NextMapsWA TenementsL 52/20

L 52/20

LiveMiscellaneous LicenceShire of MeekatharraPeak Hill M.F. District
Area
56ha
Expires
Feb 2028
in 18 months
WAMEX reports
98
WA median is 53
Report drilling
56
of 98 reports
Meekatharra Explore on the live map

Register summary

Holder
Aragon Resources Pty Ltd
Local government
Shire of Meekatharra
Application received
4 Dec 1987
Commenced
26 Feb 1988
Expiry
25 Feb 2028
Term
5 Years (Renewed)

Exploration history on this ground

98 historical WAMEX exploration reports intersect L 52/20: 46 report geochemistry or sampling, 39 include a digital data package.
When this ground was worked · 97 of 98 reports dated
171980s
421990s
132000s
222010s
32020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A133892 2023 Bryah Resources Limited Bryah Basin <1% Partial Surrender Report – E52/3401 Bryah Basin for the period ending 21/11/2022
A124043 2020 Bryah Resources Limited Bryah Basin <1% Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020
A124560 2020 Westgold Resources Limited Peak Hill <1% Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2019 to 2 June 2020.E 52
A120357 2019 Bryah Resources Limited Bryah Basin <1% Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03
A120860 2019 Westgold Resources Limited Peak Hill <1% Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2018 to 2 June 2019
93 more reports
A117043 2018 Bryah Resources Limited Bryah Basin <1% Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323
A115718 2018 Bryah Resources Limited Peak Hill <1% Annual Report E52/3401 Peak Hill Project for the period 28/11/2016 - 28/11/2016
A117397 2018 Westgold Resources Limited Peak Hill <1% Combined Annual Mineral Exploration Report, Peak Hill C152/2015 for the period 3 June 2017 to 2 June 2018, E52
A114753 2017 Westgold Resources Limited Fortnum <1% Combined Annual Mineral Exploration Report, Fortnum C152/2015, For the Period 3 June 2016 to 2 June 2017, E52/
A108743 2016 Allkarri Holdings Pty Ltd Peak Hill <1% Final Surrender Report for Peak Hill Project E52/02884 for the period 20/12/2013 to 13/01/2016
A109650 2016 Metals X Limited Peak Hill <1% Peak Hill Project Combined Mineral Exploration Report
A109989 2016 Metals X Limited Peak Hill <1% C152/2015 Final Surrender Report, P52/1189, P52/1190, P52/1191, P52/1192, P52/1193, P52/1234, P52/1343, P52/13
A104522 2015 Allkarri Holdings Pty Ltd Peak Hill <1% Peak Hill E52/2884 Annual Report for the period 20/12/2013 to 19/12/2014
A106536 2015 Grosvenor Gold Pty Ltd Peak Hill <1% Combined Annual Technical Report C164/1995 Peak Hill Project for the period 1 July 2014 to 30 June 2015, E52/2
A107467 2015 Grosvenor Gold Pty Ltd Peak Hill <1% Partial Surrender Technical Report E52/2471 (Peak Hill) for the period 16 October 2009 to 9 October 2015
A103133 2014 Grosvenor Gold Pty Ltd Peak Hill <1% COMBINED ANNUAL TECHNICAL REPORT C164/1995 PEAK HILL TENEMENT NUMBERS E52/2237, E52/2413, E52/2471, E52/2472,
A96988 2013 Padbury Mining Ltd Peak Hill <1% Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557,
A97742 2013 Padbury Mining Ltd Peak Hill <1% E52/1518 Final Surrender for the period 17th November 2003 – 16th November 2012
A99088 2013 Grosvenor Gold Pty Ltd Peak Hill <1% Combined Annual Technical Report C164/1995 Peak Hill Project for the period 1 July 2012 to 30 June 2013, E52/2
A93081 2012 Padbury Mining Ltd Peak Hill - Telecom Hill <1% 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011
A94652 2012 Montezuma Mining Company Ltd Peak Hill <1% Annual Report on Peak Hill Project Combined Annual Report C164/1995 For the Period 01/07/2011 to 30/06/2012, M
A91216 2011 Montezuma Mining Company Ltd Peak Hill <1% Annual Report on Peak Hill Project Combined Annual Report C164/1995 For the Period 01/07/2010 to 30/06/2011
A89335 2011 Padbury Mining Ltd Peak Hill <1% Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010
A85953 2010 Aurium Resources Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on
A87662 2010 Montezuma Mining Company Ltd Peak Hill <1% Combined Annual Report C164_1995, Peak Hill Project, for the Period 1/07/2009 to 30/06/2010
A80439 2009 Peak Resources Ltd PEAK HILL WEST <1% Peak Hill West – Annual Report on Exploration, 18th November 2007 to 17th November 2008, C84/2004
A81263 2009 Aurium Resources Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52
A84077 2009 Montezuma Mining Company Ltd Peak Hill <1% Annual Report on Peak Hill Project, M52/35, M52/474, M52/56, for the Period 01/07/2008 to 30/06/2009
A76998 2008 Peak Resources Ltd Peak Hill West <1% Peak Hill West - Annual Report on Exploration Report 18th November 2006 to 17th November 2007 C84/2004 E52/16
A77730 2008 Greater Pacific Gold Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1518 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series
A79550 2008 Montezuma Mining Company Ltd Peak Hill <1% Annual Report on Peak Hill Project M52/35, M52/474, M52/56 for the Period 01/07/2007 to 30/06/2008
A74150 2007 Peak Resources Ltd Peak Hill <1% Peak Hill West Project C84/2004 Annual Report for the Period 17th Nov 2005 to 16th Nov 2006 (Peak Hill)
A71629 2006 Goldstar Resources Nl Bryah <1% M52/548, M52/588, E52/1621,P52/990 and P52/991, Bryah Reporting Group(Group Reporting No. C84/2004), 2004-2005
A71688 2006 Greater Pacific Gold Nl Peak Hill <1% Annual Report on Exploration Licence E52/1518 on the Peak Hill Sheet for the year ending November 2005, (Peak
A73492 2006 Barrick Gold Of Australia Ltd Peak Hill <1% Peak Hill JV Project M52/35,56,474, Annual Report, Period 1 July 2005 to 30 June 2006, Combined Reporting No.
A69882 2005 Peak Hill Manganese Pty Ltd Peak Hill <1% Annual report for the period 15/10/03 - 16/10/04 Peak Hill Project, E52/1518.
A61060 2000 Homestake Gold Of Australia Ltd Peak Hill <1% Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5
A61900 2000 Homestake Gold Of Australia Ltd Peak Hill <1% Project 6596, Peak Hill Mine Joint Venture Project, E52/697, M52/13,116,287,324,345,346,465,541,581-582, P52/5
A58699 1999 Homestake Gold Of Australia Ltd Peak Hill <1% Project 6596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541,581-582 P52/51
A58705 1999 Homestake Gold Of Australia Ltd Peak Hill <1% Project 6596 Peak Hill Mine Joint Venture Project E52/697 Fifth Year and Final Relinquishment Report Period 24
A57938 1999 Zygot Ltd Bryah <1% Final Report for 16/03/94-08/12/98 ,Bryah Project , E52/677.
A54838 1998 Troy Resources Nl Orchard-Reefer <1% Orchard-Reefer Project, Peak Hill District, W.A. Annual Report 1997-1998 P52/845-856, ELA52/1093
A55845 1998 Homestake Gold Of Australia Ltd Peak Hill <1% Project 596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,581 582 P52
A55789 1998 Homestake Gold Of Australia Ltd Peak Hill <1% Project 596 Peak Hill Mine Joint Venture Project E52/697 Fourth Year Partial Relinquishment Report Period 24/0
A56556 1998 St Barbara Mines Ltd Bryah <1% Bryah Project Area E52/601, 677; M52/344, 350, 445, 463, for the period 01/10/1997 - 30/09/1998.
A52184 1997 Plutonic Operations Ltd Peak Hill <1% Project 596 Peak Hill Joint Venture Project E52/686,697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,5
A52258 1997 Plutonic Operations Ltd Peak Hill <1% Third Year Partial Relinquishment Report Period 24/06/94 to 23/06/97
A52798 1997 St Barbara Mines Ltd Bryah <1% Annual Report 01/10/96-30/09/97. Bryah Project Area. E52/601,628,677. M52/344,350,445,463. P52/550-555.
A53211 1997 St Barbara Mines Ltd Peak Hill <1% Peak Hill Project, Non-statutory Report: Geochemical Exploration Peak Hill/Glengarry Area W.A., 03/1996 - 03/
A51016 1997 Troy Resources Nl Orchard-Reefer 1% Orchard-Reefer Project Peak Hill District W.A Annual Report 1996-1997 Tenements P's 52/845 - 52/856 ELA 52/109
A47797 1996 Plutonic Operations Ltd Peak Hill <1% Annual Report. Period 16/03/1995-15/03/1996.
A47820 1996 Solomon Pacific Resources Nl Orchard-Reefer 1% Park Hill (Solomon Pacificferenco) Joint Venture Orchard Reefer project Annual report 1995-1996 Tenements: P52
A48742 1996 Plutonic Operations Ltd Peak Hill <1% Project 596 Peak Hill Mine Joint Venture Project E52/442 E52/686 E52/697 M52/13 M52/35 M52/56 M52/116 M52/287
A50691 1996 Plutonic Operations Ltd Peak Hill Mine <1% Peak Hill Mine Project, First and Final Relinquishment Report E52/686 for period 20/04/1996 to 19/04/1997.
A49652 1996 Plutonic Operations Ltd Bullgullan <1% Bullgullan E52/695 Final Report from 15/09/95- 14/09/96
A49726 1996 Marymia Exploration Nl Peak Hill Northwest <1% Annual Report for Exploration Licence 52/684 Peak Hill Northwest, from 21 October 1995 to 20th October 1996
A44283 1995 Plutonic Operations Ltd Peak Hill <1% Peak Hill (JV) Project, Partial Surrender Report for the period 16/3/1988 to 16/2/1995, E52/260.
A45781 1995 Plutonic Operations Ltd Bullgullan <1% Bullgullan Project, Annual Report E52/695 for the period 15/09/1994 to 14/09/1995.
A44395 1995 Plutonic Operations Ltd Peak Hill <1% Peak Hill (JV) Project, Annual Report for the period 16/03/1994 to 15/03/1995, E52/260, E52/404, E52/641, P52/
A45313 1995 Plutonic Operations Ltd Peak Hill Mine Joint Venture <1% Project 596 Peak Hill Mine Joint Venture Project Annual report E52/442 E52/686 E52/697 E52/737 M52/13 M52/35 M
A48214 1995 Marymia Exploration Nl Peak Hill Northwest <1% Peak Hill Northwest Project, Annual Report for period 21st October 1994 to 20th October 1995, E52/684.
A40476 1994 Peko Gold Ltd Peak Hill 1.6% Annual report for the period 1 July 1992 to 30 June 1993, M52/287. Peak Hill Project Part 4, Pipeline Tenement
A40474 1994 Peko Gold Ltd Peak Hill <1% Annual report for the period ending 30 June 1993, M52/35 and 347, and GML52/609, 610, 611, and 613. Peak Hill
A41117 1994 Afmeco Pty Ltd Peak Hill South <1% Peak Hill South (JV) Project, Annual Report, E52/260, E52/404, E52/641. P52/7272 (Group 1) for the period 16/0
A41882 1994 Peko Gold Ltd Peak Hill 1.6% Annual report for the period 1 July 1993 to 30 June 1994, M52/287. Peak Hill Project Part 4, Pipeline Tenement
A42347 1994 Peko Gold Ltd Peak Hill <1% Annual report for the period 01/07/93-30/06/94 Peak Hill Project GML52/609-610 M52/35,347,474
A37782 1993 Peko Gold Ltd Peak Hill <1% Annual report for the period ending 30 June 1992, M52/35, GML52/609, GML52/610 ,GML52/611, and GML52/613. Peak
A38278 1993 Afmeco Pty Ltd M6077/14: Peak Hill gold exploration <1% Annual report Peak Hill South JV
A43549 1993 Marymia Exploration Nl Peak Hill Northwest <1% Peak Hill Northwest Project, Annual Report Exploration Licence E52/684 for year ending October 1994.
A37939 1993 Peko Gold Ltd Peak Hill 1.6% Annual report for the period ending 30 June 1992, P52/335 to P52/358, and M52/287. Peak Hill Project Part 4, P
A39413 1993 Peko Gold Ltd Peak Hill <1% Report on reprocessing of aeromagnetic survey data, Peak Hill Project Western Australia. 1993.
A35601 1992 Afmeco Pty Ltd Peak Hill South <1% Peak Hill South (JV) Project, E52/260 & 404; P52/475 (Group 1)for the period 17/03/1991 to 16/03/1992.
A37368 1992 Perilya Mines Nl Reefer <1% Surrender Report, Reefer Project , for the period 19/1/92 to 26/10/92, E52/589.
A35760 1992 Peko Mines Nl Peak Hill <1% R Report for the Period 16/01/91 - 30/06/91 Peak Hill Project GML52/609-610; M52/35
A36773 1992 Afmeco Pty Ltd Peak Hill South <1% Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 30/05/1992, E52/260.
A39414 1992 Peko Gold Ltd Peak Hill <1% R Report - Assessment of controls on gold mineralisation. Peak Hill-Fiveways and Jubilee Pit environs. Recomme
A32779 1991 Geopeko Peak Hill <1% Report No WA91/14S Exploration Work Carried Out by Geopeko on M52/35 during the period 16/01/90-15/01/91 (Peak
A33455 1991 Afmeco Pty Ltd Peak Hill South <1% Peak Hill South Project, Annual Report for the period 17/03/1990 to 16/03/1991, E52/260 & 404; P52/475-477.
A33947 1991 Afmeco Pty Ltd Peak Hill South <1% Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 15/03/1991, E52/260.
A29996 1990 Afmeco Pty Ltd Peak Hill South <1% Peak Hill South Project, Annual Report for the period 1st January 1989 to 31st December 1989, E52/260,404; P52
A26830 1989 Afmeco Pty Ltd Peak Hill South <1% Annual Report for the period 16/03/88-16/03/89 Peak Hill South Project E52/260
A26322 1989 Geopeko Peak Hill <1% Report on Reverse circulation drilling carried ou at Peak Hill M52/35 to test down dip Au Mineralization. 03/8
A26326 1989 Geopeko Peak Hill <1% Reort No:89/4 Exploration work carried out on ML52/35 in the Peak Hill area during period 14/01/88-31/12/88
A26403 1989 Geopeko Peak Hill <1% Report No: 89/7 Diamond Drilling carried out on tenement M25/35 at Peak Hill During 09/88-11/88
A27396 1989 Geopeko Peak Hill <1% Report No:89/16 Manual Geological Resource Calculation for the area between 9600N and 9680N South of the curre
A29217 1989 Geopeko Peak Hill <1% Report No: WA89/31P Reverse Circulation and Diamond Drilling. Peak Hill(ML52/35) 07/89-08/89
A23073 1988 Geopeko Peak Hill <1% Report on 'Exploration work carried out on ML52/35 in the Peak Hill area during the period 14/01/87 to 13/01/8
A23373 1988 Geopeko Peak Hill <1% Report on Manual Geological Resource Calculation for Reefers Prospect at Peak Hill, W.A. (March 1988) (M52/35)
A23374 1988 Geopeko Peak Hill <1% Report on Manual Geological Resource Calculation for the area between 10125N and 9725N North and South of the
A24529 1988 Geopeko Ravelstone / Christmas Gift <1% Report on 1988 Airborne Magnetis and Radiometric Survey. Peak Hill, WA. 01/88-06/88. (E52/88, E52/93, M52/35,
A24764 1988 Geopeko Peak Hill <1% Report No 88/14 on manual geological resource calculation for the area between 9695N and 9675N south of the cu
A19911 1987 Geopeko Peak Hill <1% Report on 'Exploration work carried out on ML52/35 in the Peak Hill Area by Geopecko During the period 14/01/
A21064 1987 Geopeko Peak Hill <1% Report on 'Exploration work carried out on Tenements M52/35 E52/88 P52/109 P52/140 to P52/146 in the Peak Hill
A22019 1987 Geopeko Peak Hill <1% Peak Hill (WA) Joint Venture Geological Resource Estimate April 1987 (M52/35)
A17322 1986 Geopeko Peak Hill <1% Annual report on M52/35 Peakhill Open Cut for the period 14/01/85 to 13/01/86
A18213 1986 Geopeko Peak Hill <1% Report on Exploration work carried out on Tenements (E52/88 P52/109 P52/140 to P52/146 and M52/35) in the Peak
A11347 1982 Stockdale Prospecting Ltd Horseshoe Townsite <1% Horseshoe Townsite, Non-statutory Report: Final Report for the period 18th December 1981 to 17th June 1982, TR
A23372 1753 Geopeko Ravelstone / Christmas Gift <1% Report on Manual Geological Resource Calculation for Area East of the Peak Hill Open Cut, W.A. (03/1988) (GML5
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
18 months · 25 Feb 2028
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over L 52/20 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold L 52/20? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.