L 58/50
L 58/50 is a pending miscellaneous licence in the Shire of Mount Magnet, Western Australia, applied for by Gnt Resources Pty Ltd (part of Ramelius Resources Limited). The application was received on 28 Jan 2026 and is awaiting a decision. The ground is covered by 105 historical WAMEX reports.
Register summary
- Holder
- Gnt Resources Pty Ltd
- Part of
- Ramelius Resources Limited (ASX:RMS) as at 2026-06-30
- Local government
- Shire of Mount Magnet
- Application received
- 28 Jan 2026
The full record on L 58/50
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (1 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153392 | 2026 | Manda Resources Pty Ltd | Mt Farmer South | 1.9% | Mt Farmer South E58/610 Project Final Surrender Report for the period ending 19/11/2025. |
| A150626 | 2025 | Manda Resources Pty Ltd | Mt Farmer South | 1.9% | Mt Farmer South Project E58/610 Annual Report for the period ending 10/09/2025 |
| A143740 | 2024 | Surefire Resources Nl | Mount Farmer | <1% | Mount Farmer E59/02843 Surrender Report for the period 30 October 2023 to 15 July 2024 |
| A145314 | 2024 | Manda Resources Pty Ltd | Mount Farmer South | 1.9% | Mt Farmer South E58/00610 Annual Report for the period 11 September 2023 to 10 September 2024 |
| A145606 | 2024 | Manda Resources Pty Ltd | Mt Farmer South | 1.9% | Mt Farmer South Project E58/610 Partial Surrender Report for the period ending 07/11/2024. |
100 more reports
| A137180 | 2023 | Golden Mile Resources Ltd | Mount Magnet | <1% | Surrender Report Mt Magnet E59/02707 for the period ending 26/06/2023 |
| A123717 | 2020 | Gascoyne Resources Ltd | Dalgaranga | <1% | Dalgraranga Project C30/2015 Annual Report for the period ending 20/2/2020 |
| A124705 | 2020 | Mt Magnet Gold Pty Ltd | Hill 50 Project - Mount Magnet | <1% | Hill 50 - Mount Magnet C199/1993 Annual Technical Report for the period 1 July 2016 to 30 June 2017 |
| A123683 | 2020 | Gascoyne Resources Limited | Dalgaranga | <1% | Dalgaranga Project Surrender Report for E59/1904 and E59/1906, C30/2015, 21 February 2014 to 20 February 2020 |
| A120902 | 2019 | Mt Magnet Gold Pty Ltd | Hill 50 - Mount Magnet | <1% | Hill 50 - Mount Magnet C199/1993 Annual Technical Report for the period 01/07/2018 to 30/06/2019 |
| A120185 | 2019 | Gascoyne Resources Ltd | Dalgaranga | <1% | C30/2015 Dalgaranga Project Annual Technical Report for the period 21 May 2018 to 20 May 2019, E21/00195, E59/ |
| A117526 | 2018 | Mount Magnet Gold Pty Ltd | Hill 50 - Mount Magnet | <1% | Hill 50 Annual Technical Report, C196/1993, 01 July 2017 - 30 June 2018 |
| A116801 | 2018 | Gascoyne Resources Ltd | Dalgaranga | <1% | Dalgaranga Project C30/2015 Annual Report for the period 21/02/2017 - 22/02/2018, M59/00749, E21/00195, E59/01 |
| A113874 | 2017 | Gascoyne Resources Ltd | Dalgaranga | <1% | Dalgaranga Project C30/2015 Annual Report for the period 23 May 2016 to 22 May 2017, M59/00749, E59/01904, E59 |
| A114395 | 2017 | Gascoyne Resources Limited | Dalgaranga | <1% | Drillcore Submission by Gascoyne Resources Limited. M59/00749 [CRG #: 30/2015] |
| A114631 | 2017 | Ramelius Resources Limited | Hill 50 - Mount Magnet | <1% | Hill 50 - Mount Magnet C199/1993 Annual Technical Report for the period 1 July 2016 to 30 June 2017 |
| A109165 | 2016 | Gascoyne Resources Limited | Dalgaranga | <1% | C30/2015 DALGARANGA PROJECT Annual Report for the period 23 May 2015 to 22 May 2016, M 59/00749, E 59/01904, E |
| A109814 | 2016 | Mount Magnet Gold Pty Ltd | Mount Magnet - Hill 50 | <1% | Annual Exploration Report for the Mt Magnet - Hill 50 Gold Project for the period 01/07/2015 to 30/06/2016 |
| A105250 | 2015 | Gascoyne Resources Ltd | Dalgaranga | <1% | Annual Report For the period 17th March 2014 to 16th March 2015 Dalgaranga Project, E59/1709 |
| A106503 | 2015 | Ramelius Resources Ltd | Hill 50 | <1% | Hill 50 Gold Project, Annual Technical Report – Combined Technical Report No. C199/1993 for the period 1 July |
| A104986 | 2015 | Gascoyne Resources Ltd | Dalgaranga | <1% | Annual Report 21/02/2014 to 20/02/2015 Dalgaranga Project, E59/1906 |
| A102046 | 2014 | Gascoyne Resources Ltd | Dalgaranga | <1% | Annual Report For the period 17th March 2013 to 16th March 2014 Dalgaranga Project, E59/1709 |
| A103112 | 2014 | Mt Magnet Gold Pty Ltd | Hill 50 - Mount Magnet | <1% | Annual Technical Report – Combined Technical Report Hill 50 - Mount Magnet Project C199/1993, E21/152....P58/1 |
| A103755 | 2014 | Gascoyne Resources Ltd | Dalgaranga | <1% | Annual Report Dalgaranga Project M59/749 for the period 23/09/2013 to 22/09/2014 |
| A97455 | 2013 | Gascoyne Resources Ltd | Dalgaranga | <1% | Dalgaranga Project, Annual Report for the period 17th March 2012 to 16th March 2013, E59/1709. |
| A99048 | 2013 | Mt Magnet Gold Pty Ltd | Hill 50 | <1% | Mt Magnet - Lennonville - Lake Austin Annual Exploration Report Hill 50 Group Year Ending 30th June 2013, E21/ |
| A93724 | 2012 | Hemisphere Resources Ltd | Lakeside | 1.8% | Lakeside E59/1684 Final surrender report for the period 19 January 2011 to 4 April 2012 |
| A94060 | 2012 | Mcdowell, Ja | Dalgaranga | <1% | E59/1709 Annual mineral exploration report for the Dalgaranga gold project 17th March 2011 to 16th March 2012 |
| A94838 | 2012 | Mt Magnet Gold Nl | Hill 50 | <1% | Combined Annual Exploration Report, Hill 50 Project, Year Ending 30th June 2012, C199/1993, |
| A92710 | 2012 | Hemisphere Resources Ltd | Lakeside | <1% | Lakeside Project C26/2011 Annual report for the year ended 12 August 2011, E21/136,1659 and1684 |
| A91441 | 2011 | Mt Magnet Gold Nl | Hill 50 | <1% | Annual Exploration Report Hill 50 Group for the Year Ending 30th June 2011, C199/1993 |
| A87934 | 2010 | Mt Magnet Gold Nl | Mount Magnet | <1% | Combined Annual Exploration Report year ending 30th June 2010, Hill 50 Project Tenements C199/1993 |
| A84269 | 2009 | Mt Magnet Gold Nl | Hill 50 Group | <1% | Combined Annual Exploration Report, Year Ending 30th June 2009, Hill 50 Project Tenements, GSWA REF. C199/1993 |
| A82927 | 2009 | Lihir Gold Limited | DALGARANGA | 1.8% | COMBINED ANNUAL REPORT FOR THE DALGARANGA GOLD MINES JV DALGARANGA, WA, FOR THE PERIOD 1 JUNE 2008 TO 31MAY 20 |
| A79711 | 2008 | Mt Magnet Gold Nl | Hill 50 | <1% | COMBINED ANNUAL EXPLORATION REPORT YEAR ENDING 30th JUNE 2008 |
| A78768 | 2008 | Equigold Nl | Dalgaranga | 1.8% | TECHNICAL REPORT NO. TR260 COMBINED ANNUAL REPORT FOR THE DALGARANGA GOLD MINES JV DALGARANGA, WA For The Peri |
| A75838 | 2007 | Mount Magnet Gold Nl | Hill 50 | <1% | Hill 50 Project, Annual Report for the period ending 30/06/2007, M58/4..............M58/304; P58/825.....P58/ |
| A75755 | 2007 | Equigold Nl | Dalgaranga | 1.8% | Combined Annual Report For the Dalgaranga Gold Mines Joint Venture For the Period 1 June 2006 TO 31 May 2007 ( |
| A72998 | 2006 | Equigold Nl | Dalgaranga | 1.8% | Combined Annual Report for the Dalgaranga Gold Mines JV, For the Period 1 June 2005 to 31 May 2006, Combined R |
| A73191 | 2006 | Mount Magnet Gold Nl | Hill 50 | <1% | Combined Annual Exploration Report, Year Ending 30 June 2006 , Hill 50 Project C199/1993, (Cue). |
| A71112 | 2005 | Mount Magnet Gold Nl | Hill 50 | <1% | Combined annual exploration report, year ending 30 June 2005 Hill 50 Tenements, GSWA ref. C199/1993, M1315/1 ( |
| A71442 | 2005 | Equigold Nl | Dalgaranga Gold Mines JV | 1.4% | Combined annual report for the Dalgaranga Gold Mines JV, Dalgaranga Western Australia, For the period 1 June 2 |
| A68805 | 2004 | Equigold Nl | Dalgaranga | 1.4% | Combined Annual report for the Dalgaranga Gold Mines JV, Dalgaranga, WA for the period 01/06/2003-31/05/2004 |
| A69206 | 2004 | Mount Magnet Gold Nl | Hill 50 | <1% | Combined Annual report for the period 1/07/2003-30/06/2004 Hill 50 Project(C199/1993), |
| A69276 | 2004 | Equigold Nl | Dalgaranga | 3.7% | Partial Surrender Report for M59/293,( Dalgaranga Gold Mines JV) for the period 22/09/1996-28/05/04. |
| A66012 | 2003 | Equigold Nl | Dalgaranga | 1.1% | Dalgaranga Project, Final Surrender Report for the period 21 Nov 1992 to 26 Sep 2002 , M59/265, 277, 292, 351, |
| A67235 | 2003 | Mt Magnet Gold Nl | Hill 50 | <1% | Combined Annual Exploration Report for the year ending 30 June 2003 Hil 50 Project Tenements C199/1993: M58/4, |
| A65251 | 2002 | Mt Magnet Gold Nl | Hill 50 | <1% | Annual Combined Mineral Exploration Report Year Ending 30 June 2002 Hill 50 Project Tenements GSWA REF. C199/1 |
| A63366 | 2001 | Mt Magnet Gold Nl | Hill 50 | <1% | Combined Mineral Exploration Report year ending 30 June 2001 Hill 50 Project tenements (GSWA ref. C199/1993, M |
| A62862 | 2001 | Equigold Nl | Dalgaranga | 1.2% | Annual Report for the Dalgaranga Project,,for the Period 30 May 2000 to 29 May 2001 Mines Dept Ref No C306/199 |
| A63358 | 2001 | Mt Magnet Gold Nl | Mount Magnet | 4.6% | Surrender Report M58/049 part C199/1993. |
| A60809 | 2000 | Gullewa Ltd | Gullewa 2 | <1% | Gullewa 2 Project, Non-statutory Report (CD format), July 2000,E59/360, 419, 438, 457, 459, 483 etc ( Multiple |
| A60317 | 2000 | Equigold Nl | Dalgaranga | <1% | Final Surrender Report for the Dalgaranga Gold Mines JV for the Period 05/05/1991 to 26/11/1999 Partial Surren |
| A60090 | 2000 | Equigold Nl | Keygo Bore | 3.4% | Technical reprot No.039 Partial Surrender Report Keygo Bore for the Period 12/11/1992 to 21/01/2000 Dalgaranga |
| A61181 | 2000 | Mt Magnet Gold Nl | Hill 50 | <1% | Combined Mineral Exploration Report Year Ending 30 June 2000 Hill 50 Project Tenements GSWA Ref. C199/1993. (E |
| A61034 | 2000 | Equigold Nl | Dalgaranga | 1.2% | Annual Report for the Dalgaranga Gold Mines JV, Dalgaranga, Western Australia for the period 30/05/1999 to 29/ |
| A58667 | 1999 | Equigold Nl | Dalgaranga | <1% | Dalgaranga Gold Mines JV, Dalgaranga W.A. 30/05/1998 - 29/05/1999 E59/407, 439, 791, M59/265 |
| A59184 | 1999 | Mt Magnet Gold Nl | Hill 50 | <1% | Combined Mineral Exploration Report for year ending 30 June 1999, E58/144; M58/4,5,11,26,27,28, 30, 40, 42, 43 |
| A56382 | 1998 | Mt Magnet Gold Nl | Mount Magnet (Hill 50) | <1% | Combined annual mineral-exploration report. Mount Magnet (Hill 50). 01/07/97-30/06/98. |
| A55530 | 1998 | Equigold Nl | Dalgaranga | <1% | Dalgaranga (JV) Project, Annual Report for the period 30/05/1997 to 29/05/1998, E59/344, 407 & 439; M59/265, 2 |
| A55637 | 1998 | Equigold Nl | Dalgaranga | <1% | Surrender Report for Exploration Licence E59/344 Dalgaranga Gold Mines JV for the period 24th June 1990 to 23r |
| A51415 | 1997 | Equigold Nl | Boundary Bore | <1% | Boundary Bore Project, Annual Report Exploration Licence E59/667, for the period 22 April 1996 to 21 April 199 |
| A51766 | 1997 | Equigold Nl | Dalgaranga | <1% | Dalgaranga (JV) Project, Annual report for the Dalgaranga Gold Mines JV Dalgaranga, Western Australia for the |
| A52557 | 1997 | Hill 50 Gold Mine Nl | Hill 50 | <1% | Annual report Hill 50 Project tenements. 01/07/96 to 30/06/97. Hill 50 Gold Mine |
| A46941 | 1996 | Western Reefs Ltd | Mungoo Well | <1% | Mungoo Well Project, Annual Report for the period 1July 1994 to 30 June 1995, E59/545. |
| A49129 | 1996 | Hill 50 Gold Mine Nl | Hill 50 | <1% | Annual report to WA Department of Minerals & Energy (Hill 50 Gold Mine) 1 July 1995 to 30 June 1996 (E58/144, |
| A48387 | 1996 | Equigold Nl | Dalgaranga | <1% | Annual report for the Dalgaranga Gold Mines Joint Venture Dalgarange, Western Australia for the period 30 May |
| A46491 | 1995 | Western Mining Corporation Ltd | Hill 50 | <1% | Hill 50 Gold Mine 1 July 1994 to 30 June 1995 Ref:SGE.172 Annual report to the Department of Mines and Energy |
| A41670 | 1994 | Newcrest Mining Ltd | Keygo | 1.9% | Annual report for the period ending June 1994 Dalgaranga Project 'Keygo' M59/0265 M59/0287-0289 |
| A41669 | 1994 | Newcrest Mining Ltd | Hunter | <1% | Annual report for the period 06/93-05/94 Hunter Project E59/344 E59/407 E59/439 M59/292-293 P59/1004 |
| A41671 | 1994 | Newcrest Mining Ltd | Johanna-Dalgaranga | <1% | Annual Report for the period 05/93-05/94 Johanna/Dalgaranga Project M59/276-277,311-312 P59/1146-1166 |
| A42699 | 1994 | Western Mining Corporation Ltd | Mount Magnet | <1% | Hill 50 Gold Mine Annual report 1 July 1993 to 30 June 1994 (E58/27, E58/144, GML58/1281, GML58/1769, GML58/17 |
| A37678 | 1993 | Hunter Resources Ltd | Murrum | 10% | Dalgaranga Annual report for the year ending 16/12/92 Murrum Project P59/1004 |
| A37712 | 1993 | Hunter Resources Ltd | Dalgaranga | <1% | Annual report for the period ending 21/12/92 Dalgaranga JV Project E59/253 |
| A39307 | 1993 | Hunter Resources Ltd | Keygo Bore | <1% | E59/243 - Keygo Bore Annual Exploration Report to 14th May, 1993 |
| A39673 | 1993 | Western Mining Corporation Ltd | Mount Magnet | <1% | Annual Report for the WA Mines Dept 01/07/92 - 30/07/93 (Hill 50 Project) (E58/27, GML58/1581, GML58/1766, GML |
| A39729 | 1993 | Hunter Resources Ltd | Duffy Bore | <1% | Duffy Bore Project, Annual Report for the period 27th June 1992 to 26th June 1993, E59/344. |
| A39781 | 1993 | Hunter Resources Ltd | Duffy Bore | <1% | Duffy Bore Project, , Partial Surrender Report for the period 27 June 1992 to 26 June 1993, E59/344. |
| A35083 | 1992 | Hunter Resources Ltd | Murrum | 10% | Annual Exploration Report to 16/12/91 P59/1004 - Murrum (Project) |
| A35182 | 1992 | Hunter Resources Ltd | Dalgaranga | <1% | E59/253 - Dalgaranga Annual Exploration Report to 20/12/91 |
| A35564 | 1992 | Hunter Resources Ltd | Keygo | <1% | Annual Report for the period 15/05/91-14/05/92 Keygo (JV) Project E59/243 |
| A36808 | 1992 | Hunter Resources Ltd | Duffy Bore | <1% | Duffy Bore Project, Annual Report for the period ending 26th June 1992, E59/344. |
| A33538 | 1991 | Rgc Exploration Pty Ltd | Boogardie | <1% | Boogardie Project , Annual Report for the period 01/01/90 - 28/02/91, M58/30, 78-81, 119-122, 136, 140, 147, |
| A34479 | 1991 | Hunter Resources Ltd | Duffy Bore | <1% | Duffy Bore Project, Annual Report for period to 27th June 1991, E59/344. |
| A30731 | 1990 | Rgc Exploration Pty Ltd | Mount Magnet | <1% | Mt Magnet Project, Progress report 01 July 1988 - 31 Dec 1989 (1988-1989). |
| A30986 | 1990 | Acm Gold Ltd | Dalgaranga | <1% | Final Report on the Johanna Dalgaranga JV Exploration Licences 59/253,254 (Annual Report for 1989-1990) |
| A31772 | 1990 | Cra Exploration Pty Ltd | Lakeside | <1% | Lakeside Project, Annual Report for the period ended 24th February 1989 & 1990,E21/24 & E59/243. |
| A33403 | 1990 | Western Mining Corporation Ltd | Mount Magnet | <1% | Annual Report for the WA Mines Dept 01/07/89 - 30/06/90 (Mount Magnet; GML58/1581,1787,1795,1895-1896,1898,19 |
| A35109 | 1990 | Cra Exploration Pty Ltd | Lakeside | <1% | Lakeside (JV) Project, Final Surrender Report for the period 24th February 1990 to 4th July 1990, E21/21, 24,& |
| A30070 | 1990 | Western Mining Corporation Ltd | Mount Magnet | <1% | Annual Report 01/07/88 - 30/06/89 (Mount Magnet Project; GML58/1581, GML58/1787, GML58/1795, GML58/1895, GML58 |
| A28991 | 1989 | Cra Exploration Pty Ltd | Dalgaranga | <1% | Partial and final relinquishment report for period ended 4 March 1988 on Dalgaranga, E59/22 |
| A22421 | 1988 | Western Mining Corporation Ltd | Mount Magnet | <1% | Annual report on Mount Magnet Tenements GML58/1581, GML58/1787, GML58/1795, GML58/1895, GML58/1896, GML58/1898 |
| A24092 | 1988 | Battle Mountain Australia Inc | Mount Charles | 1% | Mount Charles Project, Final report, E59/183 |
| A26978 | 1988 | Rgc Exploration Pty Ltd | Mount Magnet | <1% | Mount Magnet Project, Annual Report for the period 1st July 1987 to 30th June 1988, M58/78-81, 119-122 & |
| A20408 | 1987 | Hill 50 Gold Mine Nl | Mount Magnet | <1% | Mount Magnet Project, Annual Report for the period 19th June 1986 to 17th June 1987, GML58/1581.......2422; |
| A23070 | 1987 | Cra Exploration Pty Ltd | Dalgaranga | <1% | Dalgaranga, Annual report for 1985 and 1986, E59/22 |
| A20163 | 1986 | Hill 50 Gold Mine Nl | Mount Magnet | <1% | Mount Magnet Project, Annual Report for the period 19th June 1985 to 17th June 1986, GML58/1581, 1787, 1795, 1 |
| A23067 | 1986 | Cra Exploration Pty Ltd | Dalgaranga | <1% | Dalgaranga - Ground Em, Follow-up of input anomalies, E59/22 |
| A23069 | 1986 | Cra Exploration Pty Ltd | Dalgaranga | <1% | Dalgaranga Project - Lasoda Prospect, Report on petrology and mineralogy of diamond drill holes, 5 November 19 |
| A15701 | 1985 | Cra Exploration Pty Ltd | Dalgaranga | <1% | Dalgaranga Project, Annual Report for the period ending 31/12/1984, E59/22 |
| A23068 | 1985 | Cra Exploration Pty Ltd | Dalgaranga | <1% | Dalgaranga, Input survey, October 1985, E59/22 |
| A14061 | 1984 | Cra Exploration Pty Ltd | Dalgaranga | <1% | Dalgaranga Project. Annual Report for the period ending 31/12/1983, E59/22. |
| A35696 | 1753 | Western Mining Corporation Ltd | Mount Magnet | <1% | Annual report for the WA Mines Dept 01/07/90-30/06/91 (Mount Magnet Project) (GML58/1581, GML58/1766, GML58/17 |
| A39314 | 1753 | Western Mining Corporation Ltd | Mount Magnet | <1% | Annual Report for the WA Mines Dept 01/07/91 - 30/06/92 Hill 50/Ard Patrick/Baxter/Bertie/Black Cat/Black Hole |
| A45059 | 1753 | Newcrest Mining Ltd | Dalgaranga | <1% | Dalgaranga Area Annual report 06/1994-05/1995 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 58/50 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 58/50? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.