L 52/20
Register summary
- Holder
- Aragon Resources Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 4 Dec 1987
- Commenced
- 26 Feb 1988
- Expiry
- 25 Feb 2028
- Term
- 5 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A133892 | 2023 | Bryah Resources Limited | Bryah Basin | <1% | Partial Surrender Report – E52/3401 Bryah Basin for the period ending 21/11/2022 |
| A124043 | 2020 | Bryah Resources Limited | Bryah Basin | <1% | Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020 |
| A124560 | 2020 | Westgold Resources Limited | Peak Hill | <1% | Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2019 to 2 June 2020.E 52 |
| A120357 | 2019 | Bryah Resources Limited | Bryah Basin | <1% | Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03 |
| A120860 | 2019 | Westgold Resources Limited | Peak Hill | <1% | Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2018 to 2 June 2019 |
93 more reports
| A117043 | 2018 | Bryah Resources Limited | Bryah Basin | <1% | Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323 |
| A115718 | 2018 | Bryah Resources Limited | Peak Hill | <1% | Annual Report E52/3401 Peak Hill Project for the period 28/11/2016 - 28/11/2016 |
| A117397 | 2018 | Westgold Resources Limited | Peak Hill | <1% | Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2017 to 2 June 2018, E52 |
| A114753 | 2017 | Westgold Resources Limited | Fortnum | <1% | Combined Annual Mineral Exploration Report, Fortnum C152/2015, For the Period 3 June 2016 to 2 June 2017, E52/ |
| A108743 | 2016 | Allkarri Holdings Pty Ltd | Peak Hill | <1% | Final Surrender Report for Peak Hill Project E52/02884 for the period 20/12/2013 to 13/01/2016 |
| A109650 | 2016 | Metals X Limited | Peak Hill | <1% | Peak Hill Project Combined Mineral Exploration Report |
| A109989 | 2016 | Metals X Limited | Peak Hill | <1% | C152/2015 Final Surrender Report, P52/1189, P52/1190, P52/1191, P52/1192, P52/1193, P52/1234, P52/1343, P52/13 |
| A104522 | 2015 | Allkarri Holdings Pty Ltd | Peak Hill | <1% | Peak Hill E52/2884 Annual Report for the period 20/12/2013 to 19/12/2014 |
| A106536 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Combined Annual Technical Report C164/1995 Peak Hill Project for the period 1 July 2014 to 30 June 2015, E52/2 |
| A107467 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Partial Surrender Technical Report E52/2471 (Peak Hill) for the period 16 October 2009 to 9 October 2015 |
| A103133 | 2014 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | COMBINED ANNUAL TECHNICAL REPORT C164/1995 PEAK HILL TENEMENT NUMBERS E52/2237, E52/2413, E52/2471, E52/2472, |
| A96988 | 2013 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, |
| A97742 | 2013 | Padbury Mining Ltd | Peak Hill | <1% | E52/1518 Final Surrender for the period 17th November 2003 – 16th November 2012 |
| A99088 | 2013 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Combined Annual Technical Report C164/1995 Peak Hill Project for the period 1 July 2012 to 30 June 2013, E52/2 |
| A93081 | 2012 | Padbury Mining Ltd | Peak Hill - Telecom Hill | <1% | 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011 |
| A94652 | 2012 | Montezuma Mining Company Ltd | Peak Hill | <1% | Annual Report on Peak Hill Project Combined Annual Report C164/1995 For the Period 01/07/2011 to 30/06/2012, M |
| A91216 | 2011 | Montezuma Mining Company Ltd | Peak Hill | <1% | Annual Report on Peak Hill Project Combined Annual Report C164/1995 For the Period 01/07/2010 to 30/06/2011 |
| A89335 | 2011 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010 |
| A85953 | 2010 | Aurium Resources Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on |
| A87662 | 2010 | Montezuma Mining Company Ltd | Peak Hill | <1% | Combined Annual Report C164_1995, Peak Hill Project, for the Period 1/07/2009 to 30/06/2010 |
| A80439 | 2009 | Peak Resources Ltd | PEAK HILL WEST | <1% | Peak Hill West – Annual Report on Exploration, 18th November 2007 to 17th November 2008, C84/2004 |
| A81263 | 2009 | Aurium Resources Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52 |
| A84077 | 2009 | Montezuma Mining Company Ltd | Peak Hill | <1% | Annual Report on Peak Hill Project, M52/35, M52/474, M52/56, for the Period 01/07/2008 to 30/06/2009 |
| A76998 | 2008 | Peak Resources Ltd | Peak Hill West | <1% | Peak Hill West - Annual Report on Exploration Report 18th November 2006 to 17th November 2007 C84/2004 E52/16 |
| A77730 | 2008 | Greater Pacific Gold Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1518 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A79550 | 2008 | Montezuma Mining Company Ltd | Peak Hill | <1% | Annual Report on Peak Hill Project M52/35, M52/474, M52/56 for the Period 01/07/2007 to 30/06/2008 |
| A74150 | 2007 | Peak Resources Ltd | Peak Hill | <1% | Peak Hill West Project C84/2004 Annual Report for the Period 17th Nov 2005 to 16th Nov 2006 (Peak Hill) |
| A71629 | 2006 | Goldstar Resources Nl | Bryah | <1% | M52/548, M52/588, E52/1621,P52/990 and P52/991, Bryah Reporting Group(Group Reporting No. C84/2004), 2004-2005 |
| A71688 | 2006 | Greater Pacific Gold Nl | Peak Hill | <1% | Annual Report on Exploration Licence E52/1518 on the Peak Hill Sheet for the year ending November 2005, (Peak |
| A73492 | 2006 | Barrick Gold Of Australia Ltd | Peak Hill | <1% | Peak Hill JV Project M52/35,56,474, Annual Report, Period 1 July 2005 to 30 June 2006, Combined Reporting No. |
| A69882 | 2005 | Peak Hill Manganese Pty Ltd | Peak Hill | <1% | Annual report for the period 15/10/03 - 16/10/04 Peak Hill Project, E52/1518. |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A61900 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine Joint Venture Project, E52/697, M52/13,116,287,324,345,346,465,541,581-582, P52/5 |
| A58699 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541,581-582 P52/51 |
| A58705 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596 Peak Hill Mine Joint Venture Project E52/697 Fifth Year and Final Relinquishment Report Period 24 |
| A57938 | 1999 | Zygot Ltd | Bryah | <1% | Final Report for 16/03/94-08/12/98 ,Bryah Project , E52/677. |
| A54838 | 1998 | Troy Resources Nl | Orchard-Reefer | <1% | Orchard-Reefer Project, Peak Hill District, W.A. Annual Report 1997-1998 P52/845-856, ELA52/1093 |
| A55845 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,581 582 P52 |
| A55789 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine Joint Venture Project E52/697 Fourth Year Partial Relinquishment Report Period 24/0 |
| A56556 | 1998 | St Barbara Mines Ltd | Bryah | <1% | Bryah Project Area E52/601, 677; M52/344, 350, 445, 463, for the period 01/10/1997 - 30/09/1998. |
| A52184 | 1997 | Plutonic Operations Ltd | Peak Hill | <1% | Project 596 Peak Hill Joint Venture Project E52/686,697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,5 |
| A52258 | 1997 | Plutonic Operations Ltd | Peak Hill | <1% | Third Year Partial Relinquishment Report Period 24/06/94 to 23/06/97 |
| A52798 | 1997 | St Barbara Mines Ltd | Bryah | <1% | Annual Report 01/10/96-30/09/97. Bryah Project Area. E52/601,628,677. M52/344,350,445,463. P52/550-555. |
| A53211 | 1997 | St Barbara Mines Ltd | Peak Hill | <1% | Peak Hill Project, Non-statutory Report: Geochemical Exploration Peak Hill/Glengarry Area W.A., 03/1996 - 03/ |
| A51016 | 1997 | Troy Resources Nl | Orchard-Reefer | 1% | Orchard-Reefer Project Peak Hill District W.A Annual Report 1996-1997 Tenements P's 52/845 - 52/856 ELA 52/109 |
| A47797 | 1996 | Plutonic Operations Ltd | Peak Hill | <1% | Annual Report. Period 16/03/1995-15/03/1996. |
| A47820 | 1996 | Solomon Pacific Resources Nl | Orchard-Reefer | 1% | Park Hill (Solomon Pacificferenco) Joint Venture Orchard Reefer project Annual report 1995-1996 Tenements: P52 |
| A48742 | 1996 | Plutonic Operations Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine Joint Venture Project E52/442 E52/686 E52/697 M52/13 M52/35 M52/56 M52/116 M52/287 |
| A50691 | 1996 | Plutonic Operations Ltd | Peak Hill Mine | <1% | Peak Hill Mine Project, First and Final Relinquishment Report E52/686 for period 20/04/1996 to 19/04/1997. |
| A49652 | 1996 | Plutonic Operations Ltd | Bullgullan | <1% | Bullgullan E52/695 Final Report from 15/09/95- 14/09/96 |
| A49726 | 1996 | Marymia Exploration Nl | Peak Hill Northwest | <1% | Annual Report for Exploration Licence 52/684 Peak Hill Northwest, from 21 October 1995 to 20th October 1996 |
| A44283 | 1995 | Plutonic Operations Ltd | Peak Hill | <1% | Peak Hill (JV) Project, Partial Surrender Report for the period 16/3/1988 to 16/2/1995, E52/260. |
| A45781 | 1995 | Plutonic Operations Ltd | Bullgullan | <1% | Bullgullan Project, Annual Report E52/695 for the period 15/09/1994 to 14/09/1995. |
| A44395 | 1995 | Plutonic Operations Ltd | Peak Hill | <1% | Peak Hill (JV) Project, Annual Report for the period 16/03/1994 to 15/03/1995, E52/260, E52/404, E52/641, P52/ |
| A45313 | 1995 | Plutonic Operations Ltd | Peak Hill Mine Joint Venture | <1% | Project 596 Peak Hill Mine Joint Venture Project Annual report E52/442 E52/686 E52/697 E52/737 M52/13 M52/35 M |
| A48214 | 1995 | Marymia Exploration Nl | Peak Hill Northwest | <1% | Peak Hill Northwest Project, Annual Report for period 21st October 1994 to 20th October 1995, E52/684. |
| A40476 | 1994 | Peko Gold Ltd | Peak Hill | 1.6% | Annual report for the period 1 July 1992 to 30 June 1993, M52/287. Peak Hill Project Part 4, Pipeline Tenement |
| A40474 | 1994 | Peko Gold Ltd | Peak Hill | <1% | Annual report for the period ending 30 June 1993, M52/35 and 347, and GML52/609, 610, 611, and 613. Peak Hill |
| A41117 | 1994 | Afmeco Pty Ltd | Peak Hill South | <1% | Peak Hill South (JV) Project, Annual Report, E52/260, E52/404, E52/641. P52/7272 (Group 1) for the period 16/0 |
| A41882 | 1994 | Peko Gold Ltd | Peak Hill | 1.6% | Annual report for the period 1 July 1993 to 30 June 1994, M52/287. Peak Hill Project Part 4, Pipeline Tenement |
| A42347 | 1994 | Peko Gold Ltd | Peak Hill | <1% | Annual report for the period 01/07/93-30/06/94 Peak Hill Project GML52/609-610 M52/35,347,474 |
| A37782 | 1993 | Peko Gold Ltd | Peak Hill | <1% | Annual report for the period ending 30 June 1992, M52/35, GML52/609, GML52/610 ,GML52/611, and GML52/613. Peak |
| A38278 | 1993 | Afmeco Pty Ltd | M6077/14: Peak Hill gold exploration | <1% | Annual report Peak Hill South JV |
| A43549 | 1993 | Marymia Exploration Nl | Peak Hill Northwest | <1% | Peak Hill Northwest Project, Annual Report Exploration Licence E52/684 for year ending October 1994. |
| A37939 | 1993 | Peko Gold Ltd | Peak Hill | 1.6% | Annual report for the period ending 30 June 1992, P52/335 to P52/358, and M52/287. Peak Hill Project Part 4, P |
| A39413 | 1993 | Peko Gold Ltd | Peak Hill | <1% | Report on reprocessing of aeromagnetic survey data, Peak Hill Project Western Australia. 1993. |
| A35601 | 1992 | Afmeco Pty Ltd | Peak Hill South | <1% | Peak Hill South (JV) Project, E52/260 & 404; P52/475 (Group 1)for the period 17/03/1991 to 16/03/1992. |
| A37368 | 1992 | Perilya Mines Nl | Reefer | <1% | Surrender Report, Reefer Project , for the period 19/1/92 to 26/10/92, E52/589. |
| A35760 | 1992 | Peko Mines Nl | Peak Hill | <1% | R Report for the Period 16/01/91 - 30/06/91 Peak Hill Project GML52/609-610; M52/35 |
| A36773 | 1992 | Afmeco Pty Ltd | Peak Hill South | <1% | Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 30/05/1992, E52/260. |
| A39414 | 1992 | Peko Gold Ltd | Peak Hill | <1% | R Report - Assessment of controls on gold mineralisation. Peak Hill-Fiveways and Jubilee Pit environs. Recomme |
| A32779 | 1991 | Geopeko | Peak Hill | <1% | Report No WA91/14S Exploration Work Carried Out by Geopeko on M52/35 during the period 16/01/90-15/01/91 (Peak |
| A33455 | 1991 | Afmeco Pty Ltd | Peak Hill South | <1% | Peak Hill South Project, Annual Report for the period 17/03/1990 to 16/03/1991, E52/260 & 404; P52/475-477. |
| A33947 | 1991 | Afmeco Pty Ltd | Peak Hill South | <1% | Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 15/03/1991, E52/260. |
| A29996 | 1990 | Afmeco Pty Ltd | Peak Hill South | <1% | Peak Hill South Project, Annual Report for the period 1st January 1989 to 31st December 1989, E52/260,404; P52 |
| A26830 | 1989 | Afmeco Pty Ltd | Peak Hill South | <1% | Annual Report for the period 16/03/88-16/03/89 Peak Hill South Project E52/260 |
| A26322 | 1989 | Geopeko | Peak Hill | <1% | Report on Reverse circulation drilling carried ou at Peak Hill M52/35 to test down dip Au Mineralization. 03/8 |
| A26326 | 1989 | Geopeko | Peak Hill | <1% | Reort No:89/4 Exploration work carried out on ML52/35 in the Peak Hill area during period 14/01/88-31/12/88 |
| A26403 | 1989 | Geopeko | Peak Hill | <1% | Report No: 89/7 Diamond Drilling carried out on tenement M25/35 at Peak Hill During 09/88-11/88 |
| A27396 | 1989 | Geopeko | Peak Hill | <1% | Report No:89/16 Manual Geological Resource Calculation for the area between 9600N and 9680N South of the curre |
| A29217 | 1989 | Geopeko | Peak Hill | <1% | Report No: WA89/31P Reverse Circulation and Diamond Drilling. Peak Hill(ML52/35) 07/89-08/89 |
| A23073 | 1988 | Geopeko | Peak Hill | <1% | Report on 'Exploration work carried out on ML52/35 in the Peak Hill area during the period 14/01/87 to 13/01/8 |
| A23373 | 1988 | Geopeko | Peak Hill | <1% | Report on Manual Geological Resource Calculation for Reefers Prospect at Peak Hill, W.A. (March 1988) (M52/35) |
| A23374 | 1988 | Geopeko | Peak Hill | <1% | Report on Manual Geological Resource Calculation for the area between 10125N and 9725N North and South of the |
| A24529 | 1988 | Geopeko | Ravelstone / Christmas Gift | <1% | Report on 1988 Airborne Magnetis and Radiometric Survey. Peak Hill, WA. 01/88-06/88. (E52/88, E52/93, M52/35, |
| A24764 | 1988 | Geopeko | Peak Hill | <1% | Report No 88/14 on manual geological resource calculation for the area between 9695N and 9675N south of the cu |
| A19911 | 1987 | Geopeko | Peak Hill | <1% | Report on 'Exploration work carried out on ML52/35 in the Peak Hill Area by Geopecko During the period 14/01/ |
| A21064 | 1987 | Geopeko | Peak Hill | <1% | Report on 'Exploration work carried out on Tenements M52/35 E52/88 P52/109 P52/140 to P52/146 in the Peak Hill |
| A22019 | 1987 | Geopeko | Peak Hill | <1% | Peak Hill (WA) Joint Venture Geological Resource Estimate April 1987 (M52/35) |
| A17322 | 1986 | Geopeko | Peak Hill | <1% | Annual report on M52/35 Peakhill Open Cut for the period 14/01/85 to 13/01/86 |
| A18213 | 1986 | Geopeko | Peak Hill | <1% | Report on Exploration work carried out on Tenements (E52/88 P52/109 P52/140 to P52/146 and M52/35) in the Peak |
| A11347 | 1982 | Stockdale Prospecting Ltd | Horseshoe Townsite | <1% | Horseshoe Townsite, Non-statutory Report: Final Report for the period 18th December 1981 to 17th June 1982, TR |
| A23372 | 1753 | Geopeko | Ravelstone / Christmas Gift | <1% | Report on Manual Geological Resource Calculation for Area East of the Peak Hill Open Cut, W.A. (03/1988) (GML5 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 18 months · 25 Feb 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 52/20 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 52/20? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.