technical Report for the Period Ended 17 January 2006, C |
| A72503 | 2006 | Crescent Gold Ltd | Jasper Hills | <1% | Jasper Hills, Combined Annual Report C242/1995, For M39/138,139,185,262, Period 1 January 2005 to 31 December |
| A70336 | 2005 | Anglogold Ashanti Australia Ltd | Jasper Hill | <1% | Annual report for the period 01/01/04 - 31/12/04 Jasper Hills, C242/1995, M39/138, M39/139, M39/185, M39/262, |
| A70382 | 2005 | Yilgarn Mining Pty Ltd | Irwin Hills | 15% | Annual technical report for the period 16/01/04 - 17/01/05 Irwin Hills Project, C112/1997, E39/352, P39/2588, |
| A71612 | 2005 | Yilgarn Mining (Wa) Pty Ltd | Coglia Well (Bungani) | <1% | Coglia Well Project E39/407, Annual Technical Report for the period ended 25 October 2005, (Minigwal). |
| A68279 | 2004 | Red Back Mining Nl | Irwin Hills | 15% | Annual Report for the period 18/01/2003-17/01/2004 Irwin Hills Project (C112/1997), E39/352, P39/2588 |
| A68539 | 2004 | Apollo Gold Mining Ltd | Jasper Hills | <1% | Annual report for the period 01/01/2003-31/12/2003 Jasper Hills Project (C242/1995), M39/0138, M39/0139, M39/0 |
| A69481 | 2004 | Sons Of Gwalia Ltd | Coglia Well | <1% | Annual report for the period 26/10/03 - 25/10/04 Coglia Well Project, E39/407 |
| A65817 | 2003 | Sons Of Gwalia Ltd | Coglia Well | <1% | Coglia Well. Annual Report For The Period 26 October 2001 - 25 October 2002. Tenement: E39/407. Report No. 029 |
| A66223 | 2003 | Sons Of Gwalia Ltd | Jasper Hills | <1% | Annual Report for the period 1 January 2001 - 31 December 2002 Jasper Hills Project C242/1995: M39/138-139, M3 |
| A66627 | 2003 | Red Back Mining Nl | Irwin Hills | 15% | Annual Report for the period 18 January 2002 to 17 January 2003 Irwin Hills Project E39/352, P39/2588 Group C1 |
| A67590 | 2003 | Sons Of Gwalia Ltd | Coglia Well | <1% | Annual Report for the period 26 October-25 October 2003 Coglia Well Project E39/407 |
| A64471 | 2002 | Sons Of Gwalia Ltd | Coglia Well | <1% | Coglia Well Project, Partial Surrender Report for the period 26th October 1993 to 6th November 2001, E39/407. |
| A64655 | 2002 | Red Back Mining Nl | Irwin Hills | 15% | Irwin Hills Project Exploration Licence: 39/352 Prosecting Licence: 39/2588 Mining Lease Applications: M39/462 |
| A62139 | 2001 | Invincible Gold Nl | Jasper Hills | <1% | Annual Report for the period 1 January 2000 - 31 December 2000 Jasper Hills Project tenements M39/138-139, M39 |
| A62171 | 2001 | Red Back Mining Nl | Irwin Hills | 15% | Irwin Hills Project , E 39/352, P 39/2588, M39/462, 641, 643 & 644 [Applications],Annual Report for 18 Januar |
| A64027 | 2001 | Sons Of Gwalia Ltd | Coglia Well | <1% | Annual Report for the period 26 October 2000 - 25 October 2001 Coglia Well tenement E39/407. Report no: 0299- |
| A60097 | 2000 | Wmc Resources Ltd | Irwin Hills | 15% | Annual Report for the Irwin Hills JV for the Period 18/01/1999 to the 17/01/2000 Exploration Licences E39/352 |
| A60940 | 2000 | Sons Of Gwalia Ltd | Jasper Hills | <1% | Jasper Hills Project Annual Report for the Period 1 January 1999 - 31 December 1999 M39/138-139, M39/185, M39/ |
| A57369 | 1999 | Wmc Resources Ltd | Irwin Hills | 15% | Annual Report For The Irwin Hills JV 18/01/98 - 17/01/99 Exploration Licence:E39/352, Prospecting Licence:P39/ |
| A58161 | 1999 | Sons Of Gwalia Ltd | Coglia Well | <1% | Coglia Well Project 26/10/97 - 25/10/98 E39/407 |
| A53705 | 1998 | Sons Of Gwalia Ltd | Coglia Well | <1% | Coglia Well Project - Annual Report 26/10/1996 - 25/10/1997 E39/407 |
| A53907 | 1998 | Wmc Resources Ltd | Irwin Hills | 15% | Annual report for the Irwin Hills JV for the period 18/01/97-17/01/98 Exploration Licences E53/352 Prospecting |
| A56748 | 1998 | Sons Of Gwalia Ltd | Coglia Well | <1% | Coglia Well Project - Partial Surrender Report 26/10/93 - 02/04/98 E39/407 |
| A50473 | 1997 | Wmc Resources Ltd | Irwin Hills | 15% | Annual report for the period 18 January 1996 to 17 January 1997 Irwin Hills (JV) Project, E39/352 & P39/2588 |
| A51433 | 1997 | Sons Of Gwalia Ltd | Jasper Hills | <1% | Laverton Region Jasper Hills Project Annual report for the period 1st January 1996 to 31st December 1996 Tenem |
| A52626 | 1997 | Sons Of Gwalia Ltd | Jasper Hills | <1% | Laverton Region. Jasper Hills Project Resource Report. M39/138-139,185,262. 01/01/97-31/12/97. |
| A46723 | 1996 | Sons Of Gwalia Ltd | Coglia Well | <1% | North Eastern Goldfields Coglia Well Project Annual report for the period 26 October 1994 - 25 October 1995 (T |
| A49836 | 1996 | Sons Of Gwalia Ltd | Coglia Well | <1% | Laverton Region Coglia Well Project Annual report for the period 26 October 1995 - 25 October 1996 (Tenement E |
| A47760 | 1995 | Laverton Gold Nl | Rocky Well | 15% | Annual Report on Reverse Circulation (Air Core) Drilling at the Rocky Well NI - PT Prospect Irwin Hills (E39/3 |
| A43153 | 1994 | Laverton Gold Nl | Rocky Well | 15% | Annual Report on Reverse Circulation Drilling at Rocky Well Project, (E39/352) WA September 1994. |
| A43299 | 1994 | Sons Of Gwalia Ltd | Coglia Well | <1% | North Eastern goldfields Coglia well project Annual report for the period 26th October 1993 - 25th October 199 |
| A41545 | 1994 | Western Mining Corporation Ltd | Jasper Hill | <1% | Western Mining Terminal technical report for Jasper Hill Project M39/138 M39/139 M39/185 M39/262 17/01/90 to |
| A43154 | 1994 | Laverton Gold Nl | Irwin Hills | 15% | Non-statutory Report : Geochemical sampling and mapping program Irwin Hills project. February 1994 (E39/352 |
| A43155 | 1994 | Laverton Gold Nl | Rocky Well | 15% | Non-statutory Report : Rock-chip Sampling- February 1994 , Rocky Well Project, Irwin Hills Project (E39/352 |
| A37562 | 1993 | Freshwater Resources Pty Ltd | Bungani | 16% | Annual Report for the Period 26/11/91 - 26/11/92, Bungani Project ,P39/2588. |
| A40336 | 1993 | Laverton Gold Nl | Irwin Hills | 15% | Annual Report for the period 10/92-10/93, Irwin Hills Project, E39/352 P39/2588 |
| A37028 | 1992 | Mining Corp Exploration Nl | Plumridge | <1% | Plumridge Project, Non-statutory Report : Airborne Magnetometer Surveys, 1971. |
| A36443 | 1992 | Western Mining Corporation Ltd | Lord Byron | <1% | Annual report for the period 01/90-01/91 Lord Byron Project M39/262 M39/185 |
| A33168 | 1991 | Western Mining Corporation Ltd | Jasper Hill | <1% | Terminal (Surrender) Technical Report 17 January 1990 to 8 March 1991. M39/84 Lord Byron Prospect. Windarra P |
| A30384 | 1990 | Western Mining Corporation Ltd | Jasper Hills | 5.5% | Annual report for the period 07/12/88-06/12/89 Jasper Hill Project E38/212 E39/144-145 E39/157 E39/159 E39/161 |
| A32148 | 1990 | Western Mining Corporation Ltd | Jasper Hill | 11% | Terminal report on Jasper Hill, M39/191-196, for the period 9 March 1989 to 2 August 1990 |
| A6220 | 1976 | Anaconda Aust Inc | Irwin Hills | 20% | Irwin Hills Project, Annual Report for the year ending 31/12/1975, MC39/4480-4482 & MC38/ 6889-6890. |
| A6377 | 1976 | Anaconda Aust Inc | Irwin Hills | 20% | Irwin Hills Pproject, Non-statutory Report: Final Geological Report, June 1976, MC39/4480-4482 & 6889-6890. |
| A2580 | 1972 | International Nickel Aust Ltd | Colga Well | 1.4% | Colga Well Project, Annual (& Final) Report for the period 1st January 1971 to 30th March 1972, TR70/3671H. |
| A1880 | 1971 | International Nickel Aust Ltd | Colga Well | 1.4% | Colga Well Project, Annual Report for the period ending 31st December 1970, TR70/3617H. |
| A312 | 1970 | International Nickel Southern Exp Ltd | Colga Well | 1.4% | Colga Well Project, Annual Report for the period ending 31st December 1969, TR70/3671H. |
| A311 | 1969 | International Nickel Aust Ltd | Cogla Well | 1.4% | Cogla Well Project, Annual Report for the period ending 31st January 1968, TR70/3671H. |
| A310 | 1968 | International Nickel Southern Exp Ltd | Cogla Well | 1.4% | Cogla Well Project, Annual Report for the year ending 31st December 1967, TR70/3671H. |
| A308 | 1966 | International Nickel Southern Exp Ltd | Cogla Well | 1.4% | Cogla Well Project, Annual Report: Geological Report, December 30th 1966, TR70/3671H. |
| A97720 | 1753 | Yilgarn Mining (Wa) Pty Ltd | Irwin Hills | 4.2% | Irwin Hills Project (E39/1284, E39/1307, E39/1471, P39/4594–4595 and P39/4682) Annual Technical Report For the |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 39/340 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.