M 16/187
M 16/187 is a live mining lease in the Shire of Coolgardie, Western Australia, held by Evolution Mining (Phoenix) Pty Ltd (part of Evolution Mining Limited). Granted on 23 Mar 1993 for 21 years (renewed), it expires on 22 Mar 2035. The ground is covered by 103 historical WAMEX reports.
Register summary
- Holder
- Evolution Mining (Phoenix) Pty Ltd
- Part of
- Evolution Mining Limited (ASX:EVN) as at 2025-06-30
- Local government
- Shire of Coolgardie, City of Kalgoorlie-Boulder
- Application received
- 8 June 1992
- Commenced
- 23 Mar 1993
- Expiry
- 22 Mar 2035
- Term
- 21 Years (Renewed)
The full record on M 16/187
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 7 changes of holder
- The full record: 35 years of expenditure and 11 conditions
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (13 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | 1.5% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A123515 | 2020 | Northern Star (Kanowna) Pty Limited | Carbine Zuleika | <1% | Carbine Zuleika Annual Technical Report, C154/2009, 5 March 2019 to 4 March 2020 |
| A124813 | 2020 | Northern Star (Kanowna) Pty Limited | Lake Carnage | 1.4% | Lake Carnage C72/2013 Annual Technical Report for the period ending 11/07/2020, E 16/00445, E 24/00167 |
| A122980 | 2020 | Torian Resources Ltd | Zuleika North | <1% | Zuleika North Project C 28/2016 Annual Report 2019 |
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | 1.4% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
98 more reports
| A119902 | 2019 | Northern Star (Kanowna) Pty Limited | Carbine Zuleika | <1% | Carbine Zuleika C154/2009 Annual Technical Report for the period 5 March 2018 to 4 March 2019 |
| A120904 | 2019 | Evolution Mining (Mungari) Pty Ltd | Lake Carnage | 1.4% | Group Annual Report - C72/2013 - Lake Carnage E16/00445, E24/00167 for the period 12 July 2018 to 11 July 2019 |
| A121803 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2952 Annual Report for the period 22 November 2017 to 21 November 2018 |
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | 1% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A118064 | 2018 | Torian Resources Limited | Zuleika North | <1% | Zuleika North Project C28/2016 Annual Report for the period 01/12/2016 - 30/11/2017 |
| A118224 | 2018 | Torian Resources Limited | Zuleika North | <1% | Zuleika North Project C28/2016 Annual Report for the period 1 December 2017 to 30 November 2018 |
| A116702 | 2018 | Northern Star (Kanowna) Pty Limited | Carbine Zuleika | <1% | Carbine Zuleika Project Annual Technical Report C154/2009 for the period 05/03/2017 - 04/03/2018 |
| A117606 | 2018 | Evolution Mining (Mungari) Pty Ltd | Lake Carnage | 1.4% | ANNUAL REPORT LAKE CARNAGE C72/2013, 12 JULY 2017 - 11 JULY 2018 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | <1% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A112715 | 2017 | Northern Star (Kanowna) Pty Limited | Carbine Zuleika | <1% | Carbine Zuleika C154/2009 Annual Report for the period 05/03/2016 to 04/03/2017 |
| A114688 | 2017 | Evolution Mining (Mungari) Pty Ltd | Lake Carnage | 1.4% | Annual Report for the Lake Carnage Project, C72/2013, For the Period 12 July 2016 to 11 July 2017 |
| A109048 | 2016 | Northern Star (Kanowna) Pty Limited | Carbine East | <1% | Carbine East JV Surrender Report C154/2009 for the period 5 March 2008 to 4 March 2016, P 16/02482, P 16/02483 |
| A108984 | 2016 | Phoenix Gold Limited | Carbine - Zuleika | 5.1% | Carbine - Zuleika Project Mineral Exploration Report Reporting Group C277/1997 For the period 10th January 201 |
| A108638 | 2016 | Northern Star (Kanowna) Pty Limited | Carbine East | <1% | C154/2009 Carbine East Annual Technical Report for the period 05/03/2015 to 04/03/2016, M16/00411, P16/02508, |
| A110024 | 2016 | Evolution Mining Limited | Lake Carnage | 1.4% | Lake Carnage Project C72/2013, E16/00445, E24/00167 Annual Report for the period 12 July 2015 to 11 July 2016 |
| A104973 | 2015 | Phoenix Gold Limited | Carbine - Zuleika | 5.1% | Carbine - Zuleika Project C277/1997 Mineral Exploration Report for the period 10th January 2014 to 9th January |
| A105538 | 2015 | Northern Star (Kanowna) Limited | Carbine East | <1% | Carbine East C154/2009 Annual Technical Report for the period 5 March 2014 to 4 March 2015, M16/00005.....P 2 |
| A106907 | 2015 | Evolution Mining Pty Ltd | Lake Carnage | 1.4% | Annual Report for the period 12th July 2014 to 11th July 2015, Lake Carnage Project, E24/167 and E16/445, C72/ |
| A103217 | 2014 | St Barbara Ltd | Lake Carnage | 1.4% | Annual Mineral Exploration Report - DMP Combined Reporting Group: C72/2013 Lake Carnage Reporting Period: 12 J |
| A101338 | 2014 | Phoenix Gold Limited | Carbine-Zuleika | 6.4% | Carbine-Zuleika Mineral Exploration Report E16/402, E16/417, M16/29, M16/32, M16/187, M16/405 (C277/1997) for |
| A101979 | 2014 | Northern Star Resources Ltd | North Zuleika | <1% | NORTH ZULEIKA PROJECT 8529 ANNUAL REPORT TECHNICAL REPORT No: Department of Mines and Petroleum Period 9 March |
| A101980 | 2014 | Northern Star Resources Ltd | Carbine East | <1% | Carbine East Project C154/2009 Annual Report 2014 for the period 5th March 2013 – 4th March 2014, P16/2482, P1 |
| A97257 | 2013 | Phoenix Gold Limited | Carbine- Zuleika | 6.4% | Carbine- Zuleika Project, Annual Report for the period 10/01/2012 to 09/01/2013, E16/402 & 417; M16/29, 32,187 |
| A97659 | 2013 | Barrick (Australia Pacific) Ltd | Carbine East | <1% | Carbine East P16/2482- 2491, P24/4184-4186 Annual Report for the period 5 March 2012 – 4 March 2013 |
| A97589 | 2013 | Barrick (Kanowna) Ltd | North Zuleika | <1% | PROJECT 8529 NORTH ZULEIKA M16/188, M16/239, M16/27, M16/411, M16/5 P16/2508 ANNUAL REPORT Period 9 March 2012 |
| A99161 | 2013 | St Barbara Ltd | Lake Carnage | 1.4% | Lake Carnage Project, Annual Report for the period 12/07/2012 to 11/07/2013, E24/167, E16/445. [C72/2013] |
| A93429 | 2012 | Barrick (Australia Pacific) Ltd | Carbine East | <1% | Carbine East P16/2482- 2491, P24/4184-4186 Annual Report for the period 5 March 2011 – 4 March 2012, C154/2009 |
| A94840 | 2012 | St Barbara Ltd | Lake Carnage | 1.7% | Annual Mineral Exploration Report - DMP Lake Carnage Tenement- E24/167 Reporting Period: 12th of July 2011 to |
| A92975 | 2012 | Phoenix Gold Limited | Carbine-Zuleika | 6.4% | Carbine-Zuleika C277/1997 Annual Technical Report for Period 10/1/11 to 9/1/12, E16/402 E16/417 M16/29, M16/3 |
| A93430 | 2012 | Barrick (Australia Pacific) Ltd | North Zuleika | <1% | Project 8529 North Zuleika Annual Report for the period 9 March 2011 – 8 March 2012, M16/188, M16/239, M16/27, |
| A95428 | 2012 | Northern Capital Resources Corporation | Mount Carnage 2 | <1% | PROSPECTING LEASES 24/4329, P24/4330, P24/4331, P24/4332, P24/4333, P24/4334, P24/4335, P24/4336, P24/4337, P2 |
| A90020 | 2011 | Barrick (Kanowna) Ltd | North Zuleika | <1% | North Zuleika Project, Annual Report for the period 9th March 2010 to 8th March 2011, M16/188, M16/239, M16/27 |
| A90833 | 2011 | Phoenix Gold Limited | Rundle Dam | 99% | Rundle Dam C127/2007, Annual Technical Report, M16/187 For the period 1st June 2010 to 31st May 2011 |
| A92055 | 2011 | Northern Capital Resources Corporation | Mount Carnage 2 | <1% | “Mount Carnage 2” C182/2010 Group Annual Report for the period 10 September 2010 to 9 September 2011, P24/4329 |
| A90022 | 2011 | Barrick (Kanowna) Ltd | Carbine East | <1% | Carbine East Project, Annual Report for the period 5th March 2010 to 4th March 2011, P16/2482-2491, P24/4184-4 |
| A85803 | 2010 | Blackham Resources Ltd | Rundle Dam | 1.7% | E24/144 Final Surrender Report, 31 May 2009 - 11 September 2009 (C127/2007) |
| A86740 | 2010 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | Project 8529, North Zuleika, M16/188, M16/239, M16/27, M16/411, M16/44, M16/45, P16/2508, Annual Report, Perio |
| A88157 | 2010 | Blackham Resources Ltd | Rundle Dam | 99% | Rundle Dam Project 2010 Annual Report, 1 June 2009 – 31 May 2010 |
| A88619 | 2010 | Northern Capital Resources Corporation | Mount Carnage 2 | <1% | “Mount Carnage 2” Group Annual Report- C182/2010 for the period 10 September 2009 to 9 September 2010 |
| A86635 | 2010 | Barrick (Australia Pacific) Ltd | Carbine East | <1% | Carbine East P16/2482- 2491, P24/4184-4186, Annual Report, Period 5 March 2009 – 4 March 2010 |
| A82319 | 2009 | Barrick Gold Of Australia Ltd | NORTH ZULEIKA | <1% | PROJECT 8529 NORTH ZULEIKA C303/1997 M16/188, M16/239, M16/27, M16/411, M16/44, M16/45, P16/2508, ANNUAL REPOR |
| A82811 | 2009 | Barrick Gold Of Australia Ltd | CARBINE EAST | <1% | CARBINE EAST PROJECT P16/2482- 2491, P24/4184-4186, ANNUAL REPORT Period 5 March 2008 – 4 March 2009 |
| A84355 | 2009 | Blackham Resources Ltd | Rundle Dam | 11% | Rundle Dam Project C127/2007, M16/187, E24/144, for the period 1 June 2008 to 31 May 2009 |
| A79582 | 2008 | Blackham Resources Ltd | Rundle Dam | 47% | Rundle Dam Project 2008 Annual Report, 1 June 2007 – 31 May 2008, C127/2007 M16/187, P16/2283, P16/2284, P16/2 |
| A78277 | 2008 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | ANNUAL REPORT Period 9 March 2007 - 8 March 2008 TECHNICAL REPORT No. 1267 C303/1997 PROJECT 8518, 8529, 8536, |
| A74832 | 2007 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | North Zuleika Project C303/1997 Annual Report, Period 9 March 2006 - 8 March 2007 Report No.1223 (Kalgoorlie) |
| A75803 | 2007 | Blackham Resources Ltd | Rundle Dam | 47% | Rundle Dam Project -2006-2007 Annual Report Report Period 1 June 2006 - 31 May 2007 |
| A75296 | 2007 | Blackham Resources Ltd | Carbine North | 99% | Carbine North Project -M16/187 2006-2007 Annual Report |
| A73083 | 2006 | Maincoast Pty Ltd | Carbine North | 99% | M16/187, Annual Report for the Two Year Period 23 March 2004 to 22 March 2006, (Carbine North Project, Kalgoor |
| A72335 | 2006 | Placer Dome Asia Pacific Ltd | North Zuleika | <1% | North Zuleika Project, Annual Report, 9 March 2005 to 8 March 2006, Combined Reporting No. C303/1997, (PDAP Re |
| A73075 | 2006 | Avoca Resources Ltd | Blister Dam | <1% | Blister Dam(Chadwin) Project E24/120,P16/2149-2151,3773-3774 , Combined Technical Report C162/2002 for the Per |
| A70420 | 2005 | Placer Dome Asia Pacific Ltd | North Zuleika | <1% | North Zuleika Project, Annual Report 9 March 2004 to 8 Marc h 2005 C303/1997 M16/23...M16/411, P16/1373...P24/ |
| A68083 | 2004 | Placer Dome Asia Pacific Ltd | Chadwin (Blister Dam) | <1% | Chadwin (Blister Dam) Project, Annual Report 03/10/2002-02/10/2003 C162/2002 |
| A68508 | 2004 | Placer Dome Asia Pacific Ltd | Carbine/Zuleika | <1% | Carbine/Zuleika Project Annual Report 09/03/2003 to 08/03/20 04 C303/1997 M16/27...M16/411, P16/1439...P24/335 |
| A68695 | 2004 | Placer Dome Asia Pacific Ltd | Carbine East | <1% | Carbine East Project,Final Report, Work completed 31/12/1999 to 31/03/2004 (C67/2000), P24/3674 to P24/3676 an |
| A69534 | 2004 | Avoca Resources Ltd | Blister Dam (Chadwin) | <1% | Blister Dam (Chadwin) Project, Exploration Licence E24/120, Prospecting licences P16/2149 - 2151, P24/3772 - 3 |
| A66622 | 2003 | Placer Dome Asia Pacific Ltd | Carbine | <1% | Carbine East Project, Annual Report 01/04/2002-31/03/2003 C67/2000:( P24/2674-76, P16/2029-37). |
| A66657 | 2003 | Placer Dome Asia Pacific Ltd | Carbine North | 99% | Carbine North Project, Annual Report 23/03/2002-22/03/2003 M16/187, Placer Report No WA03.014 |
| A66658 | 2003 | Placer Dome Asia Pacific Ltd | Carbine | <1% | Carbine/ Zuleika Project, Annual Report 09/03/2002 - 08/03/2003 C303/1997: M16/27, 44-5, 48, 58, 86, 106, 143, |
| A64809 | 2002 | Auriongold Exploration Pty Ltd | Carbine North | 99% | Annual Report 23/03/2001 - 22/03/2002 M16/187 Carbine North Project. Mineral Field Kunanalling 1:250,000 Sheet |
| A64844 | 2002 | Auriongold Exploration Pty Ltd | Carbine East | <1% | Annual Report 01/04/2001 - 31/03/2002 C67/2000 Tenement/s P16/2029-2037, P24/3674-3676 Project Number 1547. |
| A65102 | 2002 | Auriongold Exploration Pty Ltd | Carbine Zuleika | <1% | Annual Report Reporting Period 09/03/2000 - 08/03/2002 Combined Reporting NO C303/1997. Tenement/s M16/23, 27, |
| A62415 | 2001 | Goldfields Exploration Pty Ltd | Carbine East | <1% | Carbine East JV 28 March 2000-31 March 2001 Combined Report Number C67/2000 Tenements P16/2029 to P16/2037 and |
| A62416 | 2001 | Goldfields Exploration Pty Ltd | Carbine North | 99% | Carbine North JV Project M16/187 23 March 2000 - 22 March 2001. Australian Gold Report Number K01/012. Map She |
| A61372 | 2000 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | Mining Leases M16/23,27,44,45,58,86,106,143,150,156,164,188, 212, Prospecting Licences P16/1353-1356,1373,1439 |
| A61943 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | Mount Pleasant Project, Non-statutory Report: Resources Report June 1999. |
| A59105 | 1999 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | C303/1997 - Carbine - Zuleika, Joint Annual Report For the Period 9/03/1998 to 8/03/1999 (M16/23, M16/27, M16/ |
| A54403 | 1998 | Darkdale Pty Ltd | Carbine | <1% | Carbine Project, Annual Report P16/1703-1712, P24/3310-3312 01/02/97 - 31/01/98 |
| A55230 | 1998 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | C303/1997 - Carbine/Zuleika Joint Annual Report 09/03/97 - 08/03/98 Mining Licence: M16/23, 27, 44-45, 48, 58, |
| A50768 | 1997 | Darkdale Pty Ltd | Carbine | <1% | Carbine Project Annual report PL16/1703 - 1712, PL24/3310 - 3312 01 February 1996 to 31 January 1997 |
| A51915 | 1997 | Resolute Ltd | Carbine North | 8.2% | Carbine North Project Mining Leases M16/83 M16/84 M16/187 M16/311 M16/317 M24/672 M24/673 M24/599 M24/212 Pros |
| A51925 | 1997 | Yardarino Mining Nl | Credo | 5.6% | Credo Project, Final Surrender Report,June 1997, E16/135. |
| A47255 | 1996 | Newcrest Mining Ltd | Carbine | <1% | Report No. WORA 100 OB No.349 Carbine Project Exploration Report on Leases M16/27 M16/188 P16/1353 to P16/1356 |
| A49482 | 1996 | Resolute Ltd | Carbine North | 9.1% | Annual report Carbine North Project Mining Leases M16/83 M16/84 M16/187 M24/212 Prospecting Licences P16/1513 |
| A43654 | 1995 | Orion Resources Nl | Carbine | <1% | Annual Technical Report for Carbine Project Ora Banda W.A. (February 1995) |
| A43860 | 1995 | Newcrest Mining Ltd | Carbine | <1% | Report No. WORA 78 OB NO. 329 Ora Banda Gold Mine Carbine Project Exploration Report on Leases M16/27 M16/188 |
| A40178 | 1994 | Samantha Gold Nl | Carbine | 13% | Annual report for the period 30/05/91-29/05/92 Carbine North Project M16/62 M16/63 M16/64 M16/81 M16/82 M24/21 |
| A40174 | 1994 | Samantha Gold Nl | Carbine North | 8.2% | Annual report for the period 30/05/92-29/05/93 Carbine North Project M16/83-84 M16/187 M24/212 P16/1513-1514 P |
| A42058 | 1994 | Newcrest Mining Ltd | Carbine | <1% | Annual Report for the period 01/01/92-31/12/93 Carbine Project M16/27,188 P16/1353-1356 |
| A35096 | 1992 | Newcrest Mining Ltd | Carbine | <1% | Carbine Project; Money J.V M16/27 Report For the Period October 1990-september 1991 (Annual Report) |
| A33278 | 1989 | Carbine Gold Nl | Carbine North | 13% | Final Report 03/09/86 - 14/08/90 Carbine North Project M16/62-64,81-82; M24/213 & E16/02 Report No:339 |
| A21390 | 1987 | Bhp Minerals Pty Ltd | Carbine | <1% | CR 5481 Carbine Joint Venture Report for the period from 1st December 1986 to 31st May 1987 |
| A22554 | 1987 | Bhp Minerals Pty Ltd | Carbine | <1% | CR5727 Carbine Joint Venture report for the period from 01/06/87 to 30/11/87 (M16/27) 1201G |
| A20326 | 1986 | Bhp Minerals Pty Ltd | Carbine | <1% | CR 5237 Carbine Joint Venture Report for the period from 1st April 1986 to 30th November 1986 Figures 1-38 (M1 |
| A1814 | 1971 | Western Mining Corporation Ltd | Kunanalling | <1% | Kunanalling Project, Annual Report for theyear ending 30th June 1971, MC16/118-119, 124-185, & 190-205. |
| A105 | 1970 | Western Mining Corporation Ltd | Ora Banda- Kunanalling | <1% | Ora Banda- Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Reports Data File, |
| A106 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Kalgoorlie Regional & Geological Plans (8), circa July |
| A107 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report ,Data File |
| A112 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report:Annual Report, Folder 11, Sample Data Sheets for Kunanal |
| A108 | 1970 | Western Mining Corporation Ltd | Ora Banda/Kunanalling | <1% | Annual Tenements and Temporary Reserve Report Data File, Ora Banda - Kunanalling Area. |
| A109 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report,Folder 8,In |
| A110 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenement & Temporary Reserve Report, Folder 9, Vac |
| A111 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenements & Temporary Reserve Report Folder 10,Sam |
| A24549 | 1753 | Bhp Minerals Pty Ltd | Carbine | <1% | Carbine Joint Venture Report for the period 1 December 1987 to 31 Mau 1988 BHP-Utah Indian Ocean Resources C |
| A33516 | 1753 | Newcrest Mining Ltd | Carbine | <1% | Carbine - Money JV; M16/27 Exploration Report 10/88 - 09/90 CR No: W477/001 |
| A33733 | 1753 | Samantha Gold Nl | Carbine North | 13% | Annual Report 15/08/90 - 29/05/91 Carbine North Project M16/62-64,81-82; M24/213 and E16/2 Report No:338 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A50373 | 1753 | Centaur Mining & Exploration Ltd | Ora Banda South | <1% | Prospecting Licences P16/1353 to P16/1356 P16/1374 P16/1439 P16/1512 P16/1570 to P16/1573 and Mining Leases M1 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 16/187 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 16/187? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.